DETERMINACION DE LA INCIDENCIA DE LEYES SOCIALES - 2005 - OBREROS

Promedio Considerando 12 meses de trabajo para el primer ao


Jornal S/. 46.00 Asignacin Familiar S/. 53.00 0.85
MES D.O. DOM. FER. D.O. DOM. FER. A.FAM. IMPORTE VACAC. GRATIF. TOTAL L.SOC. C.T.S. COSTO
S/. S/. S/. S/. GANADO GANADO 0.1823 0.0833 ACUMULADO
Enero 26 5 0 1,196.00 230.00 - 45.05 1,471.05 1,471.05 268.17 122.54 1,861.76
Febrero 24 4 1,104.00 184.00 - 45.05 1,333.05 1,333.05 243.02 111.04 1,687.11
Marzo 25 4 2 1,150.00 184.00 92.00 45.05 1,471.05 1,471.05 268.17 122.54 1,861.76
Abril 26 4 1,196.00 184.00 - 45.05 1,425.05 1,425.05 259.79 118.71 1,803.54
Mayo 26 5 1,196.00 230.00 - 45.05 1,471.05 1,471.05 268.17 122.54 1,861.76
Junio 25 4 1 1,150.00 184.00 46.00 45.05 1,425.05 1,425.05 259.79 118.71 1,803.54
Julio 24 5 2 1,104.00 230.00 92.00 45.05 1,471.05 1,433.00 2,904.05 529.41 241.91 3,675.37
Agosto 26 4 1 1,196.00 184.00 46.00 45.05 1,471.05 1,471.05 268.17 122.54 1,861.76
Setiembre 26 4 1,196.00 184.00 - 45.05 1,425.05 1,425.05 259.79 118.71 1,803.54
Octubre 25 5 1 1,150.00 230.00 46.00 45.05 1,471.05 1,471.05 268.17 122.54 1,861.76
Noviembre 25 4 1 1,150.00 184.00 46.00 45.05 1,425.05 1,425.05 259.79 118.71 1,803.54
Diciembre 1 46.00 - - 1.50 47.50 1,433.00 1,433.00 2,913.50 531.13 242.69 3,687.33
Subtotal 279 48 8 12,834.00 2,208.00 368.00 497.05 15,907.05 1,433.00 2,866.00 20,206.05 3,683.56 1,683.16 25,572.78
C.T.S.
TOTAL 12,834.00 2,208.00 368.00 497.05 15,907.05 1,433.00 2,866.00 20,206.05 3,683.56 1,683.16 25,572.78
Prom/da 46.00 7.91 1.32 1.78 57.01 5.14 10.27 72.42 13.20 6.03 91.66
Incidencia % 100.00 17.20 2.87 3.87 11.17 22.33 28.70 13.11 99.26
TOTAL LEYES SOCIALES OBREROS : 99.26 %
Detalle de Leyes Sociales:
* ESSALUD 9.00 %
* S.C.T.R.Salud 1.00 %
* S.C.T.R.Pens. 5.70 %
* S. Vida Ley 0.53 %
16.23 %
AFP empleador 2.00 %
18.23
DETERMINACION DE LA INCIDENCIA DE LEYES SOCIALES - 2005 - EMPLEADOS
Sueldo S/. 4,300.00 Asignacin Familiar S/. 46.00 1
MES SUELDO A.FAM. IMPORTE VACAC. GRATIF. C.T.S. TOTAL L.SOC. C.T.S. COSTO
S/. S/. GANADO GANADO 0.1816 0.083 ACUMULADO
Enero 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Febrero 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Marzo 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Abril 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Mayo 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Junio 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Julio 4,300.00 46.00 4,346.00 4,346.00 8,692.00 1,578.47 724.33 10,994.80
Agosto 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Setiembre 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Octubre 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Noviembre 4,300.00 46.00 4,346.00 4,346.00 789.23 362.17 5,497.40
Diciembre 3,800.00 46.00 3,846.00 4,346.00 4,346.00 12,538.00 2,276.90 1,044.83 15,859.73
Subtotal 51,100.00 552.00 51,652.00 4,346.00 8,692.00 64,690.00 11,747.70 5,390.81 81,828.52

TOTAL 51,100.00 552.00 51,652.00 4,346.00 8,692.00 - 64,690.00 11,747.70 5,390.81 81,828.52
Incidencia 100.00 1.08 8.50 17.01 - 22.99 10.55 60.13
Detalle de Leyes Sociales: TOTAL LEYES SOCIALES EMPLEADOS : 60.13 %
* ESSALUD 9.00 %
* S.C.Salud 1.00 %
* S.C.Invalid. 5.70 %
* S. Vida Ley 0.46 %
16.16 %
AFP empleador 2.00 %
18.16 %
COSTO DE IMPLEMENTOS DE SEGURIDAD POR TAREA

