You are on page 1of 35

PERHITUNGAN VOLUME PEKERJAAN

DIMENSION DESCRIPTION
(1) (2) (3)
I. DINDING PARTISI
1.1 Rangka Kayu 5/7
1
41.3

800
2
82.6 m 650

Rangka kayu

2300
1200

total = 33.04 batang


Pembulatan = 40 batang
1.2 Tripleks (1.2 x 2.4)
1 6850

15.0305 Tripleks
250

4
60.122 m2

Tripleks
2300

5850

total = 20.87569 lembar


Pembulatan = 30 Lembar
1.3 Kaca polos 5 mm
1
13
800

2
26 bh
650

total = 26 buah
1.4 Pasir

total = 2 Pickup
1.5 Semen

total = 10 Sak
1.6 Plamir

total = 8 galon
1.7 Cat Dinding

total = 8 galon
1.8 Cat Kayu

total = 10 Kaleng
1.9 Plitur

total = 15 Kaleng
1.10 Paku beton 7 cm

total = 2 kg
1.11 Paku Tripleks 2 cm

total = 2 kg
1.12 Paku Usuk 6 cm

total = 3 kg
1.13 Rol

total = 4 bh
1.14 Kappi
390
total = 4 bh
1.15 Kuas

total = 4 bh
II. INSTALASI AIR
2.1. Keramik (20x25)
1650

1
3.19
3.5
11.165 m2

1150
total = 223.3 bh 14.886667
Pembulatan = 16 kotak
2.2. Pipa 3/4"
1 8
2 16 m

total = 16 m
Pembulatan = 6 batang
2.3. Kran 3/4"
1 1
2 2 bh

total = 2 bh
III. INSTALASI MEKANIKAL
3.1. Blower
1
ON

ka kayu

6850

Tripleks

Tripleks

5850
800

970
390

1150
kotak
ANALISA HARGA SATUAN PEKERJAAN
(AHSP)
Harga Satuan
No Uraian Pekerjaan Sat. Koefisien
(Rp.)

I PEKERJAAN PERSIAPAN

1 1 m Pembersihan Lapangan
Mandor O/H 0.0025 60000
Pekerja O/H 0.05 27000

Harga Satuan Pekerjaan

2 1 m' Pas. Bouwplank dan pengukuran


Kayu meranti (papan 2/20) m3 0.0042 1900000
Kayu meranti (usuk 4/6) m3 0.0039 1900000
Paku kg 0.02 10000
Mandor O/H 0.0295 60000
Tukang Kayu O/H 0.005 40000
Pekerja O/H 0.1 27000

Harga Satuan Pekerjaan

II PEKERJAAN STRUKTUR

1 Pekerjaan Pondasi
a 1 m Galian Tanah Pondasi
Mandor O/H 0.025 60000
Pekerja O/H 0.75 27000

Harga Satuan Pekerjaan

b 1 m Urugan pasir bawah pondasi


Pasir urug m3 1.2 151047
Mandor O/H 0.01 60000
Pekerja terampil O/H 0.3 35000

Harga Satuan Pekerjaan

c 1m Urugan Sirtu
Sirtu m3 1.2 151047
Mandor O/H 0.01 60000
Pekerja terampil O/H 0.3 35000

Harga Satuan Pekerjaan

d 1 m Anstampeng
Batu Kali pecah 15/20 cm m3 1.2 100000
Mandor O/H 0.0213 60000
Kepala Tukang Batu O/H 0.0188 50000
Tukang batu O/H 0.1875 40000
Pekerja O/H 0.4375 27000
Harga Satuan Pekerjaan

e 1 m Pasangan Pondasi batu kali


Semen PC ( Portland Cement ) 50 kg zak 2.8612 53000
Pasir Pasang m3 0.4841 175000
Batu Kali Pecah 15/20 cm m3 1.1 100000
Mandor O/H 0.075 60000
Kepala Tukang Batu O/H 0.06 50000
Tukang batu O/H 0.6 40000
Pekerja O/H 1.5 27000

Harga Satuan Pekerjaan

2 Pekerjaan Beton
a 1 m3 Beton 1 PC : 2 Psr : 3 Krl
Pasir cor / Beton m3 0.545 175000
Semen PC ( Portland Cement ) 50 kg zak 5.9946 53000
Batu pecah mesin 1/2 cm m3 0.65 253333
Mandor O.H 0.162 60000
Tukang Batu O.H 0.324 40000
Pekerja O.H 1.945 27000

Harga Satuan Pekerjaan

b 1 kg Pembesihan
Besi Beton Polos kg 1.125 6596
Kawat ikat beton ( bendrat) kg 0.0204 9200
Mandor O.H 0.005 60000
Kepala Tukang Besi O.H 0.005 50000
Tukang Besi O.H 0.005 40000
Pekerja O.H 0.15 27000

Harga Satuan Pekerjaan

c 1 m2 Bekisting
Paku kg 0.4 10000
Kayu Meranti m3 0.04 1900000
Mandor O.H 0.01 60000
Kepala Tukang Kayu O.H 0.05 50000
Tukang Kayu O.H 0.5 40000
Pekerja O.H 0.2 27000

Harga Satuan Pekerjaan

III PEKERJAAN ARSITEKTUR


1 Pekerjaan Atap
a 1 m2 Kuda-Kuda
Kayu Meranti ( balok 8/12 cm ) m3 1.1 5100000
Mandor O.H 0.3 60000
Kepala Tukang Kayu O.H 2.7 50000
Tukang Kayu O.H 18 40000
Pekerja O.H 6 27000

