TRANSWATER
Engineers of Integrated Solution
JpRovision To SUPPLY AND INSTALL MULTIPHASE FLOW METER
JFOR PETRONAS CARIGALI SON BHO. PENINSULAR MALAYSIA
lorenATiONS
PETRONAS oS
‘DOCUMENT TORAVING TRANSMATTAL
Tan NO PCSB-TWAPCSS:
RECT
[Trrormatn
These document are
[]Petmnary
Co rowew
[7 Jrwcoe
O0
Taran ay WAN HAT lose oveaR012
fe: Fon aah oncom
PROJECT MANAGER Pree! Enger
PPETRONAG CARIGALISDN 9H
(OPERAS! SEMENANJUNG MALAYSIA “Tranter API San Bh
KOMPLEKS OPERASI PETRONAS tema Operation to 25,
24300 KERTEH, TERENGGANU dain Ponts UIE2
ions PetndusionTemasye, Setayen U,
laren we MokO KHAIRUDDIN SAD anda era 40120 Shon Aam
PROJECT MANAGER Selangor Dou Ehsan
Maya
os
Reaves or even opr
Released (Approved) Released (Approved)
Tarn sith
Project Engineer ¢
feroveed egncsreg!'—eremnarcn
een
Coane (reat mars plas e089
elm fe oO Te low cesdeey [Se oor [renee
ARSPOORRENEGOS Tor] ONECK VALVE ORTASHEET ~_l=| 7
ina
occuren i
Iron b-Ferrvow €- oman
fears eco
ime
a
[PCs comment cade
[Prrrevesiteviow
[rest Fer Approval [ rentmttorreview
[honoree wn commen
Signed By
Date
|[AAGP00095-MEC-DS-1011
Rev.B0
CHECK VALVE DATASHEET
COVER PAGE
PETRONAS oO
PROVISION TO SUPPLY AND INSTALL MULTIPHASE FLOW METER FOR
PETRONAS CARIGALI SDN BHD-PENINSULAR MALAYSIA OPERATIONS
CHECK VALVE DATASHEET
AAGP00095-MEC-DS-1011
& TRANSWATER
Engineers of integrated Solution
REV
pare | status
PREPARED| QA REVIEW|
By ey
cHecKeD|
BY
APPROVED,
By
WAME 8 | WAMES
sicn_|_siGn
WANES
‘SIGN
WAWES
SIGN
OWNER'S COMMENT
80
owozit2
Tesued For
fomovel |_| MNO L
wn
‘APPROVEDIREVIEWED
aay /
‘APPROVED WITH COMMENT
RESUBMIT FOR APPROVAL
RESUBMIT FOR REVIEW
Rlo|ojolo
[ime [oaTew TRANSWATER
opine of theyre Soaton
[sso cose
Fra
sr Tonprar (6).
ine Og To 1
jars Top 7)
DATASHEET
[gaa pRoWON To SUPPLY RETA