DESCRIPCION UNID. CANT. C.UNIT. V.UTIL Obreros Obreros Obreros Obreros Ingenieros Supervisin
US$. Dias Labor Track. Labor Track. Tajeos Servicios Mina Superficie
c/ropa agua s/ropa agua c/ropa agua
Guantes de Neoprene 14" Edmont A. Par 1 6.92 25 0.28 0.28 0.28 0.28 0.28
Respirador 3M 7500 premium Pza. 1 21.00 200 0.11 0.11 0.11 0.11 0.11
Filtro alta eficiencia 3M 2097 Par 1 7.92 20 0.40 0.40 0.40 0.40 0.40
Cartucho Vap.Orgnicos 3M 6003 Par 1 7.83 13 0.63 0.63
Lentes de Seguridad BUTTOM Pza. 1 9.72 80 0.12 0.12 0.12 0.12 0.12
Tapn de oidos 3M 1270 Pza. 1 0.83 60 0.01 0.01 0.01 0.01 0.01
Casco Sombrero V-Gard MSA Pza. 1 14.95 300 0.05 0.05 0.05 0.05 0.05 0.05
Tafilete de casco Pza. 1 4.90 150 0.03 0.03 0.03 0.03 0.03 0.03
Barbiquejo Pza. 1 2.35 150 0.02 0.02 0.02 0.02 0.02 0.02
Botas de Jebe SEKUR Par 1 16.50 100 0.17 0.17 0.17 0.17 0.17
Pantalon de Jebe SEKUR Pza. 1 11.66 50 0.23 0.23
Saco de Jebe SEKUR Pza. 1 11.66 50 0.23 0.23
Chaleco Naranja con ThinsulateTGI Pza. 1 20.74 150 0.14 0.14
Mameluco C/cinta Reflec. Pza. 1 16.00 150 0.11 0.11 0.11 0.11 0.11
Correa Portalmpara Pza. 1 4.50 300 0.02 0.02 0.02 0.02 0.02
Lmpara Elctrica Pza. 1 448.00 900 0.50 0.50 0.50 0.50 0.50
Mochila de lona Pza. 1 10.60 150 0.07 0.07 0.07 0.07 0.07
Zapato Industrial Par 1 26.00 300 0.09 0.09 0.09 0.09 0.09 0.09
Porches de identificacin (nombre) Pza. 1 2.41 300 0.01 0.01 0.01 0.01 0.01 0.01
COSTO POR TAREA 149.74 US$. 3.05 2.59 2.43 1.96 2.10 0.33

* El casco se cambia, porque el portacordon dura en promedio 8 meses y el


Dpto de Seguridad obliga a cambiar todo el casco.

