PPTO. M.O. CASCO TERMINADO - ICA2 (fierro habilitado instalado)

PROY Construccin de Tienda La Curacao Ica II


REF Obra Civil, Casco Revestido
FECHA 12/06/09

ITEM DESCRIPCION UND

I OBRAS CIVILES
1.00 OBRAS PRELIMINARES
1.01 TRAZO Y REPLANTEO M2
1.02 CERCO PROVISIONAL M2
1.03 LIMPIEZA GENERAL DE OBRA M2
1.04 DEMOLICION DE LOSA DE PISO PARA ZAPATAS M2
1.05 DEMOLICION DE CIMENTACION EXISTENTE M3

2.00 MOVIMIENTO DE TIERRAS


2.01 EXCAVACION MANUAL PARA ZAPATAS, H= 1.30 M M3
2.02 EXCAV MANUAL CIMIENTO Y VIGAS DE CIMENTACION M3
2.03 RELLENO Y COMPACTACION C/PLANCHA 5 HP M3
2.04 ACARREO INTERNO M3
2.05 ELIMINACIN DE MATERIAL EXCEDENTE M3

3.00 CONCRETO SIMPLE


3.01 SOLADO DE 3" 1:12 C: (ZAPATAS Y VIGAS DE CIMENT) M2
3.02 CIMIENTO CORRIDO CONCRETO CICLOP 1:10 + 30% P.G. M3
3.03 SOBRECIMIENTO CONCRETO CICLOPEO 1:8 + 25% P.M. M3
3.04 ENCOF Y DESENCOF NORMAL EN SOBRECIMIENTO M2
3.05 AFIRMADO PARA VEREDA M2
3.06 CONCRETO PARA VEREDA f'c=140 kg/cm2 M2

4.00 CONCRETO ARMADO


4.01 ZAPATAS
4.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 M3
4.01.02 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.02 CIMIENTO ARMADO
4.02.01 CONCRETO PARA CIMIENTO f'c=210 kg/cm2 M3
4.02.02 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.03 COLUMNAS y COL DE AMARRE
4.03.01 CONCRETO EN COLUMNAS DE AMARRE f'c=210 kg/cm2 M3
4.03.02 ENCOF Y DESENCOF EN COLUMNAS DE AMARRE M2
4.03.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.04 VIGAS
4.04.01 CONCRETO PREMEZCL CON BOMBA f'c=280 kg/cm2 M3
4.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS M2
4.04.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.05 LOSA ALIGERADA
4.05.01 CONCRETO PREMEZCLADO C/BOMBA f'c=280 kg/cm2 M3
4.05.02 ENCOF Y DESENCOF NORMAL EN LOSA ALIGERADA M2
4.05.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.05.04 LADRILLO DE TECHO 30x30x15 UND
4.06 LOSA MACIZA
4.06.01 CONCRETO PREMEZCLADO C/BOMBA f'c=280 kg/cm2 M3
4.06.02 ENCOFRADO Y DESENCOFRADO M2
4.06.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.06 ESCALERAS
4.06.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 M3
4.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2
4.06.03 ACERO fy=4200 kg/cm2 GRADO 60 KG

5.00 ALBAILERIA
5.01 MURO DE SOGA LAD. K.K. MEZ. C:A 1:4 EN 1 y 2 PISO. M2
5.02 MURO DE CABEZA LAD. K.K. MEZ. C:A 1:4 EN 1 y 2 PISO. M2

6.00 REVESTIMIENTOS
6.01 TARRAJEO INTERIOR DE MUROS 1 y 2 PISO M2
6.02 TARRAJEO EXTERIOR DE MUROS FACHADA M2
6.03 CIELO RASO M2
6.04 TARRAJEO DE COLUMNAS 1 , 2 y 3 PISO M2
6.05 TARRAJEO DE VIGAS 1 y 2 PISO M2
6.06 REVESTIMIENTO FONDO DE ESCALERAS M2
6.07 DERRAMES EN PUERTAS Y VENTANAS ML
6.08 CONSTRUCCION DE MESA DE CONCRETO PARA DESPACHO (ACAB.) GB

7.00 PISOS
7.01 REPARACIN DE FALSO PISO (CIMIENTOS y ZAPATAS) M2
7.02 CONTRAPISO PULIDO DE 50mm EN ALMACEN M2
7.03 CONTRAPISO FROTACHADO EN 1er y 2do PISO PARA ENCHAPE M2
7.04 REVESTIMIENTO DE PASOS y CONTRAPASOS ML
7.05 PISO CERMICO 33X33 cm DE COLOR M2
7.04 CONTRAZOCALO DE MAYOLICA EN LOCAL ML
7.06 ENCHAPE DE BAOS PRIMER PISO HASTA EL TECHO M2
7.07 ENCHAPE DE BAOS TERCER PISO H=2.8 m M2
7.08 ENCHAPE DE ESCALERA CON CANTONERA DE ALUMINIO M2

8.00 INSTALACIONES SANITARIAS


8.01 OBRAS CIVILES
8.02 PICADO DE PISO PARA LINEAS DE AGUA y DESAGUE ML
8.03 EXCAVACION MANUAL PARA RED DE AGUA y DESAGUE ML
8.04 EXCAVACION MANUAL PARA TQ CISTERNA M3
8.05 RELLENO Y COMPACTACION C/PLANCHA 5 HP M3
8.06 ACARREO INTERNO M3
8.07 ELIMINACIN DE MATERIAL EXCEDENTE M3
8.08 REPARACIN DE FALSO PISO M2
8.09 MEZCLA PARA CUBRIR TUBERIAS M3
4.01.01 CONCRETO PARA MUROS CISTERNA f'c=210 kg/cm2 M3
4.03.02 ENCOF Y DESENCOF NORMAL EN MURO DE CISTERNA M2
4.01.02 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.03.01 CONCRETO y REV COLUMNAS DE TQ ELEVADO f'c=210 kg/cm2 UND
4.03.02 ENCOF Y DESENCOF NORMAL PARA TQ ELEVADO UND
4.03.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.06.01 CONCRETO PLATAFORMA TQ ELEV f'c=280 kg/cm2 UND
4.06.02 ENCOFRADO Y DESENCOFRADO PLATAF TQ ELEV UND
4.06.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
8.02 DESAGUE
8.01.01 INSTALACION DE RED DESAGUE ml
8.01.01 INSTALACION DE RED PLUVIAL ml
8.01.02 INSTALACION DE PUNTOS DE DESAGUE pza.
8.01.03 INSTALACION DE PUNTOS DE VENTILACION pza.
8.01.04 CONSTRUCCION DE CAJAS DE REGISTRO pza.
8.01.05 CONSTRUCCION DE TAPAS DE CONCRETO pza.
8.03 AGUA
8.02.01 INSTALACION DE RED AGUA ml
8.02.02 INSTALACION DE PUNTOS DE AGUA pza.
8.02.03 INSTALACION DE LLAVES COMPUERTAS pza.
8.02.04 INSTALACION DE ACCESORIOS BAOS pza.
8.02.05 COLOCACION DE REGISTROS 4" Y 2" pza.
8.04 INSTALACION DE TANQUE CISTERNA
8.03.01 INSTALACION DE TANQUE CISTERNA GBL
8.03.02 INSTALACION DE TANQUE ELEVADO GBL
8.03.03 INSTALACION DE BOMBA GBL

COSTO DIRECTO
G GRLS, DIR TECNICA 6.00
UTILIDAD 4.00
SUB-TOTAL
IMP GRL A LAS VENTAS 19.00
TOTAL PPTO M.O. PARA TIENDA ICA2

INCLUYE I.G.V. (19%)

PAGOS 15% ADELANTO


RESTO CONTRA VALORIZACIONES QUINCENALES
EL ADELANTO SE DESCONTAR EN CADA VALORIZACIN , DE ACUERDO AL PORCENTAJE DE AV
EJECUC 12 SEMANAS
INDUVAL INGENIEROS SAC
EMPRESA CONSTRUCTORA Y DE SERVICIOS

PPTO M.O. CASCO - ICA2 mail4

CANT P.U. PARCIAL TOTAL S/.

