Doc. No. GENL-PI-UZ-0071, Rev.

0
Group No. 6.021
GENERAL GUIDE LINES FOR PIPING SPEC. &
LAYOUT OF DM WATER UNIT PACKAGE Page No. 1
( CAPACITY 100 M /HR )
3

GENERAL GUIDE LINES FOR


PIPING SPECIFICATION AND LAYOUT OF
DEMINERALISED WATER (DM) UNIT PACKAGE
( CAPACITY 100 M3 /HR )

0 03.05.94 MKK NNG RUD ISSUED AS STANDARD DOCUMENT

Rev. Date Prepared Checked Approved Description


Doc. No. GENL-PI-UZ-0071, Rev. 0
Group No. 6.021
GENERAL GUIDE LINES FOR PIPING SPEC. &
LAYOUT OF DM WATER UNIT PACKAGE Page No. 2
( CAPACITY 100 M /HR )
3

1.0 GENERAL:
1.1 Scope:

This specification covers in general; the equipment clearances, elevations, spacing


and access for maintenance for the Demineralised Water (DM) plant. In designing
the plant layout, adequate access must be provided for plant items requiring routine
maintenance with a due consideration of simplicity and quickness in maintenance
operation such as repairs, replacement and catalyst changing and routine work like
lubrication, gland packing etc.

2.0 Clearance:

As a standard engineering practice, the following are the minimum typical


requirements to be included but not limited to :

2.1 Access passage/walkways shall be adequate enough to permit passage of


maintenance vehicles.

2.2 The head room above all the equipment shall be adequate for easy removal /
replacement for maintenance of compressors, motors etc.

2.3 Foundation height for all equipment except for pumps shall be min. 200mm above
finished floor level, while for the pumps this shall be min. 300mm. In case of small
pumps, the foundation height shall be so high that the pump shaft centre line is min.
600 mm above the finished floor level.

2.4 A platform with cat ladder access shall be provided for gauge glass, valves for NS >
80 mm, manholes, process blinds, clean out points, relief valves, level controllers,
located more than 2 M above the operating level.

2.5 A cat ladder access shall be provided for hand holes, vents, pressure and
temperature instruments, valves for NS 80 mm etc. located more than 2 m above
the operating level.

2.6 Safety chains shall be provided across ladder openings at all platforms.

2.7 Large machines such as multistage pumps shall be provided with monorails and
trolleys to take a lifting tackle capable of lifting the heaviest removable part of
equipments or driver.

2.8 Manholes covers shall be equipped with davits.

2.9 Davit shall also be provided for relief valves, control valves and motor operated
valves of NS > 100 mm.

2.10 All the valves shall be accessible.


Doc. No. GENL-PI-UZ-0071, Rev. 0
Group No. 6.021
GENERAL GUIDE LINES FOR PIPING SPEC. &
LAYOUT OF DM WATER UNIT PACKAGE Page No. 3
( CAPACITY 100 M /HR )
3

2.11 In general the following minimum clearances shall be provided:

DESCRIPTION CLEARANCES
IN METERS
Width of operating access way & working area for pumps. 1.5
Min. clear distance between the two pumps 0.9
Headroom beneath overhead piping or supports over 2.2
walkways, passage ways & working area.

Width of walkway (at grade or elevated) 0.8


Distance of operating platform below centre line of manhole. 0.8 -1.050
Width of manhole operating platform from manhole cover to 0.9
outside edge of platform.

Operating platform extension on either side beyond the centre 0.9


line of manhole flange.

3.0 Piping:
3.1 Mechanical design of piping and selection of piping materials shall be according to
ANSI/ASME B31.3 and ASTM/API/IS/BS codes.
3.2 Dimensions of all normal elements such as pipes, fittings, flanges, valves etc. shall
be according to ANSI, API, BS or IS latest issue. Should an element not be covered
by the mentioned code, manufacturer's standard has to be applied.
3.3 Piping shall be arranged so that it drains to equipment wherever possible. Pockets
and dead ends are to be avoided.
3.4 Pipe spacing be adequate for easy maintenance.

3.5 Pumps suction lines shall be as short as possible and shall be designed to avoid
pockets of vapour or gas.
3.6 All the piping shall be supported properly.