Miraflores, Noviembre de 2004


5.43
1 8.4
2 8.4
3 8.4
4 8.4
5 8.4
6 8.4
7 8.4
8 8.4
9 8.4
10 8.4
8.13
DESCRIPCION CANT. SUELDO L. SOC. SUELDO + TOTAL
BSICO 60.13 L.SOC.
SUPERVISIN Y ADMINISTRACIN
Ing. Gerente de Proyecto 1 1,656.00 995.82 2,651.82 2,651.82
Ing. Residente de Proyecto 1 1,483.50 892.09 2,375.59 2,375.59
Ing. Asistente de Residente 1 1,374.83 826.74 2,201.56 2,201.56
Ing. Jefe de Seguridad 1 1,187.15 713.88 1,901.02 1,901.02
Ing. Seguridad 2 1,124.70 676.33 1,801.03 3,602.06
Ing. Guardia zona de Mariana 3 1,124.70 676.33 1,801.03 5,403.08
Ing. Guardia Zona de Macarena 2 1,124.70 676.33 1,801.03 3,602.06
Ing. Guardia Nv. 4710, 4660, 4610 3 1,124.70 676.33 1,801.03 5,403.08
Ing. Guardia Nv. 4560, 4490 3 1,124.70 676.33 1,801.03 5,403.08
Ing. Guardia Rampa 220, Nv.4440, 4420 3 1,124.70 676.33 1,801.03 5,403.08
Ing. Jefe Mantenimiento Equipos 1 1,124.70 676.33 1,801.03 1,801.03
Ing. Transporte de Volquetes 2 1,124.70 676.33 1,801.03 3,602.06
Administrador 1 793.50 477.16 1,270.66 1,270.66
Asistentes de Administracin 2 507.15 304.97 812.12 1,624.24
Jefe Almacen 1 562.35 338.16 900.51 900.51
Aux. Almacen 2 507.15 304.97 812.12 1,624.24
Asistenta Social 2 562.35 338.16 900.51 1,801.03
31 50,570.21
CAPATACES, MANTTO. Y SERV. AUX. Jornal+L.Soc.
Capataz zona de Mariana 3 36.86 - 921.57 2,764.71
Capataz zona de Macarena 3 36.86 - 921.57 2,764.71
Capataz Nv. 4710, 4660 3 36.86 - 921.57 2,764.71
Capataz Nv. 4610 3 36.86 - 921.57 2,764.71
Capataz Nv. 4560 3 36.86 - 921.57 2,764.71
Capataz Nv. 4490, 4440 3 36.86 - 921.57 2,764.71
Capataz Nv. Rampa 220, Nv. 4420 3 36.86 - 921.57 2,764.71
Bodeguero Mariana 3 28.89 - 722.31 2,166.93
Bodeguero Macarena 3 28.89 - 722.31 2,166.93
Bodeguero Nv.4710, 4660 3 28.89 - 722.31 2,166.93
Bodeguero Nv. 4610 3 28.89 - 722.31 2,166.93
Bodeguero Nv 4560 3 28.89 - 722.31 2,166.93
Bodeguero Nv. 4490 3 28.89 - 722.31 2,166.93
Bodeguero Nv.4440, Rampa 220 3 28.89 - 722.31 2,166.93
Mec. Perforadoras Rampa Marion 3 32.21 - 805.33 2,416.00
Mec. Perforadoras Rampa Eduardo 3 32.21 - 805.33 2,416.00
Lamparero Rampa Marin 3 28.89 - 722.31 2,166.93
Lamparero Rampa Eduardo 3 28.89 - 722.31 2,166.93
Electricista Mina 2 32.21 - 805.33 1,610.67
Herreros 3 28.89 - 722.31 2,166.93
Soldador 2 28.89 - 722.31 1,444.62
Carrilanos 3 28.89 - 722.31 2,166.93
Tuberos 3 28.89 - 722.31 2,166.93
67 53,243.41
MOVILIDAD Y OTROS Mes
Camin FUSO Nv. 4710,4660 2 2,800 5,600.00
Camin FUSO Nv. Rampa eduardo 2 2,800 5,600.00
Camin FUSO Nv. Rampa Marion, Mac. 2 2,800 5,600.00
Camioneta Gerente de Proyecto 1 1,650 1,650.00
Camioneta Residente 1 1,650 1,650.00
Camioneta Supervisin de Guardia 2 1,650 3,300.00
23,400.00
E.P.P. P.Unit.
Inganieros de Supervisin 23 2.10 1,207.02
Supervisin Superficie 8 0.33 66.22
Personal de servicios 67 1.96 3,284.51
4,557.75
TOTAL C. FIJO US$. 131,771.38
UTILIDAD DE COSTO FIJO 10% 13,177.14
TOTAL COSTOS FIJOS 144,948.52
GASTOS GENERALES ( ver detalle )
COSTOS FIJOS + G. GENERALES US$. 144,948.52
Sueldo Bsico T.C. S/. 3.00
Gerente Proyecto S/. 4,968.00 US$. 1,656.00
Ing. Residente S/. 4,450.50 US$. 1,483.50
Ing Asistente S/. 4,124.48 US$. 1,374.83
Ing. Seguridad S/. 3,561.44 US$. 1,187.15
Ing. Guardia - Ing. Mantenimiento S/. 3,374.10 US$. 1,124.70
Administrador S/. 2,380.50 US$. 793.50
Aux. Administ. S/. 1,521.45 US$. 507.15
Almacenero - Asistenta Social S/. 1,687.05 US$. 562.35
OBREROS Jornal Bsico 99.26 % Jornal + L. Soc.
Capataz S/. 55.50 55.09 US$. 36.86
Jumbero S/. 64.50 64.02 US$. 42.84
Maestro S/. 48.50 48.14 US$. 32.21
Ayudante Perforista S/. 43.50 43.18 US$. 28.89 30.55
Ayudante S/. 41.50 41.19 US$. 27.56
PRODUCTO UNIDAD Valor Compra
US$ S/IGV
Mecha blanca (caja x 1000 m) Caja 85.0
F Ful comn 6-45 mm Fulmesa (caja x 100 pza) Caja 9.0
A Detonador Ensamblado s/conector 7' Caja 151.2
M Conectores (caja x 100 Pza) Caja 17.0
E Cordn Pentacord 3P (caja x 1500 m) Caja 210.0
S Guia rpida de Ignicin (caja x1500 m) Caja 525.0
A CARMEX C/CONECTOR 7' (CJAX300PZAS) Cja 141.0
EXCEL 3mts Cja 208.80
EXCEL 4mts Cja 252.00
FANEL BLANCO N 1 AL 16 PERIODO LARGO Cja 130.0
FANEL ROJO/TECNEL N1 AL 20 MILISEG Cja 130.0
Dinamita Semexsa 45, 7/8" x 7" (caja x 25 kg) Caja 52.0
Dinamita Semexsa 65, 7/8" x 7" (caja x 25 kg) Caja 54.6
Dinamita Semexsa 80, 7/8" x 7" (caja x 25 kg) Caja 63.0
E Dinamita Exadit 65, 7/8" x 7" (caja x 25 kg) Caja 49.5
X Dinamita Semexsa 65 11/4X8 (caja x 25 kg) Caja 52.5
S Dinamita Semexsa 65 1x7 (caja x 25 kg) Caja 52.5
A Dinamita Semexsa 80,1 1/4" x 8" (caja x 25 kg) Caja 55.9
Gelatina Especial 75 11/8"X8" (caja x 25 kg) Caja 58.9
Gelatina Especial 75 7/8"X7" (caja x 25 kg) Caja 57.8
S Barreno Int. 7/8" x 03 10" (714-0842) Pieza 52.0
AN Barreno Int. 7/8" x 05 03" ( 714-1639) Pieza 57.0
VIK Barreno Int. 7/8" x 05 11" (714-1839) Pieza 59.0
S Guantes de neoprene ANSELL EDMONT 9.5" Par 5.4
E Guantes Sekur de 14" Jebe Neoprene Par 8.4
K Respiradres 7500-3M PREMIUM Pieza 21.0
U Filtro 2097 3M(PQTX 2 pzas) Pqt 7.9
R Cartucho Vap.Orgnicos 3M 6003 Pza 7.8
Lentes policarbonato UVEX Pieza 8.4
Anteojo de Cristal BAUTON Pieza 9.7
Tapon de oidos 3M 1270 Pieza 0.8
Casco Sombrero V-GARD MSA Pieza 15.0
M Botas SEKUR de 36 CM Par 16.5
S Pantalon de jebe SEKUR Nro 38-40 Pieza 11.7
A Saco enjebado SEKUR Nro 40 Pieza 11.7
Mameluco DENIM Pieza 16.0
Correa portalamparas SEKUR Pieza 4.5
3 Lmpara Electrica ALMAX Pieza 299.0
M Tafilete Pieza 4.9
Bqrbiquejo Pieza 2.4
Piedra esmeril 21/2x3 1/2x6" Copa Pza. 28.9
Clavo rielero de 3/8" 3-1/2" Kg 1.7
Eclisa riel 30 Lbs Pza. 2.0
O Pico sin mango 7300/50 - 5 lbs Pza. 7.2
T Lampa minera 0060-AY Pza. 7.8
R Aceite perforadora almo 529 Gln. 5.1
O Llave stillson 14 Pza. 38.2
S Manguera de jebe 1" Mt. 4.3
Manguera de jebe 1/2" Mt. 1.9
Serrucho Corvina de 36" Pza. 46.2
Combo de 6 libras c/mango Pza. 9.6
Comba de 16 Lbs Pza 19.2
Azuela p' carpintero Tipo "C" - H-104 Pza. 12.3
Mochila Und 10.6
Arnes de Seguridad Pza 104.3
Linea de Vida Pza 29.0
Carretilla Minera Und 45.2
Petroleo Diesel 2 Gln. 8.7
Prec. Unit Unidad Prec. Unit Variacin
Mayo %