11,399.95
1,152.00 0.93 1,069.60
69.84 6.58 459.85
1,152.00 1.73 1,989.49
62.24 14.45 899.46
42.70 163.50 6,981.55

5,973.33
84.03 24.82 2,085.26
0.00 18.61 0.00
51.35 17.22 884.28
143.33 7.42 1,063.40
143.33 13.54 1,940.38

4,930.85
63.04 11.50 725.18
33.50 38.50 1,289.74
7.84 57.52 451.07
104.55 19.04 1,990.83
21.42 9.92 212.57
21.42 12.21 261.45

86,043.31

31.03 45.47 1,411.04


2,185.23 1.10 2,400.19

0.27 46.23 12.30


96.21 1.10 105.67

42.88 83.87 3,596.12


458.62 26.12 11,980.70
13,313.54 1.10 14,623.18

59.74 28.12 1,679.73


345.76 26.99 9,333.73
8,917.17 1.10 9,794.35

56.28 28.12 1,582.45


625.86 25.22 15,784.49
6,825.36 1.10 7,496.76
5,218.00 0.42 2,204.61

1.20 28.12 33.74


6.68 25.22 168.47
240.46 1.10 264.11

4.60 81.77 375.89


51.93 53.90 2,799.00
361.23 1.10 396.76

5,822.55
362.60 14.58 5,285.20
24.62 21.83 537.36

20,557.43
383.85 8.07 3,097.19
8.35 14.21 118.65
656.69 13.19 8,664.55
219.46 15.82 3,472.53
225.81 18.07 4,079.34
17.62 16.81 296.25
87.35 6.73 588.11
1.00 240.82 240.82

28,705.82
108.66 19.97 2,169.83
371.66 11.59 4,308.55
743.31 11.59 8,617.11
44.20 15.63 690.70
739.71 13.37 9,893.45
215.50 3.40 731.94
15.33 15.63 239.48
57.85 15.63 904.01
52.60 21.88 1,150.75

8,646.11

104.85 3.73 391.33


104.85 1.29 135.46
5.78 24.82 143.44
12.58 17.22 216.66
7.51 7.42 55.75
7.51 13.54 101.72
34.35 19.97 685.85
4.19 38.50 161.48
1.48 45.47 67.44
7.91 26.12 206.65
112.72 1.10 123.81
1.00 101.59 101.59
1.00 45.15 45.15
92.00 1.10 101.05
1.00 90.31 90.31
1.00 33.86 33.86
19.01 1.10 20.88
79.60 13.55 1,078.26
170.10 13.55 2,304.16
13.00 18.81 244.58
3.00 18.81 56.44
6.00 30.10 180.61
7.00 26.34 184.38

45.00 13.55 609.57


8.00 18.81 150.51
5.00 26.34 131.70
8.00 30.10 240.82
10.00 11.29 112.88

1.00 263.39 263.39


1.00 165.56 165.56
1.00 240.82 240.82

172,079.35
% 10,324.76
% 6,883.17
189,287.29
% 35,964.58
S/. 225,251.87

O AL PORCENTAJE DE AVANCE
0.75
INDUVAL I
EMPRESA CONS

PPTO. M.O. CASCO TERMINADO - ICA2 (fierro instalado)

PROY Construccin de Tienda La Curacao Ica II


REF Obra Civil, Casco Revestido
FECHA 12/06/09

ITEM DESCRIPCION UND

I OBRAS CIVILES
1.00 OBRAS PRELIMINARES
1.01 TRAZO Y REPLANTEO M2
1.02 CERCO PROVISIONAL M2
1.03 LIMPIEZA GENERAL DE OBRA M2
1.04 DEMOLICION DE LOSA DE PISO PARA ZAPATAS M2
1.05 DEMOLICION DE CIMENTACION EXISTENTE M3

2.00 MOVIMIENTO DE TIERRAS


2.01 EXCAVACION MANUAL PARA ZAPATAS, H= 1.30 M M3
2.02 EXCAV MANUAL CIMIENTO Y VIGAS DE CIMENTACION M3
2.03 RELLENO Y COMPACTACION C/PLANCHA 5 HP M3
2.04 ACARREO INTERNO M3
2.05 ELIMINACIN DE MATERIAL EXCEDENTE M3

3.00 CONCRETO SIMPLE


3.01 SOLADO DE 3" 1:12 C: (ZAPATAS Y VIGAS DE CIMENTACIN) M2
3.02 CIMIENTO CORRIDO CON CONCRETO CICLOPEO 1:10 + 30% P.G. M3
3.03 SOBRECIMIENTO CON CONCRETO CICLOPEO 1:8 + 25% P.M. M3
3.04 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO M2
3.05 AFIRMADO PARA VEREDA M2
3.06 CONCRETO PARA VEREDA f'c=140 kg/cm2 M2

4.00 CONCRETO ARMADO


4.01 ZAPATAS
4.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 M3
4.01.02 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.02 CIMIENTO ARMADO
4.02.01 CONCRETO PARA CIMIENTO f'c=210 kg/cm2 M3
4.02.02 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.03 COLUMNAS y COL DE AMARRE
4.03.01 CONCRETO EN COLUMNAS DE AMARRE f'c=210 kg/cm2 M3
4.03.02 ENCOF Y DESENCOF NORMAL EN COLUMNAS DE AMARRE M2
4.03.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.04 VIGAS
4.04.01 CONCRETO PREMEZCLADO CON BOMBA f'c=280 kg/cm2 M3
4.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2
4.04.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.05 LOSA ALIGERADA
4.05.01 CONCRETO PREMEZCLADO CON BOMBA A 3 DAS f'c=280 kg/cm2 M3
4.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA M2
4.05.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.05.04 LADRILLO DE TECHO 30x30x15 UND
4.06 LOSA MACIZA
4.06.01 CONCRETO PREMEZCLADO CON BOMBA f'c=280 kg/cm2 M3
4.06.02 ENCOFRADO Y DESENCOFRADO M2
4.06.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.06 ESCALERAS
4.06.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 M3
4.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2
4.06.03 ACERO fy=4200 kg/cm2 GRADO 60 KG