Harga Satuan Pekerjaan

b 1 m3 Gording 6/12
Kayu Meranti ( balok 6/12 cm ) m3 1.1 1900000
Paku Reng kg 0.2 10000
Mandor O.H 0.12 60000
Kepala Tukang Kayu O.H 0.72 50000
Tukang Kayu O.H 7.2 40000
Pekerja O.H 2.4 27000

Harga Satuan Pekerjaan

c 1 m2 Usuk 5/7
Kayu meranti usuk m3 0.0108 1900000
Paku kg 0.2 10000
Mandor O.H 0.1 60000
Kepala Tukang Kayu O.H 0.01 50000
Tukang Kayu O.H 0.1 40000
Pekerja O.H 0.1 27000

Harga Satuan Pekerjaan

d 1 m2 Reng 2/3
Kayu meranti usuk m3 0.0039 1900000
Paku kg 0.2 10000
Mandor O.H 0.1 60000
Kepala Tukang Kayu O.H 0.01 50000
Tukang Kayu O.H 0.1 40000
Pekerja O.H 0.1 27000

Harga Satuan Pekerjaan

e 1 m2 Genteng Karang Pilang


Genteng Kr. Pilang / wisma buah 20 5000
Mandor O.H 0.008 60000
Kepala Tukang Kayu O.H 0.008 50000
Tukang Kayu O.H 0.075 40000
Pekerja O.H 0.15 27000

Harga Satuan Pekerjaan

f 1 m' Lisplank 3/25


kayu meranti papan m3 0.0108 1900000
Paku reng kg 0.05 16200
Mandor O.H 0.005 60000
Kepala tukang kayu O.H 0.022 50000
Tukang kayu O.H 0.22 40000
Pekerja O.H 0.11 27000

Harga Satuan Pekerjaan

g 1 m' Jurai / wuwungan


Semen PC ( portland Cement ) 50 kg zak 0.237 53000
Pasir pasang m3 0.0323 175000
Genteng wuwung kr. Pilang / wisma buah 3 2750
Mandor O.H 0.02 60000
Kepala Tukang kayu O.H 0.02 50000
Tukang kayu O.H 0.2 40000
Pekerja O.H 0.4 27000
Harga Satuan Pekerjaan

2 Pekerjaan Plafond
a 1 m2 Pemasangan Plafond Eternit Rangka Kayu meranti
Kayu meranti ( Balok 5/7 ) m3 0.0116 2900000
Eternit Gresik ( 1 x 1 m ) m2 1.00 17500
Paku triplek / eternit kg 0.0324 17500
Paku kg 0.0308 16200
Mandor O.H 0.0058 60000
Kepala Tukang Kayu O.H 0.0346 50000
Tukang Kayu O.H 0.3465 40000
Pekerja O.H 0.117 27000

Harga Satuan Pekerjaan

b 1 m2 Pemasangan Plafond Gypsum (tanpa rangka)


Gypsum Tebal 9 mm uk. 1,2 x 2,4 m lembar 0.3819 60000
Paku kg 0.0486 16200
Mandor O.H 0.0024 60000
Kepala Tukang Kayu O.H 0.0144 50000
Tukang Kayu O.H 0.1444 40000
Pekerja O.H 0.0488 27000

Harga Satuan Pekerjaan

3 Pekerjaan Pasangan/Dinding
a 1 m2 Pemasangan Batu Merah 1Pc:5Ps
Semen PC (Portland cement ) 50 kg zak 0.1955 53000
Pasir Pasang m3 0.0474 175000
Batu Bata merah uk. 23x10,5x5,5 cm buah 52 475
Mandor O.H 0.0168 60000
kepala Tukang Batu O.H 0.0126 50000
Tukang Batu O.H 0.126 40000
pekerja O.H 0.378 27000

Harga Satuan Pekerjaan

b 1 m2 Pemasangan Batu Merah 1Pc:3Ps


Semen PC (Portland cement ) 50 kg zak 0.2903 53000
Pasir Pasang m3 0.0396 175000
Batu Bata merah uk. 23x10,5x5,5 cm buah 52 475
Mandor O.H 0.0236 60000
kepala Tukang Batu O.H 0.0158 50000
Tukang Batu O.H 0.1575 40000
pekerja O.H 0.4725 27000

Harga Satuan Pekerjaan

4 Pekerjaan Plesteran
a 1 m2 Plesteran Halus 1Pc:2Ps tebal 1 cm
Semen PC (Portland Cement ) 50 kg zak 0.1251 53000
Pasir pasang m3 0.0119 175000
Mandor O.H 0.01 60000
Kepala Tukang Batu O.H 0.015 50000
Tukang Batu O.H 0.15 40000
Pekerja O.H 0.2 27000

Harga Satuan Pekerjaan

b 1 m2 Plesteran Halus 1Pc:4Ps tebal 1,5 cm


Semen PC (Portland Cement ) 50 kg zak 0.1145 53000
Pasir pasang m3 0.017 175000
Mandor O.H 0.01 60000
Kepala Tukang Batu O.H 0.015 50000
Tukang Batu O.H 0.15 40000
Pekerja O.H 0.2 27000

Harga Satuan Pekerjaan

b 1 m2 Pekerjaan Acian
Semen PC (Portland Cement ) 50 kg zak 0.065 53000
Mandor O.H 0.01 60000
Kepala Tukang Batu O.H 0.01 50000
Tukang Batu O.H 0.1 40000
pekerja O.H 0.2 27000

