Name
Updated design based on lastest mechanical general
11-08-2017 0 LAM
arrangement for PU 102 A/B
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
DAFTAR ISI
HALAMAN
1. UMUM 4
1.1. LINGKUP KERJA 4
1.2. REFERENSI 4
1.3. DESIGN CRITERIA 4
2. LAYOUT FONDASI 5
3. DAYA DUKUNG TANAH IZIN 6
4. MATERIAL PROPERTI 6
5. DATA EQUIPMENT 6
6. DATA FONDASI 6
6.1 FONDASI 6
7. DATA BEBAN 6
7.1 BEBAN MATI 6
7.2 BEBAN OPERASI 6
7.3 BEBAN TEST 6
7.4 BEBAN VIBRASI 6
7.5 BEBAN GEMPA 7
7.6 BEBAN ANGIN 8
8. BEBAN PADA PONDASI 9
9. CEK MAKSIMUM DAYA DUKUNG TANAH DI DASAR FONDASI 11
10. CEK SLIDING 12
11. CEK GULING 13
12. DAYA DUKUNG TANAH MAKSIMUM BEBAN TERFAKTOR 13
13. DESAIN TULANGAN 14
13.1 DESAIN TULANGAN FONDASI 14
14. PENURUNAN SEGERA 15
15. CEK DINAMIK 16
16. HASIL 16
17. PENURUNAN KONSOLIDASI 17
1. UMUM
1.1. LINGKUP
Perhitungan ini bertujuan untuk merencanakan Pondasi Pompa Proyek Pembangunan Pabrik Minyak Goreng
KAP. 600.000 TON CPO/TH
1.2. REFERENSI
1. Dokumen Proyek
- PMG-ENG-C-SPE-U00-004-W Specification for Concrete Work
3. Referensi Lain
- Bowles, J. E., " Foundation Analysis and Design: 4th edition", McGraw-Hill,Inc,1997
- Hardiyatmo., H.R , " Teknik Fondasi 1 "
- Final report Soil investigation Project 600000 MTPY Palm Cooking Oil Plant Sei-Mangkei
- Puskim.pu.go.id/Aplikasi/desain_spektra_indonesia2011
- Braja M.Das., "Principles of Foundation Engineering"
D N B qultimate SF qall
kd kd used 2 2
(m) value (m) (kN/m ) Faktor Aman (kN/m )
0.40 8 0.80 1.17 1.17 186.40 3 62.13
Catatan:
Untuk B < 1.22 m :
2
q all = 20 N * kd (kN/m ) (by Bowles)
Dimana :
kd = 1 + 0.33 (D/B) 1.33
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
Weq Bf
Leq
Lf
Leq
heq
Hm
ht
Hf
Y Lf
Weq
He
Heq
Hm
FGL ht
Hf
Dasar Fondasi
Bf
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
4. MATERIAL PROPERTI
Kuat Tekan Beton f'c = 28 MPa
Kuat Leleh tulangan Baja fy = 390 MPa
3
Berat Jenis Beton gc = 23.5 kN/m
Berat Unit Tanah gs = 26 kN/m 3
Koefisien Friksi Tanah m1 = 0.4 (tanah lempung)
5. DATA EQUIPMENT
Lebar equipment W eq = 0.6 m DATA VENDOR
Panjang equipment Leq = 1.5 m DATA VENDOR
Tinggi equipment He = 0.689 m DATA VENDOR
CoG equipment to TOC Heq = 0.3115 m DATA VENDOR
6. DATA FONDASI
6.1 FONDASI
Lebar Fondasi Bf = 0.8 m
Panjang Fondasi Lf = 1.6 m
Tebal Fondasi Hf = 0.6 m 48344
Top Slab to Top of Grouting ht = 0.34 m 339
