You are on page 1of 4

ENGINEERING MODULES / VULCAN

Vulcan Engineering Modules


Empower your operation with tools which provide advanced mine engineering functionality.

Open Pit Mine Design Underground Mine Design


All the tools needed for open pit mine design. Design underground mining structures such as
Easy single, double and triple bench open pit design.
declines, shafts, crosscuts, pillars, stopes and levels.
Multiple pit access types from ramp to security berm; toe Automatic creation of a ramp between two points based
and crest lines. on geometric constraints.
Ramps with applied grade can be designed on any side of 3D design allows viewing and measuring the impact of
the pit. design.
Design switchback and multiple ramp system pits. 3D and graphical alerts warn of certain situations such as
Multiple pushback design options and generation of proximity of drilling, colour gradients, etc.
intersection volumes with previous pushbacks or phases. Easily run cost benefit analysis.
Automatic or manual modification of existing designs by Design can be triangulated for accurate volume
moving walls or adding ramps. calculations and creation of 3D geological intersections.
Waste dump design tools (radial dumps and benched Interactive stope design tools allow calculation of reserves
dumps according to criteria of tonnage ect). from a block model during the design process.
Automatic generation of expansions according to criteria of Costing options can be used to generate summaries of
tonnage or benefit by working directly with the block model. excavation advances, volumes, times and costs involved
Automatic generation of pit solids. in a mine development.
Access to the block modelling module allows quick In coal mines, seams can be interrogated for reporting
evaluation of designs against the resource model. underground reserves.
High productivity in the pit, dump and leach pad design Preview designs before applying settings.
stage, with flexibility to evaluate various design alternatives Design declines with intermediate access points using the
in a short time. automatic Ramp tool.
Rapid Pit Design tool for strategic mine design evaluation. Interactive Ramp Editor allows independent modification
Save the design sequence and replicate different strips of ramp sections.
(stratigraphic pit design). Transition gradient can be specified at the start, middle
Automatically generated triangulated surface of the highwall or end of the ramp.
profile (stratigraphic pit design).

Create and modify alternative designs quickly to select one that delivers
the best economic or operational results.

>
ENGINEERING MODULES / VULCAN

Pit Optimiser Stope Optimiser


Integrates with Vulcan block modelling tools. Enables Processes resource block models to create optimised
engineers to make more informed planning decisions. mineable volumes which are displayed as polygons
Uses Lerchs and Grossman or Push and Relabel algorithm,
and 3D triangulations.
block models with a previously calculated economic value, Evaluate and quickly run multiple alternative mining
as well as parameterised evaluation with one or more scenarios, changing mining method, cut-off grade, stope
products and processes. dimension or orientation.
Evaluation and calculation tools allow the use of complex Set up and visually compare multiple scenarios using section
expressions and routines for any of the parameters and/or plan polygons, and solid stope triangulations.
involved in the calculation of economic value. Minimum pillar dimensions or exclusion zones can be
A series of pit strings can be used as a final pit determination considered for a more accurate design.
tool or as an aid to define mining phases or pushbacks. Integration in the Vulcan 3D environment allows quick what-if
Geotechnical environment is specified by varying slope analysis for underground production prefeasibility studies.
angles in different regions; these can have any shape and Detailed output includes the stope optimisation report,
can be specified as polygons, complex 3D triangulations reserve tonnage and grade for each stope.
or from the block model itself. Flexible configuration means optimisation can be applied
Geological contaminants can be used to improve the to both steep and near horizontal orebodies.
optimisation process in complex deposits. Accuracy that cannot be achieved using traditional methods.
Extraction rates can be used to incorporate the effects of Prefeasibility runs identify the best design parameters for
time during design optimisation. final feasibility.
Two different options, allowing optimisation of one product Integrated with Vulcans design and scheduling tools.
and process, or multiple products and processes. Create or specify irregular frameworks.
Powerful analysis tools, with charts and reports created Variable cut-offs based on position or stope size.
in Excel.
Ability to use head grade in the evaluation.
Splitting, smoothing and merging options allow for fine
Survey tuning the desired stope shapes.

Collected survey information is imported into Vulcan What-if analysis optimisation runs can be
for review, manipulation and update. performed in minutes, compared to days
Download/upload to industry standard data collectors and using classical methods.
total stations.
Reduce raw instrument files in either radiation or coordinate
Level Designer
form directly into graphical objects on the screen.
Perform survey network adjustments using the least Drafts complete underground level development with
squares variation of coordinates method. hundreds of crosscuts in minutes, saving hours of
Automatically apply graphical attributes to feature-coded manual design time.
raw data. Optimised design based on development cost.
Calculate end area and triangulated volumes. Allows preview of mine design before creating.
Generate 3D drives from survey strings. Several discretisation modes for drives and crosscuts.
For underground topography, allows reconstruction of the Automatic calculation of design attributes.
profiles for developments and tunnels.
Direct communication with total stations and data
collectors allows easy transfer of designs and survey
updates.