Harga Satuan Pekerjaan

5 Pekerjaan Lantai
a 1 m3 Urugan Pasir Bawah Lantai
Tanah Urug m3 1.2 120000
Mandor O.H 0.01 60000
Pekerja terampil O.H 0.3 30000
Sewa Alat Bantu ( 1 set @ 3 alat ) jam 0.0213 1500

b 1 m3 Rabat Lantai Kerja 1Pc:3Ps:6Kr


Semen PC ( Portland Cement ) 50 kg zak 3.7257 53000
Pasir Cor m3 0.5081 175000
Batu Pecah 2/3 cm m3 1.0161 225000
Mandor O.H 0.08 60000
Kepala Tukang batu O.H 0.025 50000
Tukang Batu O.H 0.25 40000
Pekerja Terampil O.H 1.65 30000

c Pasangan Keramik
1 m2 Keramik Lantai 30x30
Semen PC (Portland Cement ) 50 kg zak 0.02 53000
Cor Nat AM kg 0.2 10500
Pasir Pasang m3 0.01 175000
Keramik Asia Tile 30 x 30 ( motif ) m2 0.99 32000
Mandor O.H 0.025 60000
Kepala Tukang batu O.H 0.025 50000
Tukang Batu O.H 0.25 40000
pekerja O.H 0.5 27000

Harga Satuan Pekerjaan


1 m2 Keramik Lantai 20x20
Semen PC (Portland Cement ) 50 kg zak 0.02 53000
Cor Nat AM kg 0.2 10500
Pasir Pasang m3 0.032 175000
Keramik Asia Tile 20 x 20 cm m2 1 34500
Mandor O.H 0.025 60000
Kepala Tukang batu O.H 0.025 50000
Tukang Batu O.H 0.25 40000
pekerja O.H 0.5 27000

Harga Satuan Pekerjaan

1 m2 Keramik Dinding 20x20


Semen PC (Portland Cement ) 50 kg zak 0.022 53000
Cor Nat AM kg 0.0138 10500
Pasir Pasang m3 0.022 175000
Keramik Asia Tile 20 x 20 cm m2 1.00 34500
Mandor O.H 0.03125 60000
Kepala Tukang batu O.H 0.03125 50000
Tukang Batu O.H 0.3125 40000
pekerja O.H 0.625 27000

Harga Satuan Pekerjaan

6 Pekerjaan Pintu & Jendela


a Pekerjaan Kusen Pintu dan Jendela
1 m3 Kusen Pintu Double PJ 1
Kayu Jati ( balok 6/15 cm ) m3 1.1 11805100
Mandor O.H 0.3 60000
Kepala Tukang Kayu O.H 2 50000
Tukang Kayu O.H 20 40000
Pekerja O.H 6 27000

Harga Satuan Pekerjaan

1 m3 Kusen Pintu Single (PJ 2)


Kayu Jati ( balok 6/15 cm ) m3 1.1 11805100
Mandor O.H 0.3 60000
Kepala Tukang Kayu O.H 2 50000
Tukang Kayu O.H 20 40000
Pekerja O.H 6 27000

Harga Satuan Pekerjaan

b Pekerjaan Daun Pintu dan Jendela


1 m2 Daun Pintu Jati Double
Kayu Jati Papan Klas II m3 0.036 11350500
Sekrup buah 25 455
Mandor O.H 0.03 60000
Kepala Tukang Kayu O.H 0.2 50000
Tukang Kayu O.H 2 40000
Pekerja O.H 0.6 27000

Harga Satuan Pekerjaan

1 m2 Daun Pintu Jati Single


Kayu Jati Papan Klas II m3 0.036 11350500
Sekrup buah 25 455
Mandor O.H 0.03 60000
Kepala Tukang Kayu O.H 0.2 50000
Tukang Kayu O.H 2 40000
Pekerja O.H 0.6 27000

Harga Satuan Pekerjaan

1 m2 Daun Pintu Taekwood


Kayu Kamper ( slimar ) m3 0.0196 7500000
Lem kg 0.3 8350
Paku kg 0.3 16200
Teakwood uk. 110 x 210 x 4 mm lembar 1 94640
Mandor O.H 0.03 60000
Kepala Tukang Kayu O.H 0.2 50000
Tukang Kayu O.H 2 40000
Pekerja O.H 0.6 27000

Harga Satuan Pekerjaan

1 m2 Jendela
Kayu Jati Papan Klas II m3 0.035 11350500
Kaca Polos Tebal 5 cm m2 1 85000
Paku kg 0.1 16200
Mandor O.H 0.04 60000
Kepala Tukang Kayu O.H 0.2 50000
Tukang Kayu O.H 2 40000
Pekerja O.H 0.8 27000

Harga Satuan Pekerjaan

c Pekerjaan Kunci
1 buah Kunci 2x putar (untuk Pintu Double)
Kunci tanam besar 2x putar ( kuningan ) buah 1 79500
Tukang Kayu O.H 0.36 40000
Pekerja O.H 0.15 27000

Harga Satuan Pekerjaan

1 buah Kunci 2x putar (untuk Pintu Single)


Kunci tanam besar 2x putar ( kuningan ) buah 1 79500
Tukang Kayu O.H 0.36 40000
Pekerja O.H 0.15 27000

Harga Satuan Pekerjaan

1 buah Engsel Pintu


Engsel Kuningan ( utk pintu ) buah 1 35200
Tukang Kayu O.H 0.14 40000
Pekerja O.H 0.08 27000

Harga Satuan Pekerjaan

1 buah Engsel Jendela


Engsel Kuningan buah 1 27100
Tukang Kayu O.H 0.14 40000
Pekerja O.H 0.08 27000

Harga Satuan Pekerjaan

1 buah Grendel
grendel panjang buah 1 17850
Tukang Kayu O.H 0.12 40000
Pekerja O.H 0.06 27000

