You are on page 1of 5

Quotation

Uber Project Lighting Private Limited


2nd Floor, Plot no 29, Road No 76, Jubilee Hills Date 01-09-2017
Hyderabad, Andhra Pradesh 500033 Validity 15 Days
Quote # 55
Prepared for Version # V2
M/s SSPC
Hyderabad

LIGHTING CONTROL
ARTICLE NO IMAGE DESCRIPTION UNIT PRICE QTY AMOUNT

HDL-M/DLP04.1-48 DLP Modern Series Wall Panel EU with PPI 25700 2 51400

iFlex Series 3 Folder Smart Wall Panel EU,with LED Back


HDL-M/P03.2-48 lighting, and Engraving (Insert 18500 4 74000
Paper),

Jung 4 Button With Coupler 46654 2 93308

K4015 Motion sensor 4500 3 13500

Infrared Emitter, Supports 4 channel infrared interfaces,


totally can store up to 650 infrared
HDL-M/IRAC.1 18200 4 72800
codes, The control modes are ON/OFF control, Temperature
control, Cooling/Heating, Fan
DALI Master Actuator, can connect up to 64 DALI devices for
HDL-M/DALI.1 address assignment and management.also can be real-time 51600 1 51600
to detect the device fault, such as DALI fault,Lamp
6CH 2A Leading Edge Dimming Actuator, DIN-Rail
Mount,220V/110VAC (50/60Hz)
HDL-M/DL06.1 43800 2 87600
6channel 2A per Channel, Overheat and overload protection,
fuse for each channel on the top of module
4 Channel 10A Curtain Actuator: DIN-Rail
Mount,220V/110VAC(50/60Hz) 4channel 10A
HDL-M/W04.10.1 per Channel, fully abide by europe safety standandard for 36838 2 73676
the internal use of 10A high current
magnetic, 8 Relay inside

6136/APP-500 Busch Control Touch for Ipad/Andriod interface Module 98000 1 98000

HDL--M/P960.1 640Ma Power Supply 36789 1 36789

Protection device Surge Protection 40kA, 1P+N 2 Module 8500 1 8500

Ceiling Mount Motion and Lux Sensor,


logic block. The logic condition can be ANDOR logic input
DL-M/IS05.1 conditions can be the conditionof motion sensor, Lux, 14800 1 14800
external conditions.

EIB Bus Cable EIB Bus Cable 130 300 39000

SUB TOTAL 714973


After Discount @35% 464732.45
Programming Charges 69709.8675
GST @ 28% 130125.086
Grand Total 664567.4035

UBER | light.control.sound Hyderabad | Chennai | Bangalore


Quotation
Uber Project Lighting Private Limited
2nd Floor, Plot no 29, Road No 76, Jubilee Hills Date 01-09-2017
Hyderabad, Andhra Pradesh 500033 Validity 15 Days
Quote # 55
Prepared for Version # V2
M/s SSPC
Hyderabad

OPTION-2
BOARD ROOM SYSTEM( VC)
Product Code Image Name/Description Unit Price Qty Subtotal

TRUTOUCH New Line Newline X5 SERIES Interactive Display of 55 screen


343750 1 3,43,750
X5 TRUTOUCH. -High Definition resolution with PC In-built

TT-6516UB Newline X7 SERIES Interactive Display of 70 screen 6,56,250.00 -


TRUTOUCH. -High Definition resolution with PC In-built
1)TRUcast Mirroring Project up to 4 devices at once so
your whole team can broadcast their work and
collaborate.
2)No limited number of software downloads means
TRUCAST everyone in your company can participate. 53,000.00 1 53,000
3)Connect to Ethernet, your own WiFi or use TRUCASTs
independent, private WiFi network.
4)Platform independence gives your team freedom to use
their preference of Mac or PC

Mount Kit 8,000.00 1 8,000

Subtotal 4,04,750
Installation & Programming 30,000.00
GST 28% 1,13,330.00
TOTAL 5,48,080

AUDIO
Product Code Image Unit Price Qty Subtotal
850.00 16 13,600
SPEAKERS 6W CEILING SPEAKERS - BOSCH

