You are on page 1of 3

106

CMMI
154570
75

Application Software, AP
300 AP 30
Function Points, FP
10012FP
Earned Value Management, EVM
()5
()Schedule Variance, SV
Schedule Performance Index, SPI4
()Cost Variance, CVCost
Performance Index, CPI4
()Time Variance, TV4
()()()SPICPI4
()
Cost Variance at CompletionTime Variance at Completion
4
9-2829

()
()=30()=0.8
()=20()=1.2
()=1.2() 1.2
()
()=50() 50 =3() 3

ScopeCostTimeQuality

()15
()10

9-3

()(Triple Constrain)


-- 1 --
106



()




CMMI-ACQCMMI-ACQ
()CMMI-ACQ5
()CMMI-ACQRepresentation10
( )CMMI-ACQ V1.3 Maturity Level, ML
Process Area, PAPurpose10
10-1519

()CMMI 1.2
CMMI-DEV(CMMI for Development)
CMMI-ACQ(CMMI for Acquisition) CMMI-SVC(CMMI for
Service)
()(Continuous Representation)(Capability Level)
(Staged Representation)
(Maturity Level)

()1.(Agreement Management)
2.(Acquisition Requirements Development)
3.(Configuration Management)
4.(Measurement and Analysis)
5.(Project Monitoring and Control)

Software Requirements Engineering, SRE


SRE
()User RequirementsSystem Requirements5

()Functional RequirementsNon-Functional
Requirements10
()Metrics10
3-3429


()
(Functional Specification)

()

()

-- 2 --
106




Performance (Response Time)

Usability

Reliability

Operability 30

Portability

-- 3 --