0.085 $/m 0.085 0%


0.09 $/pza 0.09 0%
0.432 $/pza
0.17 $/pza 0.17 0%
0.14 $/m 0.14 0%
0.35 $/m 0.35 0%
0.47 $/pza 0.47 0%
1.04 $/pza 1.04 0%
1.26 $/pza 1.26 0%
1.3 $/pza 1.3 0%
1.3 $/pza 1.3 0%
2.08 $/kg 1.89 9%
2.18 $/kg 1.98 9%
2.52 $/kg 2.20 13%
1.98 $/kg 1.78 10%
2.10 $/kg 1.94 8%
2.10 $/kg 1.94 7%
2.24 $/kg 2.08 7%
2.36 $/kg 2.14 9%
2.31 $/kg 2.31 0%
52 $/und 52 0%
57 $/und 57 0%
59 $/und 59 0%
5.43 $/par 5.43 0%
8.4 $/par 8.4 0%
21 $/pza 21 0%
7.92 $/pqt 7.92 0%
7.83 $/pza 7.83 0%
8.36 $/pza 8.36 0%
9.72 $/pza 9.72 0%
0.83 $/pza 0.83 0%
14.95 $/pza 14.95 0%
16.5 $/par 16.5 0%
11.66 $/pza 11.66 0%
11.66 $/pza 11.66 0%
16 $/pza 16 0%
4.5 $/pza 4.5 0%
299 $/pza 0
4.9 $/pza 4.9 0%
2.35 $/pza 2.35 0%
28.91 $/pza 28.91 0%
1.73 $/kg 1.73 0%
2 $/pza 2 0%
7.15 $/pza 7.15 0%
7.83 $/pza 7.83 0%
5.12 $/gln 4.78 7%
38.2 $/pza 38.2 0%
4.34 $/m 2.31 47%
1.93 $/m 0.83 57%
46.2 $/pza 46.2 0%
9.58 $/pza 9.58 0%
19.17 $/pza 19.17 0%
12.28 $/pza 12.28 0%
10.6 $/und 10.6 0%
104.26 $/pza 104.26 0%
28.96 $/pza 28.96 0%
45.22 $/und 45.22 0%
2.77
FACTOR DE POTENCIA POR TIPO DE LABOR