16,000.00 1 16,000
AMPLIFIER AMPLIFIER 120W
Speaker cable need to be procured directly Subtotal 29,600
Installation & Programming 2,960.00
TOTAL 32,560

UBER | light.control.sound Hyderabad | Chennai | Bangalore


Quotation
Uber Project Lighting Private Limited
2nd Floor, Plot no 29, Road No 76, Jubilee Hills Date 01-09-2017
Hyderabad, Andhra Pradesh 500033 Validity 15 Days
Quote # 55
Prepared for Version # V2
M/s SSPC
Hyderabad

Surveillance
Product Code Image Name/Description Unit Price Qty Subtotal
Hikvision 3 megapixel Indoor cameras 6,824 4 27,296
8,687
DS-2CE16C2TIR 3 megapixel High Resolution Full HD1080p Video Output 4 34,748

DS-7616NI-E2 16 channel NVR 18,000 1 18,000


Power Supply Power Supply Unit (Upto 8 Cameras) 986 2 1,972
Hard disk 2tb hardisk 8,937 1 8,937
Subtotal 90,953
Installation & Programming 1,046
TOTAL 91,999

* Taxes: As applicable
* Delivery Terms: Within 6-8 Weeks from the date of Purchase order & release of advance payment
* Payment Terms : For Automation ,surveillance& Audio, 50% advance along with purchase order, 40% against delivery and 10%after
commission
* For TRU TOUCh INTERACTIVE DISPLAY 100% in advance
* Validity: 18 month from the supply & 24 months from the installation
* Drawings & System details to be provided within 7 days from the receipt of advance payment
* Detailed terms & conditions attached
* Stable Wifi across the site to be provided by the client
* Does not include Distribution Boards, Racks and other accessories. Will be supplied as per site requirement
* Stabilizer & UPS Mandatory @ site to be provided at client

UBER | light.control.sound Hyderabad | Chennai | Bangalore


AUTOMATION AUTOMATION AUTOMATION
LIGHTING CONTROL CURTAINS IRControl PANEL PANEL PANEL AUDIO SENSOR
AUTOMATION &
CONTROL PLAN DALI Phase CUT AC on/off & Motion sensors
Curtains KEYPAD KEYPAD KEYPAD ZONE
DIMMING Dimming ckts temp. control standalone

AREA LOCATIONS

First Level 1
1 Double Height Foyer 4 1 1
1
2 Waiting Lounge 3 1 1
3 Work Station 6 1 1 1
TOIET 2
4 Cabin-1 2 1
5 Cabin-2 2 1
6 Cabin-3 2 6 1
7 Meeting Room 2 1
Second Level 1
5 Director Lounge 4 6 1 3 1 1
6 Conference Room 2 1 1
7 Director Cabin 3 4 1 1
8 Buffer Space 4
34 6 10 9 2 4 3 4 3
Quotation
Uber Project Lighting Private Limited
2nd Floor, Plot no 29, Road No 76, Jubilee Hills
Hyderabad, Andhra Pradesh 500033

Terms & Conditions


Acceptance of any order by Uber Project Lighting Private limited (UPLPL) is expressly made conditional on Buyer's assent to the terms and conditions set forth herein.

1. Price & Taxes


1.1. All prices and discounts (or concessions) given in the quotation are part of a package offer and purchase of same products at a later date will not be eligible for similar discounts or concessions.
1.2. VAT, Service Tax and other taxes and duties that may be applicable shall be added to the Price except when they are expressly included in the Price.
1.3. Unless otherwise stated in the order all prices are ex-stock Hyderabad and the price quoted does not include freight or other delivery charges. All additional charges to be charged to the buyer.

