Professional Documents
Culture Documents
Document type
LOAD CALCULATION REPORT FOR SEC APPROVAL
OCT/2017
ELECTRICAL LOADS CONDIDERATION
The total connected load, total demand load, and coincident demand load
are calculated based on SEC standard DPS-rev02 for mall.
The Demand load is considered as the following:
DL= 0.7 for shops and restaurants.
DL=1 for general lighting
DL=0.6 for power
DL=0.9 for HVAC
Coincident factor is considered 1 as per SEC standards
transformer14(2000KVA)
TCL=1548kw
TDL=1393kw
TDL+0.25spare=1741kw
transformer15(2000KVA)
TCL=1551kw
TDL=1396kw
TDL+0.25spare=1745kw
transformer16(2500KVA)
TCL=2295kw
TDL=2067kw
400V/230V,60Hz,3phase PanelName: LTP1 Location:GROUND Floor
Cable
C.B CBrating Cablesize(mm2) TCL TDL Spare Max.TDL
# DBname DF Length V(v) REMARKS
Type Rating Actual (kW) (kW) Factor (kW)
Proposedcablesize (m)
(A) (A)
1 SMDB1 MCCB TPN 331.20 179.78 0.82 147.20 25% 184.00 400
2 SMDB2 MCCB TPN 257.79 159.02 0.72 114.57 25% 143.21 400
3 KWHMRES1 MCCB TPN 880.74 559.20 0.70 391.44 25% 489.30 400
4 SMDB3 MCCB TPN 430.85 268.84 0.71 191.49 25% 239.36 400
BUSBAR 4000 A 2500 3125
1 ANCHOR SHOP-13 MCCB TPN 262.40 166.60 0.70 116.62 25% 145.78 400
2 SHOP-42 MCCB TPN 12.83 8.15 0.70 5.70 25% 7.13 400
3 SHOP-43 MCCB SPN 18.74 3.97 0.70 2.78 25% 3.47 230
4 SHOP-44 MCCB TPN 22.39 14.22 0.70 9.95 25% 12.44 400
5 SHOP-45 MCCB TPN 22.36 14.20 0.70 9.94 25% 12.42 400
6 SHOP-46 MCCB TPN 22.33 14.18 0.70 9.92 25% 12.41 400
7 SHOP-47 MCCB TPN 17.38 11.04 0.70 7.72 25% 9.66 400
8 IRP-01 MCP TPN 30.38 15.00 0.90 13.50 25% 16.88 400 CP(1DUTY,1STANDBY)
9 KOSK MCP TPN 15.75 10.00 0.70 7.00 25% 8.75 400 PROVISION
10 KOSK MCCB TPN 15.75 10.00 0.70 7.00 25% 8.75 400 PROVISION
11 FAF-02 MCCB TPN 1.52 0.75 0.90 0.68 25% 0.84 400
12 EXF-10 MCCB TPN 1.52 0.75 0.90 0.68 25% 0.84 400
BUSBAR 630 A 550 562.5
1 SHOP-8 MCCB TPN 8.64 5.49 0.70 3.84 25% 4.80 400
2 SHOP-9 MCCB TPN 8.05 5.11 0.70 3.58 25% 4.47 400
3 SHOP-10 MCCB SPN 22.23 4.70 0.70 3.29 25% 4.12 230
4 SHOP-11 MCCB SPN 22.59 4.78 0.70 3.35 25% 4.18 230
5 SHOP-12 MCCB SPN 17.80 3.77 0.70 2.64 25% 3.30 230
6 SHOP-13 MCCB SPN 15.24 3.23 0.70 2.26 25% 2.82 230
7 IRP-02 MCP TPN 15.19 7.50 0.90 6.75 25% 8.44 400 CP(1 DUTY ,1STANDBY)
8 KOSK MCCB TPN 15.75 10.00 0.70 7.00 25% 8.75 400 PROVISION
9 KOSK MCCB TPN 15.75 10.00 0.70 7.00 25% 8.75 400 PROVISION
10 FAF-02 MCCB TPN 1.52 0.75 0.90 0.68 25% 0.84 400
11 EXF-10 MCCB TPN 1.52 0.75 0.90 0.68 25% 0.84 400
BUSBAR 125 A 125 125
CP(2 DUTY
1 CWP-02 MCP TPN 22.50 10.00 1.00 10.00 25% 12.50 400
,1STANDBY)
2 J.P-2 MCP SPN 14.18 2.10 1.00 2.10 25% 2.63 230 CP
CP(2 DUTY
3 RWP-02 MCP TPN 22.50 10.00 1.00 10.00 25% 12.50 400
,1STANDBY)
4 SUMP-01 MCP SPN 14.85 2.20 1.00 2.20 25% 2.75 230 CP(2 DUTY)
5 EDB5-SER MCP SPN 37.46 5.55 1.00 5.55 25% 6.94 230
6 EDB6-SER MCP SPN 47.25 7.00 1.00 7.00 25% 8.75 230
7 EDB7-SER MCP TPN 5.29 2.35 1.00 2.35 25% 2.94 400
8 EDB8-SER MCCB TPN 5.74 2.55 1.00 2.55 25% 3.19 400
9 UDB5-SER MCCB TPN 18.23 8.10 1.00 8.10 25% 10.13 400
10 UDB6-SER MCCB TPN 14.67 6.52 1.00 6.52 25% 8.15 400
11 UDB7-SER MCCB TPN 23.18 10.30 1.00 10.30 25% 12.88 400
BUSBAR 200 A 200 200
1 ENT. MCCB TPN 1229.53 780.66 0.70 546.46 25% 683.07 400
2 MCC-ENT MCCB TPN 449.55 222.00 0.90 199.80 25% 249.75 400
3 EMCC-ENT MCCB TPN 364.50 180.00 0.90 162.00 25% 202.50 400
BUSBAR 2500 A 2500 2500