Fpotencia
Labor Ancho_Seccin T.Perforacin M.Explotacin Und TM ZICSA
kg/Tn
Tajeos <=0.9 Breasting C/R Kg/Tn 462.15 0.57
Tajeos <0.9-1.1>= Breasting C/R Kg/Tn 471.75 0.54
Tajeos <1.1-1.3>= Breasting C/R Kg/Tn 533.79 0.48
Tajeos <1.3-1.6>= Breasting C/R Kg/Tn 750.67 0.42
Tajeo 833 E <0.9-1.6> Breasting C/R Kg/Tn 12.00 0.30
Tajeos <=0.9 Vertical C/R Kg/Tn 461.00 0.8
Tajeos <0.9-1.1>= Vertical C/R Kg/Tn 587.03 0.57
Tajeos <1.1-1.3>= Vertical C/R Kg/Tn 562.83 0.5
Tajeos <1.3-1.6>= Vertical C/R Kg/Tn 562.83 0.43
Tajeos <=0.9 Vertical O/S Kg/Tn 733.31 1.20
Tajeos <0.9-1.1>= Vertical O/S Kg/Tn 590.74 1.15
Tajeos <1.1-1.3>= Vertical O/S Kg/Tn 590.74 1.05
Variacin de tarifas

Avances Unidad Anterior Actual Variacin


> Eficiencia por disparo % 75% 80% 6%
> Distancia prom. transp. subterraneo m 3000 3800 21%
> Costo de explosivos/ disparo $ 266 306 13%
> Tipo de cambio S/,/$ 2.2 2.15 -2%

Explotacin Unidad Anterior Actual Variacin


< Eficiencia por disparo % 100% 90% -11%
> Costo de explosivos/ disparo $ 14098 16477 14%