Harga Satuan Pekerjaan

IV PEKERJAAN MECHANICAL & ELECTRICAL


1 Instalasi Listrik
a 1 Titik stop kontak
Stop kontak ( broco ) buah 1 21000
Kabel NYA 500 volt 2x1,5 mm2 m1 10 5500
Pipa pralon 5/8 ljr 1 4800
T Doos PVC buah 1 1700
Kepala tukang listrik O.H 0.05 50000
Tukang listrik O.H 0.2 40000
Pekerja terampil O.H 0.001 35000

Harga Satuan Pekerjaan

b 1 Titik Lampu
Isolator buah 4 700
Kabel NYA 500 volt 2x1,5 mm2 m1 15 5500
Pipa pralon 5/8 ljr 1 4800
T Doos PVC buah 1 1700
Lass doof buah 6 250
Fitting Plafond buah 1 11310
Kepala tukang listrik O.H 0.05 50000
Tukang listrik O.H 0.5 40000
Pekerja terampil O.H 0.3 35000

Harga Satuan Pekerjaan

c 1 Titik Saklar Tunggal


Saklar tunggal Broco buah 1 16100
Kepala tukang listrik 0.H 0.05 50000
Tukang listrik 0.H 0.2 40000
Pekerja terampil 0.H 0.001 35000

Harga Satuan Pekerjaan

d 1 Titik Saklar Ganda


Saklar ganda Broco buah 1 32300
Kepala tukang listrik 0.H 0.05 50000
Tukang listrik 0.H 0.2 40000
Pekerja terampil 0.H 0.001 35000

Harga Satuan Pekerjaan


V PEKERJAAN UTILITY
1 Pekerjaan Sanitasi
a 1 m Pipa air bersih diamater 3/4'
Pipa PVC 3/4 " type AW m 1.1 22800
Lem PVC buah 0.1 10600
Tukang pipa O.H 0.0818 40000
Pekerja terampil O.H 0.8128 35000

Harga Satuan Pekerjaan

b 1 m Pipa air kotor diamater 3''


Pipa PVC 3" type C m 1.1 46100
Lem PVC buah 0.4 10600
Tukang pipa O.H 0.0818 40000
Pekerja terampil O.H 0.8128 35000

Harga Satuan Pekerjaan

c 1 m Pipa air kotor diamater 4''


Pipa PVC 4" type AW m 0.3 313400
Lem PVC buah 0.5 5130
Tukang pipa O.H 0.0818 40000
Pekerja terampil O.H 0.8128 35000

Harga Satuan Pekerjaan

d 1buah Kran Air Ex Import


Kran air buah 1 108100
Rol TBA roll 1 1000
Kepala Tukang Pipa O.H 0.03 40000
Tukang pipa O.H 0.15 35000

Harga Satuan Pekerjaan

e 1 buah Tandon air kapasitas 500 Ltr


Tandon air 500 ltr bh 0.1667 200000
Tukang pipa O.H 0.5 40000
pekerja O.H 0.1 35000

Harga Satuan Pekerjaan

2 Pekerjaan Septitank
a 1 m3 Galian tanah
Mandor O.H 0.025 60000
Pekerja O.H 0.75 27000

Harga Satuan Pekerjaan

b 1 m Urugan pasir
Pasir urug m3 1.2 151047
Mandor O/H 0.01 60000
Pekerja terampil O/H 0.3 35000

Harga Satuan Pekerjaan

c 1 m3 Beton Rabat 1 PC : 3 Psr : 6 Krl


Semen PC ( Portland Cement ) 50 kg zak 3.7257 53000
Pasir Cor m3 0.5081 175000
Batu Pecah 2/3 cm m3 1.0161 225000
Mandor O.H 0.08 60000
Kepala Tukang batu O.H 0.025 50000
Tukang Batu O.H 0.25 40000
Pekerja Terampil O.H 1.65 35000

Harga Satuan Pekerjaan

d 1 buah Buis beton diameter 90 cm


Buis beton Dia 90 cm buah 1 60000
Mandor O.H 0.0152 60000
Kepala Tukang batu O.H 0.304 40000

Harga Satuan Pekerjaan

3 Pekerjaan Sumur Resapan


a 1 m Galian tanah
Mandor O.H 0.025 60000
Pekerja O.H 0.75 27000

Harga Satuan Pekerjaan

b 1 m Urugan pasir
Pasir urug m3 1.2 151047
Mandor O/H 0.01 60000
Pekerja terampil O/H 0.3 35000

Harga Satuan Pekerjaan

c 1m Urugan Kerikil
Sirtu m3 1.2 151047
Mandor O/H 0.01 60000
Pekerja terampil O/H 0.3 35000

Harga Satuan Pekerjaan

d 1 m3 Beton Rabat 1 PC : 3 Psr : 6 Krl


Semen PC ( Portland Cement ) 50 kg zak 3.7257 53000
Pasir Cor m3 0.5081 175000
Batu Pecah 2/3 cm m3 1.0161 225000
Mandor O.H 0.08 60000
Kepala Tukang batu O.H 0.025 50000
Tukang Batu O.H 0.25 40000
Pekerja Terampil O.H 1.65 35000

Harga Satuan Pekerjaan

e 1 buah Buis beton diameter 90 cm


Buis beton Dia 90 cm buah 1 60000
Mandor O.H 0.0152 60000
Kepala Tukang batu O.H 0.304 40000

Harga Satuan Pekerjaan


4 Pekerjaan Kamar Mandi
a 1 buah Closed Jongkok
Closet jongkok porselen warna putih buah 1 125000
Kepala Tukang Batu O.H 0.15 40000
Tukang Batu O.H 1.5 35000

Harga Satuan Pekerjaan

b 1 buah Closed Duduk


Closet duduk porselen warna putih buah 1 585200
Kepala Tukang Batu O.H 0.15 40000
Tukang Batu O.H 1.5 35000

