You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

511A-PI-001 5 BARG STEAM


(SNUFFING) NOTES:
DRAWING NO.

100 - S5 - 511A - 011 - BB3 - PP 7379 1. LEGENDS AND ABBREVIATIONS REFER TO DWG.
511A-PI-002 500A-PI-001, 500A-PI-002 AND 500A-PI-003.
2. ALL SULFUR LINES, VALVES, NOZZLES, ETC. TO BE
TO MOLTEN SULFUR STEAM JACKETED AND INSULATED WITH APPROPRIATE
A STORAGE TANK B TRAPS. THE INDICATED LINE SIZES ARE CORE A

HC PP
V-401-100
PIPE LINE SIZES.
5 BARG STEAM
(SNUFFING) 3. INSTRUMENT TAG NUMBERS AND INTERLOCKS SHALL BE
5990 PREFIXED BY THE UNIT AND UNIT SUBDIVISION(I.E. 511A)
V-401-100 100 - S5 - 511A - 004 - BB3 - PP UNLESS SPECIFIED OTHERWISE.
511A-PI-003
4. HIGH POINT IN LINES.
5 BARG STEAM (SNUFFING) HC PP TO MOLTEN SULFUR 5. ALL MOLTEN SULFUR LINES TO BE FREE DRAINING WITH NO
7342 150 - S5 - 511A - 009 - BB3 - HC ST TRANSFER PIT POCKETS.
515A-PI-008
01 20 - S5 - 511A - 019 - BB3 - HC 6. CONTAINMENT AREA WILL INCLUDE MOLTEN SULFUR

80
NOTE 8 STORAGE TANKS AND SULFURIC ACID STORAGE TANKS.
FROM 5 BARG HEADER
WALL HEIGHT WILL BE 1.32 M ON THE INSIDE AND
V-405-20 V-601-20 20 - C5 - 511A - 009 - BB3 - PP 1.2 M ON THE OUTSIDE BASED ON CONTAINMENT OF ONE
T
SULFURIC ACID TANK (4180 M 3)
S5 C5

V-405-20
7. DELETED.

NC
HC PP

V-401-100
8. SNUFFING STEAM VALVES TO BE LOCATED FOR EASY
B HC ACCESS AT GROUND LEVEL OUTSIDE OF MOLTEN SULFUR B
PP CONTAINMENT AREA.
9. TANK WILL ACCOMODATE A TOTAL OF 36 HEATING COILS.
100 - S5 - 511A - 010 - BB3 - PP HEATING COILS AND ASSOCIATED STEAM AND CONDENSATE
CONDENSATE LINES SHOWN ACROSS 3 DRAWINGS. SEE 511A-PI-006 (2 OF 3)
8616 20 - C5 - 511A - 885 - BB3 - PP V-601-20 V-405-20 20 - S5 - 511A - 885 - BB3 - PP AND 511A-PI-007 (3 OF 3) FOR CONTINUATIONS OF
511A-PI-007 T TANK HEATING COIL DETAILS.
C5 S5 10. LOCATE AT GRADE LEVEL.
TO HEADER ST

V-405-20
11. LOCATE NEAR STEAM SNUFF MANIFOLD.
CONDENSATE 01
8617 12. REFER P&ID 511A-PI-011 FOR STEAM AND CONDENSATE
20 - C5 - 511A - 884 - BB3 - PP V-601-20 V-405-20 20 - S5 - 511A - 884 - BB3 - PP CONNECTIONS TO VENT LINES OF MOLTEN SULFUR
511A-PI-007 T
STORAGE TANK-A.
TO HEADER C5 S5 ST 13. REFER TO JPH/ODI P3 SITE INTERFACE SCHEDULE AND

V-405-20
3.5 BARG STEAM 01 JPH P&IDS.
8059 80 - S5 - 511A - 022 - BB3 - HC 80 - S5 - 511A - 022 - BB3 - HC
C 511A-PI-007 C

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40
20 - S5 - 511A - 029 - BB3 - HC
FROM TANK A RING HEADER INSTRUMENT NUMBERING

LOOP NUMBERS RESERVED FOR THIS P&ID: 001-040.