5.00 ALBAILERIA
5.01 MURO DE SOGA LAD. K.K. MEZ. C:A 1:4 EN 1 y 2 PISO. M2
5.02 MURO DE CABEZA LAD. K.K. MEZ. C:A 1:4 EN 1 y 2 PISO. M2

6.00 REVESTIMIENTOS
6.01 TARRAJEO INTERIOR DE MUROS 1 y 2 PISO M2
6.02 TARRAJEO EXTERIOR DE MUROS FACHADA M2
6.03 CIELO RASO M2
6.04 TARRAJEO DE COLUMNAS 1 , 2 y 3 PISO M2
6.05 TARRAJEO DE VIGAS 1 y 2 PISO M2
6.06 REVESTIMIENTO FONDO DE ESCALERAS M2
6.07 DERRAMES EN PUERTAS Y VENTANAS ML
6.08 CONSTRUCCION DE MESA DE CONCRETO PARA DESPACHO (ACAB.) GB

7.00 PISOS
7.01 REPARACIN DE FALSO PISO (CIMIENTOS y ZAPATAS) M2
7.02 CONTRAPISO PULIDO DE 50mm EN ALMACEN M2
7.03 CONTRAPISO FROTACHADO EN 1er y 2do PISO PARA ENCHAPE M2
7.04 REVESTIMIENTO DE PASOS y CONTRAPASOS ML
7.05 PISO CERMICO 33X33 cm DE COLOR M2
7.04 CONTRAZOCALO DE MAYOLICA EN LOCAL ML
7.06 ENCHAPE DE BAOS PRIMER PISO HASTA EL TECHO M2
7.07 ENCHAPE DE BAOS TERCER PISO H=2.8 m M2
7.08 ENCHAPE DE ESCALERA CON CANTONERA DE ALUMINIO M2

8.00 INSTALACIONES SANITARIAS


8.01 OBRAS CIVILES
8.02 PICADO DE PISO PARA LINEAS DE AGUA y DESAGUE ML
8.03 EXCAVACION MANUAL PARA RED DE AGUA y DESAGUE ML
8.04 EXCAVACION MANUAL PARA TQ CISTERNA M3
8.05 RELLENO Y COMPACTACION C/PLANCHA 5 HP M3
8.06 ACARREO INTERNO M3
8.07 ELIMINACIN DE MATERIAL EXCEDENTE M3
8.08 REPARACIN DE FALSO PISO M2
8.09 MEZCLA PARA CUBRIR TUBERIAS M3
4.01.01 CONCRETO PARA MUROS CISTERNA f'c=210 kg/cm2 M3
4.03.02 ENCOF Y DESENCOF NORMAL EN MURO DE CISTERNA M2
4.01.02 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.03.01 CONCRETO y REV COLUMNAS DE TQ ELEVADO f'c=210 kg/cm2 UND
4.03.02 ENCOF Y DESENCOF NORMAL PARA TQ ELEVADO UND
4.03.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
4.06.01 CONCRETO PLATAFORMA TQ ELEV f'c=280 kg/cm2 UND
4.06.02 ENCOFRADO Y DESENCOFRADO PLATAF TQ ELEV UND
4.06.03 ACERO fy=4200 kg/cm2 GRADO 60 KG
8.02 DESAGUE
8.01.01 INSTALACION DE RED DESAGUE ml
8.01.01 INSTALACION DE RED PLUVIAL ml
8.01.02 INSTALACION DE PUNTOS DE DESAGUE pza.
8.01.03 INSTALACION DE PUNTOS DE VENTILACION pza.
8.01.04 CONSTRUCCION DE CAJAS DE REGISTRO pza.
8.01.05 CONSTRUCCION DE TAPAS DE CONCRETO pza.
8.03 AGUA
8.02.01 INSTALACION DE RED AGUA ml
8.02.02 INSTALACION DE PUNTOS DE AGUA pza.
8.02.03 INSTALACION DE LLAVES COMPUERTAS pza.
8.02.04 INSTALACION DE ACCESORIOS BAOS pza.
8.02.05 COLOCACION DE REGISTROS 4" Y 2" pza.
8.04 INSTALACION DE TANQUE CISTERNA
8.03.01 INSTALACION DE TANQUE CISTERNA GBL
8.03.02 INSTALACION DE TANQUE ELEVADO GBL
8.03.03 INSTALACION DE BOMBA GBL

COSTO DIRECTO
G GRLS, DIR TECNICA 6.00
UTILIDAD 4.00
SUB-TOTAL
IMP GRL A LAS VENTAS 19.00
TOTAL PPTO M.O. PARA TIENDA ICA2

INCLUYE I.G.V. (19%)

PAGOS 15% ADELANTO


RESTO CONTRA VALORIZACIONES QUINCENALES
EL ADELANTO SE DESCONTAR EN CADA VALORIZACIN , DE ACUERDO AL PORCENTAJE DE AV
EJECUC 12 SEMANAS
INDUVAL INGENIEROS SAC
EMPRESA CONSTRUCTORA Y DE SERVICIOS

PPTO M.O. CASCO - ICA2 mail4

CANT P.U. PARCIAL TOTAL S/.

11,399.95
1,152.00 0.93 1,069.60
69.84 6.58 459.85
1,152.00 1.73 1,989.49
62.24 14.45 899.46
42.70 163.50 6,981.55

5,973.33
84.03 24.82 2,085.26
0.00 18.61 0.00
51.35 17.22 884.28
143.33 7.42 1,063.40
143.33 13.54 1,940.38

4,930.85
63.04 11.50 725.18
33.50 38.50 1,289.74
7.84 57.52 451.07
104.55 19.04 1,990.83
21.42 9.92 212.57
21.42 12.21 261.45

68,502.80

31.03 45.47 1,411.04


2,185.23 0.55 1,200.09

0.27 46.23 12.30


96.21 0.55 52.83

42.88 83.87 3,596.12


458.62 26.12 11,980.70
13,313.54 0.55 7,311.59

59.74 28.12 1,679.73


345.76 26.99 9,333.73
8,917.17 0.55 4,897.17

56.28 28.12 1,582.45


625.86 25.22 15,784.49
6,825.36 0.55 3,748.38
5,218.00 0.42 2,204.61

1.20 28.12 33.74


6.68 25.22 168.47
240.46 0.55 132.06

4.60 81.77 375.89


51.93 53.90 2,799.00
361.23 0.55 198.38

5,822.55
362.60 14.58 5,285.20
24.62 21.83 537.36

20,557.43
383.85 8.07 3,097.19
8.35 14.21 118.65
656.69 13.19 8,664.55
219.46 15.82 3,472.53
225.81 18.07 4,079.34
17.62 16.81 296.25
87.35 6.73 588.11
1.00 240.82 240.82

28,705.82
108.66 19.97 2,169.83
371.66 11.59 4,308.55
743.31 11.59 8,617.11
44.20 15.63 690.70
739.71 13.37 9,893.45
215.50 3.40 731.94
15.33 15.63 239.48
57.85 15.63 904.01
52.60 21.88 1,150.75