Harga Satuan Pekerjaan

VI PEKERJAAN FINISHING
1 Pekerjaan Pengecatan
a 1 m2 Cat Plafond
Cat tembok Catylac kg 0.012 14000
Kertas gosok no. 150 lembar 0.1 2000
Rol Kuas bh 0.01 6000
Mandor O.H 0.003 60000
Kepala Tukang cat O.H 0.008 50000
Tukang cat O.H 0.075 35000

Harga Satuan Pekerjaan

b 1 m2 Cat Dinding
Cat tembok Catylac kg 0.3 14000
Kertas gosok no. 150 lembar 0.1 2000
Rol Kuas bh 0.01 6000
Mandor O.H 0.0025 60000
Kepala Tukang cat O.H 0.0075 50000
Tukang cat O.H 0.075 35000
Pekerja O.H 0.05 27000

Harga Satuan Pekerjaan

c 1 m2 Cat Kusen Pintu


Wood Filler kg 0.2 20410
Pewarna sachet 0.5 1100
Kertas gosok no. 150 lembar 1 2800
Kertas gosok no. 280 lembar 1 3800
Shanding kg 0.5 141900
Clear Doof kg 0.2 105950
Thinner A liter 0.837 14410
Coumpond kaleng 0.2 31100
Mandor O.H 0.005 60000
Kepala Tukang cat O.H 0.0075 50000
Tukang cat O.H 0.075 35000
Pekerja O.H 0.03 27000

Harga Satuan Pekerjaan


d Cat Kusen Jendela
Wood Filler kg 0.2 20410
Pewarna sachet 0.5 1100
Kertas gosok no. 150 lembar 1 2800
Kertas gosok no. 280 lembar 1 3800
Shanding kg 0.5 141900
Clear Doof kg 0.2 105950
Thinner A liter 0.837 14410
Coumpond kaleng 0.2 31100
Mandor O.H 0.005 60000
Kepala Tukang cat O.H 0.0075 50000
Tukang cat O.H 0.075 35000
Pekerja O.H 0.03 27000

Harga Satuan Pekerjaan


e Cat Daun Pintu
Wood Filler kg 0.2 20410
Pewarna sachet 0.5 1100
Kertas gosok no. 150 lembar 1 2800
Kertas gosok no. 280 lembar 1 3800
Shanding kg 0.5 141900
Clear Doof kg 0.2 105950
Thinner A liter 0.837 14410
Coumpond kaleng 0.2 31100
Mandor O.H 0.005 60000
Kepala Tukang cat O.H 0.0075 50000
Tukang cat O.H 0.075 35000
Pekerja O.H 0.03 27000

Harga Satuan Pekerjaan


f Cat Daun Jendela
Wood Filler kg 0.2 20410
Pewarna sachet 0.5 1100
Kertas gosok no. 150 lembar 1 2800
Kertas gosok no. 280 lembar 1 3800
Shanding kg 0.5 141900
Clear Doof kg 0.2 105950
Thinner A liter 0.837 14410
Coumpond kaleng 0.2 31100
Mandor O.H 0.005 60000
Kepala Tukang cat O.H 0.0075 50000
Tukang cat O.H 0.075 35000
Pekerja O.H 0.03 27000

Harga Satuan Pekerjaan


g Cat Lisplank
Wood Filler kg 0.2 20410
Pewarna sachet 0.5 1100
Kertas gosok no. 150 lembar 1 2800
Shanding kg 0.5 141900
Clear Doof kg 0.2 105950
Thinner A liter 0.837 14410
Coumpond kaleng 0.2 31100
Mandor O.H 0.005 60000
Kepala Tukang cat O.H 0.0075 50000
Tukang cat O.H 0.075 35000
Pekerja O.H 0.03 27000

Harga Satuan Pekerjaan


VII EXTERNAL WORK
1 Pekerjaan Carport
a 1 m3 Beton 1 PC : 2 Psr : 3 Krl
Pasir cor / Beton m3 0.545 175000
Semen PC ( Portland Cement ) 50 kg zak 5.9946 52000
Batu pecah mesin 1/2 cm m3 0.65 253333
Mandor O.H 0.162 60000
Tukang Batu O.H 0.324 40000
Pekerja O.H 1.945 27000

Harga Satuan Pekerjaan

2 Pekerjaan Taman
a 1 m' Batu Rolag
Batu Rolag buah 20 475
Mandor O.H 0.0495 60000
kepala Tukang Batu O.H 0.033 50000
Tukang Batu O.H 0.33 40000
Pekerja O.H 0.99 27000

Harga Satuan Pekerjaan


PEKERJAAN

Upah Bahan Jumlah Harga


(Rp.) (Rp.) (Rp.)

150.00 150.00
1,350.00 1,350.00
1,500.00 - 1,500.00
1,500.00

7,980.00 7,980.00
7,410.00 7,410.00
200.00 200.00
1,767.52 1,767.52
200.00 200.00
2,700.00 2,700.00
4,667.52 15,590.00 20,257.52
20,257.52

1,500.00 1,500.00
20,250.00 20,250.00
21,750.00 - 21,750.00
21,750.00

181,256.40 181,256.40
600.00 600.00
10,500.00 10,500.00
10,500.00 181,256.40 192,356.40
192,356.40

181,256.40 181,256.40
600.00 600.00
10,500.00 10,500.00
11,100.00 - 11,100.00
11,100.00

120,000.00 120,000.00
1,278.00 1,278.00
940.00 940.00
7,500.00 7,500.00
11,812.50 11,812.50
21,530.50 120,000.00 141,530.50
141,530.50