>
ENGINEERING MODULES / VULCAN

Drill & Blast Design Open Pit Haulage Profile


Specialised tools for designing drill patterns on pit Calculate truck cycle times, total fuel costs, distances
benches. Upto date information means blast design to destinations by bench and truck/equipment
is as accurate as possible. productivity.
Create rectangular, triangular and equilateral patterns using Requires user defined equipment library and haulage
vertical or inclined holes on flat, inclined or undulating routes digitised in Envisage.
surfaces. Define tonnages for each truck including further breakdown
Create pre-split holes; tools provided to relocate or add by material.
holes manually. Results are printed in the Envisage Console and also
Design the detonation sequence and produce a blast plot directly exported to Excel and CSV files.
for the operators. The library contains inputs such as loading time, dumping
Create basic explosives analysis and cost reports for each time, spot time at the loader, spot time at the dump/
design. crusher/stockpile, average delays for intersections, slow
Updated pit surveys can be imported into the blast design. down areas etc., loader capacity, loader cycle time and
Drill locations can be exported to the survey instrument for different loaded and empty speeds by road grades, as well
proper loading. as fuel costs for the different scenarios.
Integrated with the Vulcan 3D design environment. Model Route Estimation option allows users to store
distances, productivity and cycle times by material type to
block model variables.
Drill & Blast Design Underground Apply information to reserving and scheduling.
Applicable to open pit and underground operations.
Fast, accurate and flexible underground blast pattern
design. Use rimpull curves to calculate cycle time.
Better estimation for distances based on actual bench
Parameter wizard allows specification of drill bit sizes,
geometry at the time of mine haulage.
capping information and explosive properties for several
Insert nodes and segments between multiple routes for
types of explosives.
running different scenarios.
Four methods allow flexibility to define radial drill spacing.
Routes designed on actual topography, capturing best slopes
Equipment and rig dimensions can be added, allowing on
and getting a better estimate of the calculations made.
the fly drill template creation, giving instant representation
of equipment for blast hole clearance checks.
Option to copy drilling templates between sections. Dragline
Automatic dump angle and number of ring sections.
Creation, manipulation and reporting of section based
Flexible naming feature.
range diagrams.
Primers and deck charging definition.
Support for grids, triangulations and Envisage objects to
Efficient creation of designs, detailed reports and plots for
develop surface profiles.
operators.
Use a cross section with the designed mine plan to create
insitu block layouts.
Cut-off Grade Optimiser Full control over highwall angles, bench offsets, material
swell and repose angles, and all functional dragline
Optimises the grade of material that maximises the dimensions.
NPV of a mining scenario. Detailed reporting functions, automatic generation of
Easy to use. operation plots.
Uses Lanes algorithm to calculate the value at different Simulate the operation of a dragline.
cut-off grades for a deposit. Simulate cast blasting, bulldozing, truck and shovel
Uses consecutive iterations to obtain the final result. operation or any other kind of material movement.
Exports the results into charts, as well as into reports Create detailed post-mine topography designs and range
directly in Excel, allowing creation of high quality output. diagrams.
Ability to work with different elements provides the flexibility Optimise the mine plan to fit equipment and material
to work with polymetallic deposits. parameters.

>
ENGINEERING MODULES / VULCAN

Interactive Road Design Interactive Polygon Reserver


Create roads using civil engineering design criteria. Short-term interactive scheduling and continuous
Using a digital terrain model, create roads, railways and
reserve calculations alongside creation of scheduled
polygon mining blocks.
pipeline alignment.
Intersection points are defined in plan and section for the Incorporates onscreen display of cumulative results.
desired road. Enables data from multiple block models to be stored
Use maximum and minimum curvatures, chainage and displayed.
increments and gradients. Calculates continuous scheduling reserves and polygon
Control over horizontal and vertical alignments. mining blocks.
Road profiles are applied to the alignment, and the Ability to create and change, remove and resequence
resultant cross sections are created to define cut and fill scheduled polygons.
volumes for the road. Dynamically report output to Excel.
Mass haul diagrams and curvature diagrams can be Scheduling allows users to simply create new mining
viewed interactively and plotted along with normal plans, blocks of polygons or adjust existing ones.
long sections and road sections.
Summaries of cut and fill volumes for each chainage section Schedule the right amount of production,
of the road are reported and written to a file for plotting. in terms of tonnage, material type and grade.
Full 3D visualisation features are available throughout the
entire design process within Envisage.

Improve efficiency with Vulcan


Vulcan software provides the user with the worlds best
3D interactive modelling and planning package. It is the
total solution of choice for the largest and best mining
companies. From geology to mine planning and scheduling,
Vulcan delivers functionality, efficiency and improved
productivity to Maptek customers worldwide.

More questions? Contact us:


solutions@maptek.com

2016 Maptek www.maptek.com

You might also like