RESUMEN DE METRADOS
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
ITEM DESCRIPCION UND TOTAL
Partida:
03.02 EXCAVACION DE ZANJAS PARA VIGA DE CIMENTACION Unidad m3
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
EJE A-A ENTRE 1-1 Y 3-3 1.00 4.38 0.40 1.45 2.54
EJE C-C ENTRE 3-3 Y 5-5 1.00 1.25 0.40 1.45 0.73
EJE C'-C' Y D'-D' ENTRE 1-1 Y 5-5 1.00 3.27 0.40 1.45 1.90
EJE E-E ENTRE 1-1 Y 5-5 1.00 2.27 0.40 1.45 1.32
EJE E'-E' ENTRE 1-1 Y 2-2 1.00 0.87 0.40 1.45 0.50
EJE F-F ENTRE 1-1 Y 2'-2' 1.00 1.99 0.40 1.45 1.15
EJE G- ENTRE 1-1 Y 2'-2' 1.00 1.59 0.40 1.45 0.92
EJE H-H ENTRE 1-1 Y 2-2 1.00 1.07 0.40 1.45 0.62
EJE 1-1 ENTRE A-A Y H-H 1.00 10.57 0.40 1.45 6.13
EJE 2-2 ENTRE A-A Y H-H 1.00 11.99 0.40 1.45 6.95
EJE 2'-2' ENTRE F-F Y H-H 1.00 1.99 0.40 1.45 1.15
EJE 3-3 ENTRE D-D Y D'-D' 1.00 1.71 0.40 1.45 0.99
EJE 4-4 ENTRE C-C Y E-E 1.00 2.27 0.40 1.45 1.32
EJE 5-5 ENTRE C-C Y C'-C' 1.00 0.50 0.40 1.45 0.29
Metrado Total 26.52
Partida:
03.04 EXCAVACION DE ZANJA PARA TANQUE CISTERNA Unidad m3
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
03.06 ELIMINACION DE MATERIAL EXCEDENTE Unidad m3
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
04.00 OBRAS DE CONCRETO SIMPLE
Partida:
04.01 SOLADO - CONCRETO C:H: 1:12 E=4" Unidad m2
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
AREA CAD
Z1 1.00 2.75 1.50 4.13
Z2 1.00 9.16 9.16
Z3 1.00 4.16 4.16
Z4 1.00 2.00 1.90 3.80
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
Partida:
05.00 OBRAS DE CONCRETO ARMADO
Partida:
05.01 ZAPATAS
EJE A-A ENTRE 1-1 Y 3-3 1.00 4.38 0.40 0.60 1.05
EJE C-C ENTRE 3-3 Y 5-5 1.00 1.25 0.40 0.60 0.30
EJE C'-C' Y D'-D' ENTRE 1-1 Y 5-5 1.00 3.27 0.40 0.60 0.78
EJE E-E ENTRE 1-1 Y 5-5 1.00 2.27 0.40 0.60 0.54
EJE E'-E' ENTRE 1-1 Y 2-2 1.00 0.87 0.40 0.60 0.21
EJE F-F ENTRE 1-1 Y 2'-2' 1.00 1.99 0.40 0.60 0.48
EJE G- ENTRE 1-1 Y 2'-2' 1.00 1.59 0.40 0.60 0.38
EJE H-H ENTRE 1-1 Y 2-2 1.00 1.07 0.40 0.60 0.26
EJE 1-1 ENTRE A-A Y H-H 1.00 10.57 0.40 0.60 2.54
EJE 2-2 ENTRE A-A Y H-H 1.00 11.99 0.40 0.60 2.88
EJE 2'-2' ENTRE F-F Y H-H 1.00 1.99 0.40 0.60 0.48
EJE 3-3 ENTRE D-D Y D'-D' 1.00 1.71 0.40 0.60 0.41
EJE 4-4 ENTRE C-C Y E-E 1.00 2.27 0.40 0.60 0.54
EJE 5-5 ENTRE C-C Y C'-C' 1.00 0.50 0.40 0.60 0.12
Metrado Total 10.97
Partida:
05.03 SOBRECIMIENTO ARMADO
Partida: m2
05.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS Unidad
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida: kg
05.03.03 ACERO DE REFUERZO EN SOBRECIMIENTOS fy = 4200 kg/cm Unidad
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
ENCOFRADO Y DESENCOFRADO EN PLACAS Unidad m2
05.04.02
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
PERIMETRO
PL-1 1.00 3.40 7.90 26.86
PL-2 1.00 2.80 7.90 22.12
PL-3 1.00 3.62 7.90 28.60
PL-4 1.00 3.00 7.90 23.70
Metrado Total 101.28
Partida:
ACERO DE REFUERZO EN PLACAS fy = 4200 kg/cm Unidad kg
05.04.03
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
05.05 COLUMNAS Y COLUMNETAS
Partida:
CONCRETO EN COLUMNAS Y COLUMNETAS f'c=210 kg/cm2 Unidad m3
05.05.01
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
AREA CAD
C-1 2.00 0.80 0.40 7.90 5.06
C-2 1.00 0.90 0.40 7.90 2.84
C-3 8.00 0.70 0.30 7.90 13.27
C-4 3.00 0.50 0.25 7.90 2.96
C-5 12.00 0.40 0.40 7.90 15.17
C-6 7.00 0.60 0.40 7.90 13.27
C-7 3.00 0.20 7.90 4.65
C-8 1.00 0.40 0.40 7.90 1.26
Metrado Total 58.49
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
Partida:
ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y COLUMNETAS Unidad m2
05.05.02
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
PERIMETRO
C-1 2.00 2.40 7.90 37.92
C-2 1.00 2.60 7.90 20.54
C-3 8.00 2.00 7.90 126.40
C-4 3.00 1.50 7.90 35.55
C-5 12.00 1.60 7.90 151.68
C-6 7.00 2.00 7.90 110.60
C-7 3.00 1.57 7.90 37.23
C-8 1.00 1.60 7.90 12.64
Metrado Total 532.56
Partida:
ACERO DE REFUERZO EN COLUMNAS Y COLUMNETAS fy = 4200 kg/cm Unidad kg