151,643.60 151,643.60
84,717.50 84,717.50
110,000.00 110,000.00
4,500.00 4,500.00
3,000.00 3,000.00
24,000.00 24,000.00
40,500.00 40,500.00
72,000.00 346,361.10 418,361.10
418,361.10

95,375.00 95,375.00
317,713.80 317,713.80
164,666.45 164,666.45
9,720.00 9,720.00
12,960.00 12,960.00
52,515.00 52,515.00
75,195.00 577,755.25 652,950.25
652,950.25

7,420.50 7,420.50
187.68 187.68
300.00 300.00
250.00 250.00
200.00 200.00
4,050.00 4,050.00
4,800.00 7,608.18 12,408.18
12,408.18

4,000.00 4,000.00
76,000.00 76,000.00
600.00 600.00
2,500.00 2,500.00
20,000.00 20,000.00
5,400.00 5,400.00
28,500.00 80,000.00 108,500.00
108,500.00

5,610,000.00 5,610,000.00
18,000.00 18,000.00
135,000.00 135,000.00
720,000.00 720,000.00
162,000.00 162,000.00
1,035,000.00 5,610,000.00 6,645,000.00
6,645,000.00
2,090,000.00 2,090,000.00
2,000.00 2,000.00
7,200.00 7,200.00
36,000.00 36,000.00
288,000.00 288,000.00
64,800.00 64,800.00
396,000.00 2,092,000.00 2,488,000.00
2,488,000.00

20,520.00 20,520.00
2,000.00 2,000.00
6,000.00 6,000.00
500.00 500.00
4,000.00 4,000.00
2,700.00 2,700.00
13,200.00 22,520.00 35,720.00
35,720.00

7,410.00 7,410.00
2,000.00 2,000.00
6,000.00 6,000.00
500.00 500.00
4,000.00 4,000.00
2,700.00 2,700.00
13,200.00 9,410.00 22,610.00
22,610.00

100,000.00 100,000.00
480.00 480.00
400.00 400.00
3,000.00 3,000.00
4,050.00 4,050.00
7,930.00 100,000.00 107,930.00
107,930.00

20,520.00 20,520.00
810.00 810.00
300.00 300.00
1,100.00 1,100.00
8,800.00 8,800.00
2,970.00 2,970.00
13,170.00 21,330.00 34,500.00
34,500.00

12,561.00 12,561.00
5,652.50 5,652.50
8,250.00 8,250.00
1,200.00 1,200.00
1,000.00 1,000.00
8,000.00 8,000.00
10,800.00 10,800.00
21,000.00 26,463.50 47,463.50
47,463.50

33,640.00 33,640.00
17,500.00 17,500.00
567.00 567.00
498.96 498.96
348.00 348.00
1,730.00 1,730.00
13,860.00 13,860.00
3,159.00 3,159.00
19,097.00 52,205.96 71,302.96
71,302.96

22,914.00 22,914.00
787.32 787.32
144.00 144.00
720.00 720.00
5,776.00 5,776.00
1,317.60 1,317.60
7,957.60 23,701.32 31,658.92
31,658.92

10,361.50 10,361.50
8,295.00 8,295.00
24,700.00 24,700.00
1,008.00 1,008.00
630.00 630.00
5,040.00 5,040.00
10,206.00 10,206.00
16,884.00 43,356.50 60,240.50
60,240.50

15,385.90 15,385.90
6,930.00 6,930.00
24,700.00 24,700.00
1,416.00 1,416.00
790.00 790.00
6,300.00 6,300.00
12,757.50 12,757.50
21,263.50 47,015.90 68,279.40
68,279.40

6,630.30 6,630.30
2,082.50 2,082.50
600.00 600.00
750.00 750.00
6,000.00 6,000.00
5,400.00 5,400.00
12,750.00 8,712.80 21,462.80
21,462.80

6,068.50 6,068.50
2,975.00 2,975.00
600.00 600.00
750.00 750.00
6,000.00 6,000.00
5,400.00 5,400.00
12,750.00 9,043.50 21,793.50
21,793.50

3,445.00 3,445.00
600.00 600.00
500.00 500.00
4,000.00 4,000.00
5,400.00 5,400.00
10,500.00 3,445.00 13,945.00
13,945.00

144,000.00 144,000.00
600.00 600.00
9,000.00 9,000.00
31.95 31.95
9,631.95 144,000.00 153,631.95
153,631.95

197,462.10 197,462.10
88,917.50 88,917.50
228,622.50 228,622.50
4,800.00 4,800.00
1,250.00 1,250.00
10,000.00 10,000.00
49,500.00 49,500.00
65,550.00 515,002.10 580,552.10
580,552.10

1,060.00 1,060.00
2,100.00 2,100.00
1,750.00 1,750.00
31,680.00 31,680.00
1,500.00 1,500.00
1,250.00 1,250.00
10,000.00 10,000.00
13,500.00 13,500.00
26,250.00 36,590.00 62,840.00
62,840.00
1,060.00 1,060.00
2,100.00 2,100.00
5,600.00 5,600.00
34,500.00 34,500.00
1,500.00 1,500.00
1,250.00 1,250.00
10,000.00 10,000.00
13,500.00 13,500.00
26,250.00 43,260.00 69,510.00
69,510.00

1,166.00 1,166.00
144.90 144.90
3,850.00 3,850.00
34,500.00 34,500.00
1,875.00 1,875.00
1,562.50 1,562.50
12,500.00 12,500.00
16,875.00 16,875.00
32,812.50 39,660.90 72,473.40
72,473.40

