Professional Documents
Culture Documents
1 12
gate valve and coupling connection to drain
the water tank
1 inch hose of approved quality
with coupling connection to fill
1" inch coupling connection to fill the the wate tank
water tank, provide a similar connection
in the basement water supply line as appropriate
T/LL
1 12 inch canvas hose with coupling
T/LL connection for draining the water
Q = 0.5 L/sec @ H = 15 with pressure tank to outside, Total hose length = 50m
switch for automatic operation to be
connected to emergency electric power
source (one is stand by)
2500
Waste Water 2.5x2x1.5 (height) mxmxm bronze floot
Waste Water
Riser stainless steel water tank with steel valve
Riser
or equivalent support .water tank bottom
level +1.5m from basement level
2000 Key Plan
Client
FDRE PALACE ADMISTRATION
PANORAMIC
LIFT
GENERAL STORE Project Title & Address
f.f Granite T.
MEKELE PALACE
STAIRCASE
GAME/CINIMA RM.
GUEST HOUSE COMPLEX
f.f Granite T.
f.f Granite T.
EL. RM
Status
W-1 Water Supply
Final Design
Riser
BOILER/MACHINE RM.
f.f Granite T.
SERVICE STAIR Drawing Name
f.f Granite T.
UTILITY RM.
f.f Granite T. Head Of State House
18 18
17 17
MCH.RM SERVICE
LIFT
16
15
16
15
LEVEL- 0
Waste Water Waste Water
14 14
Riser
Riser
13
12
13
12
WATER SUPPLY LAYOUT
11 11
Adapter
Scale Project No. Date
10 10
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
HAYEMERO DAGNEW PPSNE-016
DWG. ID
SN- 101
LEGEND
............. P.P.R. for cold water
............. P.P.R. for hot water
............. Gate valve
............. One way valve
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
1 2 3 4 5 6 7 8 9 FW ............. Fire Water
Key Plan
F
BEV. ST.
W.C.
f.f Porcelain T.
f.f Granite T.
SB Consult
f.f Granite T.
E DAY STORE
&
f.f Granite T.
ABAY Architects
UTENSIL ST. HAIR DRESSER FOYER
f.f Granite T. f.f Granite T. f.f Granite T. LOBBY
f.f Granite T. Client
CORRIDOR
FDRE PALACE ADMISTRATION
f.f Granite T.
LOBBY To water feature
D f.f Granite T. PANORAMIC Project Title & Address
LIFT
COLD ST./FREEZ.
STORE
f.f Granite T.
LOCKER/CHANGING
f.f Granite T. MEKELE PALACE
f.f Granite T.
JAN. GUEST HOUSE COMPLEX
f.f Granite T.
SHOWER
CORRIDOR SAUNA
f.f Granite T. f.f Granite T.
EL. RM SHOWER Status
C W-1
LINEN ST.
Final Design
Water Supply f.f Granite T. STEAM
MAIN KITCHEN SERVICE STAIR Riser SECURITY BEDRM.
f.f Granite T. f.f Granite T. STAIRCASE f.f Granite T.
f.f Granite T.
f.f Granite T. Drawing Name
LAUNDRY
f.f Granite T.
SECURITY BEDRM. Head Of State Guest House
f.f Granite T.
MASSAGE RESTING
MCH.RM SERVICE
Waste Water LIFT Waste Water
LEVEL 1 FLOOR WATER SUPPLY LAYOUT
Riser Riser
12
B 11
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
HAYEMERO DAGNEW PPSNE-016
Checked by
LEVEL 1 FLOOR WATER SUPPLY WOREDE MELAKU PPSNE-09
LAYOUT SC,1:150 DWG. ID
SN- 102
LEGEND
............. P.P.R. for cold water
............. P.P.R. for hot water
............. Gate valve
1 2 3 4 5 6 7 8 9
............. One way valve
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
FW ............. Fire Water
RECEPTION PROTOCOL
SECURITY/ f.f Parquet T. f.f Parquet T.
Key Plan
MONITORING
f.f Granite T.
DINING ROOM
f.f Parquet T.
SB Consult
&
PANORAMIC SALON
ABAY Architects
D LIFT f.f Parquet T.