05.05.03
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
05.06 VIGAS
Partida:
CONCRETO EN VIGAS f'c=210 kg/cm2 Unidad m3
05.06.01
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
PRIMER PISO
EJE 1-1 ENTRE A-A Y H-H 1.00 27.85 0.25 0.35 2.44
EJE 2-2 ENTRE A-A Y C-C 1.00 7.49 0.30 0.55 1.24
EJE 2-2 ENTRE D-D Y H-H 1.00 20.29 0.25 0.35 1.78
EJE 2'-2' ENTRE D'-D' Y H-H 1.00 9.85 0.25 0.35 0.86
EJE 3-3 ENTRE A-A Y C-C 1.00 6.57 0.30 0.55 1.08
EJE 3-3 ENTRE D-D Y E-E 1.00 5.71 0.25 0.35 0.50
EJES 3'-3' Y 4-4 ENTRE A-A Y E-E 1.00 11.96 0.25 0.35 1.05
EJE 5-5 ENTRE C-C Y E-E 1.00 5.21 0.25 0.35 0.46
EJE A-A ENTRE 1-1 Y 3'-3' 1.00 8.68 0.25 0.35 0.76
EJE B-B ENTRE 1-1 2-2' 1.00 2.41 0.25 0.35 0.21
EJE B-B ENTRE 2-2 Y 3-3 1.00 5.42 0.30 0.55 0.89
EJE B-B ENTRE 3-3 Y 4'-4' 1.00 1.55 0.25 0.35 0.14
EJES B-C ENTRE 2-2 Y 3-3 1.00 5.42 0.30 0.45 0.73
EJE B'-B' ENTRE 3-3 Y 4'-4' 1.00 1.82 0.25 0.35 0.16
EJE C-C ENTRE 1-1 Y 5-5 1.00 9.42 0.25 0.35 0.82
EJE D-D ENTRE 1-1 Y 2-2 1.00 1.78 0.25 0.35 0.16
EJE C'-C' ENTRE 2-2 Y 5-5 1.00 8.51 0.25 0.35 0.74
EJE D'-D' ENTRE 1-1 Y 2-2 1.00 1.13 0.25 0.35 0.10
EJE E-E ENTRE 1-1 Y 5-5 1.00 10.76 0.25 0.35 0.94
EJE E'-E' ENTRE 1-1 Y 2-2 1.00 2.47 0.25 0.35 0.22
EJE F-F ENTRE 1-1 Y 2'-2' 1.00 5.03 0.25 0.35 0.44
EJE G-G ENTRE 1-1 Y 2'-2' 1.00 5.30 0.25 0.45 0.60
EJE H-H ENTRE 1-1 Y 2'-2' 1.00 5.31 0.25 0.45 0.60
SEGUNDO PISO
EJE 1-1 ENTRE A-A Y H-H 1.00 27.85 0.25 0.35 2.44
EJE 2-2 ENTRE A-A Y C-C 1.00 7.49 0.30 0.55 1.24
EJE 2-2 ENTRE D-D Y H-H 1.00 20.29 0.25 0.35 1.78
EJE 2'-2' ENTRE D'-D' Y H-H 1.00 9.85 0.25 0.35 0.86
EJE 3-3 ENTRE A-A Y C-C 1.00 6.57 0.30 0.55 1.08
EJE 3-3 ENTRE D-D Y E-E 1.00 5.71 0.25 0.35 0.50
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
Partida:
ENCOFRADO Y DESENCOFRADO EN VIGAS Unidad m2
05.06.02
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
ACERO DE REFUERZO EN VIGAS fy = 4200 kg/cm Unidad kg
05.06.03
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
05.07 LOSA ALIGERADA
Partida:
CONCRETO EN LOSA ALIGERADA f'c=210 kg/cm2 Unidad m3
05.07.01
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
PRIMER PISO AREA concreto / m2 de losa
PAO A 1.00 85.00 0.09 7.65
PAO B 1.00 55.26 0.09 4.97
PAOS C 1.00 46.88 0.09 4.22
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
Partida: m2
05.07.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA Unidad
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
PRIMER PISO AREA
PAO A 1.00 85.00 85.00
PAO B 1.00 55.26 55.26
PAOS C 1.00 46.88 46.88
SEGUNDO PISO
PAO A 1.00 85.00 85.00
PAO B 1.00 56.71 56.71
PAOS C 1.00 46.88 46.88
Metrado Total 375.73
Partida:
LADRILLO PARA TECHO_ARCILLA 30x30x15 cm. - LOSA ALIGERADA Unidad und
05.07.04
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
PRIMER PISO AREA ladrillos / m2 de losa
PAO A 1.00 85.00 9.00 765.00
PAO B 1.00 55.26 9.00 497.34
PAOS C 1.00 46.88 9.00 421.92
SEGUNDO PISO
PAO A 1.00 85.00 9.00 765.00
PAO B 1.00 56.71 9.00 510.39
PAOS C 1.00 46.88 9.00 421.92
Metrado Total 3,381.57
Partida:
ACERO DE REFUERZO EN LOSA ALIGERADA fy = 4200 kg/cm Unidad kg
05.07.03
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
Partida:
05.08 ESCALERAS
Partida:
CONCRETO EN ESCALERA f'c=280 kg/cm Unidad m3
05.08.01
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
ESCALERA 1 AREA
PRIMER TRAMO 1.00 1.18 0.66 0.78
SEGUNDO TRAMO 1.00 1.20 0.81 0.97
TERCER TRAMO 4.00 1.50 1.03 6.18
CUARTO Y SEXTO TRAMO 4.00 1.18 0.45 2.12
SEMI DESCANSO 2.00 0.17 1.84 0.63
ESCALERA 2
Partida: kg
05.08.03 ACERO DE REFUERZO EN ESCALERA fy = 4200 kg/cm Unidad
Descripcin Cantidad Largo(m) Ancho(m) Alto(m) Metrado Parcial
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
Z1
Z2
longitudinal 3.80 5/8" 1.00 8.00 3.80
Z3
longitudinal 2.45 5/8" 1.00 6.00 2.45
Z4
longitudinal 1.85 5/8" 1.00 10.00 1.85
