Tribhuvan University

Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/22
Recorder:Group 5 Weather: Cloudy
Instrument:Theodolite,Staff,Ranging rod Temperature:20-25C
Horizontal angle Observation Sheet
Small Minor Traverse
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of Remarks & Sketches
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
M14 M15 L 010'00"
10'50"
1.485 R 18011'40"
12402'20"
m1 L 12412'40"
13'10"
R 30413'40"
m1 M14 L 010'00" 9212'00" 1.030 0.765 0.500
10'50"
1.460 R 18011'40" 212'00"
668'50"
m2 L 6619'00"
19'40"
R 24620'20"
m2 m1 L 010'00"
10'50"
1.540 R 18011'40"
23723'00"
m3 L 23733'40" 18011'40" 0.975 0.788 0.600
33'50"
R 5734'00" 18011'40"
m3 m2 L 010'00"
10'50"
1.360 R 18011'40"
10656'40"
M16 L 10706'40"
07'30"
R 28708'20"
M16 m3 L 010'00" 9259'50" 1.030 0.675 0.300
10'10"
1.430 R 18010'20" 259'50"
7413'40"
M15 L 7423'50"
23'50"
R 25423'50"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/22
Recorder:Group 5 Weather: Cloudy
Instrument:Theodolite,Staff,Ranging rod Temperature:20-25C
Horizontal angle Observation Sheet
Small Minor Traverse
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of Remarks & Sketches
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
CP1 m1 L 010'00" 9119'20" 1.480 0.980 0.410
10'05"
1.475 R 18010'10" 119'20"
5436'50"
CP2 L 5446'50"
46'55"
R 23447'00"
m1 m2 L 010'00" 9058'20" 0.910 0.660 0.410
10'05"
1.300 R 18010'10" 0058'20"
10055'05"
m1 L 10005'10"
05'10"
R 28105'10"
m2 M8 L 010'00" 9331'50" 1.221 0.776 0.331
10'05"
R 18010'10" 331'50"
26114'35"
m1 L 28124'10"
24'40"
R 8124'50"
M8 M9 L 010'00"
10'50"
R 18010'30"
7844'10"
m2 L 7854'10"
54'25"
R 25854'40"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
TBM 0.491 900.000
IP0 0+000 1.175 0.684 899.316
4.000 0.399 0.776 900.092
4.000 2.538 2.139 897.953
BC1 0+17.99 1.740 0.798 898.751
3.000 0.885 0.855 899.606
3.000 2.918 2.033 897.573
MC1 0+26.265 2.492 0.426 897.999
1.000 2.259 0.233 898.232
3.000 2.850 0.591 897.641
EC1 0+34.533 3.980 1.130 896.511
5.000 3.000 0.980 897.491
CP1 2.000 0.278 2.660 0.340 897.831
BC2 0+50.193 1.152 0.874 896.957
4.000 0.752 0.400 897.357
1.200 1.226 0.474 896.883
MC2 0+59.748 1.760 0.534 896.349
3.000 1.148 0.612 896.961
5.000 2.762 1.614 895.347
EC2 0+68.583 1.556 1.206 896.553
1.200 1.472 0.084 896.637
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
3.000 2.060 0.588 896.049
0+80 1.615 0.445 896.494
2.000 1.512 0.103 896.597
5.000 2.632 1.120 895.477
7.000 3.248 0.616 894.861

BC3 0+95.475 0.780 2.468 897.329


1.200 0.710 0.070 897.399
5.000 1.422 0.712 896.687
10.000 2.150 0.728 895.959
1.942 0.400 1.750 897.709
MC3 0+104.635 1.942 0.000 897.709
2.000 1.220 0.722 898.431
5.000 2.678 1.458 896.973
EC3 0+113.794 2.120 0.558 897.531
4.000 0.972 1.148 898.679
BC4 126.913 2.976 2.004 896.675
2.000 3.000 0.024 896.651
MC4 0+135.309 3.700 0.700 895.951
2.500 3.420 0.280 896.231
CP2 0.642 3.480 0.060 896.171
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
EC4 0+143.704 2.222 1.580 894.591
2.500 1.652 0.570 895.161
CP3 0.616 3.960 2.308 892.853
BC5 0+163.123 1.932 1.316 891.537
4.000 1.682 0.250 891.787
MC5 0+172.241 2.960 1.278 890.509
4.000 3.335 0.375 890.134
1.800 2.512 0.823 890.957
CP4 0.398 3.492 0.980 889.977
EC5 0+181.36 0.980 0.582 889.395
4.000 0.874 0.106 889.501
1.800 1.357 0.483 889.018
BC6 0+198.6 1.447 0.090 888.928
1.000 1.332 0.115 889.043
1.000 1.806 0.474 888.569
MC6 0+200.445 1.492 0.314 888.883
2.300 1.278 0.214 889.097
EC6 0+202.29 1.365 0.087 889.010
2.000 1.243 0.122 889.132
0+222.29 3.465 2.222 886.910
2.800 2.440 1.025 887.935
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
CP5 3.560 1.538 0.902 888.837
BC7 0+240.96 1.891 1.669 890.506
4.000 1.148 0.743 891.249
1.000 1.255 0.107 891.142
MC7 0+246.17 1.193 0.062 891.204
4.000 0.881 0.312 891.516
EC7 0+251.37 2.159 1.278 890.238
2.000 1.792 0.367 890.605
0+271.96 3.935 2.143 888.462
CP8 0.560 3.935 0 888.462
BC8 0+301.835 2.835 2.275 886.187
2.000 3.250 0.415 885.772
1.200 2.405 0.845 886.617
CP7 0.432 3.160 0.755 885.862
MC8 0+310.86 1.456 1.024 884.84
2.000 1.456 0.000 884.838
1.000 1.459 0.003 884.835
EC8 0+319.666 2.541 1.082 883.753
2.000 2.530 0.011 883.764
1.500 2.622 0.092 883.672
CP8 0.882 3.789 1.167 882.505
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
BC9 0+345.79 3.141 2.259 880.246
4.500 1.505 1.636 881.882
1.000 3.491 1.986 879.896
MC9 0+350.73 3.800 0.309 879.587
1.000 3.965 0.165 879.422
4.000 2.612 1.353 880.775
CP9 0.458 2.835 0.223 880.552
EC9 0+356.67 2.146 1.688 878.864
4.000 1.062 1.084 879.948
0+376.67 3.440 2.378 877.570
5.000 2.132 1.308 878.878
1.000 3.955 1.823 877.055
BC10 3.000 0+395.74 3.360 0.595 877.650
1.000 3.935 0.575 877.075
4.000 1.600 2.335 879.410
MC10 0+404.805 3.255 1.655 877.755
4.000 3.332 0.077 877.678
3.000 2.895 0.437 878.115
CP10 3.015 0.120 877.995
1.100 1.915 879.910
EC10 0+412.27 2.054 0.954 878.956
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
5.000 2.735 0.681 878.275
4.000 1.468 1.267 879.542
0+432.27 2.435 0.967 878.575
5.000 2.319 0.116 878.691
10.000 2.289 0.030 878.721
5.000 1.080 1.209 879.930
10.000 0.967 0.113 880.043
0+452.27 0.820 0.147 880.190
5.000 0.205 0.615 880.805
10.000 0.430 0.225 880.580
5.000 2.170 1.740 878.840
10.000 1.198 0.972 879.812
CP11 2.771 1.189 0.009 879.821
0+472.27 2.510 0.261 880.082
5.000 2.692 0.182 879.900
10.000 2.820 0.128 879.772
5.000 3.970 1.150 878.622
0+492.27 1.075 2.895 881.517
5.000 1.444 0.369 881.148
10.000 0.974 0.470 881.618
5.000 2.230 1.256 880.362
10.000 1.919 0.311 880.673
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
BC11 0+517.16 0.959 0.960 881.633
4.000 0.952 0.007 881.640
5.000 1.063 0.111 881.529
10.000 1.423 0.360 881.169
MC11 0+524.85 0.462 0.961 882.130
5.000 0.250 0.212 882.342
5.000 0.520 0.270 882.072
EC11 0+532.54 0.182 0.338 882.410
5.000 0.235 0.053 882.357
5.000 0.173 0.062 882.419
10.000 0.738 0.565 881.854
BC12 0+600.72 3.878 3.140 878.714
5.000 3.771 0.107 878.821
10.000 3.748 0.023 878.844
5.000 3.842 0.094 878.750
10.000 2.558 1.284 877.466
MC12 0+609.06 1.236 1.322 878.788
5.000 2.395 1.159 877.629
10.000 2.357 0.038 877.667
5.000 1.409 0.948 878.615
10.000 1.391 0.018 878.633

Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
CP12 3.612 1.379 0.012 878.645
EC12 0+617.4 1.355 2.257 880.902
5.000 1.469 0.114 880.788
10.000 1.337 0.132 880.920
5.000 1.417 0.080 880.840
10.000 1.778 0.361 880.479
BC13 0+631.74 0.950 0.828 881.307
5.000 1.116 0.166 881.141
10.000 1.147 0.031 881.110
5.000 1.368 0.221 880.889
10.000 1.200 0.168 881.057
MC13 0+639.104 1.023 0.177 881.234
5.000 0.970 0.053 881.287
10.000 1.218 0.248 881.039
5.000 0.973 0.245 881.284
EC13 0+646.468 1.013 0.040 881.244
5.000 1.010 0.003 881.247
5.000 1.102 0.092 881.155
10.000 1.209 0.107 881.048
CP13 3.600 1.116 0.093 881.141
0+666.408 3.641 0.041 881.100
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
5.000 3.659 0.018 881.082
10.000 3.660 0.001 881.081
5.000 3.632 0.028 881.109
10.000 3.638 0.006 881.103
0+686.408 2.552 1.086 882.189
5.000 3.570 1.018 881.171
5.000 2.538 1.032 882.203
10.000 2.500 0.038 882.241
0+706.408 1.519 0.981 883.222
5.000 1.972 0.453 882.769
5.000 1.177 0.795 883.564
0+726.408 0.782 0.395 883.959
5.000 0.800 0.018 883.941
10.000 1.660 0.860 883.081
CP14 5.000 0.913 0.759 0.901 883.982
CP15 10.000 4.638 0.982 0.069 883.913
BC14 0+736.078 1.583 3.055 886.968
MC14 0+742.693 1.050 0.533 887.501
1.020 1.070 0.020 887.481
EC14 0+749.308 1.240 0.170 887.311
3.000 1.150 0.090 887.401

Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Profile Levelling and cross-sectioning sheet Temperature: 25-30C
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
CP16 3.220 1.159 0.009 887.392
0+769.308 1.750 1.470 888.862
CP17 3.480 0.750 1.000 889.862
0+789.308 0.420 3.060 892.922
CP18 3.820 0.420 0.000 892.922
0+809.308 2.870 0.950 891.972
CP19 3.858 2.870 0.000 891.972
CP20 4.300 2.590 1.268 893.240
BC15 0+802.498 2.020 2.280 895.520
2 1.876 0.144 895.664
CP21 1.430 1.310 0.566 896.230
MC15 0+808.033 0.410 1.020 897.250
3.000 1.650 1.240 896.010
1.000 0.240 1.410 897.420
CP22 3.860 0.840 0.600 896.820
EC15 O+813.568 1.935 1.925 898.745
2.500 1.967 0.032 898.713
1.000 0.976 0.991 899.704
CP23 3.820 2.240 1.264 898.440
0+833.568 4.045 0.225 898.215
3.000 4.657 0.612 897.603
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
1.500 3.896 0.761 898.364
BC16 0+856.341 1.302 2.594 900.958
2.000 1.563 0.261 900.697
1.000 0.873 0.690 901.387
MC16 0+861.168 2.725 1.852 899.535
2.000 3.054 0.329 899.206
1.000 1.725 1.329 900.535
EC16 0+865.995 2.032 0.307 900.228
3.000 3.076 1.044 899.184
1.000 1.331 1.745 900.929
CP23 4.231 2.383 1.052 899.877
A 0+869.056 2.513 1.718 901.595
2.000 2.856 0.343 901.252
1.000 1.546 1.310 902.562
B 0+877.23 0.832 0.714 903.276
1.000 0.436 0.396 903.672
2.000 1.187 0.751 902.921
CP24 3.312 0.973 0.214 903.135
0+897.23 1.673 1.639 904.774
1.000 0.952 0.721 905.495
2.000 1.986 1.034 904.461
BC17 0+923.272 1.273 0.713 905.174
1.500 0.631 0.642 905.816
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 2067/11/04
Recorder: Group 5 Weather: Sunny
Instrument: Level,Staff Temperature: 25-30C
Profile Levelling and cross-sectioning sheet
Station Distance(m) B.S I.S F.S Rise Fall R.L.(m) Remarks Sketches
Left Center Right
3.000 1.342 0.711 905.105
MC17 0+928.836 0.861 0.481 905.586
1.000 0.480 0.381 905.967
2.000 1.428 0.948 905.019
2.847 1.341 0.087 905.106
EC17 0+934.4 1.527 1.320 906.426
1.000 1.056 0.471 906.897
2.500 1.871 0.815 906.082
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer: Group 5 Date: 2066/06/18
Recorder: Group 5 Weather: Cloudy
Instrument: Level,Staff Temperature: 20-25C
Precise Levelling Sheet
Backward
Stn. B.S I.S F.S Rise Fall R.L. Distance (m.) Total
Top Mid. Bot. Top Mid. Bot. Top Mid. Bot. D=ks
PBM 2.880 2.760 2.640 820.000 24.00 0.00 24.00
1 3.480 3.346 3.212 1.220 1.100 0.980 1.660 821.660 26.80 24.00 74.80
2 3.564 3.421 3.278 0.431 0.362 0.293 2.984 824.644 28.60 13.80 117.20
3 2.755 2.494 2.233 0.366 0.282 0.198 3.139 827.783 52.20 16.80 186.20
4 0.910 0.630 0.350 1.970 1.690 1.410 0.804 828.587 56.00 56.00 298.20
TBM3 1.550 1.462 1.374 1.960 1.771 1.582 1.141 827.446 17.60 37.80 353.60
5 1.758 1.731 1.704 1.150 0.770 0.390 0.692 828.138 5.40 76.00 435.00
6 2.935 2.775 2.615 0.831 0.705 0.579 1.026 829.164 32.00 25.20 492.20
7 3.060 2.910 2.760 0.408 0.302 0.196 2.473 831.637 30.00 21.20 543.40
8 2.835 2.720 2.615 0.435 0.370 0.305 2.540 834.177 22.00 13.00 578.40
9 2.630 2.440 2.250 0.440 0.270 0.100 2.450 836.627 38.00 34.00 650.40
10 2.135 2.035 1.935 0.960 0.830 0.700 1.610 838.237 20.00 26.00 696.40
11 2.445 2.335 2.225 0.640 0.560 0.480 1.475 839.712 22.00 16.00 734.40
12 2.725 2.640 2.555 0.415 0.315 0.215 2.020 841.732 17.00 20.00 771.40
13 2.670 2.595 2.520 0.530 0.475 0.420 2.165 843.897 15.00 11.00 797.40
14 2.517 2.445 2.373 0.450 0.361 0.272 2.234 846.131 14.40 17.80 829.60
TBM2 2.540 2.420 2.300 2.150 2.104 2.058 0.341 846.472 24.00 9.20 862.80
15 2.100 1.860 1.620 0.900 0.560 0.220 1.860 848.332 48.00 68.00 978.80
16 1.940 1.790 1.640 0.675 0.438 0.201 1.422 849.754 30.00 47.40 1056.20
17 3.390 3.090 2.790 0.660 0.455 0.250 1.335 851.089 60.00 41.00 1157.20
18 2.740 2.470 2.200 0.700 0.500 0.300 2.590 853.679 54.00 40.00 1251.20
19 1.995 1.795 1.595 0.770 0.550 0.330 1.920 855.599 40.00 44.00 1335.20
TBM1 1.458 1.268 1.078 1.100 0.839 0.578 0.956 856.555 38.00 52.20 1425.40
20 2.230 2.925 2.120 1.547 0.473 0.300 0.795 857.350 11.00 124.70 1561.10
21 1.645 1.510 1.375 1.248 1.071 0.900 1.854 859.204 27.00 34.80 1622.90
22 1.811 1.590 1.370 1.267 1.030 0.793 0.480 859.684 44.10 47.40 1714.40
23 2.557 2.370 2.182 0.808 0.612 0.416 0.978 860.662 37.50 39.20 1791.10
24 1.887 1.697 1.506 1.364 1.191 1.018 1.179 861.841 38.10 34.60 1863.80
25 1.710 1.530 1.350 1.634 1.459 1.284 0.238 862.079 36.00 35.00 1934.80
CP1 0.83 0.655 0.48 0.875 862.954 0.00 35.00 1969.80
Checked by:
Remarks
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 10/25/2067
Recorder: Group 5 Weather: sunny
Instrument: Level,Staff Temperature: 20-25C

