Professional Documents
Culture Documents
Q3) Design only slab the slab culvert with the data: [10]
Clear span of the culvert = 5m.
Clear carriage way width = 7.5m.
Size of kerb = 200mm600mm.
Average thickness of wearing coat 100mm.
Use material M25, Fe 500.
Loading class AA.
Draw the cross section showing details of reinforcement at mid-span and at
junction of the slab are kerb.
P.T.O.
Q4) Design the deck slab and calculate the maximum bending moment and shear
force intermediate post tensioned prestressed concrete bridge girder for the
following.
Effective span = 15m, width of carriageway = 7.5m, No. of beams 3, equally
spaced along the carriageway width, Spacing of cross girders = 3m c/c,
width of footpath on either side of carriageway = 1.2m loading class = IRC
class AA, kerb size = 200 X 600mm, Material M25 & TMT for Deck slab and
M45 & Multi-strand cables for girder. [10]
Q5) a) Describe different factor affecting the design of rigid frame bridge [5]
b) Explain with sketches, how rigid frame bridges are different from simply
supported bridges. [5]
Longitudinal load = 50 kN
Q7) a) Explain selection criterions for wing wall for bridges. [5]
b) Explain with sketches, the merits and demerits precast wing wall with
geo-textile. [5]
[4660] - 1046 2
Q8) Design a well foundation for a pier having base dimensions 8m5m founded
in sandy soil for the following: [10]
Top width of pier = 1.2m
Height of bearing above scour level = 15m
Height of pier = 7m
Total DL Reaction including Wt. of well abutment and considering buoyancy
effect = 60,000 kN
Total LL Reaction = 40,000 kN
Total lateral force at scour level = 150 kN
C/C distance of bearing on either side of centre line of pier = 1m
BM in traffic direction due to unequal DL & LL = 500 kN-m
Material of pier and footing = M40 & Fe500
Submerged Unit wt. of soil = 10 kN/m3
Velocity of water current = 3m/s consider the cross current also.
[[[
[4660] - 1046 3