80 - S5 - 511A - 010 - BB3 - PP

80 - S5 - 511A - 010 - BB3 - PP

80 - S5 - 511A - 010 - BB3 - PP

80 - S5 - 511A - 010 - BB3 - PP


80 - C5 - 511A - 016 - BB3 - PP
LOOP NUMBERS NOT USED: 004-040.
FILTERED MOLTEN SULFUR
5986 80 - SU - 511A - 014 - BP1 - HC - SJ V-122-80
511A-PI-005
NOTE 5
NOTE 4
FROM POLISHING FILTERS ST SPECIAL NOTE :
01
V-601-20 V-405-20 THIS DRAWING IS COPIED FROM DRAWING NO. 411A-PI-001
20 - C5 - 511A - 019 - BB3 - PP REV.06 CORRESPONDING PART OF SITE P1.
T

V-405-20
3.5 BARG STEAM

NC
8649 20 - S5 - 511A - 913 - BB3 - HC V-405-20 HC
PP

V-405-50
LAHH-
511A-PI-011 LAH-

NC
LI C5 S5 CONDENSATE
D 001 8057 D
FROM HEADER C LAL- 80 - C5 - 511A - 016 - BB3 - PP
LALL- 511A-PI-007
MOLTEN SULFUR
10

V-601-40 V-405-40

V-601-40 V-405-40
V-601-40 V-405-40

V-601-40 V-405-40

V-601-40 V-405-40

V-601-40 V-405-40
V-601-40 V-405-40

V-601-40 V-405-40

V-601-40V-405-40

V-601-40V-405-40
5987 300 - SU - 511A - 002 - CP1 - HC - SJ TO TANK A RING HEADER
511A-PI-002
NOTE

SEL
HS

11/12/2013 3:32:09 PM
NOTE 5 LI PP PP PP PP PP PP PP PP PP PP
TO MOLTEN SULFER 001 C5 C5 C5 C5
001 C5 C5 C5 C5 C5 C5

300 - SU - 511A - 019 - BP1 - HC - SJ


STORAGE TANK B FE FIT FQI FI
D S5 S5 S5 S5 S5 S5 S5 S5 S5 S5
003 003 003 003 HC HC HC HC HC HC HC HC HC HC
JPH JESA LDA

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40
V-405-40

V-405-40
V-405-40
MOLTEN SULFUR 001 CONDENSATE

V-405-40

V-405-40

V-405-40

V-405-40

V-405-40
V-405-40

V-405-40

V-405-40
V-405-40

V-405-40
200 - SU - 511A - 034 - BP1 - HC - SJ
6829 300 - SU - 511A - 001 - CP1 - HC - SJ V-121-300 8648

40x20

40x20
40x20

40x20

40x20

40x20

40x20

40x20
40x20

40x20
20 - C5 - 511A - 911 - BB3 - PP
NOTE 13 200 - SU - 511A - 033 - BP1 - HC - SJ 511A-PI-011

200 - SU - 511A - 035 - BP1 - HC - SJ


NOTE 5 LI LI
NOTE 4 T T T T T T T T T T

\ODI-P3\511A\511API001.pid
V-405-20
ST ST ST ST ST ST ST ST ST ST
FROM JPH BL V-121-300 SP 001 001 TO HEADER

200 - SU - 511A - 036 - BP1 - HC - SJ


40x20
A B

40x20
40x20

40x20

40x20

40x20

40x20
40x20

40x20
40x20
05-1-B 04-A 04-A 04-A 04-A 04-A 04-A 04-A 04-A 04-A 04-A
305

V-405-40

V-405-40
V-405-40
V-405-40

V-405-40

V-405-40

V-405-40

V-405-40
V-405-40

V-405-40
E E

V-601-20
3.5 BARG STEAM AI ST
8644 25 - S5 - 511A - 912 - BB3 - HC V-405-25 A B A B
LIT LIT A B 01
511A-PI-011 001 001
A B A B
A B A B A B
FROM HEADER FICV
V5 T
A B 300 C23 A B
MOLTEN SULFUR 001 C22 600
C32 600 C33 20 - S5 - 511A - 911 - BB3 - HC
5642 V-122-80 A B 600 C24
80 - SU - 511A - 012 - BP1 - HC - SJ A1 C21 600 600 C34

PID File Path:


511A-PI-004 A2 A3 M1A L1 V2 600 M1B 25x20
C31 600 C25
NOTE 5 NOTE 4 L2 V3 V1 K2
C26 600 600 S1 100 300 - SU - 511A - 029 - BP1 - HC - SJ
FROM TRANSFER SIDE PIT S2
80 600 100 600 150 150 S3 S4
300 150 V4 MOLTEN SULFUR
80 150 600 338
HC RADAR B2 511A-PI-002
3.5 BARG STEAM 300
V-405-20 NOTE 5
40 - S5 - 511A - 861 - BB3 - HC