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
Z5
longitudinal 2.35 5/8" 2.00 7.00 2.35
Z6
longitudinal 1.85 5/8" 1.00 9.00 1.85
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
Z7
longitudinal 1.85 5/8" 1.00 9.00 1.85
Z8
longitudinal 2.85 5/8" 1.00 10.00 2.85
Z9
longitudinal 1.45 5/8" 1.00 9.00 1.45
Z10
longitudinal 1.85 5/8" 1.00 9.00 1.85
Z11
longitudinal 1.45 5/8" 1.00 9.00 1.45
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
Z12
longitudinal 1.75 5/8" 1.00 8.00 1.75
Z13
longitudinal 1.85 5/8" 1.00 9.00 1.85
Z14
longitudinal 4.77 5/8" 1.00 14.00 4.77
Z15
longitudinal 3.80 5/8" 1.00 11.00 3.80
Z16
longitudinal 3.30 5/8" 1.00 9.00 3.30
Z17
longitudinal 2.90 5/8" 1.00 18.00 2.90
Z18
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
MUNICIPALIDAD PROVINCIAL DE TRUJILLO
PROPIETARIO:
FORMULA: ESTRUCTURAS
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
Z19
longitudinal 1.35 5/8" 2.00 8.00 1.35
Z20
longitudinal 2.10 5/8" 1.00 10.00 2.10
Z21
longitudinal 2.30 5/8" 1.00 11.00 2.30
Z22
longitudinal 4.30 5/8" 1.00 13.00 4.30
Z23
longitudinal 1.10 5/8" 1.00 7.00 1.10
Z24
longitudinal 1.90 5/8" 1.00 9.00 1.90
Z25
longitudinal 5.15 5/8" 1.00 9.00 5.15
FECHA: Sep-17
Partida: 05.01.02 ACERO DE REFUERZO EN ZAPATAS fy = 4200 kg/cm
20.80
18.90
30.40
13.50
13.77
30.70
14.70
17.60
5.55
3.80
18.50
19.25
S A R I A L A N O R I A
DE METRADOS SUSTENTADOS - ACERO
RVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO-LA LIBERTAD
L DE TRUJILLO
32.90
31.20
16.65
17.60
S A R I A L A N O R I A
DE METRADOS SUSTENTADOS - ACERO
RVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO-LA LIBERTAD
L DE TRUJILLO
16.65
15.95
28.50
27.20
13.05
13.05
16.65
17.60
13.05
10.80
S A R I A L A N O R I A
DE METRADOS SUSTENTADOS - ACERO
RVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO-LA LIBERTAD
L DE TRUJILLO
14.00
13.50
16.65
17.60
66.78
63.75
41.80
37.00
29.70
26.10
52.20
54.40
S A R I A L A N O R I A
DE METRADOS SUSTENTADOS - ACERO
RVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO-LA LIBERTAD
L DE TRUJILLO
91.32
46.20
20.40
58.48
S A R I A L A N O R I A
DE METRADOS SUSTENTADOS - ACERO
RVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO-LA LIBERTAD
L DE TRUJILLO
21.60
21.60
21.00
20.40
25.30
24.70
55.90
52.90
7.70
7.70
17.10
17.05
46.35
10.05
S A R I A L A N O R I A
DE METRADOS SUSTENTADOS - ACERO
RVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
TRUJILLO-LA LIBERTAD
L DE TRUJILLO
17.55
16.50
16.45
39.50
1,567.55 - -
2,432.84 - -
174.20 - -
2432.84
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
FECHA: Sep-17
N
Elem. N 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long.
ELEMENTO DISTRIBUCION DEL ACERO Igual Piezas
(m) 0.25 0.56 0.994 1.552 2.235 3.973
(Vece Elem.
s)
Partida: 05.02.03 ACERO DE REFUERZO EN VIGAS DE CIMENTACION fy = 4200 kg/cm
VIGAS DE CIMENTACION
EJE 1-1 ENTRE A-A Y H-H 0.20 32.340 0.20 5/8" 1 6 32.74 196.44
Estribos
0.32
0.10 3/8" 1 69 1.88 129.72
0.52 0.52
0.32
EJE 2-2 ENTRE A-A Y H-H 0.20 31.230 0.20 5/8" 1 6 31.63 189.78
Estribos
0.32
0.10 3/8" 1 76 1.88 142.88
0.52 0.52
0.32
Estribos
0.32
0.10 3/8" 1 18 1.88 33.84
0.52 0.52
0.32
EJE 2'-2'ENTRE F-F Y H-H 0.20 8.920 0.20 5/8" 1 6 9.32 55.92
Estribos
0.32
0.10 3/8" 1 13 1.88 24.44
0.52 0.52
0.32
EJE 3-3 ENTRE A-A Y E-E 0.20 7.690 0.20 5/8" 1 6 8.09 48.54
Estribos
0.32
0.10 3/8" 1 51 1.88 95.88
0.52 0.52
0.32
EJE 4-4 ENTRE C-C Y E-E 0.20 7.000 0.20 5/8" 1 6 7.40 44.40
Estribos
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
FECHA: Sep-17
N
Elem. N 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long.
ELEMENTO DISTRIBUCION DEL ACERO Igual Piezas
(m) 0.25 0.56 0.994 1.552 2.235 3.973
(Vece Elem.
s)
0.32
0.10 3/8" 1 14 1.88 26.32
0.52 0.52
0.32
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
FECHA: Sep-17
N
Elem. N 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long.