Precise Levelling Sheet


Forward
Stn. B.S I.S F.S Rise Fall R.L. Distance (m.) Total Remarks
Top Mid. Bot. Top Mid. Bot. Top Mid. Bot. D=ks
cp2 1.952 1.797 1.642 922.558 31.000 31.00
1 2.01 1.860 1.710 0.657 0.524 0.391 1.273 923.831 30.000 26.600 87.60
2 1.490 1.400 1.310 0.872 0.750 0.622 1.110 924.941 18.000 25.000 130.60
3 3.119 3.042 2.965 0.402 0.382 0.362 1.018 925.959 15.400 4.000 150.00
4 1.695 1.602 1.505 0.751 0.624 0.503 2.418 928.377 19.000 24.800 193.80
5 1.357 1.261 1.170 1.222 1.120 1.020 0.482 928.859 18.700 20.200 232.70
cp1 0.948 0.828 0.708 0.433 929.292 24.000 256.70
Reversing
cp1 0.897 0.800 0.703 929.292 19.400 19.40
1 1.620 1.079 0.996 1.539 1.421 1.303 0.621 928.671 62.400 23.600 105.40
2 0.765 0.645 0.521 1.603 1.495 1.385 0.416 928.255 24.400 21.800 151.60
3 0.915 0.842 0.770 1.763 1.644 1.524 0.999 927.256 14.500 23.900 190.00
4 1.250 1.170 1.090 4.425 4.325 4.222 3.483 923.773 16.000 20.300 226.30
5 0.710 0.615 0.520 1.745 1.658 1.565 0.488 923.285 19.000 18.000 263.30
cp2 1.435 1.345 1.250 0.730 922.555 18.500 281.80
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 10/25/2067
Recorder: Group 5 Weather: sunny
Instrument: Level,Staff Temperature: 20-25C

Precise Levelling Sheet


Forward
Stn. B.S I.S F.S Rise Fall R.L. Distance (m.) Total Remarks
Top Mid. Bot. Top Mid. Bot. Top Mid. Bot. D=ks
cp1 0.850 0.761 0.679 929.292 17.100 17.10
1 1.270 1.145 1.017 1.570 1.470 1.371 0.709 928.583 25.300 19.900 62.30
2 1.297 1.178 1.064 1.481 1.361 1.242 0.216 928.367 23.300 23.900 109.50
3 1.527 1.400 1.268 1.513 1.380 1.246 0.202 928.165 25.900 26.700 162.10
4 1.886 1.773 1.658 1.461 1.324 1.193 0.076 928.241 22.800 26.800 211.70
5 1.857 1.728 1.600 0.783 0.677 0.566 1.096 929.337 25.700 21.700 259.10
6 1.988 1.854 1.724 0.652 0.530 0.412 1.198 930.535 26.400 24.000 309.50
7 2.223 2.087 1.954 0.670 0.534 0.404 1.320 931.855 26.900 26.600 363.00
8 1.762 1.632 1.502 0.654 0.550 0.441 1.537 933.392 26.000 21.300 410.30
9 1.480 1.352 1.224 1.350 1.210 1.070 0.422 933.814 25.600 28.000 463.90
10 2.311 2.194 2.08 1.14 1.003 0.87 0.349 934.163 23.100 27.000 514.00
11 2.88 2.813 2.745 0.545 0.451 0.355 1.743 935.906 13.500 19.000 546.50
12 3.721 3.646 3.577 0.418 0.382 0.349 2.431 938.337 14.400 6.900 567.80
13 1.381 1.332 1.283 0.57 0.505 0.422 3.141 941.478 9.800 14.800 592.40
14 1.732 1.698 1.661 0.751 0.718 0.686 0.614 942.092 7.100 6.500 606.00
TBM 1.044 1.015 0.985 0.683 942.775 5.900 611.90
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 10/25/2067
Recorder: Group 5 Weather: sunny
Instrument: Level,Staff Precise Levelling Sheet Temperature: 20-25C
Reversing
Stn. I.S F.S Rise Fall R.L. Distance (m.) Total Remarks
B.S Mid. Bot. Top Mid. Bot. Top Mid. Bot. D=ks
TBM Top 0.692 0.638 942.775 11.40 11.40
1 0.752 0.890 0.842 2.678 2.600 2.502 1.908 940.867 9.60 17.60 38.60
2 0.938 0.502 0.476 3.185 3.126 3.065 2.236 938.631 5.60 12.00 56.20
3 0.532 0.375 0.331 2.754 2.705 2.656 2.203 936.428 8.90 9.80 74.90
4 0.420 0.983 0.900 2.255 2.161 2.070 1.786 934.642 16.60 18.50 110.00
5 1.066 1.327 1.190 1.820 1.699 1.575 0.716 933.926 27.40 24.50 161.90
6 1.464 1.341 1.185 1.739 1.622 1.510 0.295 933.631 31.60 22.90 216.40
7 1.501 0.630 0.511 2.075 1.965 1.854 0.624 933.007 23.50 22.10 262.00
8 0.746 0.730 0.590 2.355 2.220 2.088 1.590 931.417 27.70 26.70 316.40
9 0.867 0.759 0.625 2.310 2.180 2.057 1.450 929.967 26.50 25.30 368.20
10 0.890 0.845 0.706 2.170 2.025 1.880 1.266 928.701 27.70 29.00 424.90
11 0.983 1.499 1.371 1.618 1.477 1.335 0.632 928.069 25.20 28.30 478.40
12 1.623 1.477 1.344 1.427 1.272 1.114 0.227 928.296 26.60 31.30 536.30
13 1.610 1.583 1.472 1.432 1.312 1.192 0.165 928.461 22.30 24.00 582.60
cp1 1.695 0.900 0.762 0.624 0.821 929.282 27.60 610.20
TBM Forward 1.845 1.730 942.775 23.00 23.00
1 1.960 3.125 2.990 0.586 0.445 0.302 1.400 944.175 26.60 28.40 78.00
2 3.256 1.360 1.210 0.782 0.675 0.568 2.450 946.625 29.60 21.40 129.00
3 1.506 1.286 1.108 2.145 1.790 1.798 0.430 946.195 36.00 34.70 199.70
4 1.468 1.448 1.270 1.602 1.430 1.262 0.144 946.051 35.80 34.00 269.50
5 1.628 2.737 2.540 0.714 0.586 0.454 0.862 946.913 39.40 26.00 334.90
6 2.934 1.745 1.515 1.112 0.911 0.710 1.826 948.739 45.10 40.20 420.20
7 1.966 1.598 1.420 1.510 1.322 1.136 0.423 949.162 35.50 37.40 493.10
PBM 1.775 0.910 0.745 0.582 0.853 950.015 32.80 525.90

Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5 Date: 10/25/2067
Recorder: Group 5 Weather: sunny
Instrument: Level,Staff Precise Levelling Sheet Temperature: 20-25C
Reversing
Stn. I.S F.S Rise Fall R.L. Distance (m.) Total Remarks
B.S Mid. Bot. Top Mid. Bot. Top Mid. Bot. D=ks
PBM Top 0.745 0.582 950.015 32.80 32.80
1 0.910 1.124 0.964 1.593 1.408 1.226 0.663 949.352 32.20 36.70 101.70
2 1.286 1.35 1.198 1.984 1.810 1.637 0.686 948.666 30.70 34.70 167.10
3 1.505 0.593 0.48 2.126 1.955 1.785 0.605 948.061 22.60 34.10 223.80
4 0.706 0.660 0.475 1.720 1.533 1.346 0.940 947.121 37.00 37.40 298.20
5 0.845 1.300 1.150 1.279 1.160 1.041 0.500 946.621 30.00 23.80 352.00
6 1.45 1.150 0.955 2.889 2.740 2.591 1.440 945.181 39.00 29.80 420.80
7 1.345 0.980 0.790 3.024 2.850 2.676 1.700 943.481 32.00 34.80 487.60
TBM 1.11 1.880 1.689 1.498 0.709 942.772 38.20 525.80
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5
Recorder: Group 5
InstrumentTape Distance Measurement Sheet
S.no. Line Distance(m) Discrepancy Average(m)
Forward Backward (1:2000)
1 cp2-M1 64.770 64.800 2159.000 64.785
2 M1-M2 58.250 58.230 2912.500 58.240
3 M2-M3 82.950 82.961 7540.909 82.956
4 M3-M4 65.100 65.130 2170.000 65.115
5 M4-M5 86.530 86.571 2110.488 86.551
6 M5-M6 55.950 55.926 2331.250 55.938
7 M6-cp1 58.530 58.350 325.167 58.440
8 M7-M8 72.190 72.162 2578.214 72.176
9 M8-M9 76.520 76.512 9565.000 76.516
10 M9-M10 80.660 80.635 3226.400 80.648
11 M10-M11 77.530 77.561 2500.968 77.546
12 M11-M12 101.700 101.732 3178.125 101.716
13 M12-M13 59.400 59.380 2970.000 59.390
14 M13-M14 63.363 63.394 2043.968 63.379
15 M14-CP2 75.77 75.81 2444.323 75.790
Total 1079.02 1079.15 1000.000 1079.083

Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer: Group 5
Recorder: Group 5
InstrumentTape
Distance Measurement Sheet (Minor)
S.no. Line Distance(m) Discrepancy Average(m)
Forward Backward (1:2000)
16 M5-m1 64.288 64.260 2296.000 64.274
17 m1-m2 44.130 44.140 4413.000 44.135
18 m2-m3 62.080 62.070 6208.000 62.075
19 m3-m4 52.145 52.160 3476.333 52.153
20 m4-m5 41.350 41.310 1033.750 41.330
21 m5-m6 55.900 55.950 1118.000 55.925
22 m6-M11 73.400 73.360 1835.000 73.380
Date: 2067/10/24
Weather: Sunny
Temperature: 25-30C `
Remarks

common point 2

common point 1
Date: 2067/10/24
Weather: Sunny
Temperature: 25-30C

Remarks
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2068
Observer:Group 2 Date: 2068/07/21
Recorder:Group 2 Weather: Cloudy
Instrument: Theodolite,Staff Temperature:20-25C
Traverse Computation (Small Minor Traverse)

Stn Length Horizontal Bearing Bearing Corrected Consecutive Independent Corrected


Correction
pt. Line (l) Angle () correction Bearing Coordinates Coordinates Coordinates
M8 m. deg min sec deg deg deg deg Lat.=lcos Dep.=lsin Lat. Dep. Lat.(+) Dep.(+) Lat. Dep.

M9 M8-M9 63.950 93 1 20 93.022 231.0677 0.0000 231.0677 561.333 545.263 561.333 545.263 561.333 545.263

m4 M9-m4 36.910 198 51 0 198.850 144.6990 0.0000 144.6990 -30.123 21.329 531.210 566.592 0.048 0.048 531.256 566.640

m3 m4-m3 56.210 146 54 40 146.911 263.5494 0.0000 263.5494 -53.809 15.917 477.401 582.509 0.070 0.073 477.517 582.630

m2 m3-m2 47.220 164 1 20 164.022 130.4606 0.0000 130.4606 -30.542 35.927 446.859 613.436 0.062 0.064 447.037 618.621

m1 m2-m1 41.870 174 5 40 174.094 114.4828 0.0000 114.4828 -17.351 38.105 429.508 656.541 0.052 0.055 429.738 656.781

M5 m1-M5 57.080 75 14 20 75.239 108.5772 -0.0003 108.5769 -18.184 54.105 411.324 710.646 0.072 0.075 411.626 710.961

M6 M5-M6 65.920 3.8161 -0.0003 3.8158


Checked by :
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2064
Observer:Group 5 Date: 2067/10/26
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff Temperature:25-30C
Traverse Computation ( Maior Traverse)

Stn. Distance Horizontal Angle Corrected Bearing Consecutive Correction Corrected consecutive Independent Corrected Corrected Bearing

Remarks
pt. (l) Angle Corr. angle () Coordinates coordinates Coordinates Length
m. deg min sec deg deg deg deg Lat.=lcos Dep.=lsin Lat. Dep. Lat. Dep. Lat. Dep. m. deg deg min sec
1000 1000
CP1 72.176 198 25 30 198.425 0.00301 198.42801 204.4694 -65.71345 -29.8516 0.003813 0.021437 -65.7096 -29.83015 1000 1000
M6 58.34 146 46 30 146.775 0.002433 146.77743 222.898 -42.76686 -39.6806 0.003082 0.017328 -42.7638 -39.66328 957.2362 960.34
M5 55.938 225 36 35 225.6097 0.002333 225.61205 189.676 -55.14807 -9.36752 0.002955 0.016614 -55.1451 -9.350905 902.0911 950.99
M4 86.5505 101 28 20 101.4722 0.003609 101.47583 235.290 -49.33861 -71.1104 0.004572 0.025707 -49.334 -71.0847 852.7571 879.90
M3 65.115 137 55 22 137.9228 0.002715 137.92549 156.764 -59.82028 25.71959 0.00344 0.01934 -59.8168 25.738929 792.9402 905.64
M2 82.955 167 3 55 167.0653 0.003459 167.06874 114.690 -34.62254 75.38442 0.004382 0.024639 -34.6182 75.409063 758.3221 981.05
M1 58.24 116 3 50 116.0639 0.002429 116.06632 101.758 -11.84925 57.02186 0.003076 0.017298 -11.8462 57.039161 746.4759 1038.09
CP2 64.785 228 42 55 228.7153 0.002702 228.71798 37.824 51.17823 39.72261 0.003422 0.019242 51.18165 39.741848 797.6575 1077.83
M14 75.7895 156 53 0 156.8833 0.003161 156.88649 86.544 4.590036 75.65038 0.004003 0.02251 4.594039 75.67289 802.2516 1153.50
M13 63.3785 134 24 30 134.4083 0.002643 134.41098 63.431 28.35947 56.67958 0.003348 0.018824 28.36282 56.698403 830.6144 1210.20
M12 59.39 151 41 0 151.6833 0.002477 151.68581 17.841 56.5349 18.19278 0.003137 0.01764 56.53804 18.210417 887.1524 1228.41
M11 101.716 149 20 15 149.3375 0.004242 149.34174 349.523 99.99884 -18.6112 0.005373 0.030211 100.0042 -18.581 987.1566 1209.83
M10 77.546 172 54 20 172.9056 0.003234 172.90879 318.868 58.35376 -51.0707 0.004096 0.023032 58.35786 -51.04771 1045.514 1158.78
M9 80.6475 112 19 5 112.3181 0.003363 112.32142 311.777 53.66817 -60.1976 0.00426 0.023953 53.67243 -60.17361 1099.187 1098.61
M8 76.516 140 22 10 140.3694 0.003191 140.37264 244.097 -33.481 -68.802 0.004042 0.022726 -33.477 -68.77932 1065.71 1029.83
SUM 1079.08 2339.955 2340.000 -0.057 -0.32047 0.000 0.000

