To: Head (ISO), TCN - Abuja

1.5 BREAKDOWN OF PEAK & OFF PEAK GENERATION (NATIONAL PEAK & OFF PEAK)
From: General Manager, NCC, Osogbo .
DAILY OPERATIONAL REPORT SUNDAY 13/08/2017 STATION TURBINE PEAK GEN. (MW) OFF-PEAK GEN(MW)
FOR: EVENTS OF SATURDAY 12/08/2017 1 KAINJI HYDRO 246 209
1.0 EXECUTIVE OPERATIONS SUMMARY: 2 JEBBA HYDRO 444 351
1.1 GENERATION PROFILE: NATIONAL STATISTICS 3 SHIRORO HYDRO 563 305
4 EGBIN ST2 - 5 STEAM 408 300
DETAILS MW HRS DATE 5 SAPELE STEAM 65 65
PEAK DEMAND FORECAST (CONNECTED + SUPPRESSED LOAD) 17,720 21:45 12/08/2017 6 DELTA GAS 412 368
GENERATION CAPABILITY 7065.8 -do- -do- 7 AFAM IV-V GAS 0 0
UNITS ON BAR CAPABILITY AT PEAK 4611.2 -do- -do- 8 GEREGU GAS GAS 272 100
PEAK GENERATION 4155.8 -do- -do- 9 OMOTOSHO GAS GAS 101.4 76.5
LOWEST GENERATION 3007.5 14:00 12-08-17 10 OLORUNSOGO GAS GAS 126.4 84.8
3335.1 0000-0800 -do- 11 GEREGU NIPP GAS 136 66
3255.9 0900-1600 -do- 12 SAPELE NIPP GAS 111.7 82.7
4155.8 1700-2400 -do- 13 ALAOJI NIPP GAS 114.7 70.8
PEAK GENERATION TO DATE 5074.7 21:30 02/02/2016 14 OLORUNSOGO NIPP GAS 111 90.1
MAXIMUM AVAILABLE CAPACITY TO DATE 7492.6 06:00 14/04/2014 15 OMOTOSHO NIPP GAS 102.7 70.6
MAXIMUM PEAK GENERATION CAPABILITY TO DATE 7099 07:00 13/04/2014 16 ODUKPANI NIPP GAS 116.3 91
MAXIMUM ENERGY GENERATED (MWH) TO DATE 109,372.01 0000-2400 02/02/2016 17 IHOVBOR NIPP GAS 112.1 82.7
18 OKPAI GAS 190 190
19 AFAM VI GAS 123 118
20 IBOM POWER GAS 0 0
1.2 CRITICAL VOLTAGE 21 ASCO GAS 0 0
DETAILS KV STATION HRS 22 A.E.S GAS 0 0
NOMINAL VOLTAGE 330 23 OMOKU GAS 77.2 71.9
STATUTORY LIMITS 280.5 - 346.6 24 TRANS AMADI GAS 18.6 0
HIGHEST VOLTAGE FOR THE DAY 363 Omotosho T/S 10:00 25 RIVERS IPP (GAS) 0 0
LOWEST VOLTAGE FOR THE DAY 300 Gombe & Kano T/S 13:00 & 20:00 26 EGBIN ST6 (GAS) 156 151
27 PARAS ENERGY (GAS) 62.6 63.4
1.3 FREQUENCY RANGE 28 GBARAIN NIPP GAS 86.1 0
HZ HRS TOTAL 4155.8 3007.5
NOMINAL FREQUENCY 50 1.6 ENERGY GENERATED/ENERGY SENT OUT:
STATUTORY LIMITS 49.75-50.25 ENERGY GENERATED ENERGY SENT OUT
STATION TURBINE
HIGHEST FREQUENCY 50.54 07:31 MWH MWH/H MWH MWH/H
LOWEST FREQUENCY 49.55 19:19 1 KAINJI HYDRO 5,082.00 211.75 5,066.40 211.10
2 JEBBA HYDRO 8,631.00 359.63 8,613.12 358.88
1.4 SYSTEM COLLAPSE UP DATE 3 SHIRORO HYDRO 9,811.00 408.79 9,781.56 407.57
Date of last total collapse: 27th June, 2017 No. of days since last total collapse: 44 4 EGBIN ST2 - 5 STEAM 7,821.00 325.88 7,427.20 309.47
Date of last partial collapse: 19 th July, 2017 No. of days since last partial collapse: 24 5 SAPELE STEAM 1,423.70 59.32 1,356.90 56.54
Highest No of days ever attained in-between total collapses: 134 Highest No of days ever attained in-between partial collapses: 240 6 DELTA GAS 9,233.61 384.73 9,058.40 377.43
Jan Feb. Mar. Apr May Jun Jul Aug Sep. Oct Nov Dec Total 7 AFAM IV-V GAS - 0.00 - 0.00
Total 1 -- -- -- 2 5 5 4 1 -- -- 1 19 8 GEREGU GAS GAS 4,243.60 176.82 4,219.69 175.82
2009 Partial -- 5 4 3 3 -- -- 1 -- 2 1 1 20 9 GAS
OMOTOSHO GAS 1,954.00 81.42 1,932.10 80.50
Total --- 3 1 -- 3 3 3 -- 2 2 1 4 22 10 OLORUNSOGO GAS GAS 2,486.33 103.60 2,458.43 102.43
2010
Partial 1 -- -- 1 1 3 4 4 3 2 -- 1 20 11 GEREGU NIPP GAS 2,071.75 86.32 2,059.52 85.81
Total -- -- -- -- 4 3 1 1 1 2 1 -- 13 12 SAPELE NIPP GAS 2,084.80 86.87 2,072.08 86.34
2011
Partial -- 1 1 -- -- -- -- 1 -- 1 2 -- 6 13 ALAOJI NIPP GAS 1,713.40 71.39 1,696.30 70.68
Total -- 2 1 5 2 1 -- -- 2 2 1 16 14 OLORUNSOGO NIPP GAS 2,355.80 98.16 2,323.70 96.82
2012
Partial -- 2 3 -- -- -- -- 1 -- 1 1 8 15 OMOTOSHO NIPP GAS 1,855.70 77.32 1,841.40 76.73
Total -- 1 2 2 3 4 1 1 1 1 4 2 22 16 ODUKPANI NIPP GAS 2,192.42 91.35 2,171.22 90.47
2013
Partial -- -- -- -- -- -- -- 2 2 17 IHOVBOR NIPP GAS 2,203.38 91.81 2,186.23 91.09
Total 2 2 3 1 1 9 18 OKPAI GAS 4,668.00 194.50 4,511.90 188.00
2014
Partial 1 2 1 4 19 AFAM VI GAS 3,045.10 126.88 3,000.50 125.02
2015 Total 1 1 2 1 1 6 20 IBOM GAS - 0.00 - 0.00
Partial -- -- 1 2 1 4 21 ASCO GAS - 0.00 - 0.00
Total -- -- 2 3 6 5 1 1 2 2 22 22 A.E.S GAS - 0.00 - 0.00
2016
Partial -- -- 1 1 3 1 6 23 OMOKU GAS 1,681.20 70.05 1,643.36 68.47
TRANS AMADI 396.60 16.53 386.10 16.09
2017 Total 5 3 3 1 1 13 24 GAS
Partial 1 1 1 3 25 RIVERS IPP GAS - 0.00 - 0.00
26 EGBIN ST6 STEAM 3,686.00 153.58 3,491.90 145.50
27 PARAS ENERGY GAS 1,525.90 63.58 1,519.80 63.33
28 GBARAIN NIPP GAS 463.00 19.29 452.60 18.86
TOTAL 80,629.29 3,359.55 79,270.41 3,302.93