ELEMENTO DISTRIBUCION DEL ACERO Igual Piezas
(m) 0.25 0.56 0.994 1.552 2.235 3.973
(Vece Elem.
s)
EJE 5-5 ENTRE C-C Y E-E 0.20 6.920 0.20 5/8" 1 6 7.32 43.92
Estribos
0.32
0.10 3/8" 1 4 1.88 7.52
0.52 0.52
0.32
EJE A-A ENTRE 1-1 Y 3'-3' 0.20 10.200 0.20 5/8" 1 6 10.60 63.60
Estribos
0.32
0.10 3/8" 1 36 1.88 67.68
0.52 0.52
0.32
EJE B-BENTRE 1-1 Y 2-2 0.20 3.150 0.20 5/8" 1 6 3.55 21.30
Estribos
0.32
0.10 3/8" 1 14 1.88 26.32
0.52 0.52
0.32
EJE B-B ENTRE 3-3 Y 4'-4' 0.20 2.320 0.20 5/8" 1 6 2.72 16.32
Estribos
0.32
0.10 3/8" 1 9 1.88 16.92
0.52 0.52
0.32
EJE B'-B' ENTRE 3-3 Y 4'-4' 0.20 2.560 0.20 5/8" 1 6 2.96 17.76
Estribos
0.32
0.10 3/8" 1 11 1.88 20.68
0.52 0.52
0.32
EJE C-D ENTRE 1-1 Y 5-5 0.20 3.280 0.20 5/8" 2 6 3.68 44.16
Estribos
0.32
0.10 3/8" 2 32 1.88 120.32
0.52 0.52
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
FECHA: Sep-17
N
Elem. N 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long.
ELEMENTO DISTRIBUCION DEL ACERO Igual Piezas
(m) 0.25 0.56 0.994 1.552 2.235 3.973
(Vece Elem.
0.52 0.52 s)
0.32
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
FECHA: Sep-17
N
Elem. N 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long.
ELEMENTO DISTRIBUCION DEL ACERO Igual Piezas
(m) 0.25 0.56 0.994 1.552 2.235 3.973
(Vece Elem.
s)
EJE D'-C' ENTRE 1-1 Y 5-5 0.20 3.430 0.20 5/8" 1 6 3.83 22.98
Estribos
0.32
0.10 3/8" 1 22 1.88 41.36
0.52 0.52
0.32
EJE E-E ENTRE 1-1 Y 5-5 0.20 3.520 0.20 5/8" 1 6 3.92 23.52
Estribos
0.32
0.10 3/8" 1 16 1.88 30.08
0.52 0.52
0.32
EJE E'-E' ENTRE 1-1 Y 2-2 0.20 3.790 0.20 5/8" 1 6 4.19 25.14
Estribos
0.32
0.10 3/8" 1 6 1.88 11.28
0.52 0.52
0.32
EJE F-F ENTRE 1-1 Y 2'-2' 0.20 6.620 0.20 5/8" 1 6 7.02 42.12
Estribos
0.32
0.10 3/8" 1 13 1.88 24.44
0.52 0.52
0.32
EJE G-G ENTRE 1-1 Y 2'-2' 0.20 7.370 0.20 5/8" 1 6 7.77 46.62
Estribos
0.32
0.10 3/8" 1 11 1.88 20.68
0.52 0.52
0.32
EJE H-H ENTRE 1-1 Y 2'-2' 0.20 7.680 0.20 5/8" 1 6 8.08 48.48
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE
OBRA:
TRUJILLO, PROVINCIA DE TRUJILLO-LA LIBERTAD
FECHA: Sep-17
N
Elem. N 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long.
ELEMENTO DISTRIBUCION DEL ACERO Igual Piezas
(m) 0.25 0.56 0.994 1.552 2.235 3.973
(Vece Elem.
s)
Estribos
0.32
0.10 3/8" 1 7 1.88 13.16
0.52 0.52
0.32
TOTAL POR DIAM. EN M. 0.00 853.52 0.00 1,230.36 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 477.97 0.00 1,909.52 0.00 0.00
TOTAL GENERAL (KG) ###
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO D
PROVINCIA DE TRUJILLO-LA LIBERTAD
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.30
0.30
estribos
0.12
PL-1 0.35 0.10 0.35 3/8" 2 46 1.14 104.88
0.12
0.12
0.12
0.30
0.30
estribos
0.12
PL-2
0.42 0.10 0.42 3/8" 2 46 1.28 117.76
0.12
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO D
PROVINCIA DE TRUJILLO-LA LIBERTAD
PL-2
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.12
0.12
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO D
PROVINCIA DE TRUJILLO-LA LIBERTAD
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.30
estribos
0.22
0.30 0.10 0.30 3/8" 2 46 1.24 114.08
PL-3
0.22
0.22
0.22
0.30
estribos
0.12
0.25 0.10 0.25 3/8" 2 46 0.94 86.48
PL-4
0.12
0.12
0.12
FORMULA: ESTRUCTURAS
FECHA: Sep-17
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.30
0.30
C-1
estribos
0.32
0.72 0.10 0.72 3/8" 2.00 48 2.28 218.88
0.32
0.30
0.30
C-2
estribos
0.32
0.82 0.10 0.82 3/8" 1.00 48 2.48 119.04
0.32
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO D
PROVINCIA DE TRUJILLO-LA LIBERTAD
C-2
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.30
0.30
C-3
estribos
0.22
0.62 0.10 0.62 3/8" 8.00 48 1.88 721.92
0.22
0.30
estribos
0.17
0.42 0.10 0.42 3/8" 3.00 48 1.38 198.72
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO D
PROVINCIA DE TRUJILLO-LA LIBERTAD
PROPIETARIO:
C-4 MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.17
0.30
estribos
0.32
0.32 0.10 0.32 3/8" 12.00 48 1.48 852.48
0.32
0.30
estribos
0.32
0.52 0.10 0.52 3/8" 7.00 48 1.88 631.68
0.32
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
OBRA: MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO D