8,523.24

104.85 3.73 391.33


104.85 1.29 135.46
5.78 24.82 143.44
12.58 17.22 216.66
7.51 7.42 55.75
7.51 13.54 101.72
34.35 19.97 685.85
4.19 38.50 161.48
1.48 45.47 67.44
7.91 26.12 206.65
112.72 0.55 61.91
1.00 101.59 101.59
1.00 45.15 45.15
92.00 0.55 50.52
1.00 90.31 90.31
1.00 33.86 33.86
19.01 0.55 10.44
79.60 13.55 1,078.26
170.10 13.55 2,304.16
13.00 18.81 244.58
3.00 18.81 56.44
6.00 30.10 180.61
7.00 26.34 184.38

45.00 13.55 609.57


8.00 18.81 150.51
5.00 26.34 131.70
8.00 30.10 240.82
10.00 11.29 112.88

1.00 263.39 263.39


1.00 165.56 165.56
1.00 240.82 240.82

154,415.97
% 9,264.96
% 6,176.64
169,857.57
% 32,272.94
S/. 202,130.51

O AL PORCENTAJE DE AVANCE
0.75
OBRAS PRELIMINARES

CERCO PERIMETRAL 69.84

EJE 1/A-K 12.60 2.40 30.24


16.50 2.40 39.60

DEMOLICION DE LOSA DE PISO PARA ZAPATAS 62.24

EJE 1/A 2.00 1.00 2.00


EJE 1/G 1.30 1.50 1.95
EJE 1/JK 1.00 2.70 2.70
EJE 2/B 1.50 3.54 5.31
EJE 2/JK 1.85 2.90 5.37
EJE 3/C 1.70 3.15 5.36
EJE 3/JK 1.85 2.90 5.37
EJE 4/D 2.20 2.72 5.98
EJE 4/JK 1.85 2.90 5.37
EJE 5/E 3.00 2.20 6.60
EJE 5/JK 1.80 2.70 4.86
EJE 6/F 1.50 2.58 3.87
EJE 6/I 1.90 2.00 3.80
EJE 6/JK 1.00 3.72 3.72

DEMOLICION DE CIMENTACION EXISTENTE 42.70

EJE 1/A-K 12.58 0.50 0.92 5.79


EJE 6/F-K 11.50 0.50 0.92 5.29
EJE 3/B-H 3.50 0.50 0.92 1.61
EJE K/1-6 32.30 0.50 0.92 14.86
EJE A-F/1-6 32.95 0.50 0.92 15.16

MOVIMIENTO DE TIERRAS

EXCAVACION MANUAL PARA ZAPATAS, H= 1.30 M 84.03

EJE 1/A 2.00 1.00 1.35 2.70


EJE 1/G 1.30 1.50 1.35 2.63
EJE 1/JK 1.00 2.70 1.35 3.65
EJE 2/B 1.50 3.54 1.35 7.17
EJE 2/JK 1.85 2.90 1.35 7.24
EJE 3/C 1.70 3.15 1.35 7.23
EJE 3/JK 1.85 2.90 1.35 7.24
EJE 4/D 2.20 2.72 1.35 8.08
EJE 4/JK 1.85 2.90 1.35 7.24
EJE 5/E 3.00 2.20 1.35 8.91
EJE 5/JK 1.80 2.70 1.35 6.56
EJE 6/F 1.50 2.58 1.35 5.22
EJE 6/I 1.90 2.00 1.35 5.13
EJE 6/JK 1.00 3.72 1.35 5.02

EXCAV MANUAL CIMIENTO Y VIGAS DE CIMENTACION 0.00

EJE 1/A-K 12.58 0.50 0.80 0.00


EJE 1/F-K 11.50 0.50 0.80 0.00
EJE 3/B-H 3.50 0.50 0.80 0.00
EJE K/1-6 32.30 0.50 0.80 0.00
EJE A-F/1-6 32.95 0.50 0.80 0.00

RELLENO Y COMPACTACION C/PLANCHA 5 HP 51.35

EJE 1/A 2.00 1.00 0.83 1.65


EJE 1/G 1.30 1.50 0.83 1.61
EJE 1/JK 1.00 2.70 0.83 2.23
EJE 2/B 1.50 3.54 0.83 4.38
EJE 2/JK 1.85 2.90 0.83 4.43
EJE 3/C 1.70 3.15 0.83 4.42
EJE 3/JK 1.85 2.90 0.83 4.43
EJE 4/D 2.20 2.72 0.83 4.94
EJE 4/JK 1.85 2.90 0.83 4.43
EJE 5/E 3.00 2.20 0.83 5.45
EJE 5/JK 1.80 2.70 0.83 4.01
EJE 6/F 1.50 2.58 0.83 3.19
EJE 6/I 1.90 2.00 0.83 3.14
EJE 6/JK 1.00 3.72 0.83 3.07

CONCRETO SIMPLE

SOLADO DE 3" 1:12 C:A ZAPATAS 63.04


EJE 1/A 2.00 1.00 2.00
EJE 1/G 1.30 1.50 1.95
EJE 1/JK 1.00 2.70 2.70
EJE 2/B 1.50 3.54 5.31
EJE 2/JK 1.85 2.90 5.37
EJE 3/C 1.70 3.15 5.36
EJE 3/JK 1.85 2.90 5.37
EJE 4/D 2.20 2.72 5.98
EJE 4/JK 1.85 2.90 5.37
EJE 5/E 3.00 2.20 6.60
EJE 5/JK 1.80 2.70 4.86
EJE 6/F 1.50 2.58 3.87
EJE 6/I 1.90 2.00 3.80
EJE 6/JK 1.00 3.72 3.72
SOLADO DE 3" 1:12 C:A VIGAS DE CIMENTACIN
EJE 1/B-G 1.00 0.30 0.30
EJE 1/G 1.66 0.30 0.50

CIMIENTO CORRIDO CON CONCRETO CICLOPEO 1:10 + 30% P.G. 33.50

EJE 1/A-K 12.58 0.50 0.75 4.72


EJE 6/F-K 11.50 0.50 0.75 4.31
EJE K/1-6 32.30 0.50 0.75 12.11
EJE A-F/1-6 32.95 0.50 0.75 12.35

SOBRECIMIENTO CON CONCRETO CICLOPEO 1:8 + 25% P.M. 7.84

EJE 1/A-K 6.58 0.65 0.15 0.64


EJE 6/F-K 8.60 0.65 0.15 0.84
EJE K/1-6 32.30 0.65 0.15 3.15
EJE A-F/1-6 32.95 0.65 0.15 3.21

ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO 104.55

EJE 1/A-K 6.58 0.65 2.00 8.55


EJE 6/F-K 8.60 0.65 2.00 11.18
EJE K/1-6 32.30 0.65 2.00 41.99
EJE A-F/1-6 32.95 0.65 2.00 42.83

AFIRMADO PARA VEREDA 21.42

vereda 12.60 1.70 1.00 21.42

CONCRETO PARA VEREDA f'c=140 kg/cm2 21.42

concreto 12.60 1.70 1.00 21.42

ALBAILERIA
MURO DE SOGA LAD. K.K. MEZ. C:A 1:4 EN 1 y 2 PISO. 362.60

Primer Piso
EJE K/1-6 30.10 2.35 1.00 70.74
EJE A-F/1-6 31.15 2.35 1.00 73.20
EJE 1/A-K 0.00 2.35 1.00 0.00
EJE 6/F-K 9.60 2.35 1.00 22.56

