1. Company Information
Name of the institution: General Directorate Public Transport and Communications (Beneficiary of the
Chisinau project Chisinau Urban Road Sector Project ), City Hall of Chisinau
Country: Moldova
Signature: Date:
Please provide information on the status of each of the If so, please describe, including
Social and Environmental Action Plan (ESAP) that Yes details of actions to improve and
has been approved by the EBRD. If ESAP has been No prevent future occurrence:
updated during the reporting period, please attach a
copy of the new plan.
Visits by local environmental
How many inspections were made by local authorities during the reporting
environmental authorities during the reporting period? period focused on:
1. In unannounced control where
Number:2 injury to trees and shrubs was
identified during greenfield
construction.
2. Collection of samples for
pollutant emission analysis in
atmosphere from the sources of
pollution during the repair /
construction of the bd. Stephen the
Great.
The visit by the health and safety
How many checks have been made by the health and authorities during the reporting
safety authorities during the reporting period? period focused on:
1.Verification / observance of the
Number:1 health and safety requirements at
work by providing training in the
work places; Equipping workers
with equipment; Respect for
workers' work and rest.
Number:1 The visit made by the labor
How many inspections were made by the labor protection authorities during the
protection authorities during the reporting period? reporting period focused on:
1. Verification of compliance with
labor protection regulations,
normative and contractual
regulation of labor relations.
Recovery of the situation in
Have these visits caused fines or penalties and / or established terms, by observing the
corrective action plans? Yes requirements for safety and health
No at work (OSS), regarding normative
and contractual regulation of the
labor relations
These actions did not lead to the
These actions have led to its reduction, suspension or reduction, suspension or temporary
Temporary stopping due to environmental, health and Yes cessation of environmental, health
safety or working conditions? No and safety or working conditions of
the bd reconstruction. Stefan cel
Mare, V. Alecsandri, b. C.
Negruzzi.
During the reconstruction works of tefan cel Mare b. tefan cel Mare, V. Alecsandri during the
reporting period, all measures of environmental protection have been taken in compliance with the laws,
regulations and other normative acts in force, which are applicable, in which it is executed and Complies
with all environmental protection requirements. Account is taken of the environmental and social
monitoring plan, which presents a program aimed at monitoring the environmental management
requirements imposed by the legal regulations applicable to the project activities.
The data during the monitoring of environmental components were recorded in weekly reports and the
results that include analytical aspects of providing information, explanations, on the problems
encountered are present in the monthly reports throughout the reporting period.
The mitigation measures provided by the project were executed by the responsible agencies and
information on the monitoring of the requirements that are introduced in the database used as a
management tool to support the planning and timely implementation of environmental parameter
monitoring actions: And storage; Water quality (surface water and underground water); Air quality; Noise
level; Soil, green spaces; The use of hazardous materials; Traffic and pedestrian safety; Worker safety
and social effects; Maintenance during the operational phase. By executing the implementation project
according to the opinions of the Public Health Center, the Botanica Botanica Fire and Rescue Detachment
of the Ministry of Environment and Water, the Chisinau Ecological Agency, were granted the execution
project "The location of the provisional yard consisting of the asphalt production area, concrete
production area, Warehouse and "administrative" area from 5 Industriale str., Sngra mun mun. Chiinu
Beneficiary .CS Delta MCM93 SRL (local representative).
The amount of associated expenses (investment expenses and current expenses) in the period 01.2016 -
12.2016 is of: 130 million lei.
The copy of the monitoring plan for all environmental components is attached. (Appendix 1 )
Monitoring plan
- - - -
COD
substances 0,0057 mg/l ELA I'm not over CMA
Solid in
suspension
Emissions to air
Other parameters
Noise 35,5 dBA NMA- Acoustic calculation at the control
50dBA point at the protection zone boundary -
300m
Solid waste
Solid waste such as edges, broken asphalt, concrete, and soil during the reporting period were deposited
at the S.A. Edility stone mine and the waste as masonry asphalt was deposited at the UPA. Edilitate.
Total: milling asphalt -15477 tons and 2195 ml.
Solid household waste was accumulated in a returnable metal container and discharged to authorized
garbage under contract No.54 29.07.14 concluded with "Agrofin-BA" in Andries str. Sungera.
Solid waste classified as hazardous was not generated.
The waste listed above is handed over to authorized companies that reuse, recycle individually. All works
are done being minimized in all possible cases damage and affection of flora and fauna. Supervision and
reduction measures for the management of solid waste:
- Vehicles leaving the site do not have excess load (cargo), avoid spreading the waste outside the tire.
- Safety and precautions necessary to prevent damage to the landfill site but also disposal, including
washing as appropriate.
- Waste and impurities from construction works on the land or other land are discharged as a matter of
urgency from the affected territory or area.
Emergency instructions or interventions during the reporting period were not required.
There have been changes in the field Yes There have been no changes in the union field during
Trade union during the period No the reporting period.
report?
There have been changes in the Yes There were no changes in the Collective Bargaining
Agreement No Agreement.
Collective work (for example,
The Updated or Modified /
Or expired / or new agreement)?
There have been collective Yes There were no collective redundancies during the
redundancies on No reporting period.
During the reporting period?
There are projected or expected Yes There are no expected redundancies or recruitment
redundancies No for employees next year.
Recruitment for the next year?
Employees filed complaints within Yes Employees did not complain to the project during the
Project during the period No reporting period.
report?
There have been strikes and other riots Yes There have been no strikes and other collective
Collectively with reference to the No revolts with reference to the working conditions in
Work in the institution during the period the institution during the reporting period.
report?
There have been cases filed in Yes There were no cases filed in the labor courts during
The courts of law No the reporting period.
Work during the reporting period?
45.18.1.2.3 8. Involvement of stakeholders
During the reporting period complaints / interpellations were not received from members of public or
civil public organizations.
On a monthly basis, the contractor together with the social and environmental specialist met with local
health authorities to strengthen systematic collaboration such as: efficient use of local health services to
provide services where needed. The contractor facilitates medical care to maintain staff health and work
protection.
The contractor has developed and submitted a specific, detailed traffic planning plan for each type of
work, approved by the Engineer, which corresponds to the approved General Traffic Management Plan.
The visibility, safety of vehicles and pedestrians in peak hours is in order. Repaired parts are isolated
from the rest of the road through the net and panels for road repair. The contractor has on site all
necessary equipment and a qualified road traffic safety specialist who monitors compliance with the
traffic organization plan. Monitoring is done to prevent any disturbance or degradation of the
environment and to protect both the General Directorate of Public Transport and the Communication Way
and the affected parties from unjustified statements of accusations of environmental damage.