DAILY OPERATIONAL REPORT


1.7A GENERATION POSITION AT 06:00HRS OF SUNDAY 13/08/2017
GENERATION CAPABILITY OF
INSTALLED CAPACITY OF UNITS ON BAR GENERATION AT
STATIONS AVAILABLE UNITS CAPABILITY OF UNITS ON BAR REMARKS
AVAILABLE UNITS(MW) 06:00HRS(MW)
AVAILABLE UNITS(MW) (MW)

1G5, 6 &12 0 1G5, 6 & 12 - Shut down on emergency due to pole discordance problem on cct K2J
breaker. 1G7 - Out on stator winding failure. 1G8 - Out due to loss of supply to the
KAINJI HYDRO 0
320 320 0 0 auxiliary. 1G9 - Out due to burnt 7.5MVA 33/0.415kV & 183.6MVA 16/330kV station
3 service transformer and generator transformer. 1G10 - Shut down due to thrust bearing
temperature problem. 1G11 -Out on maintenance.
2G2 - 5 2G1, 2, 4 & 5 2G1 - Out on maintenance. 2G6 Out due to burnt generator winding and AVR.
JEBBA HYDRO 380 380 369 369
4 4
411G1 - 4 411G1 - 4 411G1 - 3 - Load reduced due to high frequency.
SHIRORO HYDRO 600 600 500 387
4 4
PRIVATISED COMPANIES

EGBIN STEAM ST2, 4 & 5 ST2 & 4 ST1 - Tripped on generator CB trouble. ST3 - Tripped on high vibration.
3 660 660 2 440 352 ST5 - Out for frequency management.

