Systematic Risk Assessment of High-

risk Structures against


Disproportionate Collapse
Based on IStructE guidelines

Harikrishnan Panikkaveettil
Key Concepts and Eurocode Requirements

2. BACK GROUND AND DESIGN


OBJECTIVES

7/18/2014 Harikrishnan Panikkaveettil 2


Risk-based approach for design
(against disproportionate collapse)

Not a substitute for the lack of structural form


Objectives
Identify Hazards
Eliminate the hazards
Develop risk-reduction measures
Level of detail Engineer to decide
Qualitative, Semi-quantitative & fully quantitative

7/18/2014 Harikrishnan Panikkaveettil 3


Risk
Hazard: something which has the potential to cause harm
Action on the structure
Soft hazard [eg: failure to communicate effectively]
Risk = Likelihood Consequence

7/18/2014 Harikrishnan Panikkaveettil 4


Risk-based design
Acceptable level of risk unique for a structure
Good risk management
Costs of risk reduction magnitude of risk
Secondary benefit
Indentifying and communicating risks

7/18/2014 Harikrishnan Panikkaveettil 5


Reduction of risk
As low as reasonably
practicable

Approach 1:
Reduce all risk to threshold
Approach 2:
Reduce all risks so far as reasonably practicable(SFARP)
Risks above threshold unacceptable
7/18/2014 Harikrishnan Panikkaveettil 6
Building risk classification
Class 1
Class 2A Lower Risk Group
Class 2B Upper Risk Group
Class 3 High Risk Group
a systematic risk assessment of the building
should be undertaken taking into account both
foreseeable and unforeseeable hazards

7/18/2014 Harikrishnan Panikkaveettil 7


Framework for a systematic risk assessment

3. DEVELOPMENT OF A SYSTEMATIC
RISK ASSESSMENT

7/18/2014 Harikrishnan Panikkaveettil 8


Framework
Single author full responsibility
Suitable Qualification and Experience (SQEP)
Risk assessment workshop
HAZard and Operability study (HAZOP)
Framework
Scenario-independent design
Scenario-dependent design

7/18/2014 Harikrishnan Panikkaveettil 9


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 10
remaining risks
Likelihood scale
Example Likelihood scale
Approximate return period
Likelihood Frequency
(based on 50 year design life)
Frequent/
10 times in design life Less than 1 in 10 years
common

Likely 50% probability of occurrence during design life 1 in 10 years to 1 in 100 years

Unlikely 10% probability of occurrence during design life 1 in 100 years to 1 in 1000 years

Rare 2% probability of occurrence during design life 1 in 1000 years to 1 in 10000 years

Improbably 0.1% probability of occurrence during design life 1 in 10000 years to 1 in 100000 years

Negligible Less than 0.1% probability of occurrence during design life Greater than 1 in 100000 years

7/18/2014 Harikrishnan Panikkaveettil 11


Consequence Scale

7/18/2014 Harikrishnan Panikkaveettil 12


Risk Threshold

7/18/2014 Harikrishnan Panikkaveettil 13


Parties involved in risk assessment
Client/building owner
Structural engineer (designer)
Other designers
External stakeholders
Building control authority
CDM coordinator/ risk management specialist

7/18/2014 Harikrishnan Panikkaveettil 14


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 15
remaining risks
(1) Identify the hazards

7/18/2014 Harikrishnan Panikkaveettil 16


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 17
remaining risks
1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 18
remaining risks
(2) Eliminate the hazards
Easier at the early stages of design

7/18/2014 Harikrishnan Panikkaveettil 19


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 20
remaining risks
1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 21
remaining risks
(3) Determine the tolerable risk
threshold
Extent of collapse for any given likelihood
The threshold should be skewed towards
consequence
This effect diminishes beyond a certain point

7/18/2014 Harikrishnan Panikkaveettil 22


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 23
remaining risks
1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 24
remaining risks
(4) Evaluate the risk
Risk = likelihood consequence
Watch points
Sensitivity of solution/risk

7/18/2014 Harikrishnan Panikkaveettil 25


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 26
remaining risks
1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 27
remaining risks
(5) Identify risk reduction measures
Irrespective of level of risk
Reduction of a risk may increase another risk
Not limited technical
Soft (procedural)

7/18/2014 Harikrishnan Panikkaveettil 28


1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 29
remaining risks
1 Identify the hazards

Eliminate the Determine the


2 3
hazards if possible tolerable risk level

Risk = Likelihood Consequence 4

Identify risk reduction measures 5

Benefit / Cost assessment 6


Review

Implement risk reduction 7

Residual risk 8

Sensitivity of the risk assessment 9

Communicate
7/18/2014 ReviewHarikrishnan
the overall level of risk
Panikkaveettil 30
remaining risks
(6) Cost-benefit assessment
Cost financial cost, programme delay
Benefit reduction in fatality, injury

7/18/2014 Harikrishnan Panikkaveettil 31