Engineering II Keiza Cindy Callista Randie C Tombuku Ray Hutahaean
Production Engineering II _ STT MIGAS 2017 _ KRR
Opening Requirement Rule and Role Objective Reference
Production Engineering II _ STT MIGAS 2017 _ KRR
Production Engineering II _ STT MIGAS 2017 _ KRR PRE TEST
Production Engineering II _ STT MIGAS 2017 _ KRR
Pre Test Mention the petroleum system! What is Production Engineering? Draw a well schematic and shows where are : Reservoir pressure Bottom hole pressure Well flowing pressure What is IPR? Explain about IPR and VLP relation Explain about drive mechanisms Describe type of hydrocarbon fluid and the composition? Draw a diagram phase Shows reservoir until separator condition on the diagram phase? Shows the bubble point and dew point Shows where is 100% liquid, 100% gas and mixture Shows and explain tricondenbar, tricondenterm and critical point
Production Engineering II _ STT MIGAS 2017 _ KRR POST TEST
Production Engineering II _ STT MIGAS 2017 _ KRR
PostTest Draw a diagram phase Shows reservoir until separator condition on the diagram phase? Shows the bubble point and dew point Shows where is 100% liquid, 100% gas and mixture Shows and explain tricondenbar, tricondenterm and critical point Describe type of hydrocarbon fluid and the composition? Explain about drive mechanisms What is IPR? Explain about IPR and VLP relation Draw a well schematic and shows where are : Reservoir pressure Bottom hole pressure Well flowing pressure What is Production Engineering?