12,985,610.00 12,985,610.00
18,000.00 18,000.00
100,000.00 100,000.00
800,000.00 800,000.00
162,000.00 162,000.00
1,080,000.00 12,985,610.00 14,065,610.00
14,065,610.00

12,985,610.00 12,985,610.00
18,000.00 18,000.00
100,000.00 100,000.00
800,000.00 800,000.00
162,000.00 162,000.00
1,080,000.00 12,985,610.00 14,065,610.00
14,065,610.00

408,618.00 408,618.00
11,375.00 11,375.00
1,800.00 1,800.00
10,000.00 10,000.00
80,000.00 80,000.00
16,200.00 16,200.00
108,000.00 419,993.00 527,993.00
527,993.00
408,618.00 408,618.00
11,375.00 11,375.00
1,800.00 1,800.00
10,000.00 10,000.00
80,000.00 80,000.00
16,200.00 16,200.00
108,000.00 419,993.00 527,993.00
527,993.00

147,000.00 147,000.00
2,505.00 2,505.00
4,860.00 4,860.00
94,640.00 94,640.00
1,800.00 1,800.00
10,000.00 10,000.00
80,000.00 80,000.00
16,200.00 16,200.00
108,000.00 249,005.00 357,005.00
357,005.00

397,267.50 397,267.50
85,000.00 85,000.00
1,620.00 1,620.00
2,400.00 2,400.00
10,000.00 10,000.00
80,000.00 80,000.00
21,600.00 21,600.00
114,000.00 483,887.50 597,887.50
597,887.50

79,500.00 79,500.00
14,400.00 14,400.00
4,050.00 4,050.00
18,450.00 79,500.00 97,950.00
97,950.00

79,500.00 79,500.00
14,400.00 14,400.00
4,050.00 4,050.00
18,450.00 79,500.00 97,950.00
97,950.00

35,200.00 35,200.00
5,600.00 5,600.00
2,160.00 2,160.00
7,760.00 35,200.00 42,960.00
42,960.00

27,100.00 27,100.00
5,600.00 5,600.00
2,160.00 2,160.00
7,760.00 27,100.00 34,860.00
34,860.00

17,850.00 17,850.00
4,800.00 4,800.00
1,620.00 1,620.00
6,420.00 17,850.00 24,270.00
24,270.00

21,000.00 21,000.00
55,000.00 55,000.00
4,800.00 4,800.00
1,700.00 1,700.00
2,500.00 2,500.00
8,000.00 8,000.00
35.00 35.00
10,535.00 82,500.00 93,035.00
93,035.00

2,800.00 2,800.00
82,500.00 82,500.00
4,800.00 4,800.00
1,700.00 1,700.00
1,500.00 1,500.00
11,310.00 11,310.00
2,500.00 2,500.00
20,000.00 20,000.00
10,500.00 10,500.00
33,000.00 104,610.00 137,610.00
137,610.00

16,100.00 16,100.00
2,500.00 2,500.00
8,000.00 8,000.00
35.00 35.00
10,535.00 16,100.00 26,635.00
26,635.00

32,300.00 32,300.00
2,500.00 2,500.00
8,000.00 8,000.00
35.00 35.00
10,535.00 32,300.00 42,835.00
42,835.00
25,080.00 25,080.00
1,060.00 1,060.00
3,272.00 3,272.00
28,448.00 28,448.00
31,720.00 26,140.00 57,860.00
57,860.00

50,710.00 50,710.00
4,240.00 4,240.00
3,272.00 3,272.00
28,448.00 28,448.00
31,720.00 54,950.00 86,670.00
86,670.00

94,020.00 94,020.00
2,565.00 2,565.00
3,272.00 3,272.00
28,448.00 28,448.00
31,720.00 96,585.00 128,305.00
128,305.00

108,100.00 108,100.00
1,000.00 1,000.00
1,200.00 1,200.00
5,250.00 5,250.00
6,450.00 109,100.00 115,550.00
115,550.00

33,340.00 33,340.00
20,000.00 20,000.00
3,500.00 3,500.00
23,500.00 33,340.00 56,840.00
56,840.00

1,500.00 1,500.00
20,250.00 20,250.00
21,750.00 - 21,750.00
21,750.00

181,256.40 181,256.40
600.00 600.00
10,500.00 10,500.00
11,100.00 181,256.40 192,356.40
192,356.40
197,462.10 197,462.10
88,917.50 88,917.50
228,622.50 228,622.50
4,800.00 4,800.00
1,250.00 1,250.00
10,000.00 10,000.00
57,750.00 57,750.00
73,800.00 515,002.10 588,802.10
588,802.10

60,000.00 60,000.00
912.00 912.00
12,160.00 12,160.00
13,072.00 60,000.00 73,072.00
73,072.00

1,500.00 1,500.00
20,250.00 20,250.00
21,750.00 - 21,750.00
21,750.00

181,256.40 181,256.40
600.00 600.00
10,500.00 10,500.00
11,100.00 181,256.40 192,356.40
192,356.40

181,256.40 181,256.40
600.00 600.00
10,500.00 10,500.00
11,100.00 181,256.40 192,356.40
192,356.40

197,462.10 197,462.10
88,917.50 88,917.50
228,622.50 228,622.50
4,800.00 4,800.00
1,250.00 1,250.00
10,000.00 10,000.00
57,750.00 57,750.00
73,800.00 515,002.10 588,802.10
588,802.10

60,000.00 60,000.00
912.00 912.00
12,160.00 12,160.00
13,072.00 60,000.00 73,072.00
73,072.00
125,000.00 125,000.00
6,000.00 6,000.00
52,500.00 52,500.00
58,500.00 125,000.00 183,500.00
183,500.00

