You are on page 1of 54

REPORT ENDING: June 30, 2017 TODAY'S DATE: July 4, 2017

REPORT NO.: 18 TIME ELAPSED: 557 DAYS

PROJECT NAME:

PROJEK SKIM PEMBETUNGAN BEAUFORT

JABATAN KERJA RAYA, SABAH PENGARAH KERJA RAYA, SABAH

CONTRACTOR:

AREACH MARKETING & SUPPLIES SDN. BHD

CONTRACT NO: CONTRACT AMOUNT:

HQ.63/2015(S) RM169,937,228.00

CONTRACTOR ADDRESS: CONTRACT PERIOD:


Block A, Wisma Kosan, TKT.9, Flat No. 15, 36 MONTHS
KM7, Jalan Tuaran,
88450 Kota Kinabalu.

Tel No: 088-734186, 088-734187


Fax No. 088-734196

CONSULTANT:

PROJECT START: December 25, 2015

PROJECT FINISHED: December 24, 2018


PROJEK SKIM PEMBETUNGAN BEAUFORT

MONTHLY PROGRESS REPORT


NO.18
FOR THE PERIOD ENDING
June 30, 2017

CLIENT:

JABATAN KERJA RAYA, SABAH

AND

PREPARED BY: CONTRACTOR:

AREACH MARKETING & SUPPLIES SDN. BHD


Block A, Wisma Kosan, TKT.9, Flat No. 15,
KM7, Jalan Tuaran,
88450 Kota Kinabalu.
LOCALITY PLAN
CONTRACT PARTICULAR
ORGANIZATION CHART
SCOPE OF WORKS
WORK PROGRAMME
WEATHER REPORT
MANPOWER REPORT
MACHINERY REPORT
PROGRESS PHOTO
SAFETY REPORT
PROBLEM AT SITE
PROJEK SKIM PEMBETUNGAN BEAUFORT

CONTENT

ITEM DESCRIPTION

1 LOCALITY PLAN

2 CONTRACT PARTICULARS

3 ORGANIZATION CHART - CONTRACTOR

4 SCOPE OF WORKS

5 WORK PROGRAMME
- EXECUTIVE SUMMARY
- FINANCIAL S-CURVE
- PHYSICAL S-CURVE
- PROGRESS REPORT

6 WEATHER CHART

7 MANPOWER REPORT

8 MACHINERY REPORT

9 PROGRESS PHOTOGRAPHS

10 SAFETY REPORT

11 PROBLEM AT SITE
PROJEK SKIM PEMBETUNGAN BEAUFORT

LOCALITY PLAN
MBETUNGAN BEAUFORT
PROJECT PARTICULARS

1 Project : PROJEK SKIM PEMBETUNGAN BEAUFORT

2 Contract No. : HQ.63/2015(S)

3 Client : JABATAN KERJA RAYA, SABAH

4 Superintending Officer :
PENGARAH KERJA RAYA, SABAH

4 Superintending Officer : KETUA JURUTERA PENGUASA PROJEK


Representative KAWASAN PANTAI BARAT SELATAN

5 Contractor : AREACH MARKETING & SUPPLIES SDN. BHD


Block A, Wisma Kosan, TKT.9, Flat No. 15,
KM7, Jalan Tuaran,
88450 Kota Kinabalu.
Tel: 088-734186, 088-734187
Fax: 088-734196

6 Contract Value : RM 169,937,228.00

7 Contract Period : 36 MONTHS

8 Commencement Date : December 25, 2015

9 Completion Date : December 24, 2018

10 Contractor's All Risk : DECRKK0421941500


Insurance Policy No.

