You are on page 1of 3

List of assessment Experts

EXECUTIVE SUMMARY..
TABLE OF CONTENTS.
LIST OF TABLES...
LIST OF FIGURES.
1.0 INTRODUCTION 1
1.1 Development Concept 1
1.2 The Project Location.. 2-3
1.3 Project Coordinator 4-5
1.4 Statement of Need. 5
1.5 The Benefit. 6
2.0 STATEMENT OF NEED 7
3.0 DESCRIPTION OF PROPOSED PROJECT... 8
3.1 How to Manage The Proposed Project... 8
3.1.1 Project Activities 8
3.1.2 Land Clearing and Earthwork 9
3.1.3 Construction of Infrastructure and Building.. 9
3.1.4 Construction Activities.. 10
3.1.5 Disposal of Construction Wastes... 11
3.1.6 Dredging or Excavation Works. 12
3.1.7 Reclamation Works 12
3.1.8 Temporary Facilities.. 13
3.1.9 Transportation of Building Materials and Machinery 13
3.2 When to Manage The Proposed Project. 14
3.2.1 Project Schedule. 14
3.2.2 Duration. 15
3.2.3 Phasing.. 15
3.2.4 Work Schedule.. 16
4.0 DESCRIPTION OF EXISTING ENVIRONMENT. 16
4.1 Components of Baseline Conditions and Study Area Boundaries. 16
4.2 Interpretation of Existing Quality for Components... 17
4.2.1 Institution and students residential. 17
4.2.2 Roads.. 17
4.2.3 Trees... 17
4.3 Topography and Physical Characteristics.. 17
4.4 Soils and Geology.. 18
4.4.1 Soils 18
4.4.2 Geology.. 18
4.5 Meteorology and Climatetology 18
4.5.1 Rainfall.. 19
4.5.2 Temperature... 19
4.5.3 Relative Humidity.. 19
4.5.4 Surface Wind. 19
4.6 Drainage System and Hydraulic Regime.. 20
4.6.1 Off-site drainage 20
4.6.2 On-site drainage. 20
4.7 Land Use 20
4.7.1 Within Project Site. 20
4.8 Water Quality. 21
4.8.1 River 21
4.9 Air Quality. 21
4.10 Noise Level....... 22
4.11 Traffic and Transportation. 22
4.11.1 Performance of Existing Road....... 23
4.12 Socio-Economic. 24
4.13 Amenities and Utilities.. 25
4.13.1 Drainage System 25
4.13.2 Sewerage System.. 26
4.13.3 Water Supply. 26
4.13.4 Electricity.. 27
4.13.5 Telecommunication.. 27
4.13.6 Road and Transportation.. 27
4.14 Flora and Fauna. 27
4.14.1 Flora.. 27
4.14.2 Fauna. 28
5.0 IMPACTS OF PROPOSED PROJECT AND MITIGATION
METHODS 29
5.1 Introduction 29
5.2 Pre-construction Stage... 29
5.2.1 Sensitive Receptor. 29
5.3 Construction Stage. 30
5.3.1 Water Quality. 30
5.3.2 Air Quality. 32
5.3.3 Construction and Domestic Waste. 33
5.3.4 Socio-Economy.. 33
5.3.5 Traffic and Access. 34
5.3.6 Noise Levels... 34
5.4 Operational Stage... 35
5.4.1 General of Noise 35
5.4.2 Flooding and Changes to Hydraulic Regime. 36
5.4.3 General of Waste 36-37
5.4.4 Traffic Flow... 38
5.4.5 Socio-Economy.. 38
5.4.6 Security Threat... 39
5.5 Abandonment. 39
6.0 EVALUATION OF ALTERNATIVES.. 40
6.1 Description of Alternatives 40
6.2 Pre-construction Stage... 41
6.3 Construction Stage. 41
6.3.1 Water Quality 41
6.3.2 Air Quality. 42
6.3.3 Noise.. 42
6.4 Operational Stage... 42
6.4.1 Noise. 42
6.4.2 Flooding. 42
6.4.3 Waste Disposal.. 43
6.4.4 Traffic Flow... 43
6.4.5 Security Threat.. 43
6.5 Abandonment. 43
7.0 PLANNED ENVIRONMENTAL MONITORING.. 44
7.1 Environmental Monitoring Plan (EMP). 44
7.2 Description of monitoring programmes. 45-50
7.3 Glossary of Terms.. 51-55
7.4 List of Abbreviations. 56
8.0 CONCLUSIONS . 57
APPENDICES

You might also like