PROVINCIA DE TRUJILLO-LA LIBERTAD
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.30
estribos
C-8 estribos
0.32
0.32 0.10 0.32 3/8" 1.00 48 1.48 71.04
0.32
34.80
69.60
69.60
52.20
A R I A L A N O R I A
ETRADOS SUSTENTADOS - ACERO
.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
121.80
208.80
69.60
104.40
52.20
34.80
A R I A L A N O R I A
ETRADOS SUSTENTADOS - ACERO
.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
417.60
278.40
156.60
104.40
A R I A L A N O R I A
ETRADOS SUSTENTADOS - ACERO
.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
417.60
835.20
365.40
243.60
A R I A L A N O R I A
ETRADOS SUSTENTADOS - ACERO
.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
104.40
104.40
34.80
8.60
0.20 0.20 1/2" 2 2 9.00
Estribo 0.17
0.27 0.10 0.27 3/8" 2 46 1.08 99.36
0.17
1y 2 Piso
V(.25x.35)
17.77
EJE 1-1 ENTRE D-D Y G-G 0.20 0.20 5/8" 2 2 18.17
17.77
Estribo 0.17
0.32 0.10 0.32 3/8" 2 105 1.18 247.80
0.17
1y 2 Piso
V(.25x.35)
4.80
EJE 1-1 ENTRE G-G Y H-H 0.20 0.20 5/8" 2 2 5.20
4.80
0.20 0.20 1/2" 2 2 5.20
Estribo 0.17
0.32 0.10 0.32 3/8" 2 25 1.18 59.00
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
0.17
1y 2 Piso
V(.25x.35)
8.23
EJE 2-2 ENTRE A-A Y C-C 0.20 0.20 5/8" 2 4 8.63
2.71
0.20 5/8" 2 2 2.91
1.22
0.20 5/8" 2 2 1.42
Estribo 0.17
0.32 0.10 0.32 3/8" 2 53 1.18 125.08
0.17
1y 2 Piso
VAP100 (25X40)
17.40
17.40
0.20 0.20 1/2" 2 1 17.80
17.20
0.20 0.20 5/8" 2 2 17.60
17.20
0.20 0.20 1/2" 2 1 17.60
Estribo 0.17
0.32 0.10 0.32 3/8" 2 101 1.18 238.36
0.17
1y 2 Piso
VAP100 (25X40)
19.21
19.21
0.20 0.20 1/2" 2 1 19.61
18.81
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
18.81
0.20 0.20 1/2" 2 1 19.21
Estribo 0.17
0.32 0.10 0.32 3/8" 2 94 1.18 221.84
0.17
1y 2 Piso
VAP100 (25X40)
6.46
6.46
0.20 0.20 1/2" 2 2 6.86
Estribo 0.17
0.32 0.10 0.32 3/8" 2 46 1.18 108.56
0.17
1 Piso
VAP100 (25X40)
4.08
4.08
0.20 0.20 1/2" 2 2 4.48
Estribo 0.17
0.32 0.10 0.32 3/8" 2 21 1.18 49.56
0.17
1y 2 Piso
VAP100 (25X40)
7.28
7.28
0.20 0.20 1/2" 2 2 7.68
Estribo 0.17
0.32 0.10 0.32 3/8" 2 38 1.18 89.68
0.17
1y 2 Piso
VAP100 (25X40)
3.84
Err:509 0.20 0.20 5/8" 2 4 4.24
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
3.84
0.20 0.20 1/2" 2 2 4.24
Estribo 0.17
0.32 0.10 0.32 3/8" 2 21 1.18 49.56
0.17
1y 2 Piso
VAP100 (25X40)
6.95
Err:509 0.20 0.20 5/8" 2 4 7.35
6.95
0.20 0.20 1/2" 2 2 7.35
Estribo 0.17
0.32 0.10 0.32 3/8" 2 14 1.18 33.04
0.17
1y 2 Piso
VAP100 (25X40)
7.27
Err:509 0.20 0.20 5/8" 2 4 7.67
7.27
0.20 0.20 1/2" 2 2 7.67
Estribo 0.17
0.32 0.10 0.32 3/8" 2 21 1.18 49.56
0.17
1y 2 Piso
VAP100 (25X40)
7.68
Err:509 0.20 0.20 5/8" 2 4 8.08
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
7.68
0.20 0.20 1/2" 2 2 8.08
Estribo 0.17
0.32 0.10 0.32 3/8" 2 45 1.18 106.20
0.17
1y 2 Piso
VAP100 (25X40)
8.60
Err:509 0.20 0.20 5/8" 2 4 9.00
8.60
0.20 0.20 1/2" 2 2 9.00
Estribo 0.17
0.32 0.10 0.32 3/8" 2 50 1.18 118.00
0.17
1y 2 Piso
VAP100 (25X40)
10.28
Err:509 0.20 0.20 5/8" 2 2 10.68
10.28
0.20 0.20 1/2" 2 1 10.68
10.07
0.20 0.20 5/8" 2 2 10.47
10.07
0.20 0.20 1/2" 2 1 10.47
Estribo 0.17
0.32 0.10 0.32 3/8" 2 54 1.18 127.44
0.17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
1y 2 Piso
VAP100 (25X40)
11.95
Err:509 0.20 0.20 5/8" 2 2 12.35
11.95
0.20 0.20 1/2" 2 1 12.35
11.75
0.20 0.20 5/8" 2 2 12.15
11.75
0.20 0.20 1/2" 2 1 12.15
Estribo 0.17
0.32 0.10 0.32 3/8" 2 40 1.18 94.40
0.17
1y 2 Piso
VAP100 (25X40)
11.82
Err:509 0.20 0.20 5/8" 2 2 12.22
11.82
0.20 0.20 1/2" 2 1 12.22
11.62
0.20 0.20 5/8" 2 2 12.02
11.62
0.20 0.20 1/2" 2 1 12.02
Estribo 0.17
0.32 0.10 0.32 3/8" 2 40 1.18 94.40
0.17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
1y 2 Piso
VAP100 (25X40)
10.97
Err:509 0.20 0.20 5/8" 2 2 11.37
10.97
0.20 0.20 1/2" 2 1 11.37
10.77
0.20 0.20 5/8" 2 2 11.17
10.77
0.20 0.20 1/2" 2 1 11.17
Estribo 0.17
0.32 0.10 0.32 3/8" 2 62 1.18 146.32
0.17
1y 2 Piso
VAP100 (25X40)
3.85
Err:509 0.20 0.20 5/8" 2 4 4.25
3.85
0.20 0.20 1/2" 2 2 4.25
Estribo 0.17
0.32 0.10 0.32 3/8" 2 21 1.18 49.56
0.17
1y 2 Piso
VAP100 (25X40)
13.45
EJES 3'-3' Y 4-4 ENTRE A-A
Y E-E 0.20 0.20 5/8" 2 2 13.85