11 Workmen's Compensation : DLWCKK0524361500


Insurance Policy No.
PROJEK SKIM PEMBETUNGAN BEAUFORT

PENGARAH KERJA RAYA, SABAH

KETUA JURUTERA PENGUASA PROJEK


KAWASAN PANTAI BARAT SELATAN

AREACH MARKETING & SUPPLIES SDN. BHD


PROJEK SKIM PEMBETUNGAN BEAUFORT, SABAH

AREACH MARKETING & SUPPLIES SDN BHD


PROJECT ORGANIZATION CHART

PROJECT DIRECTOR
MISAH BINTI ABDULLAH

PROJECT MANAGER
CHONG KET SANG
019 880 8228

SURVEYOR
SAFETY & HEALTH PROCUREMENT PROJECT ADMIN PROJECT ENGINEER SITE AGENT QUANTITY BONIFACE N. DAI
OFFICER MARCELLA / MOHD SALLEH HASANIA ABDUL CHONG LIN YU SURVEYOR 013 891 9212
JOHN BERNARD LAI SHEILA 088 734 187 RAHMAN 016 322 3132 ANDY WONG088
088 734 187 088 734 187 012 827 2306 734187

SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR
(PIPE WORKS) (PIPE JACKING) (PILING) (C&S) (M&E)
ISA BIN ALI DAVID TOH WONG NIAP ONN LEE FOOK LEE SYAMRIE
012 8797999 012 848 4247 016 847 8685 016 846 1633 016 835 0235
SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR
(PIPE WORKS) (PIPE JACKING) (PILING) (C&S) (M&E)
ISA BIN ALI DAVID TOH WONG NIAP ONN LEE FOOK LEE SYAMRIE
012 8797999 012 848 4247 016 847 8685 016 846 1633 016 835 0235
EMBETUNGAN BEAUFORT, SABAH

ARKETING & SUPPLIES SDN BHD


ECT ORGANIZATION CHART

SURVEYOR
BONIFACE N. DAIM
013 891 9212
SCOPE OF WORKS

Construction and completion of trunk Sewer Main, Housing and House Connection, Pump Station
and related works.

1 Sewerage Treatment Works


i Site Preparation - Earth filling & cutting
ii Piling works
iii Treatment Plant Structure
iv External Works - Fencing & Gate, Drainage Works
P
Water Supply, Armour Rock Protection Wall

2 Building Works
i M&E Building
ii Office / Laboratory
iii Rest House/ Quarters
iv Air Blower

3 Pump Station
i Pump Station 1
ii Pump Station 2

4 Trunk Sewer Works


i Pipeline Works
ii Pipe Jacking Works (9573 M)
iii Pipe Bridge
iv Manholes

5 Service Connection
i Connection to proposed trunk sewer - pipeline, pipe jacking (810M) & manholes
ii Servioce connection to individual Septic Tanks - Pipeline works, manholes

6 Traffic Mangement

7 Landscaping Works

8 MECHANICAL & ELECTRICAL WORKS


8.1 Mechanical Works
i For Pumping Station At Sewage Treatment Plant
ii For Sewage Treatment Plant
iii For Pumping Station No 1
iv For Pumping Station No 2
v For Taman Beaufort Jaya, Taman Selangon, SMK Vokasional Beaufort
& SMK Beaufort III Pumping Station

8.2 Electrical Works


i For Sewage Treament Plant
ii For Pumping Station No 1
iii For Pumping Station No 1
iv For Pumping Station No 2
v For Taman Beaufort Jaya, Taman Selangon, SMK Vokasional Beaufort
& SMK Beaufort III Pumping Station

8.3 Diesel Power Standby Generating Sets & Associated Equipments

8.4 Laboratory Equipments & Facilities

8.5 Building Mechanical Services


8.6 Monitoring & Control Systems

8.7 Pipeline CCTV Inspection Equipment & High Pressure Water Jet Sewer Pipe Cleaning Machine
PROJEK SKIM PEMBETUNGAN BEAUFORT
EXECUTIVE SUMMARY
FINANCIAL PROGRESS :

Financial Progress Previous Accumulated Progress Current Month Progress Accumulated Progress This Month