Segundo Piso
EJE K/1-6 30.10 2.65 1.00 79.77
EJE A-F/1-6 31.15 2.65 1.00 82.55
EJE 1/A-K 3.15 2.65 1.00 8.35
EJE 6/F-K 9.60 2.65 1.00 25.44

REVESTIMIENTOS

TARRAJEO INTERIOR DE MUROS 1 y 2 PISO 383.85

Primer Piso
EJE K/1-6 30.10 2.65 1.00 79.77
EJE A-F/1-6 31.15 2.65 1.00 82.55
EJE 1/A-K 0.00 2.65 1.00 0.00
EJE 6/F-K 9.60 2.65 1.00 25.44

Segundo Piso
EJE K/1-6 30.10 2.65 1.00 79.77
EJE A-F/1-6 31.15 2.65 1.00 82.55
EJE 1/A-K 3.15 2.65 1.00 8.35
EJE 6/F-K 9.60 2.65 1.00 25.44

TARRAJEO EXTERIOR DE MUROS FACHADA 8.35

Primer Piso
EJE 1/A-K 0.00 2.65 1.00 0.00

Segundo Piso
EJE 1/A-K 3.15 2.65 1.00 8.35

CIELO RASO 656.69

1 Y 2 PISO
EJE 1,..,6/G-K 34.25 7.85 2.00 537.73
EJE 1,..,6/G-K 36.05 1.65 2.00 118.97

TARRAJEO DE COLUMNAS 1 , 2 y 3 PISO 219.46

1er PISO - EJE 1


C-A1 1.14 2.65 2.00 6.04
C-B1 1.34 2.65 2.00 7.10
C-C1 1.07 2.65 2.00 5.67
1er PISO - EJE 2,3 y 4
C-A1 1.14 2.65 6.00 18.13
C-B1 1.60 2.65 6.00 25.44
1er PISO - EJE 5
C-A2 1.14 2.65 2.00 6.04
C-B1 1.60 2.65 2.00 8.48
1er PISO - EJE 6
C-A1 0.59 2.65 1.00 1.56
C-D1 1.04 2.65 3.00 8.27
C-A2 0.77 2.65 1.00 2.04
2do PISO - EJE 1
C-A1 1.14 2.65 2.00 6.04
C-B1 1.34 2.65 2.00 7.10
C-C1 1.07 2.65 2.00 5.67
2do PISO - EJE 2,3 y 4
C-A1 1.14 2.65 6.00 18.13
C-B1 1.60 2.65 6.00 25.44
2do PISO - EJE 5
C-A2 1.14 2.65 2.00 6.04
C-B1 1.60 2.65 2.00 8.48
2do PISO - EJE 6
C-A1 0.59 2.65 1.00 1.56
C-D1 1.04 2.65 3.00 8.27
C-A2 0.77 2.65 1.00 2.04
3cer PISO - EJE 1
C-A3 1.14 2.30 1.00 2.62
C-A4 1.34 2.30 1.00 3.08
C-B4 1.07 2.30 2.00 4.92
3er PISO - EJE 2,3 y 4
C-A4 1.14 2.30 6.00 15.73
3er PISO - EJE 5
C-A3 1.14 2.30 1.00 2.62
C-A4 1.14 2.30 1.00 2.62
3er PISO - EJE 6
C-A3 0.59 2.30 1.00 1.36
C-D1 1.04 2.30 3.00 7.18
C-A5 0.77 2.30 1.00 1.77

TARRAJEO DE VIGAS 1 y 2 PISO 225.81

EJE 1/A-K 0.44 1.10 2.00 0.97


EJE 1/A-K 0.54 6.75 2.00 7.29
EJE 1/A-K 0.44 2.03 2.00 1.79

EJE 2,3,4,5/B-K 0.44 1.10 8.00 3.87


EJE 2,3,4,5/B-K 1.10 7.35 8.00 64.68
EJE 2/B-K 0.44 1.85 2.00 1.63
EJE 3/B-K 0.44 1.65 2.00 1.45
EJE 4/B-K 0.44 1.45 2.00 1.28
EJE 5/B-K 0.44 1.10 2.00 0.97

EJE 6/A-K 0.54 8.24 2.00 8.90


EJE 6/A-K 0.44 1.00 2.00 0.88

EJE A,..,E,/1-6 0.54 31.12 2.00 33.61


EJE A,..,E,/1-6 0.54 30.55 2.00 32.99
EJE I, J/1-6 0.54 30.55 2.00 32.99
EJE K/1-6 0.54 30.10 2.00 32.51

REVESTIMIENTO FONDO DE ESCALERAS 17.62


1 piso
TRAMO 1 2.23 1.30 2.90
1.16 1.30 1.51
TRAMO 2 2.23 1.30 2.90
1.16 1.30 1.51
TRAMO 3 2.23 1.30 2.90
1.16 1.30 1.51
TRAMO 4 2.23 1.30 2.90
1.16 1.30 1.51

DERRAMES EN PUERTAS Y VENTANAS 87.35


1 piso
EJE 1/A-K 2.01 4.70 1.00 9.45
EJE 1/A-K 1.39 4.70 1.00 6.53
EJE 1/A-K 1.35 4.70 1.00 6.35
EJE 1/A-K 1.07 4.70 1.00 5.03
EJE 1/A-K 4.00 5.30 1.00 21.20
2 piso
EJE 1/A-K 7.32 5.30 1.00 38.80

PISOS

REPARACIN DE FALSO PISO (CIMIENTOS y ZAPATAS) 108.66

EJE 1/A 2.00 1.00 2.00


EJE 1/G 1.30 1.50 1.95
EJE 1/JK 1.00 2.70 2.70
EJE 2/B 1.50 3.54 5.31
EJE 2/JK 1.85 2.90 5.37
EJE 3/C 1.70 3.15 5.36
EJE 3/JK 1.85 2.90 5.37
EJE 4/D 2.20 2.72 5.98
EJE 4/JK 1.85 2.90 5.37
EJE 5/E 3.00 2.20 6.60
EJE 5/JK 1.80 2.70 4.86
EJE 6/F 1.50 2.58 3.87
EJE 6/I 1.90 2.00 3.80
EJE 6/JK 1.00 3.72 3.72

EJE 1/A-K 12.58 0.50 6.29


EJE 6/F-K 11.50 0.50 5.75
EJE 3/B-H 3.50 0.50 1.75
EJE K/1-6 32.30 0.50 16.15
EJE A-F/1-6 32.95 0.50 16.47

CONTRAPISO PULIDO DE 50mm EN ALMACEN 371.66

EJE 1,..,6/G-K 11.79 32.30 1.00 380.82


EJE 1,..,6/G-K -2.43 3.40 1.00 -8.26
EJE 1,..,6/G-K -0.15 12.00 0.00 0.00
EJE 1,..,6/G-K -0.08 12.00 1.00 -0.90

PISO CERMICO 33X33 cm DE COLOR 739.71


1 y 2 PISO
EJE 1,..,6/G-K 11.79 32.30 2.00 761.63
EJE 1,..,6/G-K -2.43 3.40 2.00 -16.52
EJE 1,..,6/G-K -0.15 12.00 2.00 -3.60
EJE 1,..,6/G-K -0.08 12.00 2.00 -1.80