Transporte Unidad Anterior Actual Variacin


> Costo horario $/hr 39.43 42.63 8%
> Precio de llanta, camara, guardacamara $/Pza 329 453.71 27%
> Precio de Aceite motor $/gl 11.8 13 9%
> Costo fijo por tolveros $/tm 0.13 0.12 -8%
PARAMETROS DE CLCULO
Potencia Ancho Minado Alt. Corte Long. Perf. P.E. TM # Taladros TM/Tal. Kg/TM
< 0.90 mts. 0.80 2.60 1.55 2.41 7.77 11 0.71 0.57
Produccin Tajeo/mes(T.M.) 466 TM Nmero Taladros 594.00
Eficiencia Operativa 90% Rend. Locomotora / mes (TM/Locom.) 5,000
Produccin Tajeo/mes(T.M.) 420 TM Rend. Winche en detrtico (m3/Hr.) 4
Nmero Cortes/mes 1.05 Personal en Mov. Winche/corte 4
Rendimiento Winche (TM / gdia.) 15 C/R Detrtico
Personal p' Relleno detr./ ala de 80 m. 8 Acarreo Mineral 1 Nivel
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/TM
Unit.$ Util Mes $ (US$/TM)
Mano de Obra
Perforista + Ayudante Tareas 60.00 30.55 1,833.17
Winchero + Ayudante (Mineral) Tareas 60.00 30.55 1,833.17
Motorista +Ayudante (Mineral) Tareas - 30.55 -
Winchero + Ayudante (Detrtico) Tareas - 30.55 -
Movimiento winche Tareas 4.20 30.55 128.19
Limpieza general Tareas 2.00 30.55 61.11
126.20 3,855.65 9.19
Explosivos m3.
Dinamita Semexsa 65, 7/8"x7" Kgr. 155.45 2.18 339.57
Dinamita Semexsa 80, 7/8"x7" Kgr. 59.79 2.52 150.67
Gelatina 75, 11/8"x8" Kgr. 23.92 2.36 56.35
Excel Pza. 594.00 1.04 620.14
Cordon detonante Mts. 260.13 0.14 36.42
Guia Impermeable (chispeo) Mts. 32.92 0.35 11.52
Carmex Pza. 27.00 0.47 12.69
1,227.36 2.93
Barreno de 6' P.P. 3,564 59.00 900.00 233.64 0.56
Equipo perforacin
Perforadora P.P. 3,564 7,600 90,000 300.96
Aceite perforadora Gln. 5.94 5.12 600.00 30.41
Manguera de jebe de 1" Mts. 10.80 4.34 150.00 46.87
Manguera de jebe de 1/2" Mts. 10.80 1.93 150.00 20.84
399.09 0.95
Herramientas y otros
Piedra esmeril Afilad. 23.76 28.91 50.00 13.74
Pico minero Pza. 0.90 7.15 60.00 6.44
Lampa minera Pza. 1.80 7.83 30.00 14.09
Comba de 16 lbs. Pza. 0.72 19.17 75.00 13.80
Arnes de seguridad Pza. 0.36 104.26 150.00 37.53
Linea de vida Pza. 0.36 28.96 150.00 10.43
Llave stillson 14" Pza. 0.27 38.20 200.00 10.31
Mango de Pico Pza. 0.90 2.56 60.00 2.30
108.65 0.26
Implementos de Seguridad
Tareas con ropa agua Tajeo Tareas 126.20 2.43 306.31 0.73
COSTOS DIRECTOS 14.61
UTILIDAD 10% 1.46
COSTO TOTAL ( US$/TM ) US$ 16.07
ALQUILER DE EQUIPOS
Locomotora US$/TM 0.60
Winche elctrico US$/TM 1.80
Carros mineros U-35 US$/TM 0.31
COSTO TOTAL DE EXPLOTACION (US$/TM) 18.78
Standares de consumo de explosivos y accesorios
Dinamita SEMEXSA 65 Kgr/TM 0.37
Carmex o fulminante Pza/TM 0.62
Guia Rpida Mts/TM 0.08
Guia Seguridad Mts/TM 0.06
EXPLOTACIN CORTE Y RELLENO MECANIZADO PERF. BREASTING
Con SCOOP ELECTRICO 0.70 YD3 CIA
PARAMETROS DE CLCULO
Potencia Ancho Minado Alt. Corte Long. Perf. P.E. TM # Taladros TM/Tal. Kg/TM
> 1.50 mts. 1.50 1.55 2.70 2.41 15.13 12 1.26 0.39
Produccin Tajeo/Guardia(T.M.) 1,778 TM Nmero Taladros 1,269.00
Eficiencia Operativa 90.00% Rend. Scoop Electrico (Tm/Hr) 1.00
Produccin Tajeo/Guardia(T.M.) 1,600.00 TM

DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/TM


Unit.$ Util Mes $ (US$/TM)
Mano de Obra
Perforista + Ayudante Tareas 210.00 30.55 6,416.11
Operador Scoop Tareas 75.00 32.21 2,416.00
285.00 8,832.11 5.52
Explosivos m3.
Dinamita Semexsa 65, 7/8"x7" Kgr. 401.75 2.18 877.59
Dinamita Semexsa 80, 7/8"x7" Kgr. 154.52 2.52 389.39
Gelatina 75, 11/8"x8" Kgr. 61.81 2.36 145.64
Excel Pza. 1,269.00 1.04 1,324.84
Cordon detonante Mts. 992.00 0.14 138.88
Guia Impermeable (chispeo) Mts. 64.47 0.35 22.56
Carmex Pza. 52.88 0.47 24.85
2,923.76 1.83
Barreno de 5' P.P. 7,614 57.00 900.00 482.22 0.30
Equipo perforacin
Perforadora P.P. 7,614 7,600 90,000 642.96
Aceite perforadora Gln. 12.69 5.12 600.00 64.97
Manguera de jebe de 1" Mts. 21.15 4.34 150.00 91.80
Manguera de jebe de 1/2" Mts. 21.15 1.93 150.00 40.82
840.55 0.53
Herramientas y otros
Piedra esmeril Afilad. 50.76 28.91 50.00 29.35
Pico minero Pza. 1.76 7.15 60.00 12.60
Lampa minera Pza. 3.53 7.83 30.00 27.60
Comba de 16 lbs. Pza. 1.41 19.17 75.00 27.03
Arnes de seguridad Pza. 0.71 104.26 150.00 73.51
Linea de vida Pza. 0.71 28.96 150.00 20.42
Llave stillson 14" Pza. 0.53 38.20 200.00 20.20
Mango de Pico Pza. 1.76 2.56 60.00 4.51
215.23 0.13
Implementos de Seguridad
Tareas con ropa agua Tajeo Tareas 285.00 2.43 691.78 0.43
COSTOS DIRECTOS 8.74
UTILIDAD 10% 0.87
COSTO TOTAL ( US$/TM ) US$ 9.62
ALQUILER DE EQUIPOS
Scoop Elctrico 0.75 YD3 Horas 120.00 28.23 2.12
COSTO TOTAL DE EXPLOTACION (US$/TM) 11.73