Angular Error=( 0.045


Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066

Adjustment of Levels of Major Traverse

S.No. Stations Distance Cumm. Distance Observed Elevations Correction Adjusted Elevation
1 CP1 - - 863.060 - -
2 M1 70.438 70.438 862.190 0.001 862.191
3 M2 69.268 139.706 861.440 0.003 861.443
4 M3 94.619 234.325 859.860 0.004 859.864
5 M4 81.210 315.535 858.455 0.006 858.461
6 M5 103.502 419.037 856.565 0.008 856.573
7 M6 69.313 488.350 855.665 0.009 855.674
8 M7 62.669 551.019 855.575 0.010 855.585
9 M8 58.326 609.345 856.005 0.011 856.016
10 M9 59.699 669.044 851.715 0.013 851.728
11 M10 71.841 740.885 851.689 0.014 851.703
12 M11 58.380 799.265 851.734 0.015 851.749
13 M12 84.733 883.998 853.354 0.017 853.371
14 M13 115.110 999.108 855.424 0.019 855.443
15 M14 68.574 1067.682 854.794 0.020 854.814
16 M15 104.776 1172.458 854.814 0.022 854.836
17 M16 90.800 1263.258 856.158 0.024 856.182
18 CP2 64.628 1327.886 862.093 0.025 862.118
19 CP1 102.790 1430.676 863.033 0.027 863.060
SUM 1430.676
Error = -0.027

Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066

Adjustment of Levels of Minor Traverse

Small Minor Traverse


S.No. Stations Distance Cumm. Distance Observed Elevations Correction Adjusted Elevation
1 M16 - - 856.182 - -
2 m3 73.12 73.120 853.006 0.006 853.012
3 m2 50.35 123.470 853.438 0.011 853.449
4 m1 68.80 192.270 854.508 0.017 854.525
5 M14 39.60 231.870 854.794 0.020 854.814
SUM 231.870
Error= -0.020

Big Minor Traverse


S.No. Stations Distance Cumm. Distance Observed Elevations Correction Adjusted Elevation
1 CP1 - - 863.060 - -
2 m1 99.88 99.880 861.420 0.001 861.421
3 m2 49.22 149.100 861.255 0.002 861.257
4 M8 96.15 245.250 856.013 0.003 856.016
SUM 245.250
Error= -0.003

Checked by:
Date: 2066/06/23

Remarks

Correction for M1:


M1=+(0.027*70.438/1430.676) =0.001

Correction for M2:


M2=+(0.027*139.706/1430.676) =0.003

Correction for M13:


M13=+(0.027*883.998/1430.676) =0.017

Correction for CP1:


CP1=+(0.027*1430.676/1430.676) =0.027
`
Therefore

Correction =(Error*Cumm.Distance/Sum)
Date: 2066/06/23

Remarks

Correction for m3:


m3=+(0.020*73.12/231.87) =0.006

Correction for M14:


M14=+(0.020*231.87/231.87) =0.020

Remarks
Correction for m1:
m1=+(0.003*99.88/245.25) =0.001

Correction for M8:


M8=+(0.003*245.25/245.25) =0.003
Tribhuvan University
Institute of Engineering 1
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/23
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet
Horizontal
Horizontal Vertical Stadia Reading Vertical Remarks
Stadia Distance Reduced
Inst. Intercept
Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos Level
at V=Dsinq
deg min sec deg deg min sec deg 2q (RL) m.
M2 M3 0 0 0 0.000
63 17 20 30 17.342 5 29 0
64 85 20 10 2 9 30
0 6 30
-1 30 50
0 26 50
1 42 20
Tribhuvan University
Institute of Engineering 2
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/23
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet
Horizontal
Horizontal Vertical Stadia Reading Vertical Remarks
Stadia Distance Reduced
Inst. Intercept
Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos Level
at V=Dsinq
deg min sec deg deg min sec deg 2q (RL) m.
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/23
Recorder:Group 5 Weather: Sunny
Instrument: Temperature:25-30C
Ordinary Levelling Sheet
R.L. Transfer to Major Stations
Stn. B.S I.S F.S Rise Fall R.L. Distance Remarks
CP1 0.650 - - - - 863.060 -
M1 1.330 - 1.520 - 0.870 862.190 70.438
M2 0.800 - 2.080 - 0.750 861.440 69.268 B.S - F.S = +ve (Rise)
M3 0.700 - 2.380 - 1.580 859.860 94.619
M4 0.260 - 2.105 - 1.405 858.455 81.210 B.S - F.S = -ve (Fall)
M5 0.810 2.150 - 1.890 856.565 103.502
M6 0.860 - 1.710 - 0.900 855.665 69.313 For R.L.Computation
M7 1.720 - 0.950 - 0.090 855.575 62.669
M8 0.150 - 1.290 0.430 - 856.005 58.326 R.L. of M1 = R.L. of CP1 - Fall of M1
M9 2.020 - 4.440 - 4.290 851.715 59.699 (due to Fall)
M10 1.349 - 1.480 0.540 - 852.255 71.841
M11 1.710 - 1.870 - 0.521 851.734 58.380 R.L. of M8 = R.L. of M7 + Rise of M8
a 2.645 - 1.755 - 0.045 851.689 - (due to Rise)
M12 2.510 0.980 1.665 - 853.354 84.733
M13 1.205 - 0.440 2.070 - 855.424 115.110
M14 1.140 - 1.835 - 0.630 854.794 68.574
M15 0.550 - 1.120 0.020 854.814 104.776
b 1.510 - 1.535 - 0.985 853.829 -
c 1.905 - 0.590 0.920 - 854.749 -
M16 2.850 - 0.496 1.409 - 856.158 90.800
d 3.440 - 0.135 2.715 - 858.873 64.628
CP2 1.860 - 0.220 3.220 - 862.093 102.790
CP1 - - 0.920 0.940 - 863.033 -
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/23
Recorder:Group 5 Weather: Sunny
Instrument: Temperature:25-30C
Ordinary Levelling Sheet

R.L. Transfer to Small Minor Traverse Stations


Stn. B.S I.S F.S Rise Fall R.L. Distance Remarks
M16 0.312 - - - - 856.182 - B.S - F.S = +ve (Rise)
a 0.752 - 2.425 - 2.113 854.069 - B.S - F.S = -ve (Fall)
m3 1.897 - 1.815 - 1.063 853.006 73.12
m2 1.495 - 1.465 0.432 - 853.438 50.35 For R.L.Computation
m1 1.593 - 0.425 1.070 - 854.508 68.80 R.L. of a = R.L. of M16 - Fall of a (due to Fall)
M14 - - 1.275 0.318 - 854.826 39.60 R.L.of m1 = R.L.of m2 +Rise of m1 (due to Rise)

Ordinary Levelling Sheet


R.L. Transfer to Big Minor Traverse Stations
Stn. B.S I.S F.S Rise Fall R.L. Distance Remarks
CP1 0.770 - - - - 863.060 - B.S - F.S = +ve (Rise)
m1 1.240 - 2.41 - 1.640 861.420 99.88 B.S - F.S = -ve (Fall)
m2 0.875 - 1.405 - 0.165 861.255 49.22
a 0.900 - 4.665 - 3.790 857.465 - For R.L.Computation
M8 - - 2.352 - 1.452 856.013 96.15 R.L of m1 = R.L.of CP1-Fall of m1 (due to Fall)

