CUADRO DE AVANCE FSICO A/F RO PUTUMAYO

Actualizado: Al 04/09/17 Avance fsico : 46.49%

% de Avance
Taller Grada Avance
Mdulo Ponderado Soldadura post fsico
Fabricacin Montaje Alineamiento
enamble Ponderado
55% 5% 10% 30%
1 15.5 75% 100% 100% 0% 2.75%
2 4.6 75% 100% 100% 0% 0.82%
3.1 6.4 100% 100% 100% 35% 1.62%
3.2 6.4 100% 100% 100% 35% 1.62%
3.5 2.3 65% 0% 0% 0% 0.26%
3.6 2.3 65% 0% 0% 0% 0.26%
3.7 1 25% 0% 0% 0% 0.04%
3.8 1.3 25% 0% 0% 0% 0.06%
3.9 2.8 40% 0% 0% 0% 0.19%
3.10 3 40% 0% 0% 0% 0.21%
4.1 6.4 100% 100% 100% 25% 1.56%
4.2 6.4 100% 100% 100% 25% 1.56%
4.3 6.4 100% 100% 100% 25% 1.56%
4.4 6.4 100% 100% 100% 25% 1.56%
4.5 5.1 75% 0% 0% 0% 0.66%
4.6 5.1 75% 0% 0% 0% 0.66%
4.7 2.4 25% 0% 0% 0% 0.10%
4.8 3 25% 0% 0% 0% 0.13%
4.9 5.9 35% 0% 0% 0% 0.36%
4.10 6.5 35% 0% 0% 0% 0.39%
5.1 6.6 100% 100% 100% 30% 1.64%
5.2 6.6 100% 100% 100% 30% 1.64%
5.3 6.3 100% 100% 100% 30% 1.57%
5.4 6.3 100% 100% 100% 30% 1.57%
5.5 5.5 85% 0% 0% 0% 0.81%
5.6 5.5 85% 0% 0% 0% 0.81%
5.7 2.4 25% 0% 0% 0% 0.10%
5.8 3 25% 0% 0% 0% 0.13%
5.9 6.1 25% 0% 0% 0% 0.26%
5.10 6.5 25% 0% 0% 0% 0.28%
6.1 6.3 85% 0% 0% 0% 0.93%
6.2 6.3 100% 100% 100% 0% 1.39%
6.3 6.4 100% 100% 80% 0% 1.37%
6.4 6.4 100% 100% 80% 0% 1.37%
6.5 5.3 80% 0% 0% 0% 0.74%
6.6 5.3 80% 0% 0% 0% 0.74%
6.7 2.4 25% 0% 0% 0% 0.10%
6.8 3 25% 0% 0% 0% 0.13%
6.9 5.9 25% 0% 0% 0% 0.26%
6.10 6.3 25% 0% 0% 0% 0.27%
7.1 6.1 0% 0% 0% 0% 0.00%
7.2 6.1 0% 0% 0% 0% 0.00%
7.3 6.4 60% 0% 0% 0% 0.67%
7.4 6.4 60% 0% 0% 0% 0.67%
7.5 4.8 75% 0% 0% 0% 0.62%
7.6 4.8 75% 0% 0% 0% 0.62%
7.7 2.2 25% 0% 0% 0% 0.10%
7.8 2.7 25% 0% 0% 0% 0.12%
7.9 5.4 25% 0% 0% 0% 0.23%
7.10 5.8 25% 0% 0% 0% 0.25%
8 4.6 50% 50% 50% 0% 0.51%
9 15.4 65% 0% 0% 0% 1.74%
A 7.87 100% 100% 100% 100% 2.48%
B 8.1 100% 100% 100% 100% 2.55%
C 7.8 100% 100% 100% 100% 2.46%
REFINERA SELVA

CONTRATO:
N 4100006495
GERENCIA DE PROYECTOS
CLIENTE: Petrleos del Per PETROPER S.A.
PROYECTO: Servicio de Supervisin de los Trabajos de Construccin de REFINERA SELVA
Barcazas para el transporte de Hidrocarburos de Refinacin Iquitos
CONTRATO:
EMISIN: 9/5/2017 CODIGO DEL DOCUMENTO: PETRO-SCBP17-RA-006
N 4100006495

