Jazan Refinery

and Terminal Project


Package EPC - 14

Activity:MV/LV CABLE Rev.


TESTING/MEGERING

Location: Prepared by: LALMANI BHUSAL

Description
Step No. Hazard Cause Control Measure/Preventive Measure
of Task Step
1.1.1 unfamiliar
1.1.1.1.All personnel prior to site deployment must attend the required Safety
of the worksite
Induction
1.1.2 unaware
1.1 Slips/Trips 1.1.1.2 Prior to start the activity a work permit must be secure, and ensure a
of the task /
Toolbox talk was been conducted to aware all work force for the target activity to
Site/Area work
be done,
preparation assignment
1 (Materials, 1.2.1.1 Ensure all workers are guided by the Supervisor, F/M or Senior workers i
Tools & n their daily activity
Equipment) 1.2.1 1.2.1.2 Arrangement of Materials, Tools & equipments must be in place with bar
1.2 Obstruction Unfamiliar of ricade and equipped with signage.
the work place 1.2.1.3
Housekeeping in work place. Provide adequate PPE. Supervising properly for wo
rk site
2.1.Location 2.1.1.1 Insulation resistance testing should be done by qualified personnel,
,leakage and familiar with both insulation resistance testing and with the safe operation of the
Test 2.1 . Before Making
power test equipment. Consult the insulation resistance test equipment manual or
Measurements
Cables shutdowns manufacturer for insulation resistance testing procedures and recommended
2 between safety guidelines. This document is intended to be a guideline only.
Cores 2.2.1.1 A safe work practice shall be implemented to reduce the possibilities of
and Earth accident / incident caused by lack of communication, Personal Protective
2.2 Nips, Cuts and 2.2.1 Body Equipment (PPE) shall be worn at all times
abrasion injury
2.2.1.2 Provide adequate PPE, Supervising the work properly, PPE Training,
Comply Work Permit Procedure

pg. 1
JRTP 14 MIDONG E&C JSA #00 MV/LV CABLE TESTING (ELECTRICAL)
3.1.1 gloves
3.1.2 Ensure 3.1.1.Wear the proper lather gloves
Megger the 3.1 live conductors megger 3.1.2 Current that starts out high and drops after the insulation has been charged t
3
cables 3.2 Capacitance: discharge to o full voltage (much like water flow in a garden hose when you first turn on the s
earth pigot).

Housekeepi 5.1.1.1 Always conduct good housekeeping prior and after work on the area, to
5 5.1 Slips/Trips maintain good and proper cleanliness and arrangement of materials.
ng

pg. 2
JRTP 14 MIDONG E&C JSA #00 MV/LV CABLE TESTING (ELECTRICAL)