Scheduled 18.58% 8.77% 25.31%

Actual 26.86% 7.35% 29.56%

Short fall / Ahead 8.28% -1.42% 4.25%

PHYSICAL PROGRESS :

Physical Progress Previous Accumulated Progress Current Month Progress Accumulated Progress This Month

Scheduled 16.30% 9.10% 22.32%


Actual 23.04% 3.84% 27.99%
Short fall / Ahead 6.74% -1.07% 5.67%

PROGRESS PAYMENT SUMMARY

Contractor Submitted JKR Verified Payment Received


Progress Claim No.
Date Of Amount Date Of Amount Date Of Amount REMARKS
No Month Evaluation (RM) Certificate (RM) Payment (RM)
1 Mar-16 13.04.2016 12,331,159.02 14.03.2016 12,331,159.02 22.7.2016 12,331,159.02
2 May-16 06.06.2016 36,854,588.51 13.06.2016 36,854,588.51 36,854,588.51 Voucher date: 29.08.201
3 Jul-16 14.07.2016 4,971,325.55 29.07.2016 4,971,325.55
4 Aug-16 24.08.2016 11,366,467.51 01.09.2016 8,081,481.95
TOTAL PROGRESS CLAIM TO-DATE 65,523,540.59 62,238,555.03

TOTAL PROGRESS PAYMENT RECEIVED TO-DATE 49,185,747.53

BALANCE PAYMENT TO RECEIVE 120,751,480.47


M PEMBETUNGAN BEAUFORT

REMARKS

Voucher date: 29.08.2016


PROJEK SKIM PEMBETUNGAN BEAU

Physical / Overall Progress Summary For Period Ending :

Acc

NO. DESCRIPTION AMOUNT (RM)


