Midas model for construction stage analysis of the Almonte River Bridge

Designing an arch bridge to carry high-speed trains is a complex and demanding process.
Guillermo Capelln and Juan Jos Arenas explain how software can help

C
onstruction is just beginning on the main structure of what will be the worlds arch section of the bridge, the spans are reduced to 42m.
longest high-speed railway arch bridge when it opens in 2015. The 384m-long The main challenges in the analysis of the structure included calculation of the anti-
main span structure, which is close to Cceres in the western side of Spain, funicular shape of the arch, taking into account construction stages, non-linear analysis
will carry high-speed trains travelling from the capital Madrid to Extremadura for the service limit state and ultimate limit state, dynamic analysis and track-structure
on the Portuguese border. interaction. Special studies included wind tunnel testing and non-linear behaviour.
The Almonte River Bridge designed by Arenas & Asociados is 996m long and will carry The 384m-long concrete arch structure has an octagonal cross-section with a depth
trains across the Alcantara Reservoir on an arch structure. As well as being the longest that varies from 4.2m at the key section to 6.3m at the end sections. The width at the
high speed railway arch it will be the third longest concrete arch bridge in the world. Its central key section is 6m, increasing towards the end sections. Beyond the central 220m,
design and construction incorporate many special features which required demanding the arch splits into two separate sections that diverge to a maximum overall width of
and complex analysis; this was carried out using bridge engineering software Midas Civil. 19m. This provides the necessary lateral stability against wind loads and addresses the
The high speed rail system has undergone rapid expansion in Spain in the last two global instability phenomena stemming from the narrow deck and the heavy railway
decades and last year became the second largest network in the world, with some loads. The arch will be built of 80MPa self-compacting concrete.
2,900km already in use and 1,500km under construction. The particular features of high The typical deck section is a 3.1m-deep prestressed concrete box girder. Its 14m width
speed rail bridges that make them so demanding to design include heavier loads than is typical of high speed rail bridges and can accommodate two railway tracks and all
road bridges, dynamic effects, significant horizontal loads, fatigue considerations, and the functional elements such as the railway platform, communications ducts, ballast,
functional considerations such as the smaller permissible deflections, accelerations and electrification catenary posts, service paths, barriers and so on.
limited length that relate to rail expansion joint capacity and track-structure interaction. The concrete arch staged erection forms the basis for predicting the real static state
Given these peculiarities, spans longer than 100m are unusual for high speed rail, render- of the structure and carrying out all other calculations such as non-linear analysis, anti-
ing this structure even more challenging. funicular curve analysis, cable stay tensioning forces and so on.
The arch bridge deck has a typical span of 45m over the total deck length of 996m The arch will be erected using the cable-stayed cantilever method; its total length is
and the 14m-wide deck, which consists of a 3.1m-deep box girder, will be constructed divided into 66 segments which will be cast in situ, 33 on each side of the bridge.
using a movable scaffolding system. The arch will be built using a cantilever method with In order to ensure that they stay within the allowable stresses and that the optimum
form travellers and temporary stays tied back to two temporary steel towers. Over the geometry of the arch is maintained, the segments will be supported by temporary

50 www.bridgeweb.com Bd&e | ISSUE 72 | 2013


n SPECIALIST SOFTWARE

Midas model for


stage analysis

stay cables during influence for the final safety of the finished structure
the construction. Second order effects were studied considering the impact of existing
A total of 26 cables will be imperfections on the initial arch geometry. It was considered as a defor-
used on each side with corre- mation homothetic with the first buckling mode, which was introduced as a different
sponding back stays; cables one to model of initial geometry for each load combination.
eight will be anchored to piers six and As previously described, permanent and variable loads achieve their ultimate limit
15, while the anchorages for the remaining state at the same load step. For permanent loads, values from characteristic to factored
cables will be placed on temporary steel towers were divided into five steps and live loads were also stepped in five increments. For every
that will be built on the piers. Cable forces will be step, the section stiffness was re-calculated according to the stress-strain relationships
adjusted during the construction process, and some given by EC-2 for concrete and reinforcement steel, properly considering concrete crack-
cables will be released at intermediate construction ing. This was an incremental, iterative process.
stages in order to avoid excessive stress. Once the arch Firstly, no cracking was considered, and this assumption was checked for member
structure has been closed, the piers on top of the arch and forces obtained at each calculation step, considering sectional moment-curvature
the deck structure will be erected. diagrams. Secondly, the section stiffness was modified according to EC-2 stress-strain
For the concrete arch erection using temporary stays and steel towers, diagrams, and new member forces were calculated.
a Midas model was used for stage analysis. The calculation process was divided Finally, checking was carried out if the considered stiffness matched the tension lev-
into a series of steps, the first one being to carry out non-linear analysis for every els achieved. This process was repeated until there was no significant variation between
construction stage right up to the permanent load situation. Geometrical imperfections the stiffness considered for the member force calculations and the one obtained on the
were considered for every stage. moment-curvature diagram. In this incremental calculation procedure, the stiffness was
Secondly, non-linear material and geometric long-term analysis was carried out for obtained as the tangent to the moment-curvature diagram at the point corresponding to
creep and shrinkage due to member forces resulting from the first step of the process. the previous load step.
The third step was to carry out non-linear (material and geometric) analysis for Given the long span and the structures slenderness, it is necessary to take into
thermal actions, followed by incremental non-linear analysis to the ultimate limit state account the aeroelastic phenomena in the bridge analysis, covering all the oscillatory
starting with the geometry and member forces resulting from the third step. effects induced by the wind-structure interaction. This is not only because IAPF-2007
Permanent loads are divided into five steps, from the characteristic to factored specifications require this type of study for spans longer than 200m, but also the fact
values. Live loads are also stepped in five increments, so the ultimate limit state values that the structures main modal vibration frequencies are very low below 0.3Hz indi-
were reached at the same step for both type of loads. At every step, the section stiffness cates that the structure may be sensitive to these effects.
was re-calculated to comply with the strain-stress EC-2 models, both for concrete and A complete wind analysis study was carried out including wind tunnel sectional
steel. This way, concrete cracking was considered for every step. aerodynamic response analysis and aeroelastic studies in the wind tunnel with a scaled
Analysis took into account the effects of cracking on concrete, creep and shrinkage model for the bridge at the final state and construction cantilever stages. The tests were
of concrete, non-linear relationships - steel and concrete, and the construction stage carried out in the Limit Layer II Wind Tunnel at Western Ontario University in Canada.
These studies validated the structures behaviour in service and construction stages
and also underlined the importance of using aerodynamic sections for the arch from an
early design stage.
Construction of the bridge began in 2012 and when Bd&e went to press, all the founda-
tions, piers and most of the deck outside of the arch had been completed. Arch erection
was just starting and is due to continue through 2014, using the temporary stay system.
The arch piers and deck are due to be finished by the summer of 2015 n

Guillermo Capelln is technical director and Juan Jos Arenas is president of Arenas &
Asociados

Owner: ADIF (Spanish Railway Infrastructure Administrator)


Project design: Arenas & Asociados
Construction: FCC
Project management: Arenas & Asociados, IDOM
Piers for the bridge under construction in June this year

52 www.bridgeweb.com Bd&e | ISSUE 72 | 2013