3.7 Small bore lines may be supported from large bore lines wherever no local support
from steel work is available or practical. Wherever possible, small bore lines shall
have simplified supporting methods.
3.8 The rubber lining shall be of natural rubber and rubber lining shall be done as per IS
4682. Minimum size of rubber lined pipes shall be NS 50.
3.9 A minimum clearance of 150mm shall be provided from all the flanges from the
finished floor level.
3.10 A minimum clearance of 200mm shall be provided from the bottom of pipe to the
finished floor level.
Doc. No. GENL-PI-UZ-0071, Rev. 0
Group No. 6.021
GENERAL GUIDE LINES FOR PIPING SPEC. &
LAYOUT OF DM WATER UNIT PACKAGE Page No. 4
( CAPACITY 100 M /HR )
3

FLUID FLUID UIL PIPE SIZE PIPES PIPE FLANGES


MEDIUM DESC. CLASS RANGE FITTINGS
GASKETS

WDM Deminera- RX30 1 6 Seamless, Seamless, Hard Rubber. lined.,


lised water (Heavy) Hard rubber Hard rubber IS 2062, FF
(10 bar, lined, IS lined, A234
75C) 1239, Pt.1 Gr.WPB -----------------------------
Sch.40
Full face, 6.0mm,
HCL Hydrochloric Natural rubber with
Acid (30%) steel insert.

AII Instrument BX30 " - 2" Seamless IS Welded, A234 Plate Fabricated
Air (10 bar, (Heavy) 1239 pt.1, Gr. WPBW, 150#, R.F. IS 2062
75C) Sch. 40
-----------------------------

Self centering, Flat


ring 1.6mm thk IS
2712 Gr. W/1

WD Drinking RE30U " - 2" ERW, IS Forged, Plate fabricated,


Water (Heavy) 1239, part-1 3000#, Screwed (F),
(10 bar, Heavy, Female Galvanised, IS 2062.
75C) Galvanised, threaded
Male A105 - -----------------------------
threaded Galvanised.
ends. Self centering, full
face, 1.6mm thk,
IS2712, Gr.W/1.

CSH Caustic BX30B " - 6" Seamless, IS Welded A234 Plate fabricated, 150#
(32%) (10 Heavy 1239 Pt.1 Gr.WPBW RF IS 2062.
bar, 75C) Sch.40.
-----------------------------
Self Centering, Flat
ring, 1.6 mm thk,
IS2712, Gr.W/1

RW Raw Water
(10 bar,
75C)
Doc. No. GENL-PI-UZ-0071, Rev. 0
Group No. 6.021
GENERAL GUIDE LINES FOR PIPING SPEC. &
LAYOUT OF DM WATER UNIT PACKAGE Page No. 5
( CAPACITY 100 M /HR )
3

VALVES REMARKS
FLUID GATE GLOBE CHECK BALL BUTTER PLUG DIA-
MEDIUM FLY PHRAGM

WDM -- "Y" type Swing Flap, Weir type, Rubber lined


Globe, Flgd, Flgd, 125#, 125#, FF, as per IS
125# FF, FF, Body- -- -- -- Body-C.I., 4682, Min.
Body-C.I., C.I, HR HR lined, thk. 3 mm.
HR lined lined, Trim- N.R. Hardness 75
Trim-HR HR Diaphragm 5, Shore "D".
HCL

AII Solid Regulating, Lift Check, Full Bore,


Wedge, thread (F) Threaded Threaded
Thread(F) ends, class (F) ends, (F) ends,
ends, class 150, Body- class 150 class 150,
150, Body- Bronze B62, Body - Body-Brass
Bronze Trim-Bronze Bronze B62, Ball-Brass,
B62, Trim- B62. Trim-Bronze Seat- PTFE. -- -- -- --
Bronze B62
B62.

WD Regulating Lift check, Full Bore,


thread (F) Threaded(F) Threaded
--- ends, class ends, class (F) ends,
150, Body- 150, Body- class 150,
Bronze B62, Bronze B62, Body-Brass,
Trim-Bronze Trim-Bronze Ball-Brass,
B62. B62. Seat-PTFE. -- -- -- --

CSH OS&Y, OS&Y, Lift/Swing, Full Bore


Solid/flex. Regulating, check, Flgd, flgd, 150#,
wedge, Flgd, 150# 150# RF, RF, Body-
Flgd, RF, Body- Body-C.S, CS, Ball-SS
150# RF, C.S, Trim- Trim-13% 304, Seat-
Body-C.S, 13% Cr. Cr. PTFE.
RW Trim-13%, -- -- -- --
Cr.