2. Payment, Delivery & Service Terms:


2.1. Payment Terms:
* Payment Terms : For Automation ,surveillance& Audio, 50% advance along with purchase order, 40% against delivery and 10%after commission
* For TRU TOUCh INTERACTIVE DISPLAY 100% in advance
* Validity: 18 month from the supply & 24 months from the installation
* Drawings & System details to be provided within 7 days from the receipt of advance payment
* Detailed terms & conditions attached
* Stable Wifi across the site to be provided by the client
* Does not include Distribution Boards, Racks and other accessories. Will be supplied as per site requirement
* Stabilizer & UPS Mandatory @ site to be provided at client

3. Our Responsibility (Sellers Responsibility)


3.1. We will ensure that all materials UPLPL comply with safe building practices and are free from defects and that any work carried out is carried out with reasonable care and skill and to a reasonable standard.
3.2. Before starting any work we will carry out an inspection to make sure that all work quoted is appropriate and practicable.
3.3. If after our inspection any further work is necessary either because of alterations in design, specification or otherwise and this causes an increase in costs we will send you a further proposal giving details of the extra costs and will only proceed with the works once
your written acceptance has been received.
3.4. Subject to paragraphs 3.2 and 3.3 we will carry out the work in accordance with our proposal.
3.5. Our execution engineer will have regular visit to the site as per the visit schedule submitted or as agreed on previous visit.
3.6. Installation & Execution: Subject to the availability of the site, the installation and commissioning of products at your site will be completed within a period of 4-6 weeks (or as specified otherwise) from the date of site handover to UPLPL for installation.

4. Your Responsibility (Buyers Responsibility)


4.1. You will permit us during normal working hours to carry out an inspection and thereafter to undertake the works according to the schedule agreed upon.
4.2. You will remove all items necessary to allow us to commence the works and cover and protect all fixtures and fittings, which cannot be removed.
4.3. You will obtain all permissions and consents, (including if necessary planning permission) from landlords, Builders and others, which are required before the work can commence.
4.4. Where you are required to provide us with measurements or other information regarding third party equipment to be controlled from our devices, such measurements or information must be correct. If we rely on the measurements or information given when
preparing our proposal and such measurements or information are incorrect we reserve the right to increase the price to make good any errors or additional works required as a result.
4.5. The installation site and the entire electrical & electronic equipment proposed has to be protected from any surges arising due to over voltage by providing necessary Voltage Stabilizers and UPS as recommended. (This is under the scope of Client.)
4.6. Installation will begin only after all light fixtures are fixed and checked by electrical contractor and Voltage Stabilizers and UPS system as recommended is installed.
4.7. An additional resource (electrician & carpenter) is to be provided by the client during the period of installation for miscellaneous work at the site like
- Carpenter for fixing sensors/electronic locks/VDP's in window frame/door frame etc
4.8. All Carpentry, Civil & Electrical work is to be done by the clients Contractors. All Conducting and Cable laying works for cabling to be done by Client's Contractors.

4.9. Additional accessories like Mounting Racks, Distribution Boards, Cable & Wires, MCBs, Wall Boxes ubder the scope of the client unless specified in the work order/quotation. Necessary technical detail will be provided for Cable type/ DB size/ Rack Size/ MCB's etc
4.10. The Lighting Automation programming will begin only after all the light fixtures are fixed by the electrician. Any programming work that is sought before all light fixtures are fixed will be an additional charge to the client.
4.11. All lighting fixtures to be installed at the site need to be approved by UPLPL before the fixtures are mounted.
4.12. Once the lighting system is installed the type of light (or) load of light fixture should never be changed without prior approval from UPLPL, any failure of equipment due to change of lights will be directly charged to the client.
4.13. All equipment is to be protected from water leakages, high humidity & abnormally high temperatures. It is the responsibility of the client to take a clearance from UPLPL before installing other systems that could enable such adverse conditions near any of the
equipment sUPLPLied by UPLPL.

4.14. UPLPL Does not take the responsibility of any damage of its equipment due to other painting, carpentry, drilling and other civil works at the site. Once the product of delivered at the site, the safe keeping of all automation equipment is the responsibility of the client.

5. Outstation (i.e. outside Hyderabad):


5.1. All travel & lodging cost incurred by our site engineers will be charged to the client
5.2. All freight & courier charges from Hyderabad to site will be charged to the client

6. Warranty & Service


6.1. All Warranties & Guaranties will remain as per Equipment Manufacturers Terms & Conditions.
6.2. UPLPL will provide free service for the first one year after installation. Any service beyond this time is chargeable to the buyer on a per day basis. (Note: This does not include replacement of products out of warranty)
6.3. For continued service beyond the first year after Installation UPLPL offers Annual Maintenance Contracts which can be purchased separately.

You might also like