13.45
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
13.25
0.20 0.20 5/8" 2 2 13.65
13.25
0.20 0.20 1/2" 2 1 13.65
Estribo 0.17
0.32 0.10 0.32 3/8" 2 44 1.18 103.84
0.17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
1y 2 Piso
VAP100 (25X40)
5.24
EJES 3'-3' Y 4-4 ENTRE A-A
Y E-E 0.20 0.20 5/8" 2 4 5.64
0.90
0.20 0.20 1/2" 2 2 1.30
Estribo 0.17
0.32 0.10 0.32 3/8" 2 5 1.18 11.80
0.17
1y 2 Piso
VAP100 (25X40)
5.24
2.42
1.37
Estribo 0.17
0.32 0.10 0.32 3/8" 2 24 1.18 56.64
0.17
VAP100 (25X40)
1y 2 Piso
2.42
1.37
Estribo 0.17
0.17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
VAP100 (25X40)
1y 2 Piso
1.92
1.33
Estribo 0.17
0.17
VAP100 (25X40)
1y 2 Piso
1.47
2.90
Estribo 0.17
0.17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
VAP100 (25X40)
1y 2 Piso
1.47
1.80
0.17
VAP100 (25X40)
1y 2 Piso
1.32
2.05
Estribo 0.17
0.17
VAP110 (15X30)
1y 2 Piso
Estribo 0.07
0.22 0.10 0.22 3/8" 2 100 0.78 156.00
0.07
VX (15X20)
1y 2 Piso
0.07
0.07
5.22
Estribo 0.07
0.07
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
VX (15X20)
1 Piso
EJE 3-3 ENTRE A-A Y C-C 3.32
Estribo 0.07
0.07
TERCER PISO
3 Piso
VP100 (25X40)
3.25
0.20 0.20 5/8" 1 4 3.65
0.00
Estribo 0.17
0.32 0.10 0.32 3/8" 1 25 1.18 29.50
0.17
3 Piso
VP100 (25X40)
28.83
0.00
1.37
0.20 5/8" 1 2 1.57
1.25
0.20 5/8" 1 2 1.45
28.13
Estribo 0.17
0.32 0.10 0.32 3/8" 1 165 1.18 194.70
0.17
3 Piso
VP100 (25X40)
44.21
1.60
0.20 5/8" 1 2 1.80
2.72
0.20 5/8" 1 2 2.92
41.71
0.20 0.20 5/8" 1 2 42.11
Estribo 0.17
0.32 0.10 0.32 3/8" 1 238 1.18 280.84
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
0.17
3 Piso
VP100 (25X40)
23.64
#REF!
0.20 0.20 5/8" 1 2 24.04
3.15
0.20 5/8" 1 2 3.35
1.66
0.20 5/8" 1 2 1.86
23.24
0.20 0.20 5/8" 1 2 23.64
Estribo 0.17
0.32 0.10 0.32 3/8" 1 172 1.18 202.96
0.17
3 Piso
VP100 (25X40)
8.23
2.71
0.20 5/8" 1 2 2.91
1.22
0.20 5/8" 1 2 1.42
Estribo 0.17
0.32 0.10 0.32 3/8" 1 53 1.18 62.54
0.17
3 Piso
VAP100 (25X40)
17.40
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
17.40
0.20 0.20 1/2" 1 1 17.80
17.20
0.20 0.20 5/8" 1 2 17.60
17.20
0.20 0.20 1/2" 1 1 17.60
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
0.17
3 Piso
VAP100 (25X40)
13.75
13.75
0.20 0.20 1/2" 1 2 14.15
Estribo 0.17
0.32 0.10 0.32 3/8" 1 72 1.18 84.96
0.17
3 Piso
VAP100 (25X40)
6.46
6.46
0.20 0.20 1/2" 1 2 6.86
Estribo 0.17
0.32 0.10 0.32 3/8" 1 46 1.18 54.28
0.17
3 Piso
VAP100 (25X40)
2.92
2.92
0.20 0.20 1/2" 1 2 3.32
Estribo 0.17
0.32 0.10 0.32 3/8" 1 17 1.18 20.06
0.17
3 Piso
VAP100 (25X40)
6.95
Err:509 0.20 0.20 5/8" 1 4 7.35
6.95
0.20 0.20 1/2" 1 2 7.35
Estribo 0.17
0.32 0.10 0.32 3/8" 1 14 1.18 16.52
0.17
3 Piso
VAP100 (25X40)
7.27
Err:509 0.20 0.20 5/8" 1 4 7.67
7.27
0.20 0.20 1/2" 1 2 7.67
Estribo 0.17
0.32 0.10 0.32 3/8" 1 21 1.18 24.78
0.17
3 Piso
VAP100 (25X40)
7.68
Err:509 0.20 0.20 5/8" 1 4 8.08
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
7.68
0.20 0.20 1/2" 1 2 8.08
Estribo 0.17
0.32 0.10 0.32 3/8" 1 45 1.18 53.10
0.17
3 Piso
VAP100 (25X40)
8.60
Err:509 0.20 0.20 5/8" 1 4 9.00
8.60
0.20 0.20 1/2" 1 2 9.00
Estribo 0.17
0.32 0.10 0.32 3/8" 1 50 1.18 59.00
0.17
3 Piso
VAP100 (25X40)
10.28
Err:509 0.20 0.20 5/8" 1 2 10.68
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
10.28
0.20 0.20 1/2" 1 1 10.68
10.07
0.20 0.20 5/8" 1 2 10.47
10.07
0.20 0.20 1/2" 1 1 10.47
Estribo 0.17
0.32 0.10 0.32 3/8" 1 54 1.18 63.72
0.17
3 Piso
VAP100 (25X40)
11.95
Err:509 0.20 0.20 5/8" 1 2 12.35
11.95
0.20 0.20 1/2" 1 1 12.35
11.75
0.20 0.20 5/8" 1 2 12.15
11.75
0.20 0.20 1/2" 1 1 12.15
Estribo 0.17
0.32 0.10 0.32 3/8" 1 40 1.18 47.20
0.17
3 Piso
VAP100 (25X40)
11.82
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
11.82
0.20 0.20 1/2" 1 1 12.22
11.62
0.20 0.20 5/8" 1 2 12.02
11.62
0.20 0.20 1/2" 1 1 12.02
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
0.17
3 Piso
VAP100 (25X40)
10.97
Err:509 0.20 0.20 5/8" 1 2 11.37
10.97
0.20 0.20 1/2" 1 1 11.37
10.77
0.20 0.20 5/8" 1 2 11.17
10.77
0.20 0.20 1/2" 1 1 11.17
Estribo 0.17
0.32 0.10 0.32 3/8" 1 62 1.18 73.16
0.17
3 Piso
VAP100 (25X40)
3.85
Err:509 0.20 0.20 5/8" 1 4 4.25
3.85