Tinggi efektif Fondasi Tertanam hemb = Hf - ht
= 0.26 m
Hm = Heq +Hf
= 0.91 m
Luas Fondasi Af = 1.28 m2
7. DATA BEBAN
7.1 BEBAN MATI
Berat Kosong W empty = 4.938 kN (Dinaikan 10% dari berat kosong
Berat Fondasi akibat beban Pipa dan aksesoris Pompa)
Berat Fondasi Wf = {(Bf*Lf*Hf)}*gc
= 18.05 kN
Total berat Fondasi Wt = Wf
= 18.05 kN
Rasio Berat = W f/W empty
= 3.66
Kriteria jika Wf/W empty 3, maka OK OK
Percepatan percepatan respons SM1 = Fv*S1 Ref. SNI 1726-2012 Sec. 6.2
spektral MCE pada perioda 1 = 0.544 g
detik yang sudah disesuaikan
terhadap pengaruh kelas situs
Parameter percepatan respons SDS = 2/3*SMS Ref. SNI 1726-2012 Sec. 6.3
spektral pada perioda pendek = 0.449 g
redaman 5 %,
Parameter percepatan respons SD1 = 2/3*SM1 Ref. SNI 1726-2012 Sec. 6.3
spektral pada perioda 1 detik, = 0.363 g
redaman 5 %
Tinggi Struktur hn = 1.03 m (ht+He)
Nilai parameter perioda pendekatan Ct = 0.0488 Ref. SNI 1726-2012 Table 15
Nilai parameter perioda pendekatan x = 0.75
Perioda fundamental struktur Ta = Ct*hnx Ref. SNI 1726-2012 Sec. 7.2.8.1
= 0.05 s
Koefisien modifikasi respons R = 1.25 Ref. SNI 1726-2012 Table 21
Koefisien respons gempa Cs = SDS/(R/Ie) Ref. SNI 1726-2012 Sec. 7.8.1.1
= 0.359
Check Cs max
Cs max = SD1/Ta(R/Ie) Ref. SNI 1726-2012 Sec. 7.8.1.1
= 5.818
Check Cs min Cs min 1 = 0.044*SDS* (Ie) 0.01
= 0.020 0.01 OK- Cs min calculate Govern
S1 = 0.303 g
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
Condition if S1 0.6g Cs min2 = 0.5 *S1/(R/Ie) Ref. SNI 1726-2012 Sec. 7.8.1.1
= 0.121
Cs max = 5.818
Cs min = 0.020
Seismic Response Coefficient Cs = 0.359
V = Cs*W
Arah -X
H/D = 1.0
Koefisien Gaya Arah X Cf = 1.300 Per SNI 1727-2013: Figure 29.5-1
Area efektif Arah-X Aex = He * D
= 0.827 m2
P = qz * Cf *G
2
= 575.760 N/m
Hwx = P* Aex /1000
= 0.476 kN
Beban Angin Arah Transversal-X
Horizontal Load Hwx = Hwx
= 0.476 kN
Momen di atas fondasi Mwz-zP = Hwx * Heq
= 0.148 kNm (Rotation z-z)
Arah -Z
Tipe Pemukaan = All
Lebar Efektif 1 De1 = 1.2*Leq
= 1.80 m
Lebar Efektif 2 De2 = Leq+0.6)
= 2.10 m
D = max(De1, De2)
= 2.1 m
H/D = 1
Cf = 1.300 Per SNI 1727-2013: Figure 29.5-1
Area efektif Arah-Z Aez = He*D
= 0.654 m2
P = qz * Cf *G
= 575.760 N/m2
Hwz = P* Aez /1000
= 0.377 kN
kN kN kN kNm kNm
Beban mati Equipment (De) 4.94
Beban Mati Fondasi (Ds) 18.05
Beban Operasi Equipment (Do) 4.94
Beban Vibrasi (J) 1.22 1.22 1.22 1.11 1.11
Beban Test (Dt) 4.94