ST2 ST 2 ST1 - Tripped on low drum level. ST4 & 5 - Awaiting major overhaul.
SAPELE (STEAM) 120 67 67 67 ST6 - Tripped on gas control valve not following reference point.
1 1
GT4, 7, 9 - 13,15, 18 GT3 & 5 Out due to generator winding fault. GT6 & 8 - Out on maintenance.
DELTA (GAS) GT4, 7, 9 - 13, 15,18 & 19 GT14 - Out on major overhaul. GT15, 18 & 19 - On frequency response.
455 455 & 19 455 429
GT16 - Shut down to rectify various fault on the unit. GT17 - Out on excitation trouble.
10 10
GT20 - Out on major inspection.
AFAM IV & V (GAS) 0 0 GT1 - 12 - De-commissioned and scrapped. GT13 -16 Out on blade failure.
0 0 0 0 GT17 & 18 - Out due to burnt generator transformer. GT19 & 20 - Awaiting major
0 0 overhaul.
GT11 & 13 GT11 & 13 GT12 - Out on maintenance. GT11 & 13 - On frequency response.
GEREGU GAS 290 290 290 166
2 2
OMOTOSHO GAS GT1 - 8 GT1, 5 & 7 GT1, 5 & 7 - On frequency response. GT2 - 4, 6 & 8 - Out for frequency management.
336 304
3 114 102.7
8
GT1 - 8 GT2, 5, 6 & 7 GT1 - Out for frequency management. GT2, 5, 6 & 7 - On frequency response. GT3, 4
OLORUNSOGO GAS 336 304 152 129.2 & 8 - Out for frequency management.
8 4
GT21 & 22 GT22 GT21 - Out due to gas constraints. GT22 - On frequency response.
GEREGU NIPP 290 290 145 86
2 1 GT23 - Tripped on ventilation system trip.
GT4 GT4 GT1 - Out on undisclosed fault. GT2 - Out due to auxiliary oil pump problem.
SAPELE NIPP 112.5 112.5 112.5 82.6 GT3 - Out on bearing lift pump trouble. GT4 -On frequency response.
1 1
GT1, 2 & 4 GT1 GT1 - On frequency response. GT2 - On standby due to high frequency. GT3 - Shut
ALAOJI NIPP GAS 375 360 1 70.4 70.4 down due to generator air inlet filter trouble. GT4- Out due to gas constraints.
3 Generation reduced due to high air inlet differential pressure.
GT1 -3 GT1 GT1 - On frequency response. GT2 & 3 - Out for frequency management.
NIPP

OLORUNSOGO NIPP GAS 375 360 120 82.8 GT4 & ST2 - Out of production since 25/10/2016.
3 1
GT1, 2 & 4 GT1 GT1 - On frequency response. GT2 - Out for frequency management.
OMOTOSHO NIPP GAS 3 375 360
1 120 85.4 GT3 - Out of production since 02/08/2016. GT4 - Out due to gas constraints.

GT1 & 2 GT2 Gt1 - On frequency management. GT3 & 5 - Out due to internal problem.
ODUKPANI NIPP 250 240 116.6 116.6 GT4- Out on unit transformer problem.
2 1
GT1 - 3 GT2 GT1 - Out for frequency management. GT3 - Out due to tripping of ccts H7V & V7B.
IHOVBOR NIPP 337.5 337.5 112.5 82.5
3 1 Generation reduced due to high frequency.
GT2 GT2
GBARAIN NIPP GAS 112.5 112.5 112.5 84.2 Available unit on bar. Generation reduced due to high frequency.
1 1
GT11, 12 & ST18 GT11, 12 & ST18 GT12 - On frequency response. Generation limited to 305MW due to unavailability of
OKPAI GAS/STEAM 450 305 305 190 one boiler.
3 3
GT11, 13 & ST10 GT11 GT11 - On frequency response. GT12 - Shut down due to power oil pump system fault.
AFAM VI GAS/STEAM 433.3 433.3 150 123
3 1 GT13 & ST10 - Out for frequency management.
0 0 GT2 - Out due to the fire outbreak on the control panel. GT3 - Out on maintenance
IBOM POWER GAS 0 0 0 0 work. Generation reduced due to highair inlet differential pressure.
0 0
AES 0 0 0 0 0 0 Out of production since 27/09/2014.
IPP

0 0
ASCO 0 0 0 0 0 0 GT1 - Shut down due to leakage in the furnace.
0 0
GT1, 2, 5 & 6 GT1, 2, 5 & 6 GT3 - Out on maintenance.
OMOKU GAS 100 80 80 75.4
4 4
TRANS-AMADI GT4 25 20 GT4 18.7 18.7 Available unit on bar.
1 1
0 0 Out of production since 16/09/2016.
RIVERS 0 0 0 0
0 0
SUB TOTAL 72 6732.8 6390.8 47 3850.2 3099.5 Frequency = 50.36Hz.

DAILY OPERATIONAL REPORT


1.7B GENERATION POSITION AT 06:00HRS OF SUNDAY 13/08/2017 FOR UNITS ON BILATERAL AGREEMENT
ST6 ST6 Available unit on bar.
EGBIN 220 220 154 154
1 1
GT2 - 4, 6 - 9 GT2 - 4, & 6 - 9 GT5 - Out on maintenance.
PARAS ENERGY 63 63 62.6 62.6
7 7
SUB TOTAL 8 288.8 288.8 8 216.6 216.6

GRAND TOTAL 80 7021.6 6679.6 55 4,066.80 3,316.10 Frequency = 50.36Hz.