0.20 0.20 1/2" 1 2 4.25
Estribo 0.17
0.32 0.10 0.32 3/8" 1 21 1.18 24.78
0.17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
3 Piso
VAP100 (25X40)
13.45
EJES 3'-3' Y 4-4 ENTRE A-A
Y E-E 0.20 0.20 5/8" 1 2 13.85
13.45
0.20 0.20 1/2" 1 1 13.85
13.25
0.20 0.20 5/8" 1 2 13.65
13.25
0.20 0.20 1/2" 1 1 13.65
Estribo 0.17
0.32 0.10 0.32 3/8" 1 44 1.18 51.92
0.17
3 Piso
VAP100 (25X40)
5.24
EJES 3'-3' Y 4-4 ENTRE A-A
Y E-E 0.20 0.20 5/8" 1 4 5.64
0.90
0.20 0.20 1/2" 1 2 1.30
Estribo 0.17
0.32 0.10 0.32 3/8" 1 5 1.18 5.90
0.17
3 Piso
VAP100 (25X40)
5.24
2.42
1.37
Estribo 0.17
0.32 0.10 0.32 3/8" 1 24 1.18 28.32
0.17
VAP100 (25X40)
3 Piso
2.42
1.37
0.17
VAP100 (25X40)
3 Piso
1.92
1.33
Estribo 0.17
0.17
VAP100 (25X40)
3 Piso
1.47
2.90
Estribo 0.17
0.17
VAP100 (25X40)
3 Piso
1.47
1.80
Estribo 0.17
0.17
VAP100 (25X40)
3 Piso
1.32
2.05
Estribo 0.17
0.17
VAP110 (15X30)
3 Piso
18.32
EJE B-B ENTRE 2-2 Y 3-3
0.20 0.20 1/2" 1 6 18.72
Estribo 0.07
0.22 0.10 0.22 3/8" 1 100 0.78 78.00
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA,
OBRA:
PROVINCIA DE TRUJILLO-LA LIBERTAD
0.07
VX (15X20)
3 Piso
Estribo 0.07
0.07
5.22
Estribo 0.07
0.07
AZOTEA
azotea
V140 (50X20)
20.84
Err:509 0.20 0.20 5/8" 1 4 21.24
20.84
0.20 0.20 1/2" 1 2 21.24
Estribo 0.12
0.42 0.10 0.42 3/8" 1 120 1.28 153.60
0.12
azotea
V140 (50X20)
Err:509 1.65
3.25
3.55
3.75
Estribo 0.12
0.42 0.10 0.42 3/8" 1 155 1.28 198.40
0.12
VX (15X20)
azotea
3.25
Estribo 0.07
0.07
36.00
36.00
72.68
72.68
20.80
20.80
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
69.04
11.64
5.68
9.40
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
3.70
3.80
71.20
35.60
70.40
35.20
78.44
39.22
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
38.42
54.88
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
27.44
35.84
17.92
61.44
30.72
33.92
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
16.96
58.80
29.40
61.36
30.68
64.64
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
32.32
72.00
36.00
42.72
21.36
41.88
20.94
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
49.40
24.70
48.60
24.30
48.88
24.44
48.08
24.04
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
45.48
22.74
44.68
22.34
34.00
17.00
55.40
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
54.60
27.30
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
45.12
5.20
45.12
10.48
6.28
15.28
45.12
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
10.48
6.28
15.28
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
36.88
8.48
3.06
13.00
52.00
6.68
6.20
22.40
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
43.20
6.68
4.00
18.00
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
44.96
6.08
4.50
19.60
224.64
65.60
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
22.48
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
14.88
14.60
58.46
3.14
2.90
6.80
5.20
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
3.80
4.30
4.70
5.40
57.06
2.55
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
2.50
1.50
1.80
1.65
2.00
2.39
89.22
3.60
5.84
5.00
6.30
4.00
3.40
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
4.40
6.40
5.20
3.80
4.30
4.70
84.22
1.96
1.90
3.00
3.60
2.40
2.40
2.50
1.65
2.03
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
48.08
6.70
3.72
5.50
4.20
5.60
7.20
47.28
2.11
1.20
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
3.00
5.10
5.44
34.52
5.82
2.84
4.70
1.85
1.90
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
35.60
17.80
35.20
17.60
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
56.60
28.30
27.44
13.72
13.28
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
6.64
29.40
14.70
30.68
15.34
32.32
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
16.16
36.00
18.00
21.36
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
10.68
20.94
10.47
24.70
12.35
24.30
12.15
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
12.22
24.04
12.02
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
22.74
11.37
22.34
11.17
17.00
8.50
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
27.70
13.85
27.30
13.65
22.56
2.60
22.56