Checked by:
4
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer:Group 5 Date: 2067/11/07
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet for Bridge Site Survey
Horizontal
Inst. Horizontal Vertical Stadia Reading Vertical Remarks
Stadia Distance Reduced
Intercept
at & Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos Level
V=Dsinq
H.I deg min sec deg deg min sec deg 2q (RL) m.
Axis AB
A 879.088
1.027 1 357 18 30 357.308 75 45 30 75.7583 2 1.91 1.84 0.16 16 4.060207 874.145
2 355 53 20 355.889 76 55 50 76.9306 1.64 1.53 1.405 0.235 23.5 5.454346 873.131
3 358 44 20 358.739 78 43 30 78.725 1.43 1.26 1.1 0.33 33 6.577804 872.277
4 359 31 5 359.518 78 43 30 78.725 1.01 0.84 0.67 0.34 34 6.777132 872.498
5 358 49 40 358.828 84 56 50 84.9472 1.75 1.57 1.39 0.36 36 3.182406 875.363
6 358 29 0 358.483 84 26 40 84.4444 2.54 2.34 2.15 0.39 39 3.792722 873.982
7 1 9 20 1.15556 83 39 30 83.6583 1.07 0.85 0.63 0.44 44 4.889105 874.376
8 1 24 20 1.40556 86 39 50 86.6639 1.44 1.15 0.85 0.59 59 3.438579 875.526
25 m. Down Stream Side
A 1 35 5 10 35.0861 84 14 40 84.2444 1.34 1.09 0.84 0.5 50 5.038675 873.986
1.027 2 38 37 0 38.6167 84 14 20 84.2389 1.81 1.6 1.39 0.42 42 4.2366 868.308
3 47 8 20 47.1389 84 14 20 84.2389 2.57 2.4 2.22 0.35 35 3.5305 867.200
4 47 34 20 47.5722 82 2 30 82.0417 2.56 2.39 2.21 0.35 35 4.892041 864.995
5 51 27 20 51.4556 82 2 30 82.0417 2.95 2.78 2.61 0.34 34 4.752269 864.966
6 57 20 20 57.3389 80 56 10 80.9361 2.68 2.54 2.4 0.28 28 4.465918 868.357
7 78 28 40 78.4778 80 56 20 80.9389 3.03 2.94 2.82 0.21 21 3.348395 867.694
8 105 7 30 105.125 80 59 40 80.9944 3.13 3.02 2.92 0.21 21 3.327522 868.028
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer:Group 5 Date: 2067/11/07
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet for Bridge Site Survey
Horizontal
Inst. Horizontal Vertical Stadia Reading Vertical Reduced Remarks
Stadia Distance
Intercept
at & Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos V=Dsinq Level
H.I deg min sec deg deg min sec deg 2q (RL) m.
50 m. Down Stream Side
A 1 129 41 30 129.692 85 22 40 85.3778 2.47 2.23 1.98 0.49 49 3.960824 873.924
1.027 2 115 39 0 115.65 83 28 20 83.4722 1.75 1.51 1.27 0.48 48 5.491438 873.114
3 113 53 0 113.883 83 28 30 83.475 2.3 2.06 1.83 0.47 47 5.374726 872.680
4 100 59 30 100.992 83 28 30 83.475 1.77 1.52 1.26 0.51 51 5.832149 872.763
5 92 27 40 92.4611 83 25 20 83.4222 1.05 0.78 0.51 0.54 54 6.225605 873.109
6 78 45 50 78.7639 86 15 10 86.2528 1.69 1.4 1.1 0.59 59 3.863461 874.852
7 74 47 0 74.7833 86 56 50 86.9472 1.19 0.88 0.56 0.63 63 3.359249 875.876
75 m. Down Stream Side
A 1 102 4 30 102.075 85 36 20 85.6056 2.65 2.28 1.9 0.75 75 5.762529 872.0724713
1.027 2 106 4 40 106.078 85 36 10 85.6028 2.91 2.56 2.19 0.72 72 5.535538 872.0194618
3 109 40 40 109.678 85 36 40 85.6111 3.37 3.01 2.65 0.72 72 5.525006 871.5799936
4 121 23 10 121.386 85 36 0 85.6 2.85 2.47 2.65 0.2 20 1.538625 876.1063753
5 134 31 50 134.531 86 34 0 86.5667 1.4 1.02 0.66 0.74 74 4.438775 874.6562245
6 147 27 50 147.464 86 33 40 86.5611 1.87 1.5 1.13 0.74 74 4.445975 874.1690248
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer:Group 5 Date: 2067/11/07
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet for Bridge Site Survey
Horizontal
Inst. Horizontal Vertical Stadia Reading Vertical Reduced Remarks
Stadia Distance
Intercept
at & Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos V=Dsinq Level
H.I deg min sec deg deg min sec deg 2q (RL) m.
25 m. Up Stream Side
D 1 12 58 30 12.975 96 54 30 96.9083 1.19 1.02 0.86 0.33 33 -3.997547 879.5655472
1.41 2 12 58 50 12.9806 94 1 40 94.0278 2.37 2.23 2.08 0.29 29 -2.04162 876.3996199
3 15 57 20 15.9556 86 50 30 86.8417 1.68 1.55 1.43 0.25 25 1.37922 873.6587804
4 11 57 0 11.95 87 34 0 87.5667 2.19 2.1 2.01 0.18 18 0.76477 873.7232303
5 5 43 40 5.72778 86 40 20 86.6722 2.625 2.49 2.355 0.27 27 1.569647 872.5283528
6 344 35 20 344.589 86 40 50 86.6806 2.29 2.222 2.16 0.13 13 0.753859 873.6121407
7 330 13 40 330.228 86 41 0 86.6833 1.345 1.29 1.24 0.105 10.5 0.608376 874.6896243
8 290 13 50 290.231 86 41 0 86.6833 0.882 0.832 0.764 0.118 11.8 0.683698 875.0723016
9 237 26 20 237.439 89 51 40 89.8611 0.42 0.318 0.216 0.204 20.4 0.049442 876.2205582
10 238 47 20 238.789 97 34 6 97.5683 1.85 1.35 0.85 1 100 -13.28406 888.5220643
50 m. Up Stream Side
D 1 31 31 0 31.5167 90 0 0 90 1.95 1.65 1.35 0.6 60 0 874.938
1.41 2 28 43 40 28.7278 90 0 0 90 2.746 2.45 2.154 0.592 59.2 0 874.138
3 24 19 20 24.3222 88 42 30 88.7083 2.57 2.24 1.95 0.62 62 1.397691 872.9503091
4 18 50 0 18.8333 87 34 40 87.5778 2.25 1.97 1.7 0.55 55 2.326113 872.2918868
5 12 17 0 12.2833 87 4 10 87.0694 2.09 1.78 1.52 0.57 57 2.917421 871.8905793
6 5 3 10 5.05278 86 46 50 86.7806 1.72 1.47 1.32 0.4 40 2.249539 872.8684607
7 359 37 50 359.631 86 50 0 86.8333 1.37 1.13 0.89 0.48 48 2.655103 872.802897
8 354 2 10 354.036 86 46 50 86.7806 0.99 0.76 0.53 0.46 46 2.58697 873.2410298

Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer:Group 5 Date: 2067/11/07
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet for Bridge Site Survey
Horizontal
Inst. Horizontal Vertical Stadia Reading Vertical Reduced Remarks
Stadia Distance
Intercept
at & Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos V=Dsinq Level
H.I deg min sec deg deg min sec deg 2q (RL) m.
9 340 59 20 340.989 88 52 30 88.875 0.94 0.72 0.5 0.44 44 0.863886 875.004114
75 m. Up Stream Side
F 1 56 38 0 56.6333 92 37 50 92.6306 1.94 1.7 1.46 0.48 48 -2.204902 877.688
1.37 2 54 34 10 54.5694 92 21 10 92.3528 2.34 2.12 1.9 0.44 44 -1.807478 876.870
3 54 17 20 54.2889 92 3 50 92.0639 2.8 2.6 2.4 0.4 40 -1.441218 876.024
4 52 7 20 52.1222 87 34 20 87.5722 2.07 1.87 1.67 0.4 40 1.695603 873.617
5 48 2 0 48.0333 87 31 40 87.5278 2.93 2.78 2.63 0.3 30 1.295012 873.108
6 42 37 20 42.6222 86 56 40 86.9444 3.01 2.85 2.7 0.31 31 1.654471 872.679
7 38 42 50 38.7139 83 18 40 83.3111 1.8 1.33 0.86 0.94 20 2.345082 873.508
8 23 26 40 23.4444 83 19 0 83.3167 1.04 0.96 0.87 0.17 17 1.991649 874.231
9 7 58 20 7.97222 84 30 30 84.5083 1.11 1.045 0.98 0.13 13 1.249612 874.888
10 294 51 40 294.861 89 14 40 89.2444 1.48 1.39 1.31 0.17 17 0.224149 875.569
11 282 43 40 282.728 97 0 20 97.0056 1.08 0.97 0.86 0.22 22 -2.702911 878.916
100 m. Up Stream Side
1 91 27 40 91.4611 89 18 0 89.3 1.2 0.95 0.7 0.5 50 0.61078 875.6222196
2 93 29 20 93.4889 88 12 20 88.2056 1.57 1.34 1.11 0.46 46 1.440872 874.4021285
3 93 58 0 93.9667 85 38 20 85.6389 1.74 1.62 1.5 0.24 24 1.829967 873.7330326
4 94 48 0 94.8 85 27 0 85.45 2.19 2.04 1.9 0.29 29 2.307378 872.8356219
5 96 41 0 96.6833 83 44 40 83.7444 1.39 1.27 1.14 0.25 25 2.739877 873.1731226

Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2067
Observer:Group 5 Date: 2067/11/07
Recorder:Group 5 Weather: Sunny
Instrument: Theodolite,Staff,Ranging Rod Temperature:25-30C
Tachometric Sheet for Bridge Site Survey Horizontal
Inst. Horizontal Vertical Stadia Reading Vertical Reduced Remarks
Stadia Distance
Intercept
at & Object angle angle Top(T) Mid.(M) Bot.(B) Intercept(s) D=KsCos V=Dsinq Level
H.I deg min sec deg deg min sec deg 2q (RL) m.
6 98 48 40 98.8111 83 45 20 83.7556 1.07 0.98 0.9 0.17 17 1.859781 874.343219
7 99 33 10 99.5528 83 44 50 83.7472 0.97 0.925 0.88 0.09 9 0.985914 875.2720856
8 225 14 40 225.244 93 26 20 93.4389 1.41 1.31 1.21 0.2 20 -1.201615 877.0746149
9 231 46 0 231.767 96 48 10 96.8028 0.38 0.29 0.2 0.18 18 -2.146846 879.0398462
125 m. Up Stream Side
1 115 55 30 115.925 90 22 40 90.3778 2.59 2.2 1.82 0.77 77 -0.507608 875.4906085
2 120 19 50 120.331 90 23 0 90.3833 3.57 3.21 2.85 0.72 72 -0.481627 874.4546272
3 126 42 10 126.703 89 26 0 89.4333 3.03 2.69 2.35 0.68 68 0.672429 873.8205714
4 127 5 0 127.083 89 34 0 89.5667 3.7 3.37 3.04 0.66 66 0.49908 873.3139205
5 130 4 20 130.072 89 12 50 89.2139 2.65 2.34 2.02 0.63 63 0.864265 873.9787345
6 137 33 30 137.558 90 23 40 90.3944 2.02 1.72 1.42 0.6 60 -0.41299 875.8759899
7 156 51 20 156.856 90 23 50 90.3972 1.7 1.4 1.1 0.6 60 -0.415898 876.1988983
8 158 51 30 158.858 90 45 20 90.7556 1 0.7 0.4 0.6 60 -0.791113 877.2741125
9 162 21 40 162.361 92 31 0 92.5167 1.08 0.78 0.48 0.6 60 -2.636645 879.0396452
10 130 4 10 130.069 93 9 0 93.15 1.81 1.18 0.52 1.29 129 -7.097958 883.1009576
11 146 13 50 146.231 93 7 30 93.125 1.6 0.96 0.34 1.26 126 -6.877756 883.1007562
12 155 51 0 155.85 96 7 50 96.1306 1.96 1.34 0.73 1.23 123 -13.20874 889.0517448
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2068
Observer:Group 2 Date:
Recorder:Group 2 Weather: Sunny
Instrument:Theodolite,Ranging rod Road Alignment Sheet Temperature:20-25C
Intersection Distance Chainage of Deflection Radius Tangent Length of curve Apex Distance,E Ch. Of beginning Ch.Of mid,Of Ch. Of End of
point, IP betn. IP IP angle, () of length,TL= LC= R*(1/Cos(/2)-1) of curve, curve, MC=Ch.Ofcurve, EC=Ch. Of
L/R Curve(R) Rtan(/2) 3.142*R*/180 BC=Ch. Of IP-TL BC+LC/2 MC+LC/2
IP0 0+000
IP1 47.200 47.42 57.169 30 16.346 29.938 4.164 30.854 45.823 60.792
IP2 51.250 95.696 6.108 120 6.403 12.795 0.171 89.293 95.691 102.088
IP3 37.210 132.895 33.094 50 14.855 28.884 2.160 118.040 132.488 146.924
IP4 47.180 179.249 58.303 20 11.155 20.354 2.901 168.094 178.271 188.448
IP5 30.790 208.083 34.058 50 15.314 29.725 2.293 192.769 207.632 222.494
IP6 41.330 248.51 12.489 100 10.942 21.800 0.597 237.568 248.468 259.368
IP7 26.800 275.226 29.096 20 5.352 10.461 0.704 269.874 275.105 280.335
IP8 47.604 322.587 57.900 15 8.297 15.160 2.142 314.290 321.870 329.450
IP9 45.830 366.983 76.707 30 23.738 40.168 8.255 343.245 363.329 383.413
IP10 52.180 411.855 37.006 25 8.366 16.148 1.362 403.489 411.563 419.637
IP11 26.580 437.851 27.572 20 4.907 9.624 0.593 432.944 437.756 442.568
IP12 51.850 489.511 59.457 30 17.131 31.135 4.547 472.380 487.947 503.515
IP13 115.460 601.844 17.327 50 7.618 15.123 0.577 594.226 601.787 609.349
IP14 135.820 737.551 17.633 50 7.755 15.389 0.598 729.796 737.490 745.185
IP15 56.450 793.88
1

7/25/2068
Weather: Sunny
Temperature:20-25C
Remark & Sketch
curve, EC=Ch. Of

(L)
(L)

(L)

(L)
(L)

(L)