Beban Gempa Operasi (Eo) 1.77 1.77 1.62 1.62
Beban Gempa Kosong (Ee) 1.77 1.77 1.62 1.62
Beban Angin (W) 0.48 0.38 0.15 0.12
kN kN kN kNm kNm
LC.11 Ds+De+0.7Ee 22.99 1.24 1.24 1.13 1.13
LC.12 Ds+Do+J 24.21 1.22 1.22 1.11 1.11
LC.13: Ds+Do+J+0.7Eo 24.21 2.46 2.46 2.24 2.24
LC.14: 0.9*(Ds+Do+J)+0.7Eo 21.79 2.34 2.34 2.13 2.13
LC.15: 0.83 (Ds+Dt) 19.08 0.00 0.00 0.00 0.00
LC.16: Ds+Do+J+W 24.21 1.70 1.60 1.26 1.23
LC.17: 0.9*(Ds+Do+J)+W 21.79 1.58 1.48 1.15 1.12
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
kN kN kN kNm kNm
LC.21: 0.9(Ds+De)+Ee 20.69 1.77 1.77 1.62 1.62
LC.22: 1.2(Ds+Do+J) 29.05 1.47 1.47 1.34 1.34
LC.23: 1.4(Ds+Do+J) 33.89 1.71 1.71 1.56 1.56
LC.24: 0.9(Ds+Do+J)+Eo 21.79 2.87 2.87 2.62 2.62
LC.25: 1.2(Ds+Do+J)+Eo 29.05 3.24 3.24 2.95 2.95
LC.26: 1.4(Ds+Dt) 32.18 0.00 0.00 0.00 0.00
LC.27: 1.2(Ds+Do+J)+ 1.6W 29.05 2.23 2.07 1.57 1.52
LC.28: 0.9(Ds+Do+J)+ 1.6W 21.79 1.86 1.70 1.24 1.19
Arah- Z
qmax = P/ Af (1+ 6ez/Bf) qall
qmin = P/ Af (1-6ez/Bf) 0
Rumus in dapat digunakan dengan kondisi :
ex = Mz/P < Lf/6 atau
ez = Mx/P < Bf/6
Kondisi 2
Arah- X
qmax = 2P/ 3*Bf (Lf/2-ex) qall
qmin = 0
Arah- Z
qmax = 2P/ 3*Lf (Bf/2-ez) qall
qmin = 0
Rumus ini dapat digunakan dengan kondisi :
ex = Mz/P >Lf/6 atau
ez = Mx/P> Bf/6
Eksentrisitas
eksentrisitas-X eksentrisitas-Z
Gaya
Koefisien Friksi Gaya Tahanan Ratio Stabilitas Faktor Safety Kriteria
TIPE BEBAN Horisontal
m1 HR = m1*P Hx SF=HR/Hx
LC.11 Ds+De+0.7Ee 0.4 9.19 1.24 7.41 1.5 PASS
LC.12 Ds+Do+J 0.4 9.68 1.22 7.93 1.5 PASS
LC.13: Ds+Do+J+0.7Eo 0.4 9.68 2.46 3.93 1.5 PASS
LC.14: 0.9*(Ds+Do+J)+0.7Eo 0.4 8.71 2.34 3.72 1.5 PASS
LC.15: 0.83 (Ds+Dt) 0.4 7.63 0.00 0.00 1.5 PASS
LC.16: Ds+Do+J+W 0.4 9.68 1.70 5.70 1.5 PASS
LC.17: 0.9*(Ds+Do+J)+W 0.4 8.71 1.58 5.53 1.5 PASS
Gaya
Koefisien Friksi Gaya Tahanan Ratio Stabilitas Faktor Safety Kriteria
TIPE BEBAN Horisontal
m1 HR =m1*P Hz SF=HR/Hz
LC.11 Ds+De+0.7Ee 0.4 9.19 1.24 7.41 1.5 PASS
LC.12 Ds+Do+J 0.4 9.68 1.22 7.93 1.5 PASS
LC.13: Ds+Do+J+0.7Eo 0.4 9.68 2.46 3.93 1.5 PASS
LC.14: 0.9*(Ds+Do+J)+0.7Eo 0.4 8.71 2.34 3.72 1.5 PASS
LC.15: 0.83 (Ds+Dt) 0.4 7.63 0.00 0.00 1.5 PASS
LC.16: Ds+Do+J+W 0.4 9.68 1.60 6.06 1.5 PASS
LC.17: 0.9*(Ds+Do+J)+W 0.4 8.71 1.48 5.91 1.5 PASS
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
CEK GULING -Z
Arah-X
Momen Momen Ratio
LOAD TYPE Bf Faktor
Tahanan Guling Stabilitas Kriteria