Client
FDRE PALACE ADMISTRATION
MCH.RM SERVICE 17 17
Drawing Name
Waste Water
16 16
LIFT 15 15
Waste Water
Riser 14 14
Riser
13
12
13
12
Head Of State Guest House
B 11 11
10 10
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
LEVEL 2 FLOOR WATER SUPPLY HAYEMERO DAGNEW PPSNE-016
DWG. ID
SN- 103
LEGEND
............. P.P.R. for cold water
............. P.P.R. for hot water
............. Gate valve
............. One way valve
@HL ............. At higher level
B T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
1 2 3 4 5 6 7 8 9
F/A ............. From above
T/A ............. To above
T/B ............. To below
FW ............. Fire Water
BALCONY
BALCONY
DRESSING DRESSING
Key Plan
MASTER BEDROOM-1 MASTER BEDROOM-2
wc f.f Parquet T. f.f Parquet T.
BATH RM.
f.f Porcelain T.
CLOSET CLOSET
f.f Parquet T. f.f Parquet T.
1. Final Design Issued March 24,2016
No. Description/ Reference Date
E
SB Consult
CORRIDOR
OFFICE
&
f.f Granite T.
f.f Parquet T.
ABAY Architects
@HL
BALCONY
PANORAMIC Client
D PRIVATE LIFT
LIVING/DINING FDRE PALACE ADMISTRATION
BALCONY
f.f Parquet T.
STORE
Project Title & Address
BEDROOM-2
f.f Parquet T.
MEKELE PALACE
GUEST HOUSE COMPLEX
EL. RM W-1
@HL
C
OPEN DOWN
Status
Water Supply
SERVICE STAIR STAIR C.
f.f Granite T.
Riser
f.f Granite T. Final Design
16
17
16
Head Of State Guest House
LIFT 15 15
14 14
13 13
12 12
B 11
10
11
10
LEVEL 3 FLOOR WATER SUPPLY LAYOUT
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
LEVEL 3 FLOOR WATER SUPPLY HAYEMERO DAGNEW PPSNE-016
DWG. ID
SN- 104
LEGEND
WASTE WATER RISER DIAGRAM ............. P.P.R. for cold water
SC.1:50 ............. P.P.R. for hot water
............. One way valve
............. Gate valve
H.W. ............. Hand wash basin
W.C. ............. Low flush water closet
S.H. ............ Shower
K.S. ............. Kitchen sink
B.T.............. Bathtap
H.W. J.A. ............. Jacuzzi
W1 ............. Water Riser
W-1
Key Plan
SB Consult
&
ABAY Architects
Client
FDRE PALACE ADMISTRATION
MEKELE PALACE
GUEST HOUSE COMPLEX
Status
Final Design
Drawing Name
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
HAYEMERO DAGNEW PPSNE-016
Checked by
WOREDE MELAKU PPSNE-09
DWG. ID
SN- 110
LEGEND
............. PVC waste pipe
............. PVC vent pipe
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
1 2 3 4 5 6 7 8 9
G
UPVC PIPE
2570
F 2500
Waste Water 600 2100 F.W.G Waste Water
Riser 355 Riser
2900
2500
F.W.G 600 SAFE HEAVEN STORE Key Plan
600
1. Final Design Issued March 24,2016
SAFE HEAVEN
1430
STORE STORE Description/ Reference
SAFE HEAVEN No. Date
E
SB Consult
F.W.G
&
UPVCPIPE HALL
f.f Granite T.
ABAY Architects
@HL F.W.G Client
PANORAMIC
D LIFT
FDRE PALACE ADMISTRATION
GENERAL STORE
f.f Granite T. UPVCPIPE
Project Title & Address
STAIRCASE
f.f Granite T. GAME/CINIMA RM. MEKELE PALACE
f.f Granite T.
GUEST HOUSE COMPLEX
EL. RM
BOILER/MACHINE RM. Status
C f.f Granite T.
Water Supply Final Design
Riser
SERVICE STAIR
f.f Granite T.
Drawing Name
UTILITY RM.
Head Of State Guest House
18 18
17 17
MCH.RM SERVICE
LEVEL 0 FLOOR WASTE WATER
16 16
Waste Water
14 14
Riser
13
12
13
12
Riser
DRAINAGE LAYOUT
B 11 11
10 10
Design Team
HAYEMERO DAGNEW PPSNE-016
DWG. ID
SN- 120
LEGEND
............. PVC waste pipe
............. PVC vent pipe
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
1 2 3 4 5 6 7 8 9
& T/B
& T/B Key Plan
F
DRAINAGE LAYOUT
& T/A
v3
& T/B Scale Project No. Date
& T/B
1:150 Jan 19,2016
Drawn by
M.H. M.H. M.H. M.H. M.H. BIZUAYEHU TAMERAT CEA 1565
Design Team
DWG. ID
SN- 121
LEGEND
............. PVC waste pipe
1 2 3 4 5 6 7 8 9 ............. PVC vent pipe
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
B F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
SB Consult
DINING ROOM
f.f Parquet T. &
ABAY Architects
PANORAMIC SALON Client
D LIFT f.f Parquet T.
