Mechanical Design I
Meeting Details
Date: 6-Sep-16 Title:
Time: 2.00 PM - 4.00 PM Chairperson: MOHD ASYRAAF BIN JEFRY FAIZAL
Venue: B2-A4-2 Group Name: EMD5M4A
ATTENDANCE
1 Forming Group 1 Deciding the group leader of this class team. Distribute the division among all 1 Every division need to study all about their part
the classmates and decide the division leader. deeply to run task smoothly.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 20/09/2016 (TUESDAY), any changes will be informed later.
LEGEND :
G Y R
_______________________ ____________________________
Group Leader Lecturer
PIC Remarks
Status Due Date Expand Date
All the team 20 / 2 / 2016
members.
Y
MINUTES OF MEETING
Mechanical Design I
Meeting Details
Date: 20/09/2016 Title:
Time: 2.00 PM - 4.00 PM Chairperson: MOHD YUSRI BIN ABU HARIS
Venue: B2-A4-2 Group Name: EMD5M4A
ATTENDANCE
1 Study about power train and drive 1 Introduction to all the parts involve in power train system. 1 All members study about every part involved in
train system clearly. power train system and specification of the given
engine was known well.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 27/09/2016 (TUESDAY), any changes will be informed later.
LEGEND :
_______________________ ____________________________
Group Leader Lecturer
PIC Remarks
Status Due Date Expand Date
All the team 27 / 2 / 2016
members.
Y
MINUTES OF MEETING
Mechanical Design I
Meeting Details
Date: 27/09/2016 Title:
Time: 2.00 PM - 4.00 PM Chairperson: MOHD YUSRI BIN ABU HARIS
Venue: B2-A4-2 Group Name: EMD5M4A
ATTENDANCE
2 Dividing every small part in drive 1 We are deciding to divide the part in power train system into 5, which is 1 Every members are taking part to get more
train system among our group engine,spocket, chain, diffential and gear. knowledge about theirs part.
members.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 04/10/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 Get dimension about every small 1 We are still in the process of getting and measuring the accurate dimensions 1 Most dimension are taken by refering to the actual
part in power train system. of some parts. car from the previous car which belongs to senior.
Sample of engine used are shown in workshop.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 11/10/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 Discussion about the arrangement 1 Still cannot proceed on the arrangement because some problem at chasis 1 Waiting for chasis department to finalize their chasis
of every part in power train system. department. Actual dimenson of chasis still did not finalize. So, we cannot design.
make the rough sketching of arrangement in power train system.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 18/10/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 Last week issue : Make a 1 Still cannot be made due to the problem at chasis design. 1 Waiting for the chasis department.
discussion about the arrangement
of every part in power train system.
3 Discuss the calculation needed in 1 Study about all the calcuation needed in power train system such as 1 All team members need to study about all the
power train system. calculation at spocket to get the actual size of its. calculation needed.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 25/10/2016 (TUESDAY), any changes will be informed later.
LEGEND :
G CLOSED Y WORK IN PROGRESS / OPEN R NOT YET STARTED / HIGH RISK
_______________________ ____________________________
Group Leader Lecturer
PIC Remarks
Status Due Date Expand Date
All the team
members.
G
Y
MINUTES OF MEETING
Mechanical Design I
Meeting Details
Date: 25/10/2016 Title:
Time: 2.00 PM - 4.00 PM Chairperson: MOHD YUSRI BIN ABU HARIS
Venue: B2-A4-2 Group Name: EMD5M4A
ATTENDANCE
2 Last week issue : Discuss the 2 Need more knowledge to make the calculation because we have not learn 1 All members are still in learning process to calculate
calculation needed in power train about this topic in our lecture class yet. the important aspect in power train system.
system.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 01/11/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 Start to draw every part in CATIA 1 Start on designing each part using CATIA.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 08/11/2016 (TUESDAY), any changes will be informed later.
LEGEND :
_______________________ ____________________________
Group Leader Lecturer
PIC Remarks
Status Due Date Expand Date
All the team
members.
G
8/11/2016
2 All team member learn and get to 1 Doing the research on internet regarding calculation needed in every single 1 Learn first what the important parameter need in all
know important parameter that part of power train system. the calculation.
involve in calculation
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 15/11/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 Team member doing the research 1 It is important to make analysis on the system. 1 Start get to know the reason on every decision.
on every size or decision made on
the important part
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 22/11/2016 (TUESDAY), any changes will be informed later.
LEGEND :
22/11/2016
Y
22/11/2016
Y
MINUTES OF MEETING
Mechanical Design I
Meeting Details
Date: 22-Nov-16 Title:
Time: 2.00 PM - 4.00 PM Chairperson: MOHD YUSRI BIN ABU HARIS
Venue: B2-A4-2 Group Name: EMD5M4A
ATTENDANCE
2 Discuss about the arrangement of 1 Power system will be located on the back of the car. Unfortunately, we almost 1 Discuss the arrangment of every part in the back
every part in the chasis. forget to design the exhaust of this system. Team members need to discuss side of the car. Still in progress because exhaust is
and design the exhaust system as soon as possible. still in designing process.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 06/12/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 Dividing task to complete the 1 Every team member need to complete all the parameters needed in the report.
division report.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 13/12/2016 (TUESDAY), any changes will be informed later.
LEGEND :
13/12/2016 20/12/2016
Y
MINUTES OF MEETING
Mechanical Design I
Meeting Details
Date: 13-Dec-16 Title:
Time: 2.00 PM - 4.00 PM Chairperson: MOHD YUSRI BIN ABU HARIS
Venue: B2-A4-2 Group Name: EMD5M4A
ATTENDANCE
2 All the team member give a full commitment to finish up the report in very short
time. Every analysis have been done and already shown in the report
2 Assembly all te component into a 1 All the components were assemble to the chasis by following the arrangement 1 All the divisions also assemble their part in the
chasis. that have been discuss last week. chassis.
NOTE:
NEXT FOLLOW-UP MEETING WILL BE ON 20/12/2016 (TUESDAY), any changes will be informed later.
LEGEND :
2 All the important things that need Logbook, report and slide presentation was
to evaluate on the presentation day completely done.
was completely done
NOTE:
Get ready for presentation day on 24/12/2016 (Saturday)