Schedule

Total Progress Works For The Month : 22.82%


167,564,590.60 % wtg%

1 SEWERAGE TREATMENT WORKS 36,802,218.00 42.33% 9.75%

a SITE PREPARATION 7,682,840.00 100.00% 4.81%

b PILING WORKS 9,060,472.00 67.00% 3.80%

c TREATMENT PLANT STRUCTURE 13,624,140.00 11.00% 0.94%

d GREASE & GRIT CHAMBER 974,000.00 45.00% 0.27%

e EXTERNAL WORKS 5,460,766.00 6.00% 0.27%

2 BUILDING WORKS 2,912,355.00 65.39% 1.19%

a PILING WORKS 1,063,394.00 100.00% 0.67%

b EXCAVATION WORKS 12,625.00 100.00% 0.01%

c SLUDGE PLANT & m&E ROOM 1,026,072.00 50.00% 0.32%

d OFFICE/LAB 143,990.00 30.00% 0.03%

e REST HOUSE 175,342.00 90.00% 0.10%

f AIR BLOWER 380,932.00 30.00% 0.07%

g MISC. WORKS -DIESEL STORAGE FARM 110,000.00 0.00% 0.00%

3 PUMP STATION 1 3,890,555.60 13.61% 0.330%

a SITE CLEARING AND GRUBING 14,000.00 80.00% 0.01%

b PILING WORKS 647,489.00 80.00% 0.32%

c EXCAVATION WORKS & DEWATERING 463,000.00 0.00% 0.00%

d EARTHFILLING & STRUCTURE WORKS 2,143,085.00 0.00% 0.00%

e FENCING AND GATE 294,262.60 0.00% 0.00%


PROJEK SKIM PEMBETUNGAN BEAU

e FENCING AND GATE 294,262.60 0.00% 0.00%

f DRAINAGE WORKS 95,900.00 0.00% 0.00%

g INTERNAL CONCRETE PAVEMENT 100,548.00 0.00% 0.00%

h TURFING 12,271.00 0.00% 0.00%

i WATER SUPPLY 15,000.00 0.00% 0.00%

j GENERATOR ROOM 105,000.00 0.00% 0.00%

4 PUMP STATION 2 2,749,107.00 16.12% 0.28%

a SITE CLEARING AND GRUBING 12,800.00 100.00% 0.01%

b PILING WORKS 537,949.00 80.00% 0.27%

c EXCAVATION WORKS 472,500.00 0.00% 0.00%

d EARTHFILLING & STRUCTURE WORKS 1,006,570.00 0.00% 0.00%

e FENCING AND GATE 141,888.00 0.00% 0.00%


PROJEK SKIM PEMBETUNGAN BEAU

Acc

NO. DESCRIPTION
Sche

f DRAINAGE WORKS 340,900.00 0.00% 0.00%

g INTERNAL CONCRETE PAVEMENT 99,750.00 0.00% 0.00%

h WATER SUPPLY 15,000.00 0.00% 0.00%

i TURFING 16,750.00 0.00% 0.00%

j GENERATOR ROOM 105,000.00 0.00% 0.00%

5 MAIN SEWER TRUNK 78,651,625.00 8.47% 4.20%

a SITE PREPARATION & EXCAVATION 240,000.00 5.00% 0.01%

b PIPELINE WORKS (OPEN CUT) 25,219,510.00 8.00% 1.26%

c PIPE JACKING WORKS 46,169,500.00 10.00% 2.89%

d INSPECTION OF VCP AT FACTORY 40,000.00 100.00% 0.03%

e MANHOLES 5,031,595.00 0.00% 0.00%

f PIPE BRIDGE 1,496,200.00 0.00% 0.00%

g TESTING 454,820.00 0.00% 0.00%

6 CONNECTION TO MAIN TRUNK SEWER 7,035,745.00 0.00% 0.00%

7 SERVICE CONNECTION TO INDIVIDUAL SEPTIC TANK 6,323,600.00 0.00% 0.00%

8 TRAFFIC MANAGEMENT 724,700.00 0.00% 0.00%

9 ELECTRICAL WORKS 5,235,275.00 0.00% 0.00%

a For Sewage Treament Plant 2,929,230.00 0.00% 0.00%

b For Pumping Station No 1 1,165,485.00 0.00% 0.00%

c For Pumping Station No 2 925,360.00 0.00% 0.00%

For Taman Beaufort Jaya, Taman Selangon, SMK Vokasional


d
Beaufort & SMK Beaufort III Pumping Station
215,200.00 0.00% 0.00%

10 MECHANICAL WORKS 22,739,410.00 0.00% 0.00%

a For Sewage Treament Plant 14,060,860.00 0.00% 0.00%


PROJEK SKIM PEMBETUNGAN BEAU

a For Sewage Treament Plant 14,060,860.00 0.00% 0.00%

b For Pumping Station No 1 2,294,000.00 0.00% 0.00%

c For Pumping Station No 2 1,338,000.00 0.00% 0.00%

For Taman Beaufort Jaya, Taman Selangon, SMK Vokasional


d
Beaufort & SMK Beaufort III Pumping Station
457,200.00 0.00% 0.00%

Diesel Power Standby Generating Sets & Associated


e
Equipments
1,937,800.00 0.00% 0.00%

f Laboratory Equipments & Facilities 654,200.00 0.00% 0.00%

g Building Mechanical Services 82,650.00 0.00% 0.00%

h Monitoring & Control Systems 1,304,700.00 0.00% 0.00%

Pipeline CCTV Inspection Equipment & High Pressure Water


i
Jet Sewer Pipe Cleaning Machine
610,000.00 0.00% 0.00%

j LANDSCAPING 500,000.00 0.00% 0.00%


SKIM PEMBETUNGAN BEAUFORT

Accumulated Physical Progress

Schedule Actual Short fall/ Ahead

22.82% 28.00% 5.18%


wtg% % wtg% wtg %

9.75% 47.50% 10.94% 1.19%

4.81% 95.20% 4.47% -0.33%

3.80% 100.00% 3.85% 0.06%

0.94% 20.00% 1.58% 0.64%

0.27% 78.00% 0.37% 0.10%

0.27% 11.83% 0.40% 0.12%

1.19% 82.81% 1.51% 0.32%

0.67% 100.00% 0.64% -0.03%

0.01% 100.00% 0.01% 0.00%

0.32% 67.00% 0.34% 0.02%

0.03% 98.00% 0.09% 0.06%

0.10% 98.00% 0.10% 0.00%

0.07% 88.00% 0.09% 0.02%

0.00% 0.00% 0.00% 0.00%

0.330% 29.14% 0.710% 0.380%

0.01% 100% 0.01% 0.002%