585,200.00 585,200.00
6,000.00 6,000.00
52,500.00 52,500.00
58,500.00 585,200.00 643,700.00
643,700.00

168.00 168.00
200.00 200.00
60.00 60.00
180.00 180.00
400.00 400.00
2,625.00 2,625.00
3,205.00 428.00 3,633.00
3,633.00

4,200.00 4,200.00
200.00 200.00
60.00 60.00
150.00 150.00
375.00 375.00
2,625.00 2,625.00
1,350.00 1,350.00
4,500.00 4,460.00 8,960.00
8,960.00

4,082.00 4,082.00
550.00 550.00
2,800.00 2,800.00
3,800.00 3,800.00
70,950.00 70,950.00
21,190.00 21,190.00
12,061.17 12,061.17
6,220.00 6,220.00
300.00 300.00
375.00 375.00
2,625.00 2,625.00
810.00 810.00
4,110.00 121,653.17 125,763.17
125,763.17

4,082.00 4,082.00
550.00 550.00
2,800.00 2,800.00
3,800.00 3,800.00
70,950.00 70,950.00
21,190.00 21,190.00
12,061.17 12,061.17
6,220.00 6,220.00
300.00 300.00
375.00 375.00
2,625.00 2,625.00
810.00 810.00
4,110.00 121,653.17 125,763.17
125,763.17

4,082.00 4,082.00
550.00 550.00
2,800.00 2,800.00
3,800.00 3,800.00
70,950.00 70,950.00
21,190.00 21,190.00
12,061.17 12,061.17
6,220.00 6,220.00
300.00 300.00
375.00 375.00
2,625.00 2,625.00
810.00 810.00
4,110.00 121,653.17 125,763.17
125,763.17

4,082.00 4,082.00
550.00 550.00
2,800.00 2,800.00
3,800.00 3,800.00
70,950.00 70,950.00
21,190.00 21,190.00
12,061.17 12,061.17
6,220.00 6,220.00
300.00 300.00
375.00 375.00
2,625.00 2,625.00
810.00 810.00
4,110.00 121,653.17 125,763.17
125,763.17

4,082.00 4,082.00
550.00 550.00
2,800.00 2,800.00
70,950.00 70,950.00
21,190.00 21,190.00
12,061.17 12,061.17
6,220.00 6,220.00
300.00 300.00
375.00 375.00
2,625.00 2,625.00
810.00 810.00
4,110.00 117,853.17 121,963.17
121,963.17
95,375.00 95,375.00
311,719.20 311,719.20
164,666.45 164,666.45
9,720.00 9,720.00
12,960.00 12,960.00
52,515.00 52,515.00
75,195.00 571,760.65 646,955.65
646,955.65

9,500.00 9,500.00
2,970.00 2,970.00
1,650.00 1,650.00
13,200.00 13,200.00
26,730.00 26,730.00
44,550.00 9,500.00 54,050.00
54,050.00
RENCANA ANGGARAN BIAYA
Pekerjaan : Renovasi Ruang Kerja (Bagian Anggaran)
Lokasi : Kantor DPKA Sumbawa Besar - NTB

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan Volume Satuan
(Rp.) (Rp.)

I DINDING PARTISI
1 Rangka Kayu 5/7 40 btg 95,000.00 3,800,000.00
2 Tripleks 30 lmbr 110,000.00 3,300,000.00
3 Kaca Polos 5 mm 26 lmbr 105,000.00 2,730,000.00
4 Pasir 2 dump 450,000.00 900,000.00
5 Semen 10 sak 72,000.00 720,000.00
6 Plamir 8 gln 95,000.00 760,000.00
7 Cat dinding 8 gln 130,000.00 1,040,000.00
8 Cat kayu 10 klg 60,000.00 600,000.00
9 Plitur 15 klg 45,000.00 675,000.00
10 Paku beton 7 cm 2 kg 40,000.00 80,000.00
11 Paku Tripleks 2 kg 35,000.00 70,000.00
12 Paku Usuk 3 kg 30,000.00 90,000.00
13 Rol 4 bh 35,000.00 140,000.00
14 Kappi 4 bh 18,000.00 72,000.00
15 Kuas 4 bh 15,000.00 60,000.00
16 Pintu dan aksesoris 2 bh 2,100,000.00 4,200,000.00
17 Jasa Pemasangan Dinding 14 m 650,000.00 9,100,000.00
18 Jasa Pengecatan 56 m2 70,000.00 3,920,000.00
Jumlah I

II INSTALASI AIR
1 Keramik (20x25) 16 ktk 110,000.00 1,760,000.00
2 Pipa 3/4" 6 btg 80,000.00 480,000.00
3 Kran air 3/4" 2 bh 55,000.00 110,000.00
4 Jasa Pemasangan Instalasi air 2 ls 3,500,000.00 7,000,000.00
Jumlah II

III MEKANIKAL
1 Blower dan aksesoris 2 bh 2,500,000.00 5,000,000.00
2 Jasa Pemasangan Blower 2 ls 3,500,000.00 7,000,000.00
Jumlah III

III LAIN-LAIN
1 Pembuatan Andang (Scafolding) 1 ls 800,000.00 800,000.00
Jumlah III
JUMLAH
PPN 10%
TOTAL

Terbilang
Lima puluh sembilan juta delapan ratus empat puluh tujuh ribu tujuh ratus rupiah
Jumlah Total
(Rp.)

32,257,000.00

9,350,000.00

12,000,000.00

800,000.00
54,407,000.00
5,440,700.00
59,847,700.00
REKAPITULASI

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
I DINDING PARTISI 32,257,000.00
II INSTALASI AIR 9,350,000.00
III MEKANIKAL 12,000,000.00

TOTAL 53,607,000.00

You might also like