40 - S5 - 511A - 841 - BB3 - HC

40 - S5 - 511A - 856 - BB3 - HC

40 - S5 - 511A - 836 - BB3 - HC

40 - S5 - 511A - 866 - BB3 - HC

40 - S5 - 511A - 846 - BB3 - HC

40 - S5 - 511A - 855 - BB3 - HC

40 - S5 - 511A - 835 - BB3 - HC

40 - S5 - 511A - 865 - BB3 - HC

40 - S5 - 511A - 845 - BB3 - HC

40 - S5 - 511A - 864 - BB3 - HC

40 - S5 - 511A - 844 - BB3 - HC

40 - S5 - 511A - 854 - BB3 - HC

40 - S5 - 511A - 834 - BB3 - HC

40 - S5 - 511A - 863 - BB3 - HC

40 - S5 - 511A - 843 - BB3 - HC

40 - S5 - 511A - 853 - BB3 - HC

40 - S5 - 511A - 833 - BB3 - HC

40 - S5 - 511A - 862 - BB3 - HC

40 - S5 - 511A - 842 - BB3 - HC


8645 20 - S5 - 511A - 914 - BB3 - HC TO/FROM MOLTEN
511A-PI-011 1000
M2B SULFUR STORAGE
F TW
TANK B
F
FROM HEADER 002
K1 F
SP TAH-
150 SP SP SP SP SP SP SP SP SP TE TIT TI
51 51 51 51 51 51 51 51 51 51 T1A 002 002 002
40 F F F
TW
002
E TE TIT TI
TAH-
T1B BEACON
40 002 002 002 XA
TW E E E
002
002
D TE TIT TI
TAH-
NOTE 11
T1C
40 002 002 002 TSH
TW D D D
002
002
C TAH-
T1D TE TIT TI
40 002 002 002
TW C C C
HORN
G 002
B TAH-
TA G
TE TIT TI 002
T1E 002 002 002
40 B B B TAH- NOTE 11
TE TIT TI
T1F HS
40 002 002 002
TW A A A 002
K3 002 150 - SU - 511A - 005 - BP1 - HC - SJ
50 A DCS HORN SILENCE
MOLTEN SULFUR
B1B V-123-150 5989 25 - S5 - 511A - 915 - BB3 - HC
M2A
511ABE02 511ASE02 511ACE02 511ATE02 511ADE02 511AEE02 511AUE02 511AFE02 511AVE02 511AGE02 150 511A-PI-004
1000 3.5 BARG STEAM
V-405-25 TO TRANSFER SIDE PIT 8646
511AAR01 511A-PI-011
V-123-200 MOLTEN SULFUR
W B1A V-123-100 5634
200 V-405-25 FROM HEADER
TRIM: SU-511A-025-BP1-HC 150 511A-PI-003

H 25 - S5 - 511A - 916 - BB3 - HC TO FILTER SIDE PIT H


NOTE 6 150 - SU - 511A - 003 - BP1 - HC - SJ

511ABE02 511ASE02 511ACE02 511ATE02 511ADE02 511AEE02 511AUE02 511AFE02 511AVE02 511AGE02 511AAR01
MOLTEN SULFUR
TANK A HEATING
COILS B #2
MOLTEN SULFUR
TANK A HEATING
COILS S #2
MOLTEN SULFUR
TANK A HEATING
COILS C #2
MOLTEN SULFUR
TANK A HEATING
COILS T #2
MOLTEN SULFUR
TANK A HEATING
COILS D #2
MOLTEN SULFUR
TANK A HEATING
COILS E #2
MOLTEN SULFUR
TANK A HEATING
COILS U #2
MOLTEN SULFUR
TANK A HEATING
COILS F #2
MOLTEN SULFUR
TANK A HEATING
COILS V #2
MOLTEN SULFUR
TANK A HEATING
COILS G #2
MOLTEN SULFUR
STORAGE TANK A
OCP SA
ODI P3

*511API001*
This drawing is the property of Jacobs Engineering. Neither this document nor any
information herein shall be copied or reproduced in any manner, loaned or otherwise
disposed of, or used for any purpose whatsoever without the prior written permission

This drawing was generated using SmartPlant and must not be altered manually. Do not Scale.
of Jacobs Engineering. If this document is loaned by or with the authority of Jacobs
Engineering, the borrower in consideration of such loan, agrees to the foregoing conditions.
ODI AT P3 SITE - OSBL
I REV DESCRIPTION BY CKD DATE APPD APPD APPD REV DESCRIPTION BY CKD DATE APPD APPD APPD
APPROVED
Proj. Mgr.: Z. HILAL PIPING & INSTRUMENTATION DIAGRAM I
Checker: STK
LEAD ENGINEER DATE MOLTEN SULFUR STORAGE TANK A
APPROVED
Discipline Lead: RDK
Originator: RDA 1 OF 3
DISCIPLINE MANAGER DATE Date: 28SEP2013
APPROVED SCALE ORDER NO. DRAWING NO. REV.
CAD File: 511API001.pid

0 ISSUED FOR CONSTRUCTION RDA STK 12NOV2013 RMK OA (seal) PROJECT MANAGER DATE
NONE Q3601XXX 511A-PI-001 0
1 2 3 4 5 6 7 8 9 10

You might also like