0.32% 100% 0.40% 0.07%

0.00% 50.00% 0.14% 0.14%

0.00% 9.60% 0.13% 0.13%

0.00% 0.00% 0.00% 0.00%


SKIM PEMBETUNGAN BEAUFORT

0.00% 0.00% 0.00% 0.00%

0.00% 36.50% 0.02% 0.02%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.28% 29.21% 0.50% 0.22%

0.01% 100% 0.01% 0.00%

0.27% 97.18% 0.33% 0.06%

0.00% 0.00% 0.00% 0.00%

0.00% 23.08% 0.14% 0.14%

0.00% 0.00% 0.00% 0.00%

progress report page 1 of 2


SKIM PEMBETUNGAN BEAUFORT

Accumulated Physical Progress

Sche Act Short fall/ Ahead

0.00% 10.27% 0.02% 0.02%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

4.20% 22.19% 11.00% 6.80%

0.01% 4.03% 0.01% 0.00%

1.26% 26.00% 2.02% 0.76%

2.89% 29.00% 3.53% 0.64%

0.03% 100.00% 0.03% 0.00%

0.00% 6.00% 0.02% 0.02%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 4.45% 0.22% 0.22%

0.00% 0.00% 0.00% 0.00%

0.00% 17.30% 0.07% 0.07%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.03% 0.03%

0.00% 0.00% 0.00% 0.00%


SKIM PEMBETUNGAN BEAUFORT

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 66.69% 0.03% 0.03%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

progress report page 2 of 2


AREACH MARKETING & SUPPLIES SDN. BHD

PROJEK SKIM PEMBETUNGAN BEAUFORT


WEATHER REPORT
FOR PERIOD ENDING
June 30, 2017

June/17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TIME
thu fri sat sun mon tue wed thu fri sat sun mon tue wed thu fri sat sun mon tue wed thu fri sat sun mon tue wed thu fri
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

LEGEND : Sunny/Fine Rain


Recorded by : Verified by:
(Contractor)

Name : MOHAMMAD HAFEZZI BIN ISMADI Name :


AREACH MARKETING & SUPPLIES SDN. BHD

PROJEK SKIM PEMBETUNGAN BEAUFORT

MANPOWER REPORT

June/17
Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Project Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Asst. Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 0 0
Site Agent 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Supervisors 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Site Clerk 3 2 4 4 4 4 4 4 3 4 4 4 4 4 4 3 4 4 4 4 4 4 3 4 4
Foreman 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Chief surveyor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Surveyor & Chainmen 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Excavator Operator 8 8 7 7 7 7 7 7 8 7 8 7 8 7 7 7 9 9 8 9 10 9 8 7 8
Breaker operator 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Vibro Hammer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Tractor operator 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Compactor Operator 1 1 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 1 0 1
Mobile crane 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry Crane 1 1 1 1 0 1 1 1 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1
lorry 3tonne 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Truck Drivers 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2
Pipe Jacking 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Open Cut 15 9 15 15 15 15 15 15 9 15 15 15 15 15 15 9 15 15 15 15 15 15 9 15 15
General Workers 14 14 15 15 15 15 15 15 15 14 14 14 14 15 15 15 15 15 15 15 13 12 12 13 10
Traffic Controller 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Piler 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Store Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Bar Bender 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Concretor 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Mechanical Workers 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Bricklayer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Painter 5 5 5 5 5 5 5 5 5 5 5 4 4 5 5 5 5 5 5 5 5 5 5 5 5
Ceiler 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 0
Mason 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Welder 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Hawk man 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Mechanic 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Electrician 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Total 171 164 171 171 170 171 171 171 165 169 169 167 169 170 170 163 172 170 169 169 171 170 162 167 165