REVESTIMIENTO DE PASOS y CONTRAPASOS 44.20

TRAMO 1,2 8.50 1.30 2.00 22.10


TRAMO 3,4 8.50 1.30 2.00 22.10

CONTRAZOCALO DE MAYOLICA EN LOCAL 215.50


1 PISO
EJE K/1-6 32.30 1.00 1.00 32.30
EJE A-F/1-6 32.95 1.00 1.00 32.95
EJE 1/A-K 8.60 1.00 1.00 8.60
EJE 6/A-K 11.50 1.00 1.00 11.50
Columnas 1.70 1.00 12.00 20.40

2 PISO
EJE K/1-6 32.30 1.00 1.00 32.30
EJE A-F/1-6 32.95 1.00 1.00 32.95
EJE 1/A-K 12.60 1.00 1.00 12.60
EJE 6/A-K 11.50 1.00 1.00 11.50
Columnas 1.70 1.00 12.00 20.40
M2

M2

M3

M3
M3

M3

M2
M3

M3

M3

M2

M2
M2

M2

M2

M2
M2
M2

M2

ML
M2

M2

M2
ML

ML
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO M3
Z-1 1.00 2.00 1.06 0.50 1.06
Z-2 1.00 1.30 1.50 0.50 0.98
Z-3 1.00 1.00 2.70 0.50 1.35
Z-4 1.00 1.50 3.55 0.50 2.66
Z-5 1.00 1.85 2.90 0.50 2.68
Z-6 1.00 1.70 3.16 0.50 2.69
Z-7 1.00 1.85 2.90 0.50 2.68
Z-8 1.00 2.20 2.71 0.50 2.98
Z-9 1.00 1.85 2.90 0.50 2.68
Z-10 1.00 3.00 2.21 0.50 3.32
Z-11 1.00 1.80 2.70 0.50 2.43
Z-12 1.00 1.50 2.54 0.50 1.91
Z-13 1.00 1.90 2.00 0.50 1.90
Z-14 1.00 1.85 1.00 0.50 0.93
Z-15 1.00 1.60 1.00 0.50 0.80

ACERO KG
Z-1 1.00 5.00 1.90 2.46 1.10 25.71
1.00 8.00 0.96 1.55 1.10 13.09
Z-2 1.00 5.00 1.20 2.46 1.10 16.24
1.00 8.00 1.40 1.55 1.10 19.10
Z-3 1.00 5.00 3.20 1.55 1.10 27.28
2.00 8.00 1.50 1.55 1.10 40.92
2.00 10.00 1.73 0.58 1.10 22.07
1.00 10.00 1.99 0.58 1.10 12.70
1.00 7.00 2.27 0.58 1.10 10.14
1.00 7.00 3.43 0.58 1.10 15.32
Z-4 1.00 7.00 3.55 1.55 1.10 42.37
2.00 8.00 1.95 1.55 1.10 53.20
2.00 15.00 1.99 0.58 1.10 38.09
1.00 15.00 2.33 0.58 1.10 22.30
1.00 9.00 2.27 0.58 1.10 13.03
1.00 9.00 3.43 0.58 1.10 19.70
Z-5 1.00 8.00 3.35 1.55 1.10 45.69
2.00 8.00 2.30 1.55 1.10 62.74
2.00 12.00 2.19 0.58 1.10 33.53
1.00 12.00 2.39 0.58 1.10 18.30
1.00 10.00 2.27 0.58 1.10 14.48
1.00 10.00 3.43 0.58 1.10 21.88
Z-6 1.00 8.00 3.61 1.55 1.10 49.24
2.00 8.00 2.15 1.55 1.10 58.65
2.00 13.00 2.19 0.58 1.10 36.33
1.00 13.00 2.39 0.58 1.10 19.82
1.00 9.00 2.27 0.58 1.10 13.03
1.00 9.00 3.43 0.58 1.10 19.70
Z-7 1.00 8.00 3.35 1.55 1.10 45.69
2.00 8.00 2.30 1.55 1.10 62.74
2.00 12.00 2.19 0.58 1.10 33.53
1.00 12.00 2.39 0.58 1.10 18.30
1.00 10.00 2.27 0.58 1.10 14.48
1.00 10.00 3.43 0.58 1.10 21.88
Z-8 1.00 10.00 3.31 1.55 1.10 56.44
2.00 8.00 2.65 1.55 1.10 72.29
2.00 11.00 2.45 0.58 1.10 34.39
2.00 11.00 2.39 0.58 1.10 33.55
1.00 12.00 2.27 0.58 1.10 17.38
1.00 12.00 3.43 0.58 1.10 26.26
Z-9 1.00 8.00 3.35 1.55 1.10 45.69
2.00 8.00 2.30 1.55 1.10 62.74
2.00 12.00 2.19 0.58 1.10 33.53
2.00 12.00 2.39 0.58 1.10 36.60
1.00 10.00 2.27 0.58 1.10 14.48
1.00 10.00 3.43 0.58 1.10 21.88
Z-10 1.00 13.00 2.66 1.55 1.10 58.96
2.00 8.00 2.66 1.55 1.10 72.56
2.00 9.00 2.47 0.58 1.10 28.37
1.00 9.00 2.53 0.58 1.10 14.53
1.00 16.00 2.27 0.58 1.10 23.17
1.00 16.00 3.43 0.58 1.10 35.01
Z-11 1.00 8.00 3.15 1.55 1.10 42.97
2.00 8.00 3.15 1.55 1.10 85.93
2.00 11.00 2.19 0.58 1.10 30.74
1.00 11.00 2.49 0.58 1.10 17.47
1.00 10.00 2.27 0.58 1.10 14.48
1.00 10.00 3.43 0.58 1.10 21.88
Z-12 1.00 16.00 1.35 2.46 1.10 58.45
1.00 10.00 2.25 2.46 1.10 60.89
Z-13 1.00 12.00 1.75 2.46 1.10 56.83
1.00 10.00 1.95 1.55 1.10 33.25
Z-14 1.00 12.00 0.85 2.46 1.10 27.60
1.00 5.00 1.70 2.46 1.10 23.00
Z-15 1.00 10.00 0.85 2.46 1.10 23.00
1.00 5.00 1.45 2.46 1.10 19.62

VIGA DE CIMENTACION
CONCRETO M3 1.00 1.00 0.25 0.40 0.10
1.00 1.66 0.25 0.40 0.17
ACERO KG 1.00 2.00 3.95 2.63 20.79
1.00 2.00 3.95 1.55 12.26
1.00 2.00 2.35 1.55 7.29
1.00 9.00 1.13 0.60 6.09
1.00 2.00 3.92 2.63 20.64
1.00 2.00 3.92 1.55 12.16
1.00 2.00 2.85 1.55 8.84
1.00 12.00 1.13 0.60 8.13

COLUMNAS
CONCRETO M3
CA-1 1 0.3 0.55 8.075 1.33
CA-2 11 0.3 0.55 8.075 14.66
CB-2 2 0.3 0.5 8.075 2.42
CB-3 8 0.3 0.5 8.075 9.69
CC-1 2 0.3 0.3 8.075 1.45
CD-1 3 0.25 0.4 8.075 2.42
CCON-1 36 0.25 0.15 8.075 10.90