(L)
(L)
(L)
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/19
Recorder:Group 5 Weather: Cloudy
Instrument:Theodolite,Staff,Ranging rod Temperature:20-25
Horizontal angle Observation Sheet
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
CP1 M1 L 010'00"
10'10"
1.35 R 18010'20"
17437'05"
CP2 L 17447'10"
47'15"
R 35447'20" 8842'30" 1.02 0.66 0.30
17437'12.5"
CP1 M1 L 9010'00"
10'00"
1.35 R 27010'00"
17437'20"
CP2 L 26447'20"
47'20"
R 8447'20"
M1 M2 L 010'00"
10'00"
1.26 R 18010'00"
15008'30"
CP1 L 15001'40"
01'30"
R 33001'20" 8858'10" 1.14 0.80 0.45
15008'35"
M1 M2 L 9010'00"
10'00"
1.26 R 27010'00"
15008'40"
CP1 L 24001'20"
01'20"
R 6001'20"
M2 M3 L 010'00"
10'40"
1.5 R 18011'20"
11004'10"
M1 L 11014'00"
14'50"
R 29015'40" 9000'00" 1.86 1.33 0.80
11004'05"
M2 M3 L 9010'00"
10'50"
1.5 R 27011'40"
11004'00"
M1 L 20014'00"
14'50"
R 2015'40"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/19
Recorder:Group 5 Weather: Cloudy
Instrument:Theodolite,Staff,Ranging rod Temperature:20-25
Horizontal angle Observation Sheet
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
M3 M4 L 010'00"
10'40"
1.53 R 18011'20"
15904'10"
M2 L 15914'00"
14'30"
R 33915'40" 8812'00" 2.04 1.42 0.80
15904'20"
M3 M4 L 9010'00"
10'00"
1.53 R 27010'00"
15904'30"
M2 L 15914'20"
14'30"
R 6914'40"
M4 M5 L 010'00"
10'40"
1.53 R 18011'20"
15850'10"
M3 L 15900'00"
00'50"
R 33901'40" 8745'00" 1.88 1.09 0.30
15850'00"
M4 M5 L 9010'00"
10'50"
1.53 R 27011'40"
15849'50"
M3 L 24900'00"
00'40"
R 6901'20"
M5 M6 L 010'00"
10'50"
1.43 R 18011'40"
13914'00"
M4 L 13924'00"
24'50"
R 31925'40" 8800'00" 0.83 0.57 0.30
13914'30"
M5 M6 L 9010'00"
10'40"
1.43 R 27011'20"
13915'00"
M4 L 22924'00"
25'40"
13914'30"

13915'00"
M4
25'40"
R 4925'20"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/19
Recorder:Group 5 Weather: Cloudy
Instrument:Theodolite,Staff,Ranging rod Temperature:20-25
Horizontal angle Observation Sheet
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Mean R.L. of
Horizontal Distance m.
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
M6 M7 L 010'00"
10'40"
1.4 R 18011'20"
12129'20"
M5 L 12139'20"
40'00"
R 30140'40" 8942'00" 1.27 1.04 0.80
12129'10"
M6 M7 L 9010'00"
10'50"
1.4 R 27011'40"
12129'00"
M5 L 21139'00"
39'50"
R 3140'40"
M7 M8 L 010'00"
09'55"
1.5 R 18009'50"
18620'55"
M6 L 18630'50"
30'50"
R 630'50" 9000'30" 1.21 0.93 0.59
18620'12.5"
M7 M8 L 9010'00"
10'10"
1.5 R 27010'20"
18619'30"
M6 L 27629'20"
29'40"
R 9630'00"
M8 M9 L 010'00"
10'10"
1.49 R 18010'20"
19548'20"
M7 L 19558'20"
58'30"
R 1558'40"
19547'50"
M8 M9 L 9010'00"
10'10"
1.49 R 27010'20"
19547'20"
19547'50"

19547'20"
M7 L 28557'20"
57'30"
R 10557'40"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/19
Recorder:Group 5 Weather: Cloudy
Instrument:Theodolite,Staff,Ranging rod Temperature:20-25
Horizontal angle Observation Sheet
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
M9 M10 L 010'00"
10'10"
1.47 R 18010'20"
16140'10"
M8 L 16150'10"
50'20"
R 34150'30" 1.25 0.90 0.55
16117'55"
M9 M10 L 9010'00"
09'55"
1.47 R 27009'50"
16055'40"
M8 L 25105'40"
05'35"
R 7105'30"
M10 M11 L 010'00"
10'40"
1.48 R 18011'20"
18708'30"
M9 L 18701'40"
02'10"
R 702'40" 8830'00" 1.04 0.82 0.60
18708'15"
M10 M11 L 9010'00"
10'50"
1.48 R 27011'40"
18708'00"
M9 L 27701'40"
02'10"
R 9702'40"
M11 M12 L 010'00"
10'40"
1.51 R 18011'20"
24404'30"
M10 L 24414'40"
15'10"
R 6415'40" 9130'00" 1.25 0.93 0.60
24404'45"
M11 M12 L 9010'00"
10'40"
24405'00"
24404'45"
M12
10'40"
1.51 R 27011'20"
24405'00"
M10 L 33415'40"
16'10"
R 15416'40"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/20
Recorder:Group 5 Weather: Rainy
Instrument:Theodolite,Staff,Ranging rod Temperature:15-20
Horizontal angle Observation Sheet
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
M12 M13 L 010'00"
10'05"
1.25 R 18010'10"
8331'05"
M11 L 8341'10"
41'10"
R 26341'10" 9057'10" 1.60 1.03 0.46
8331'25"
M12 M13 L 9010'00"
10'05"
1.25 R 27010'10"
8331'45"
M11 L 17304'50"
41'50"
R 35341'50"
M13 M14 L 010'00"
10'05"
1.485 R 18010'10"
10400'00"
M12 L 10410'00"
10'05"
R 28410'10" 8853'00" 1.19 0.85 0.50
10400'15"
M13 M14 L 9010'00"
10'00"
1.485 R 27010'00"
10400'15"
M12 L 19410'20"
10'30"
R 1410'40"
M14 M15 L 010'00"
10'50"
1.52 R 18011'40"
16202'00"
M13 L 16208'20"
08'50"
R 34209'20" 9103'00" 3.56 3.16 2.76
16202'05"
16202'05"
M14 M15 L 9010'00"
10'50"
1.52 R 27011'40"
16202'10"
M13 L 25208'00"
08'40"
R 7209'20"
Checked by:
Tribhuvan University
Institute of Engineering
Western Region Campus
Civil Engineering Department
BCE Survey Camp -2066
Observer:Group 5 Date: 2066/06/20
Recorder:Group 5 Weather: Rainy
Instrument:Theodolite,Staff,Ranging rod Temperature:15-20
Horizontal angle Observation Sheet
Inst.St. Object Face Horizontal Mean Horizontal Mean of Sets Vertical /Zenithal Stadia Reading m. Horizontal Distance m. Mean R.L. of
and Ht. circle reading (m-s) angle (d-m-s) angle Sta. Dist. Tape Dist. Staff point
of Ins. (d-m-s) (d-m-s) (d-m-s) T M B by Stadia
M15 M16 L 010'00"
10'00"
1.577 R 18010'00"
11116'30"
M14 L 11126'20"
26'30"
R 29126'40" 9041'20" 1.72 1.27 0.82
11116'35"
M15 M16 L 9010'00"
10'00"
1.577 R 27010'00"
11116'40"
M14 L 20126'40"
26'40"
R 2126'40"
M16 CP2 L 010'00"
10'00"
1.44 R 18010'00"
20800'00"
M15 L 20810'00"
10'00"
R 2810'00" 8450'00" 1.64 1.32 0.99
20800'00"
M16 CP2 L 9010'00"
10'00"
1.44 R 27010'00"
20800'00"
M15 L 29810'00"
10'00"
R 11810'00"
CP2 CP1 L 010'00"
10'05"
1.465 R 18010'10"
22300'55"
M16 L 22311'00"
11'00"
22301'15"
22300'55"
M16
11'00"
R 4311'00" 9008'40" 1.36 0.84 0.32
22301'15"
CP2 CP1 L 9010'00"
10'05"
1.465 R 27010'10"
22301'35"
M16 L 31311'40"
11'40"
R 13311'40"
Checked by:
1

Date: 2066/06/19
Weather: Cloudy
Temperature:20-25C

Remarks & Sketches


2

Date: 2066/06/19
Weather: Cloudy
Temperature:20-25C

Remarks & Sketches


3

Date: 2066/06/19
Weather: Cloudy
Temperature:20-25C

Remarks & Sketches


4

Date: 2066/06/19
Weather: Cloudy
Temperature:20-25C

Remarks & Sketches