1.7C BILATERAL AGREEMENT UNITS DISPATCH - SATURDAY 12/08/2017


FEEDERS NAME MAX. LOAD (MW) TIME (HRS) HOURS IN SERVICE REMARK

BILATERAL AGREEMENT LOAD DISPATCH


Egbin ST6 120MW GENERATION TO IKEJA ELECTRICITY DISTRIBUTION COMPANY
60MW PARAS ENERGY GENERATION TO CEB
U-STEEL ON 1:00 24 NIL FEEDER MAX TIME HOURS IN SERVICE REMARK
OGBA

PTCEXPRESS 9 9:00 24 NIL IKEJA WEST/SAKATE 64.8 02:00 24 NIL


330kV LINE
SANKYO ON 1:00 24 NIL
FEEDER 8 8 9:00 24 NIL
PULK IT 3 23:00 24 NIL
INDUSTRIAL 18 10:00 24 NIL
IKORODU

SPINTEX 4 1:00 24 NIL


DANGOTE 3 1:00 24 NIL
LAND CRAFT 4 23:00 24 NIL
TR4 15MVA 3.7 9:00 24 NIL
ALAUSA

TR5 -15MVA 3.7 9:00 24 NIL


ALAUSA 10.6 21:00 17 PLANNED OUTAGE

M/LAND PTC (MARYLAND) 11 12:00 24 NIL


TOTAL LOAD 78

3.0 SYSTEM SPINNING RESERVE AS AT 0600HRS OF SUNDAY 13/08/2017 =


0MW. FREQUENCY 50.36Hz.

DAILY OPERATIONAL REPORT


UNIT ON CONTRACTED ACTUAL
TOTAL
1.8 HYDROLOGICAL DATA: SUNDAY 13/08/2017 S/N POWER STATION SPINNING RESERVE RESERVE
(MW)
RESERVE (MW)
KAINJI JEBBA SHIRORO ST2 0
HEAD WATER ELEVATION (METERS) 137.36 102.93 367.7 1 Egbin ST4 100 0 0
TAIL WATER ELEVATION (METERS) 104.98 74.20 271.2 ST5 0
GROSS OPERATING HEAD (METERS) 32.38 28.73 96.5 ST6 0
AVERAGE TURBINE DISCHARGE (M3/SEC) 738 1392 490
AVERAGE SPILLAGE (M3/SEC) 0 0 0 GT16 40 0
3 Delta 0
AVERAGE TOTAL STATION DISCHARGE (M3/SEC) 738 1392 490 GT17 40 0
COMPUTED INFLOW (M3/SEC) 2009 1357 698 GT1 0
STORAGE DIFFERENTIAL 1271 -35 208 GT2 0
4 Olorunsogo NIPP 40 0
MAXIMUM LEVEL FOR SPILLAGE COMMENCEMENT 141.73 103 382.5 GT3 0
` MINIMUM LEVEL BELOW WHICH NO GENERATION 130 99 355 GT4 0
5 Geregu NIPP GT22 35 0 0
1.9 MAXIMUM/ALLOCATED LOAD/MINIMUM LOADS FOR ABUJA AND LAGOS AS AT SATURDAY 12/08/2017 GT1 0
ALLOCATED LOAD MINIMUM GT2
DISCO MAXIMUM LOAD(MW) TIME(HRS) TIME(HRS) 6 Omotosho NIPP
GT3
40 0 0
(MW) LOAD(MW)
ABUJA 408.4 23:00 478.72 320 14:00 GT4 0
EKO 0 0:00 0 0 0:00 TOTAL (MW) 295 0 0
IKEJA 472.0 22:00 703.99 362.2 04:00
4.0 UNUTILIZED GENERATION CAPABILITY
2.0 GAS POSITION: SUNDAY 13/08/2017 The unutilized generation capability for Sunday 13/08/2017 as at0600Hrs was = 2059.8MW.
SIGNED NGC DECLARED INSTALLED CAPACITY OF PREVIOUS CAPABILITY OF UNITS DIFFERENCE ACTUAL GENERATION AT UNUTILIZED
GENERATION 0600HRS (MW) GENERATION
STATION ACQ Annual Contracted QUANTITY THERMAL STATIONS DAY OFF-TAKE ON BAR OF THERMAL (MW) STATION
S/NO CAPABILITY (MW) CAPABILITY
SUB -TOTAL
Quantity MMSCF/D (MMS317.578CF/D) (MW) (MMSCF/D) STATIONS (MW)
(MW)