Standares de consumo de explosivos y accesorios


Dinamita SEMEXSA 65 Kgr/TM 0.25
Carmex o fulminante Pza/TM 0.62
Guia Rpida Mts/TM 0.04
Guia Seguridad Mts/TM 0.03

EXPLOTACIN CORTE Y RELLENO MECANIZADO PERF. BREASTING


Con SCOOP ELECTRICO 1.00 YD3 CIA
PARAMETROS DE CLCULO
Potencia Ancho Minado Alt. Corte Long. Perf. P.E. TM # Taladros TM/Tal. Kg/TM
> 1.50 mts. 1.50 1.55 2.70 2.41 15.13 12 1.26 0.39
Produccin Tajeo/Guardia(T.M.) 1,778 TM Nmero Taladros 1,269.00
Eficiencia Operativa 90.00% Rend. Scoop Electrico (Tm/Hr) 1.50
Produccin Tajeo/Guardia(T.M.) 1,600.00 TM

DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/TM


Unit.$ Util Mes $ (US$/TM)
Mano de Obra
Perforista + Ayudante Tareas 210.00 30.55 6,416.11
Operador Scoop Tareas 75.00 32.21 2,416.00
285.00 8,832.11 5.52
Explosivos m3.
Dinamita Semexsa 65, 7/8"x7" Kgr. 401.75 2.18 877.59
Dinamita Semexsa 80, 7/8"x7" Kgr. 61.81 2.52 155.76
Gelatina 75, 11/8"x8" Kgr. 154.52 2.36 364.11
Excel Pza. 1,269.00 1.04 1,324.84
Cordon detonante Mts. 992.00 0.14 138.88
Guia Impermeable (chispeo) Mts. 64.47 0.35 22.56
Carmex Pza. 52.88 0.47 24.85
2,908.59 1.82
Barreno de 6' P.P. 7,614 59.00 900.00 499.14 0.31
Equipo perforacin
Perforadora P.P. 7,614 7,600 90,000 642.96
Aceite perforadora Gln. 12.69 5.12 600.00 64.97
Manguera de jebe de 1" Mts. 21.15 4.34 150.00 91.80
Manguera de jebe de 1/2" Mts. 21.15 1.93 150.00 40.82
840.55 0.53
Herramientas y otros
Piedra esmeril Afilad. 50.76 28.91 50.00 29.35
Pico minero Pza. 1.76 7.15 60.00 12.60
Lampa minera Pza. 3.53 7.83 30.00 27.60
Comba de 16 lbs. Pza. 1.41 19.17 75.00 27.03
Arnes de seguridad Pza. 0.71 104.26 150.00 73.51
Linea de vida Pza. 0.71 28.96 150.00 20.42
Llave stillson 14" Pza. 0.53 38.20 200.00 20.20
Mango de Pico Pza. 1.76 2.56 60.00 4.51
215.23 0.13
Implementos de Seguridad
Tareas con ropa agua Tajeo Tareas 285.00 2.43 691.78 0.43
COSTOS DIRECTOS 8.74
UTILIDAD 10% 0.87
COSTO TOTAL ( US$/TM ) US$ 9.62
ALQUILER DE EQUIPOS
Scoop Elctrico 1.00 YD3 Horas 180.00 24.41 2.75
COSTO TOTAL DE EXPLOTACION (US$/TM) 12.36