LEGEND Recorded by : Verified by:


(Contractor)
Sunday

Public Holiday MOHAMMAD HAFEZZI BIN ISMADI Name :


MBETUNGAN BEAUFORT

FOR PERIOD ENDING


June 30, 2017

June/17
26 27 28 29 30 31
1 1 1 1 1 1
1 1 1 1 1 1
0 1 1 1 1 1
1 1 1 1 1 1
5 5 5 5 5 5
4 4 4 4 2 2
6 6 6 6 6 6
1 1 1 1 1 1
3 3 3 3 3 3
8 8 8 8 8 8
0 0 0 0 0 0
0 0 0 0 0 0
1 1 1 1 1 1
1 1 1 1 1 1
0 0 0 0 0 0
1 1 1 1 1 1
2 2 2 2 2 2
2 2 2 2 2 2
50 50 50 50 50 50
15 15 15 15 9 9
10 10 11 11 11 11
8 8 8 8 8 8
0 0 0 0 0 0
1 1 1 1 1 1
6 6 6 6 6 6
6 6 6 6 6 6
8 8 8 8 8 8
0 0 0 0 0 0
5 4 5 5 5 5
0 0 0 0 0 0
4 4 4 4 4 4
8 8 8 8 8 8
1 1 1 1 1 1
2 2 2 2 2 2
4 4 4 4 4 4
165 165 167 167 159 159
AREACH MARKETING & SUPPLIES SDN. BHD

PROJEK SKIM PEMBETUNGAN BEAUFORT

MACHINERY REPORT
FOR PE

June/17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Item Description
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
1 Excavator 8 8 7 7 7 7 7 7 8 7 8 7 8 7 7 7 9 9 8 9 10 9 8 7 8 8
2 Tractor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1
3 Shovel 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Lorry crane 2 1 1 1 0 1 1 1 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1
5 Mobile crane 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 Mixer truck 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 Grinder 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
8 Water Pump 10 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
9 Welding Machine 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
10 Robin Engine 4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
11 Piling Rig 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12 Gen Set 4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
13 Cutting & Bending Machine 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
14 10 Ton Dump Truck 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2
15 Compactor 2 1 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 1 0 1 1
16 Loader 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17 Breaker 2 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18 Vibro Hammer 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19 lorry 3tonne Driver 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL 73 35 33 33 32 33 33 33 34 32 32 31 33 32 32 32 34 34 33 34 37 37 36 34 37 37

LEGEND Recorded by : Verified by:


(Contractor)
Sunday

Public Holiday MOHAMMAD HAFEZZI BIN ISMADI Name :


MBETUNGAN BEAUFORT

FOR PERIOD ENDING


June 30, 2017

June/17
27 28 29 30
Tue Wed Thu Fri
8 8 8 8
1 1 1 1
0 0 0 0
1 1 1 1
0 0 0 0
0 0 0 0
10 10 10 10
5 5 5 5
1 1 1 1
2 2 2 2
0 0 0 0
2 2 2 2
2 2 2 2
2 2 2 2
1 1 1 1
0 0 0 0
0 0 0 0
0 0 0 0
2 2 2 2
37 37 37 37
PROJEK SKIM PEMBETUNGAN BEAUFORT

SITE SAFETY & HEALTH REPORT


( APRIL 2017 )

AREACH MARKETING & SUPPLIES SDN. BHD


Block A, Wisma Kosan, TKT.9, Flat No. 15,
KM7, Jalan Tuaran,
88450 Kota Kinabalu.