CUADRO DE AVANCE FSICO A/F RO YARAPA

Actualizado: Al 04/09/17 Avance fsico : 39.89%

% de Avance
Taller Grada Avance
Mdulo Ponderado Soldadura post fsico
Fabricacin Montaje Alineamiento
enamble Ponderado
55% 5% 10% 30%
1 15.5 75% 100% 100% 0% 2.75%
2 4.6 75% 100% 100% 0% 0.82%
3.1 6.4 100% 100% 100% 0% 1.41%
3.2 6.4 100% 100% 100% 0% 1.41%
3.5 2.3 60% 0% 0% 0% 0.24%
3.6 2.3 60% 0% 0% 0% 0.24%
3.7 1 25% 0% 0% 0% 0.04%
3.8 1.3 25% 0% 0% 0% 0.06%
3.9 2.8 25% 0% 0% 0% 0.12%
3.10 3 25% 0% 0% 0% 0.13%
4.1 6.4 90% 100% 100% 0% 1.30%
4.2 6.4 90% 100% 100% 0% 1.30%
4.3 6.4 100% 100% 100% 0% 1.41%
4.4 6.4 100% 100% 100% 0% 1.41%
4.5 5.1 70% 0% 0% 0% 0.62%
4.6 5.1 70% 0% 0% 0% 0.62%
4.7 2.4 25% 0% 0% 0% 0.10%
4.8 3 25% 0% 0% 0% 0.13%
4.9 5.9 35% 0% 0% 0% 0.36%
4.10 6.5 35% 0% 0% 0% 0.39%
5.1 6.6 75% 0% 0% 0% 0.86%
5.2 6.6 90% 0% 0% 0% 1.03%
5.3 6.3 90% 0% 0% 0% 0.98%
5.4 6.3 90% 0% 0% 0% 0.98%
5.5 5.5 75% 0% 0% 0% 0.72%
5.6 5.5 75% 0% 0% 0% 0.72%
5.7 2.4 25% 0% 0% 0% 0.10%
5.8 3 25% 0% 0% 0% 0.13%
5.9 6.1 35% 0% 0% 0% 0.37%
5.10 6.5 35% 0% 0% 0% 0.39%
6.1 6.3 60% 0% 0% 0% 0.66%
6.2 6.3 80% 0% 0% 0% 0.87%
6.3 6.4 80% 0% 0% 0% 0.89%
6.4 6.4 80% 0% 0% 0% 0.89%
6.5 5.3 75% 0% 0% 0% 0.69%
6.6 5.3 75% 0% 0% 0% 0.69%
6.7 2.4 25% 0% 0% 0% 0.10%
6.8 3 25% 0% 0% 0% 0.13%
6.9 5.9 35% 0% 0% 0% 0.36%
6.10 6.3 35% 0% 0% 0% 0.38%
7.1 6.1 0% 0% 0% 0% 0.00%
7.2 6.1 0% 0% 0% 0% 0.00%
7.3 6.4 20% 0% 0% 0% 0.22%
7.4 6.4 20% 0% 0% 0% 0.22%
7.5 4.8 75% 0% 0% 0% 0.62%
7.6 4.8 75% 0% 0% 0% 0.62%
7.7 2.2 25% 0% 0% 0% 0.10%
7.8 2.7 25% 0% 0% 0% 0.12%
7.9 5.4 25% 0% 0% 0% 0.23%
7.10 5.8 25% 0% 0% 0% 0.25%
8 4.6 50% 50% 50% 0% 0.51%
9 15.4 65% 0% 0% 0% 1.74%
A 7.87 100% 100% 100% 100% 2.48%
B 8.1 100% 100% 100% 100% 2.55%
C 7.8 100% 100% 100% 100% 2.46%
REFINERA SELVA

CONTRATO:
N 4100006495
EMBARCACIN:

Actualizado:

% de Avance
Taller Grada
Soldadura post Avance
Mdulo Ponderado Fabricacin Montaje Alineamiento fsico
enamble
Ponderado
55% 5% 10% 30%

1
2
3.1
3.2
3.5
3.6
3.7
3.8
3.9
3.10
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
8
9
A
B
C
0 0.00%