EGBIN P/S 304 1100 440 660 4.1 DUE TO GAS CONSTRAINTS:
DELTA (GAS) 408 765 455 310 1 Geregu NIPP GT21 145 0 145
OMOTOSHO GAS 76.7 336.8 114 222.8 2 Alaoji NIPP GT4 120 0 120
OMOTOSHO NIPP 80.5 500 120 380 3 Omotosho NIPP GT4 120 0 120
OLORUNSOGO (GAS) 104.3 336 152 184 0
OLORUNSOGO NIPP 107.4 750 120 630 0
SAPELE NIPP 0 500 112.5 387.5 0
SAPELE STEAM 48 720 67 653 0 385
AFAM IV-V 0 300 0 300 0
AFAM VI 110 650 150 500 0
GEREGU GAS 80 435 290 145 0
GEREGU NIPP 68 435 145 290 0
OKPAI (GAS/STEAM) 223 480 305 175 0
ALAOJI NIPP 0 504 120 384 0
IHOVBOR NIPP 110.2 450 112.5 337.5 IT IS ENVISAGED WITH IMPROVED PLANT AVAILABILITY AND RELIEF FROM EXISTING POWER SYSTEM
IBOM 0 198 0 198 NETWORK RELATED CONSTRAINTS, ADDITIONAL 1670.72MWSCF OF GAS (EQUIVALENT TO 6265.2MW WILL
BE REQUIRED WHEN ALL THERMAL UNITS ARE ON BAR.
ODUKPANI NIPP 114.9 625 116.6 508.4
TOTAL 1835 9085.72 2819.6 6265.2 4.2 DUE TO LINE CONSTRAINTS
0
0 0
0
1 MMSCF IS EQUIVALENT TO 3.75MW 4.3 DUE TO FREQUENCY MANAGEMENT OCCASIONED BY DISCOS' LOAD DEMAND
1 Afam VI GT13 & ST10 283.3 0 283.3
2 Ihovbor GT1 112.5 0 112.5
3 Olorunsogo NIPP GT2 & 3 240 0 240
SYSTEM BLACK START CAPABILITY 4 Omotosho Gas GT2, 3, 4,6 & 8 190 0 190
Delta, Shiroro & Egbin - Available. 5 Shiroro 411G1-3 375 375
6 Olorunsogo Gas GT3,4 & 8 114 0 114
SPINNING RESERVE FOR : SATURDAY 12/08/2017 7 Omotosho NIPP GT2 120 0 120
(MW) TIME FREQUENCY 8 Alaoji NIPP GT2 120 0 120 1674.8
Maximum (MW) 9 Odukpani GT1 120 0 120
Minimum (MW) 0
AVERAGE (MW) 0

0
4.4 DUE TO WATER MANAGEMENT
0
Total 2059.8

DAILY OPERATIONAL REPORT


5. 0 OUTAGES:` 5 (E) EMERGENCY OUTAGES:- NIL

5 (A) FORCED OUTAGES (GENERATION):-

1 12:18 15:15Hrs, Delta P/S GT4 tripped on reverse power due to tripping of 91MVA 132/33kV transformer T3 at Delta T/S. LHR = 15MW.
2 12:34Hrs, Omoku GTs1, 2, 5 & 6 went on house load due to switching operation carried out at Afam 1 T/S. LHR = 70.2MW.
13:28Hrs, 13:30Hrs, 13:31Hrs & 13:32Hrs GTs 6, 1, 2 & 5 were tied respectively
3 12:37- 15:22Hrs, Trans Amadi GT4 tripped due to the switching operation carried out at Afam 1 T/S . LHR = 18MW. 5 (F) AUTOMATIC UNDER FREQUENCY OPERATION: NIL
4 15:03 -16:10Hrs, Odukpani GT2 tripped on reverse power due to tripping of Ikot-Ekpene/Ugwuaji 330kV line 3(cct K3U) at Uguwaji T/S. LHR = 90MW.

5 15:11 16:01Hrs, Alaoji NIPP GT1 tripped due to tripping of Alaoji/Ikot Ekpene 330kV line 1 (cct A1K). LHR = 70.6MW. 5 (G) 330KV LINES THAT ARE OUT ON VOLTAGE CONTROL:- cct L7G &
U2A.
6 18:29Hrs, Kainji 1G5, 6 & 12 tripped on reverse power due to tripping of cct K2J. LHR: 1G5 = 94MW, 1G6 = 93MW & 1G12 =72MW.
19:34Hrs,19:36Hrs & 20:09Hrs, Kainji 1G5, 6 & 12 were tied respectively.
5 (I) 330KV LINES THAT ARE OUT ON BREAKER PROBLEM:- ccts K1J,
A2K & N4J.

5 (J) 330KV LINES THAT ARE OUT ON PLANNED OUTAGE:- NIL

5 (B) FORCED OUTAGES TRANSMISSION:-


1 09:58 10:03Hrs, Benin/Egbin 330kV line (cct B6N) CB tripped at Benin T/S on auxiliary relay K86 ABC. No load loss as ccts H7V, V7B, H1W & N6W were in service. 5 (K) 330KV LINES THAT ARE OUT ON LINE FAULT:- cct M5W

2 15:04 15:28Hrs, Ikot Ekpene/ Ugwuaji 330kV (cct K3U) tripped at Ugwuaji T/S on the following relay ABB relay O/C 3-Phases, DEF Lockout. LHR = 84MW.
3 15:06 15:31Hrs, Alaoji/Ikot Ekpene 330kV line 1 (cct A1K) CB tripped at Alaoji T/S only on Micom relay E/F, tie >>, tie >. LHR = 30MW. 9 WEATHER REPORT: Rainfall was reported at Ayede.

4 15:25 15:45Hrs, Ayede/Shagamu/Ijebu- Ode 132kV line CB tripped at Ayede T/S on Optimho relay DEF delay, location = 74.81km. Micom relay instantaneous
E/F. LHR = 50MW.
5 16:00 16:17Hrs, Ayede/Ibadan North/Iwo/Iseyin 132kV line CB tripped at Ayede T/S on Optimho relay: location = 191.5km.
Siemens relay E/F. LHR = 48MW.
6 16:01 16:26Hrs, Osogbo/Ikeja West 330kV line (cct H1W) CBs tripped at both ends on the following relay indications:
At Osogbo T/S: Ohmega relay DEF forward, DEF reverse, location = 291.22km, Auxiliary relay 86T/2.