Standares de consumo de explosivos y accesorios


Dinamita SEMEXSA 65 Kgr/TM 0.25
Carmex o fulminante Pza/TM 0.62
Guia Rpida Mts/TM 0.04
Guia Seguridad Mts/TM 0.03
PARAMETROS DE CLCULO
Potencia Ancho Minado Alt. Perf. Longitug P.E. TM # Taladros TM/Tal. Kg/TM
< 0.90 mts. 0.80 1.60 2.70 2.41 8.33 11 0.76 0.75
Produccin Tajeo/mes(T.M.) 535 TM Nmero Taladros 635.91
Eficiencia Operativa 90% Rend. Locomotora / mes (TM/Locom.) 5,000
Produccin Tajeo/mes(T.M.) 482 TM Rend. Winche en detrtico (m3/Hr.) 4
Nmero Cortes/mes 1.20 Personal en Mov. Winche/corte 4
Rendimiento Winche (TM / gdia.) 15 C/R Detrtico
Personal p' Relleno detr./ ala de 80 m. 8 Mineral directo a O.P.
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/TM
Unit.$ Util Mes $ (US$/TM)
Mano de Obra
Perforista + Ayudante Tareas 57.00 30.55 1,741.52
Winchero + Ayudante (Mineral) Tareas 57.00 30.55 1,741.52
Winchero + Ayudante (Detrtico) Tareas 9.63 30.55 294.22
Movimiento winche Tareas 4.82 30.55 147.11
Limpieza general Tareas 2.00 30.55 61.11
130.45 3,985.47 8.28
Explosivos m3.
Dinamita Semexsa 65, 7/8"x7" Kgr. 270.99 2.18 591.95
Dinamita Semexsa 80, 7/8"x7" Kgr. 36.13 2.52 91.05
Gelatina 75, 11/8" x 8" Kgr. 114.82 2.36 270.57
Excel Pza. 635.91 1.04 663.89
Cordon detonante Mts. 298.53 0.14 41.79
Guia Impermeable (chispeo) Mts. 35.24 0.09 3.00
Carmex Pza. 115.62 0.47 54.34
1,716.60 3.57
Barreno de 6' P.P. 3,815 59.00 900.00 250.13 0.52
Equipo perforacin
Perforadora P.P. 3,815 7,600 90,000 322.20
Aceite perforadora Gln. 6.36 5.12 600.00 32.56
Manguera de jebe de 1" Mts. 11.56 4.34 150.00 50.18
Manguera de jebe de 1/2" Mts. 11.56 1.93 150.00 22.31
427.25 0.89
Herramientas y otros
Piedra esmeril Afilad. 25.44 28.91 50.00 14.71
Pico minero Pza. 0.96 7.15 60.00 6.89
Lampa minera Pza. 1.93 7.83 30.00 15.09
Comba de 16 lbs. Pza. 0.77 19.17 75.00 14.78
Arnes de seguridad Pza. 0.39 104.26 150.00 40.18
Linea de vida Pza. 0.39 28.96 150.00 11.16
Llave stillson 14" Pza. 0.29 38.20 200.00 11.04
Mango de Pico Pza. 0.96 2.56 60.00 2.47
116.31 0.24
Implementos de Seguridad
Tareas con ropa agua Tajeo Tareas 130.45 2.43 316.63 0.66
COSTOS DIRECTOS 14.15
UTILIDAD 10% 1.41
COSTO TOTAL ( US$/TM ) US$ 15.56
ALQUILER DE EQUIPOS
Locomotora US$/TM
Winche elctrico US$/TM 1.80
Carros mineros U-35 US$/TM
COSTO TOTAL DE EXPLOTACION (US$/TM) 17.36
Standares de consumo de explosivos y accesorios
Dinamita SEMEXSA 65 Kgr/TM 0.56 14.02
Carmex o fulminante Pza/TM 1.32
Guia Rpida Mts/TM 0.62 3.34
Guia Seguridad Mts/TM 0.07
DESCAJE CONVENCIONAL SIN LIMPIEZA (tajeos)

Nro. Taladros/Disp.: 45.00 tal.


Avance/disp. : 0.50 mts.
Volumen Roto : 22.50 m3.
DESCRIPCIN Unid. Cant. Costo Vida
Unit.$ Util
MANO DE OBRA
Perforista Tarea 1.50 32.21
Ayudante Perf. Tarea 1.50 28.89
3.00
EXPLOSIVO 22.50 m3.
Dinamita Semexsa 65 Kgr. 10.96 2.29
Carmex Pza. 45.00 0.47
Guia Rpida de ignicin Mts. 13.72 0.35
Guia Impermeable (chispeo) Mts. 0.61 0.09

BARRENO DE 6' P.P. 180.00 57.00 900.00


EQUIPO PERFORACIN
Perforadora P.P. 180.00 7,600 90,000
Aceite perforadora Gln. 0.30 5.12 600.00
Manguera de jebe de 1" Mts. 30.00 4.34 150.00
Manguera de jebe de 1/2" Mts. 30.00 1.93 150.00

HERRAMIENTAS Y OTROS
Piedra esmeril Afilad. 1.20 28.91 50.00
Pico minero Pza. 1.00 7.15 60.00
Lampa minera Pza. 1.00 7.83 30.00
Llave stillson 14" Pza. 2.00 38.20 200.00
Mango de Pico Pza. 1.00 2.56 60.00

IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 3.05
Tareas sin ropa de agua Tar.

COSTOS DIRECTOS
Imprevistos 0.05
Utilidad costo directo 10%
COSTO TOTAL (US$/m3.)
(tajeos)

Costo x COSTO
Parcial. $ US$/Mt3

48.32
43.34
91.66 4.07

25.05
21.15
4.80
0.05
51.05 2.27
11.40 0.51

15.20
1.54
0.87
0.39
17.99 0.80

0.69
0.12
0.26
0.38
0.04
1.50 0.07

9.16
-
9.16 0.41
8.12
0.41
0.81
US$ 9.34