ENCOFRADO M2
CA-1 1 2 0.3 8.075 4.85
1 2 0.55 8.075 8.88
CA-2 11 2 0.3 8.075 53.30
11 2 0.55 8.075 97.71
CB-2 2 2 0.3 8.075 9.69
2 2 0.5 8.075 16.15
CB-3 8 2 0.3 8.075 38.76
8 2 0.5 8.075 64.60
CC-1 2 4 0.3 8.075 19.38
CD-1 3 2 0.25 8.075 12.11
CCON-1 1 72 0.25 2.8 50.40
1 72 0.25 2.8 50.40
1 72 0.25 1.8 32.40

ACERO
1er Nivel
CA-1 1 6 5.045 4.15 1.07 134.41
1 22 1.925 0.56 1.07 25.38
CA-2 11 10 5.045 4.15 1.07 2,464.26
11 2 5.045 2.46 1.07 292.15
11 22 1.925 0.56 1.07 279.14
CB-2 2 12 5.045 4.15 1.07 537.66
2 22 1.825 0.56 1.07 48.12
CB-3 8 4 5.045 4.15 1.07 716.87
8 4 5.045 2.46 1.07 424.94
8 22 1.43 0.56 1.07 150.81
CC-1 2 4 5.045 4.15 1.07 179.22
2 4 5.045 1.45 1.07 62.62
2 22 1.03 0.56 1.07 27.16
CD-1 3 4 5.045 4.15 1.07 268.83
3 4 5.045 2.46 1.07 159.35
3 22 1.13 0.56 1.07 44.69
CCON-1 36 1 0.62 1.45 1.07 34.63
36 4 3.9 0.56 1.07 336.51
36 16 0.63 0.25 1.07 97.07

2do Nivel
CA-1 8 6 4.1 4.15 1.07 873.89
8 20 1.925 0.56 1.07 184.55
CA-2 4 10 4.1 4.15 1.07 728.24
4 2 4.1 2.46 1.07 86.34
4 20 1.925 0.56 1.07 92.28
CB-2 2 12 4.1 4.15 1.07 436.95
2 20 1.825 0.56 1.07 43.74
CB-3 8 4 4.1 4.15 1.07 582.59
8 4 4.1 2.46 1.07 345.34
8 20 1.43 0.56 1.07 137.10
CC-1 2 4 4.1 4.15 1.07 145.65
2 4 4.1 1.45 1.07 50.89
2 20 1.03 0.56 1.07 24.69
CD-1 3 4 4.1 4.15 1.07 218.47
3 4 4.1 2.46 1.07 129.50
3 20 1.13 0.56 1.07 40.63
CCON-1 36 1 0.62 1.45 1.07 34.63
36 4 3.9 0.56 1.07 336.51
36 16 0.63 0.25 1.07 97.07

3er Nivel
CA-3 3 4 2.5 4.15 1.07 133.22
3 2 2.5 2.46 1.07 39.48
3 16 1.925 0.56 1.07 55.37
CA-4 8 4 2.5 4.15 1.07 355.24
8 2 2.5 0.89 1.07 38.09
8 16 1.925 0.56 1.07 147.64
CA-5 1 6 2.5 2.46 1.07 39.48
1 16 1.925 0.56 1.07 18.46
CB-4 2 12 2.5 4.15 1.07 266.43
2 16 1.825 0.56 1.07 34.99
CB-3 8 4 2.5 4.15 1.07 355.24
8 4 2.5 2.46 1.07 210.58
8 16 1.43 0.56 1.07 109.68
2 16 1.03 0.56 1.07 19.75
CD-2 3 4 2.5 4.15 1.07 133.22
3 4 2.5 2.46 1.07 78.97
3 16 1.13 0.56 1.07 32.50
CCON-1 36 1 0.62 1.45 1.07 34.63
36 4 3 0.56 1.07 258.85
36 13 0.63 0.25 1.07 78.87

ESCALERA
CONCRETO M3
TRAMO 1 1.00 0.60 1.30 1.00 0.78
1.00 2.48 1.30 0.15 0.48
1.00 0.88 1.30 0.15 0.17
8.00 1.30 0.25 0.09 0.23
TRAMO 2 Y 4 2.00 1.30 1.30 0.15 0.51
2.00 2.43 1.30 0.15 0.95
16.00 1.30 0.25 0.09 0.47
TRAMO 3 1.00 2.94 1.30 0.15 0.57
1.00 0.88 1.30 0.15 0.17
9.00 1.30 0.25 0.09 0.26

ENCOFRADO M2
TRAMO 1 1.00 1.00 2.83 1.30 3.68
1.00 1.00 0.99 1.30 1.29
1.00 2.00 0.99 0.15 0.30
1.00 2.00 0.18 1.30 0.47
1.00 2.00 0.60 0.18 0.22
1.00 2.00 2.48 0.15 0.74
1.00 16.00 0.25 0.09 0.36
1.00 8.00 0.18 1.30 1.87
TRAMO 2 Y 4 2.00 1.00 2.40 1.30 6.24
2.00 1.00 1.34 1.30 3.48
2.00 2.00 1.34 0.15 0.80
2.00 2.00 2.43 1.30 12.61
2.00 16.00 0.25 0.09 0.72
2.00 8.00 0.18 1.30 3.74
TRAMO 3 1.00 1.00 2.83 1.30 3.68
1.00 1.00 0.99 1.30 1.29
1.00 2.00 0.99 0.15 0.30
1.00 2.00 2.94 1.30 7.63
1.00 18.00 0.25 0.09 0.41
1.00 9.00 0.18 1.30 2.11

ACERO
TRAMO 1 1.00 7.00 1.44 0.99 1.10 10.98
1.00 7.00 3.91 0.99 1.10 29.81
1.00 7.00 1.95 0.99 1.10 14.86
1.00 8.00 1.82 0.56 1.10 8.97
1.00 8.00 2.43 0.56 1.10 11.98
1.00 9.00 2.55 0.56 1.10 14.14
1.00 18.00 1.25 0.56 1.10 13.86
TRAMO 2 Y 4 2.00 7.00 4.65 0.99 1.10 70.89
2.00 8.00 1.47 0.56 1.10 14.49
2.00 8.00 0.90 0.56 1.10 8.87
2.00 8.00 1.56 0.56 1.10 15.38
2.00 8.00 2.25 0.56 1.10 22.18
2.00 20.00 1.25 0.56 1.10 30.80
TRAMO 3 1.00 7.00 3.69 0.99 1.10 28.13
1.00 7.00 1.95 0.99 1.10 14.86
1.00 8.00 0.83 0.56 1.10 4.09
1.00 8.00 1.52 0.56 1.10 7.49
1.00 8.00 2.17 0.56 1.10 10.69
1.00 9.00 2.55 0.56 1.10 14.14
1.00 19.00 1.25 0.56 1.10 14.63
31.03