Keamanan
m MR = 0.5*Bf*P MOx SF=MR/MOx
LC.11 Ds+De+0.7Ee 0.8 9.19 1.132 8.12 1.5 PASS
LC.12 Ds+Do+J 0.8 9.68 1.113 8.70 1.5 PASS
LC.13: Ds+Do+J+0.7Eo 0.8 9.68 2.245 4.31 1.5 PASS
LC.14: 0.9*(Ds+Do+J)+0.7Eo 0.8 8.71 2.134 4.08 1.5 PASS
LC.15: 0.83 (Ds+Dt) 0.8 7.63 0.000 0.00 1.5 PASS
LC.16: Ds+Do+J+W 0.8 9.68 1.230 7.87 1.5 PASS
LC.17: 0.9*(Ds+Do+J)+W 0.8 8.71 1.119 7.79 1.5 PASS
2
kN/m kN/m2
LC.21: 0.9(Ds+De)+Ee 20.90 11.43
LC.22: 1.2(Ds+Do+J) 26.61 18.78
LC.23: 1.4(Ds+Do+J) 31.04 21.91
LC.24: 0.9(Ds+Do+J)+Eo 24.69 9.35
LC.25: 1.2(Ds+Do+J)+Eo 31.34 14.04
LC.26: 1.4(Ds+Dt) 25.14 25.14
LC.27: 1.2(Ds+Do+J)+ 1.6W 27.30 18.09
LC.28: 0.9(Ds+Do+J)+ 1.6W 20.65 13.39
2
quz max = 31.34 kN/m
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
kN/m2 kN/m2
LC.21: 0.9(Ds+De)+Ee 25.63 6.69
LC.22: 1.2(Ds+Do+J) 30.52 14.87
LC.23: 1.4(Ds+Do+J) 35.61 17.34
LC.24: 0.9(Ds+Do+J)+Eo 32.36 1.68
LC.25: 1.2(Ds+Do+J)+Eo 39.99 5.39
LC.26: 1.4(Ds+Dt) 25.14 25.14
LC.27: 1.2(Ds+Do+J)+ 1.6W 31.62 13.77
LC.28: 0.9(Ds+Do+J)+ 1.6W 23.99 10.05
2
qux max 39.99 kN/m
16. HASIL
Fondasi
Diskripsi Unit Ukuran
Lebar Fondasi m 0.8
Panjang Fondasi m 1.6
Tebal Fondasi m 0.6
Tulangan
Diskripsi Tulangan
Tulangan Arah Longitudinal atas & bawah 4- D16
Tulangan Arah Tranversal atas & bawah 8- D16
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
Lokasi BH-03
Load qmax = 32.06 kN/m2
Area Ao = 1.28 m2
Bf = 0.8 m
Lf = 1.6 m
H Bf+ zi Lf+zi Ai Pc gs Po Cc Cr eo zi
No Layer
m m m m2 kN/m2 kN/m3 kN/m2 m
1 2.7 2.60 2.95 7.67 104.15 18.73 25.29 0.147 0.0362 0.829 1.35
2 2.8 5.45 5.70 31.07 104.15 18.73 76.79 0.147 0.0362 0.829 4.1
3 7.6 10.30 10.90 112.27 103.47 18.73 174.19 0.164 0.0362 0.72 9.3
Total Settlement = Sc + Se
= 5.89 mm OK
Penurunan Izin = 25 mm
Catatan:
Normal Konsolidasi Jika Pc Po De = Cc log ((Po+DP)/Po)
Over Konsolidasi Jika Pc >Po
Kondisi Over Konsolidasi :
Over Konsolidasi 1 Jika P1 < Pc De = Cr log ((Po+DP)/Po)
Over Konsolidasi 2 Jika Po<Pc<P1 De = Cr log ((Pc/Po) + Cc log ((Po+DP)/Pc)
DPi = qmax * Ao/ Ai
Sci = H*De / 1+ eo
PROYEK PEMBANGUNAN PABRIK MINYAK
GORENG KAP. 600.000 TON CPO/TH
PT. INDUSTRI NABATI LESTARI
Document No. Rev.1
CALCULATION FOR PFAD EXPORT PUMP
Page:
PMG-ENG-C-CAL-U15-012-W (PU102 A/B) FOUNDATION
Lampiran-1-1 .
STEMPEL
MNM #ET123021
REVISION HISTORY
COMMENT FROM
DATE REV AMENDER NAME FEEDBACK FROM KSB
TRUWATER