Professional Documents
Culture Documents
1 INTRODUCTION.............................................................................................................................................. 3
1.1 General ..................................................................................................................................................... 3
1.2 Objective .................................................................................................................................................. 3
1.3 Design methodology ................................................................................................................................ 3
1.4 Materials .................................................................................................................................................. 3
1.5 Software applied ...................................................................................................................................... 3
1.6 Loads ........................................................................................................................................................ 3
2 DESIGN CALCULATIONS.............................................................................................................................. 5
2.1 Introduction .............................................................................................................................................. 5
2.2 Design of footing ..................................................................................................................................... 5
List of annexes
2
1 INTRODUCTION
1.1 General
This document presents the design calculations of of HMA 9251 Duo decagon Light pole foundation. HMA
9251 is for light mast of 25m high. It is supported on individual spread footing.
1.2 Objective
1.4 Materials
1.7 Loads
3
Permanent:
- Vertical load caused by the self-weight.
Incidental:
- Wind load.
1.7.1 Self-weight
The load case consists of the self-weight of light pole which is provided by vendor and is attached in Annex
01. The load is tabulated below:
Wind load is applied on the exposed area of the steel structure with a design wind pressure of 1.25 kPa. The
design wind pressure of 1.25 kPa is calculated for a wind speed of 45 m/sec. The load on the foundation due
to wind is provided by the vendor and is attached in Annex 01. The load is tabulated below:
4
3 DESIGN CALCULATIONS
3.1 Introduction
After the evaluation of the working loads presented in Section 1.7, the reinforced concrete footing is
modelled in Prokon to check for strength and stability.
One reinforced concrete footing will be used to support the steel structure of light pole HMA 9251. The
forces considered at the top of the pedestal are the supports reactions in SLS (provided by the vendor). The
footing has been designed in Prokon.
5
Annexure 01
Reference Data
6
CU Lighting Ltd. Page No:___________
Highmast Design (Duo). Initials:___________
Version: 1*09 Date:__08/12/05__
Mast Height m. : 25.00 Across Flats mm. Top : 150 Bottom : 520 mm.
Head Load (V) kN. : 8.00 Height of flange above ground level : 0 m.
Head Frame Moment : Dead : 0.00 Live : 0.00 kN.m.
Mast Details: Additional Loads: (Live: S. Dead: M & V.) Factors:
Joint Heights Thickness Shears Moments Vertical Gama Gama Gama
No. m. mm. kN. kN.m. kN. Dead Wind Materials
15 25.00 3.00 1.00 1.25 1.15
14 22.00 3.00 Bolts : 1.15
13 20.37 3.00
12 18.00 4.00 Force Coefficients.
11 17.00 4.00 Head Shaft
10 15.50 4.00 CF CF
9 14.00 4.00 1.00 0.60
8 12.00 4.00
7 10.12 4.00 Shaft Material.
6 9.00 4.00 Grade Yield
5 7.00 4.00 S355 355
4 5.50 4.00
3 2.00 4.00
2 0.40 4.00
1 0 4.00 (Live) (Dead) (Dead)
Wind loading for a Duodecagon (20 sided) High Mast is in accordance with the ILE Technical Report Number 7, based on BS
CP3 Chapter V Part 2. In this Standard the Basic Wind Speed is the 3 second gust speed estimated to be exceeded only once in
50 years. The force coefficient Cf for a 20 sided polygon section with rounded corners from De Havilland wind tunnel
investigations has been found to be a worst case of 0.6 when "point into wind". Mean hourly wind speed factor is given in
Appendix A , Paragraph A1 for each Category.
Foundation Studs.
Type of stud :- McCalls High Strength Precision Ties. Flange Yield : 275 N/sq.mm.
Ultimate Tensile : 775 N/sq. mm. Bolt Diameter : 27 mm.
Proof Stress(.2%) : 585 N/sq. mm. Number equispaced : 10 no.
Elastic Modulus : 205 kN/sq. mm. Pitch Circle Diameter : 650 mm.
Threads are :- ISO metric coarse pitch to BS3643 Part 2, cold rolled.
V.No. 1*09 Maximum Stud Load :- 259 kN.
V.No. 1*09
V.No. 1*09
V.No. 1*09
Note: Bending Stress (Elastic, unfactored) for flange bolt designs only.
V.No. 1*09
5.05 8.00
V.No. 1*09
Threads are :- ISO metric coarse pitch to BS3643 Part 2, cold rolled.
V.No. 1*09
Design of foundation
(using Prokon)
7
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
Sketch of Base
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
BS8110 - 1997 Y
C1
X
D1
B
Mx Y
P
Hx
X
Z
1.20 1.20
X X
2.50
2.50
1.20 1.20
2.50 2.50
Y Y
Mx Mx
P P
Hx Hx
1.00
1.00
1.20 1.20
0.75 0.75
1.20 1.20
X X
2.50
2.50
1.20 1.20
2.50 2.50
Y Y
Mx Mx
P P
Hx Hx
1.00
1.00
1.20 1.20
0.75 0.75
1.20 1.20
X X
2.50
2.50
1.20 1.20
2.50 2.50
Y Y
Mx Mx
P P
Hx Hx
1.00
1.00
1.20 1.20
0.75 0.75
F F
F F
F F
F F
E GGGGG E
col1 SECTION: col1
PLAN
4T20-E +
8T20-F +
10T20-G
3R12-H
B B B B B B B B B
SECTION
Annexure 03
Design Drawings