At Ikeja West T/S: Siprotec relay General trip, Yellow Phase fault, zone 1 trip, 5X B, PUIP Phase B, PU time = 76ms, trip time = 0ms, distance = 30.4km. 10 INTERNATIONAL LINES:-
On Micom relay General trip, Yellow Phase, distance zone 1 trip, started B-N trip Phase B, distance = 85.22km. No load loss as ccts H2A, R2A & R1W were in
7 16:20 - 16:28Hrs, Olorunsogo/Ayede 330kV line (cct R2A) CB tripped at Olorunsogo T/S on -ROCP H3-OP Phase AB & C, trip time = 1273ms, fault location Phase B, A IKEJA WEST/SAKATE 330KV LINE(TCN+PARAS)
1428.9km. No load loss as cct R1W was in service. Maximum load - 986MW at 22:00Hrs.
Minimum load - 697MW at 14:00Hrs.
8 18:29Hrs, Jebba/Osogbo 330kV line 2 (cct J2H) CB tripped at Osogbo T/S, simultaneously 330kV bus coupler breaker tripped at Jebba T/S along with cct B9J as B BIRNIN KEBBI/NIAMEY 132KV LINE
follows: Maximum load - 82.0MW at 01:00Hrs.
At Osogbo T/S: Ohmega relay zone 3, Phase A, Earth, MVAJ relay 86T/1, 86A/1, distance = 257.37km. Minimum load - 67.0MW at 18:00Hrs.
At Jebba T/S: Bus coupler breaker tripped on DUTR relay MP TR & 86T.
On cct B9J: ABB relay trip tip, TR L2, TOC STL3, STN, .auxiliary relay K86ABC. C KATSINA/GAZAOUA/MARADI 132KV LINE
18:54Hrs, cct J2H was restored. Maximum load - 37.5MW at 22:00Hrs.
19:05Hrs, Jebba 330kV bus coupler breaker was restored. Minimum load - 25.0MW at 07:00Hrs.
19:06Hrs, cct B9J was restored.
9 18:29 19:22Hrs, Kainji/Jebba 330kV line 2 (cct K2J) CB tripped at Jebba T/S
On differential & backup trip relay. LHR = 134MW.
10 18:29 -19:03Hrs, Osogbo/Offa/Omuaran 132kV line CB tripped at Osogbo T/S on D/P, E/F, distance = 184.0km. LHR = 26MW.
11 18:29 19:47Hrs, Birnin-Kebbi T/S lost supply from Kainji due to tripping at cct K2J from Jebba T/S. Load loss = 141MW.

5 (C) PLANNED OUTAGES:


1 11:09 - 18:36Hrs, Ugwuaji T/S 150MVA 330/132/33kV transformer T1 was taken out to check and rectify the cause of incessant trippings of the transformer.
Load loss = 7.5MW.
2 11:22 16:24Hrs, Lekki T/S 300MVA 330/132kV transformer T1 was taken out for contractor to install temperature transducer on the transformer. Load loss = 36MW.
3 13:01 14:31Hrs, Afam 1 T/S 132kV reverse bus bar was taken out for safe working space to enable LMD crew terminate the down dropper conductor to the 150MVA
330/132kV inter bus transformer., replace the short span conductor between the CB and the line isolator and also replace Blue Phase conductor between the CB and
CT on Afam/IPP 132kV line 1. No load interruption as the load was transferred to the main bus.