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
5.24
3.14
7.64
22.56
5.24
3.14
7.64
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
18.44
4.24
1.53
6.50
26.00
3.34
3.10
11.20
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
21.60
3.34
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
2.00
9.00
22.48
3.04
2.25
9.80
112.32
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
32.80
22.48
84.96
42.48
32.80
A R I A L A N O R I A
METRADOS SUSTENTADOS - ACERO
OLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO,
RTAD
29.20
31.60
16.60
29.20
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
0.75
0.10 1/2" 2 7 0.85 11.90
1y 2 Piso
PAO B
3.75
11.30
0.10 1/2" 2 23 11.40 524.40
0.85
0.10 1/2" 2 23 0.95 43.70
1, 2 y 3 Piso
PAOS C
9.00 1/2" 3 4 9.00 108.00
1.10
0.10 1/2" 3 4 1.20 14.40
0.75
0.10 1/2" 3 4 0.85 10.20
0.65
0.10 1/2" 3 7 0.75 15.75
0.75
0.10 1/2" 3 7 0.85 17.85
1, 2 y 3 Piso
Err:509
1.75
0.10 0.10 1/2" 3 4 1.95 23.40
1, 2 y 3 Piso
Err:509
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
1.20
0.10 1/2" 3 6 1.30 23.40
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
0.80
0.10 1/2" 3 6 0.90 16.20
2.77
0.10 0.10 1/2" 3 7 2.97 62.37
1, 2 y 3 Piso
Err:509
5.20 1/2" 3 13 5.20 202.80
2.30
0.10 1/2" 3 13 2.40 93.60
0.95
0.10 1/2" 3 13 1.05 40.95
1, 2 y 3 Piso
Err:509
7.35 1/2" 3 11 7.35 242.55
0.85
0.10 1/2" 3 11 0.95 31.35
1.30
0.10 1/2" 3 11 1.40 46.20
1, 2 y 3 Piso
Err:509
3.85 1/2" 3 3 3.85 34.65
0.85
0.10 1/2" 3 3 0.95 8.55
0.85
0.10 1/2" 3 3 0.95 8.55
1, 2 y 3 Piso
Err:509
7.55 1/2" 3 10 7.55 226.50
0.85
0.10 1/2" 3 10 0.95 28.50
0.85
0.10 1/2" 3 10 0.95 28.50
1, 2 y 3 Piso
Err:509
8.05 1/2" 3 7 8.05 169.05
2.90
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
0.85
0.10 1/2" 3 7 0.95 19.95
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
1.40
0.10 1/2" 3 12 1.50 54.00
1, 2 y 3 Piso
Err:509
8.52 1/2" 3 5 8.52 127.80
0.65
0.10 1/2" 3 5 0.75 11.25
1.40
0.10 1/2" 3 5 1.50 22.50
1, 2 y 3 Piso
Err:509
6.55 1/2" 3 7 6.55 137.55
0.65
0.10 1/2" 3 7 0.75 15.75
0.85
0.10 1/2" 3 7 0.95 19.95
1, 2 y 3 Piso
Err:509
7.95 1/2" 3 6 7.95 143.10
0.65
0.10 1/2" 3 6 0.75 13.50
0.85
0.10 1/2" 3 6 0.95 17.10
1, 2 y 3 Piso
Err:509
8.00 1/2" 3 6 8.00 144.00
3.08
0.10 1/2" 3 4 3.18 38.16
0.85
0.10 1/2" 3 8 0.95 22.80
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
1, 2 y 3 Piso
Err:509
4.35 1/2" 3 7 4.35 91.35
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
FECHA: Sep-17
Partida: 05.07.04 ACERO CORRUGADIO f'y = 4200 Kg/cm2 GRADO 60
1.92
0.10 1/2" 3 2 2.02 12.12
0.85
0.10 1/2" 3 8 0.95 22.80
AZOTEA
Azotea
Err:509
3.40 1/2" 2 11 3.40 74.80
1.00
0.10 1/2" 2 11 1.10 24.20
1.00
0.10 1/2" 2 11 1.10 24.20
Azotea
Err:509
3.72 1/2" 1 11 3.72 40.92
1.15
0.10 1/2" 1 11 1.25 13.75
1.15
0.10 1/2" 1 11 1.25 13.75
TOTAL POR DIAM. EN M. 0.00 0.00 0.00 0.00 4,754.85 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 0.00 4,726.32 0.00 0.00 0.00
TOTAL GENERAL (KG) 4,726.32
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
Err:509
3.70
0.10 0.10 1/2" 1 16 3.90 62.40
2.72
Err:509
0.30
0.30
Err:509
Err:509
### 0.20
### 0.30
2.70
0.10 0.10 3/8" 1 50 2.90 145.00
TOTAL POR DIAM. EN M. 0.00 0.00 645.04 0.00 396.76 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 361.22 0.00 394.38 0.00 0.00 0.00
TOTAL GENERAL (KG) 755.60
SEMI DESCANSO
1.40
0.10 0.10 3/8" 2 10 1.60 32.00
PRIMER TRAMO
1.56
1.25
0.25
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.30
1.40
###
0.35
###
###
###
0.30
1.10
FONDO
DESCANSO
SEGUNDO TRAMO
0.60
1.55
1.65
0.30
TERCER TRAMO
0.10
0.60
1.75
1.65
0.30
C O M I S A R I A L A N O R I A
PLANILLA DE METRADOS SUSTENTADOS - ACERO
MEJORAMIENTO DEL SERVICIO POLICIAL C.P.N.P. LA NORIA EN LA URBANIZACION LA NORIA, DISTRITO DE TRUJILLO, PROVINCIA DE
OBRA:
TRUJILLO-LA LIBERTAD
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE TRUJILLO
FORMULA: ESTRUCTURAS
FECHA: Sep-17
0.80
CUARTO Y SEXTO
TRAMO
0.30 ###
0.60
3.35
1.55
1.65
0.30
0.10 1.85
TOTAL POR DIAM. EN M. 0.00 0.00 32.00 0.00 2,547.52 0.00 0.00 0.00
TOTAL POR DIAM. EN KG. 0.00 0.00 17.92 0.00 2,532.23 0.00 0.00 0.00
TOTAL GENERAL (KG) 2,550.15