Introduction
Shakarganj Food Products Limited is a leading manufacturer and exporter of fruit juice
concentrate, purees & pulps in Pakistan, specializing in Citrus, Mango, Peach and Guava. It have
a dedicated facility for processing of fruit pulps. Their clients include both domestic and
international customers.
Plan
After careful evaluation of system and also taking help from previous audit reports, following is the
tentative schedule for improving Food safety system in shakarganj Foods P.v.t Ltd.
Improvement steps are divided into numerous step, here termed as tasks. The details are as follows

Reference from
Task no. Description
ISO Manual

1 Short training of workers on Good manufacturing practices (GMP). 7.5 & 8.4.2

Develop and implementation of foreign material program.


Inspection and installation of metal detectors with complimentary 4.1, 7.2.1 &
2
development of monitoring procedures and documentation. 7.3.5.1
Updating flow diagram accordingly.
Risk assessment of processing line to give proposals to enhance or
3 7.7, 8.1 & 8.5.2
update existing HACCP system.
Color coding of containers and brushes used in different areas to
4 7.5
minimize cross contamination in a processing plant.
Gap analysis to identify entry points of pests inside the processing
5 7.2.3
plant.
Training of workers and operators on personal Hygiene and food
6 8.5.1 & 6.2.2
safety system.
Development of pest monitoring program for raw material shed to
7 7.2.3
track activities of pest and take necessary actions.
Revising system to include monitoring and documentation of
variety coming on feeding conveyor to ensure food product
8 7.9
authenticity. It also improves traceability capabilities of present
system.
Tentative schedule is as follows

Task No. Start End Duration (days)


Task 1 18-Aug 19-Aug 1
Task 2 16-Aug 23-Aug 7
Task 3 24-Aug 7-Sep 14
Task 4 23-Aug 24-Aug 1
Task 5 7-Sep 10-Sep 3
Task 6 12-Sep 15-Sep 3
Task 7 16-Sep 18-Sep 2
Task 8 24-Sep 26-Sep 2

Timeline for Tasks


8-Aug 18-Aug 28-Aug 7-Sep 17-Sep 27-Sep 7-Oct

Task 1
Task 2
Task 3
Task 4
Task 5
Task 6
Task 7
Task 8