DAILY OPERATIONAL REPORT


11 MISCELLANEOUS:-
5(D) URGENT OUTAGES: 1 00:06Hrs,Egbin P/S was instructed to reduce generation by 55MW.
Frequency was 50.39Hz.
1 12:03 14:42Hrs, Delta T/S 132kV reserve bus bar was taken out for LMD crew to treat hot spot on the Yellow Phase jumper clamp of the bus bar isolator. 2 00:08Hrs, Odukpani NIPP was instructed to reduce generation by 80MW.
Load loss = 54MW. Frequency was 50.39Hz.
2 12:14 14:49Hrs, Afam/IPP/Port Harcourt 132kV lines 1 & 2 were taken out to facilitate the job at Afam 1 T/S. Load loss = 45MW. 3 01:02Hrs, Egbin P/S was instructed to reduce generation by 55MW.
Frequency was 50.39Hz.
3 12:34 14:43Hrs, Afam/Alaoji 132kV line 2 was taken out to facilitate the job at Afam 1 T/S. Load loss = 10MW. 4 01:22Hrs, Delta P/S was instructed to reduce generation by 50MW.
Frequency was 50.43Hz.
4 12:35 14:44Hrs, Afam/Alaoji 132kV line 1 was taken out to facilitate the job at Afam 1 T/S. No load interruption as the line was on soak. 5 02:08Hrs, Shiroro P/S was instructed to reduce generation by 100MW.
Frequency was 50.46Hz.
5 12:37 17:24Hrs, Kaduna/Zaria 132kV line was taken out due to DC failure (50V) at Zaria T/S. Load loss = 30MW. 6 02:09Hrs, Okpai P/S was instructed to reduce generation by 50MW.
Frequency was 50.46Hz.
6 13:14 14:07Hrs, Alaoji/Aba 132kV line 1 was taken out to enable maintenance crew treat hot spot on Red Phase conductor clamp to the wave trap. 7 06:29Hrs, Delta GT16 was shut down for maintenance crew to carry out
Load loss = 20MW. test on the unit for proper operation. No load interruption as its load was
transferred to other units.
7 14:04 15:04Hrs, Jebba/Osogbo 330kV line 1(cct J1H) CB was taken out for maintenance crew to top up low SF6 gas of the line breaker to normal level . No load 8 07:40Hrs, Delta P/S was instructed to reduce generation by 50MW.
loss as ccts J2H, J3G & H3G were in service. Frequency was 50.47Hz.
8 14:30 17:47Hrs, Itu/Uyo 132kV line CB was taken out for LMD crew to replace cut jumper at tower #40. No load loss as the line was on soak. 9 07:40Hrs, Kainji P/S was instructed to reduce generation by 30MW.
Frequency was 50.47Hz.
10 07:40Hrs, Geregu Gas was instructed to reduce generation by 10MW.
Frequency was 50.47Hz.
11 07:40Hrs, Geregu NIPP was instructed to reduce generation by 10MW.
Frequency was 50.47Hz.
12 08:19Hrs, Odukpani NIPP GT2 was tied to swap with GT1.
6 GENERATOR MERIT ORDER BASED ON SYSTEM RESPONSE AND GRID RELIABILITY 13 08:35Hrs, Odukpani NIPP GT1 was shut down, load transferred to GT2.
GROUP 1 - ALL UNITS OFFERING FREE GOVERNOR FREQUENCY RESPONSE. 14 09:58Hrs, Trial restoration on Omotosho/Ikeja West 330kV line (cct M5W)
at Ikeja West T/S after broken insulators on tower #s 713 & 716 were
replaced failed on the following relay operations:
GROUP 2 - ALL UNITS OFFERING REGULATING RESERVE. Siprotec relay, Yellow Phase fault, 5X - B, PU IP Blue Phase, PU
time110.9ms, distance = 57.6km. Simultaneously, Egbin/Ikeja West 330kV
line (cct N6W) CB tripped at Ikeja West T/S on Siprotec relay: General trip,
DEF operated 50N/51N pickup, PU time: 1587ms, trip time = 1500ms,
distance = -2989.0km.
GROUP 4 - HYDRO IN HIGH FLOOD PERIOD SEASON, KAINJI, JEBBA AND SHIRORO. 15 11:55Hrs, Odukpani NIPP was instructed to reduce generation by 80MW.
Frequency was 50.38Hz.
GROUP 5 - ALL UNITS USED TO AVOID OVERLOADING TRANSMISSION LIMITS. 16 12:09Hrs, Olorunsogo was instructed to reduce generation by 50MW.
Frequency was 50.38Hz.
17 12:13Hrs, Kainji P/S was instructed to reduce generation by 60MW.
GROUP 6 - ALL UNITS OFFERING VOLTAGE SUPPORT OUTSIDE NORMAL LEVEL. Frequency was 50.40Hz.
GROUP 7 - ALL UNITS IN LOCATION TO DIMINISH LOSSES 18 12:15Hrs, Egbin P/S was instructed to reduce generation by 55MW.
Frequency was 50.35Hz.
19 12:26Hrs, Jebba 2G1 was declared available, the unit was out on fault.
20 12:48Hrs, Jebba 2G1 was tied to swap with 2G2.
21 12:49Hrs, Jebba 2G2 was shut down and load transferred to 2G1.
8 (A) COMMUNICATION MEDIA 22 13:10 -19:44Hrs, Gbarain GT2 was shut down for frequency management.
LHR = 45MW.
STATIONS NO. INSTALLED NO. WORKING 23 13:35Hrs, Jebba 2G2 was tied. The unit was out to swap with 2G1.
PLC/PAX 37 35 24 13:36Hrs, Jebba 2G1 was shut down for further check on the unit, load
transferred to 2G2.
OPTIC FIBRE 13 10 25 14:22Hrs, Jebba 2G1 was tied to swap with 2G2.
PLS 14 5 26 14:23- 17:40Hrs, Jebba 2G2 was shut down load was transferred to 2G1.
27 17:27Hrs, Akangba T/S 90MVA 330/132/33kV transformer T5 was
restored. The transformer tripped at 11:41Hrs of 11/08/2017 on HV REF.
28 20:15Hrs, Jebba 2G1 was tied to the grid. The unit had been out on
maintenance.
31 23:01 through 24:00Hrs, Jebba 2G2 was shut down for frequency
management. LHR = 80MW.

DAILY OPERATIONAL REPORT


8 (B) SCADA RTU STATUS

STATIONS TOTAL NO OF NO OF RTU INSTALLED NO OF RTU


STATIONS WORKING
POWER STATIONS 23 8 3

330kV 41 17 12

132kV 119 103 19

12.0 UNAVAILABLE EQUIPTMENTS


12(A) UNAVAILABLE TRANSFORMERS/REACTORS:

SHIRORO REGION:
1 Apo T/S 60MVA 132/33kV transformer TR3 - Burnt.