Prepared By:

_________________________
JOHN BERNARD LAI
(SAFETY OFFICER)
CONTRACT NO : HQ.63/2015(S)

PROJEK SKIM PEMBETUNGAN BEAUFORT


SAFETY & HEALTH REPORT

TABLE OF CONTENTS

1 Introduction
2 Safety & Health Committee Organization

3 Toolbox Meeting

4 Site Inspection

5 Safety Signage

6 Site Security

7 Accident/Incident/Near-Miss Investigation
8 Summary

9 Safety Statistic
CONTRACT NO : HQ.63/2015(S)

PROJEK SKIM PEMBETUNGAN BEAUFORT

SAFETY & HEALTH REPORT

1.0 Introduction

As per to complied with Occupational Safety and Health Act 94 (OSHA) and Factory
Machinery Act 1967 (FMA) and also to complied with client requirement, AREACH
MARKETING & SUPPLIES SDN BHD as appointed and employed me as their Safety
Officer for the project of Projek Skim Pembetungan Beaufort.

2.0 Safety & Health Committee Organization


The Safety and Health Committees meeting will held early July 2017.

3.0 Toolbox Meeting


A safety briefing was held on 6th June 2017.

4.0 Site Inspection


Housekeeping Waste building material temporary kept at site & to be
o removed.
o Use of Personal Protective Equipment (PPE) Workers were seen with safety
equipment during inspection.
o Site Access In maintainable state.
o Excavation protection during excavation works for jacking pit/manhole
Inspection & supervision done by competent person (registered with JKKP)

5.0 Safety Signage


Safety signages are placed at site project.

6.0 Site Security


Site security is under control.

7.0 Accident/Incident/Near-Miss Investigation


No incident was reported for the past month.

8.0 a Safety Officer,


As Summary
its my duties to advise the company to comply with whatever safety
requirement stated at the OSHA 94 and FMA 1967.

9.0 Safety Statistic


For this project, we are targeting zero accident and the total man hours are as follow:-

160 Person X 8 hours = 1,280 Hours


1280 Hours X 31 days = 39,680 Hours
Previous Manhours = 378,216 Hours

Total manhours achieved = 417,896 Hours


PROBLEMS AT SITE

1 PIPELINE B2 - STP (OPEN CUT) - SOFT SOIL CONDITION - CONTRACTOR PROPOSE CHANGE
PIPE BEDDING FROM TYPE B TO TYPE D

2 PIPELINE B7 - B5 - B1A (MH3 - MH13) (OPEN CUT) - NO ROAD RESERVE FOR PIPE LAYING WORKS

3 STP SITE - SOIL SETTLEMENT - CONTRACTOR PROPOSE EARTH FILLING TO STP SITE

4 PUMP STATION 2 - STOP WORK DUE TO LAND PROBLEM

5 UTILITIES OBSTRUCTION UTILITIES INSTALLED LACK OF INFORMATION

6 PIPELINE AT SMK BEAUFORT II - STOP WORK DUE TO THE PIPELINE HAVE ENTERED
YAYASAN SABAH LAND.

7 PIPELINE B8-B3(MH1 TO MH2) 600MM DIA G RCP SMK BFT. 3 - PIPE LAID DAMAGED BY OTHER
CONTRACTOR

8 SMK BFT. 2 (MH7 TO MH11) OP - STOP WORK DUE TO SESB TM POST OBSTRUCTION

9 E2A - A6 - ( MH26-MH31 ) TO RELOCATE CELCOM SERVICES, TM & SESB POST.

10 A2A - A5 (MH1) TO RELOCATE DUE TO SESB TM UNDERGROUND CABLE & JABATAN AIR PIPE