FDRE PALACE ADMISTRATION
& T/B
S4
Project Title & Address
& T/B S3
Head Of State Guest House
16 16
LIFT
Waste Water
Riser & T/B
S5 15 15
B
12
11
12
11
LEVEL 2 FLOOR WASTE WATER
10 10
DRAINAGE LAYOUT
& T/A v3
Scale Project No. Date
1:150 Jan 19,2016
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
HAYEMERO DAGNEW PPSNE-016
BALCONY
BALCONY
S1 v2
F
Key Plan
S2
DRESSING DRESSING
MASTER BEDROOM-1 MASTER BEDROOM-2
wc f.f Parquet T. f.f Parquet T.
BATH RM.
f.f Porcelain T.
1. Final Design Issued March 24,2016
CLOSET CLOSET
f.f Parquet T. f.f Parquet T. No. Description/ Reference Date
F.W.G
F.W.G
E
SB Consult
&
CORRIDOR
f.f Granite T.
OFFICE
f.f Parquet T. ABAY Architects
Client
BALCONY S4
PANORAMIC FDRE PALACE ADMISTRATION
D PRIVATE LIFT
LIVING/DINING
BALCONY
f.f Parquet T.
Project Title & Address
STORE
BEDROOM-2
f.f Parquet T.
MEKELE PALACE
GUEST HOUSE COMPLEX
EL. RM
C
OPEN DOWN
Status
Water Supply
SERVICE STAIR STAIR C.
f.f Granite T.
Riser
f.f Granite T. Final Design
T/HL
PRIVATE KITCHEN
f.f Granite T. BEDROOM-1 Drawing Name
18 18
f.f Parquet T.
MCH.RM SERVICE
17
16
17
16
Head Of State Guest House
LIFT 15
14
15
14
v3
13
12
13
12
S3 LEVEL 3 FLOOR WASTE WATER
B 11
10
11
10 DRAINAGE LAYOUT
S5
Scale Project No. Date
1:150 Jan 19,2016
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Design Team
HAYEMERO DAGNEW PPSNE-016
DWG. ID
SN- 123
1 2 3 4 5 6 7 8 9
S1 S2
S=2%
S=2 1. Final Design Issued March 24,2016
%
No. Description/ Reference Date
E
SB Consult
S=2%
S=2% &
& T/B
& T/B ABAY Architects
S4 Client
D
FDRE PALACE ADMISTRATION
MEKELE PALACE
GUEST HOUSE COMPLEX
C
Status
Final Design
Drawing Name
Drawn by
BIZUAYEHU TAMERAT CEA 1565
Checked by
WOREDE MELAKU PPSNE-09
DWG. ID
SN- 124
LEGEND
............. PVC waste pipe
............. PVC vent pipe
H.W. ............. Hand wash basin
W.C. ............. Low flush water closet
S.H. ............ Shower
K.S. ............. Kitchen sink
F.D.............. Floor drin
B.T. ............. Bathtap
J.A. ............. Jacuzzi
C.O. ............. clean out
WASTE WATER RISER DIAGRAM F.C.O.............. floor clean out
SC.1:50 S4 S1 ............. Waste water riser
v3 S3 H.W.
@HL @HL
@HL W.C.
SECOND
A FLOOR
H.W. W.C.
@HL FIRST
H.W. H.W. FLOOR
SECOND
@HL FLOOR
H.W. V.P.
SB Consult
W.C.
&
S.H.
H.W.
TO MH
SECOND
FLOOR
W.C.
H.W.
TO MH
v2
F.D.
GROUND
FLOOR
TO MH
ABAY Architects
GROUND @HL
GROUND FLOOR
FLOOR
Client
@HL
FIRST
@HL FLOOR
Project Title & Address
SECOND W.C. S5
FLOOR
W.C. H.W.
W.C. W.C.
H.W.
H.W.
W.C.
K.S.
MEKELE PALACE
SECOND
@HL
H.W.
F.W.G
FLOOR
GUEST HOUSE COMPLEX
TO MH
GROUND
J.A. FLOOR
F.W.G
@HL
FIRST K.S.
S.H. FLOOR TO MH
F.D.
Status
BASEMENT
FIRST
FLOOR Final Design
FLOOR
@HL
Drawn by
W.C.
Design Team
HAYEMERO DAGNEW PPSNE-016
Checked by
WOREDE MELAKU PPSNE-09
DWG. ID
SN- 130