KADUNA REGION: 12(D) LAGOS REGION


1 Kumbotso 150MVA 330/132/33kV transformer T1A - Burnt control cables. 1 Egbin/Aja 330kV line 2 (cct N4J) - faulty breaker at Aja T/S.

2 Agbara/Ojo line 1 on soak.

ENUGU REGION:

1 Onitsha T/S 90MVA 330/132/13.8kV transformer 9T2 - Out due to differential fault.
SHIRORO REGION:- Nil
12 (B) UNAVAILABLE BREAKERS/ISOLATORS
LAGOS REGION: 12(E) UNAVAILABLE CAPACITOR BANK:
1 Akangba T.S. 132kV Bus Coupler CB - Serious Air leakage.(Undergoing repair) (i) Ogba T.S, (ii) Maiduguri T/S, (iii) Isolo T/S, (iv) Ado-Ekiti T/S, (v) Ilorin
T/S, (vi) Akure T/S.
2 Egbin/Aja 330kV line 2 (cct N4J) - faulty breaker at Aja T/S.

3 Otta/Ogba 132kV line isolator - defective control shaft. 12 (F) LINES WITH MISSING SKY WIRE
4 Osogbo/Ikeja West and Olorunsogo/Ikeja West tie CB at Ikeja West T/S - defective pole LAGOS REGION
5 Oke-Aro/Ikeja West 330kV lines 1 & 2 tie CB at Ikeja West T/S - Defective pole. 1 Omotosho/Ikeja West line (M5W) and Egbin/Ikeja West line 3 (N6W) - 21
spans.
6 Jebba G.S/Jebba T.S 330kV line 2 CB at Jebba T/S. 2 Ikeja West/Olorunsogo line (cct R1W) - 80 spans.
7 Omotosho/Ikeja West 330kV line CB at Ikeja West T/S. 3 330kV Ikeja West/Osogbo line. - 95 spans.
4 Ikeja West/Alimosho/Ogba 132kV lines 1 & 2 - 15 spans.
OSOGBO REGION: 5 Ikeja West/Akangba 330kV line 2 - 1 span.

1 Omotosho 330kV T/S, 2nd series 330kV CB #3322 out due to control circuit problem. 6 Ikeja West/ Ilupeju 132kV lines 1 & 2 - 8 spans.
2 Jebba/Osogbo 330kV line 1 (cct J1H) - Defective line isolator mechanism at Osogbo T/S 7 Akangba/Itire 132kV lines 1 & 2 - 1 span.
8 Ikeja West/Agbara 132kV lines 1 & 2 - 61 spans.
ENUGU REGION: 9 Ikeja West/Otta 132kV lines 1 & 2- 17 spans.

1 New Haven/Yendev 132kV line CB - Faulty Red phase CB pole. Protection is transferred to the bus coupler CB. SHIRORO REGION

2 Abakaliki T/S 30MVA 132/33kV transformer T1A and 60MVA 132/33kV transformer T2 primary CBs - Breakers were not provided since commissioning but the 1 Jebba T/S 330kV Osogbo lines 1 & 2 and Ganmo line - 9 spans
transformers are protected by Nkalagu 132kV line CB.
3 Oji River T/S 30MVA 132/33kV transformer T1A primary CB - The breaker is completely out of service and bypassed. The transformer is either protected by 2 Minna T/S 132kV Bida line - 32 spans
Onitsha/Oji 132kV line CB or New Haven/Oji 132kV line CB.
4 Oturkpo/Yendev 132kV By pass isolator - Canibalized to repair the line isolator. 3 Apo T/S 132kV Keffi line - 36 spans

4 Shiroro T/S 330kV Jebba line 2 - 28 spans

DAILY OPERATIONAL REPORT


SHIRORO REGION 12 (G) UNAVAILABLE SYNCHROSCOPES :
1 Kainji/Jebba 330kV line 1 - CB problem at Kainji T/S. 1 Benin, Ikeja West, Onitsha, Egbin, Ugwuaji, Osogbo, Kaduna, Jos,
Gwagwalada & Alaoji T/S.
2 Jebba T/S 75MX reactor 2R2 CB - exploded.
PORT HARCOURT REGION
1 Alaoji/Ikot-Ekpene 330KV line 2 (cct A2K) Yellow Phase isolator not latching properly. FOR MORE INFORMATION: NCC Telephone Lines -
a PAX 09/300, 309, 303 & 305.
12 (C) UNAVAILABLE/DEFECTIVE GROUND SWITCHES b NCC GSM - 08074888524, 08069379367, 08023572651 & 08051401331.
Benin Region c CUG
PLS -Nos.
622 08129458488, 08129458489, 08129929806; 08036665323.
1 Irrua T/S: Benin/Irrua 132kV line Earth Switch - faulty. d GM (NCC) -08036744641.
e AGM (S/O) - 08056002757, CUG: 08129458475
ENUGU REGION:
1 New Haven/Nkalagu 132kV line 2 ground switch - Canibalized Red phase female contact and canibalized Yellow phase male contact.