38.80

35.33

128.43

188.68

196.64
196.77

196.64

240.30

214.93

232.60

213.48

119.33

90.07

50.60

42.62 2,185.23
0.27

46.44

49.77 96.21

42.88

458.62 458.62
6,283.80

4,589.06
2,440.68

4.60
51.93

361.23
RESUMEN

VIGAS
CONCRETO PREMEZCLADO CON BOMBA f'c=280 kg/cm2 M3
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2
ACERO fy=4200 kg/cm2 GRADO 60 KG

LOSA ALIGERADA
CONCRETO PREMEZCLADO CON BOMBA f'c=280 kg/cm2 M3
ENCOF Y DESENC NORMAL EN LOSA ALIGERADA M2
ACERO fy=4200 kg/cm2 GRADO 60 KG
LADRILLO DE TECHO 30x30x15 UND

CONCRETO VIGAS 1er PISO

DIMENSIONES
DESCRIPCIN UND. PARCIAL
LARGO ANCHO ALTURA
CONCRETO ARMADO
VIGAS PERALTADAS
6.14 0.25 0.50 0.77
6.28 0.25 0.50 0.79
VP- 1A m3 6.29 0.25 0.50 0.79
6.29 0.25 0.50 0.79
6.14 0.25 0.50 0.77
VP-111 m3 2.83 0.25 0.50 0.35
VP-112 m3 1.79 0.25 0.50 0.22
VP-113 m3 4.30 0.25 0.50 0.54
VP-114 m3 1.77 0.25 0.50 0.22
VP-115 m3 1.89 0.25 0.40 0.19
6.13 0.25 0.50 0.77
6.28 0.25 0.50 0.79
6.28 0.25 0.50 0.79
VP-1K m3
6.28 0.25 0.50 0.79
3.53 0.25 0.40 0.35
2.40 0.25 0.40 0.24
6.13 0.25 0.50 0.77
6.28 0.25 0.50 0.79
VP-1G m3 6.28 0.25 0.50 0.79
VP-1G m3
6.28 0.25 0.50 0.79
6.18 0.25 0.50 0.77
6.13 0.25 0.50 0.77
6.28 0.25 0.50 0.79
VP-1J m3
6.28 0.25 0.50 0.79
6.28 0.25 0.50 0.79
6.13 0.40 0.20 0.49
6.28 0.40 0.20 0.50
VCH-1 m3 6.28 0.40 0.20 0.50
6.28 0.40 0.20 0.50
6.18 0.40 0.20 0.49
VP-1I m3 6.18 0.25 0.50 0.77
VP-121 2.73 0.25 0.40 0.27
VP-122 7.85 0.30 0.60 1.41
VP-123 1.65 0.25 0.40 0.17
VP-131 2.37 0.25 0.40 0.24
VP-132 7.85 0.30 0.60 1.41
VP-133 1.65 0.25 0.40 0.17
VP-141 2.01 0.25 0.40 0.20
VP-142 7.85 0.30 0.60 1.41
m3
VP-143 1.65 0.25 0.40 0.17
VP-151 1.65 0.25 0.40 0.17
VP-152 7.85 0.30 0.60 1.41
VP-153 1.65 0.25 0.40 0.17
VP-161 1.25 0.25 0.40 0.13
VP-162 6.10 0.30 0.60 1.10
VP-163 3.45 0.25 0.40 0.35
V-1 3.53 0.20 0.40 0.28

TOTAL CONCRETO

TOTAL CONCRETO
x 1.05 DESPERDICIO

1 PISO 29.87

2 PISO 29.87

TOTAL (m3) 59.74


ENCOFRADO VIGAS - 1ER PISO

DIMENSIONES
DESCRIPCIN UND. N V PARCIAL
LARGO ALTURA
1A m2 1.00 32.95 0.50 16.48
1.00 6.19 0.25 1.55
1.00 6.19 0.30 1.86
1.00 6.31 0.25 1.58
1.00 6.31 0.30 1.89
1.00 6.29 0.25 1.57
1.00 6.29 0.30 1.89
1.00 6.29 0.25 1.57
1.00 6.29 0.30 1.89
1.00 6.14 0.25 1.54
1.00 6.14 0.30 1.84
111-115 m2 1.00 3.10 0.40 1.24
1.00 1.39 0.50 0.70
1.00 4.60 0.40 1.84
1.00 1.37 0.50 0.69
1.00 2.15 0.40 0.86
1.00 2.03 0.25 0.51
1.00 2.03 0.30 0.61
1.00 1.39 0.25 0.35
1.00 1.39 0.30 0.42
1.00 4.00 0.25 1.00
1.00 4.00 0.20 0.80
1.00 1.37 0.25 0.34
1.00 1.37 0.30 0.41
1.00 1.10 0.25 0.28
1.00 1.10 0.30 0.33
VP - K m2 1.00 26.47 0.50 13.24
1.00 6.43 0.40 2.57
1.00 6.13 0.25 1.53
1.00 6.13 0.30 1.84
1.00 6.28 0.25 1.57
1.00 6.28 0.30 1.88
1.00 6.28 0.25 1.57
1.00 6.28 0.30 1.88
1.00 6.28 0.25 1.57
1.00 6.28 0.30 1.88
1.00 3.43 0.25 0.86
1.00 3.43 0.20 0.69
1.00 2.30 0.25 0.58
1.00 2.30 0.20 0.46
161 - 163 m2 1.00 10.80 0.50 5.40
1.00 0.29 0.25 0.07
1.00 0.29 0.30 0.09
1.00 5.70 0.25 1.43
1.00 5.70 0.30 1.71
1.00 2.90 0.25 0.73
1.00 2.90 0.30 0.87
121 - 123 m2 2.00 1.68 0.20 0.67
1.00 1.68 0.25 0.42
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
2.00 1.10 0.20 0.44
1.00 1.10 0.25 0.28
131 - 133 m2 2.00 1.32 0.20 0.53
1.00 1.32 0.25 0.33
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
2.00 1.10 0.20 0.44
1.00 1.10 0.25 0.28
141 - 143 m2 2.00 0.96 0.30 0.58
1.00 0.96 0.25 0.24
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
2.00 1.10 0.20 0.44
1.00 1.10 0.25 0.28
151 - 153 m2 2.00 0.60 0.30 0.36
1.00 0.60 0.25 0.15
2.00 3.48 0.40 2.78
1.00 3.48 0.30 1.04
1.00 1.88 0.40 0.75
1.00 1.85 0.40 0.74
1.00 3.48 0.30 1.04
1.00 3.48 0.40 1.39
2.00 1.10 0.20 0.44
1.00 1.10 0.25 0.28
V-1 m2 2.00 3.28 0.20 1.31
1.00 3.28 0.20 0.66
V - 1I m2 1.00 6.18 0.30 1.85
1.00 6.18 0.25 1.55
1.00 3.53 0.30 1.06
1.00 2.45 0.30 0.74
VP - 1J m2 2.00 6.13 0.30 3.68
1.00 6.13 0.25 1.53
2.00 6.28 0.30 3.77
1.00 6.28 0.25 1.57
2.00 6.28 0.30 3.77
1.00 6.28 0.25 1.57
2.00 6.28 0.30 3.77
1.00 6.28 0.25 1.57
VP - 1G m2 2.00 6.13 0.30 3.68
1.00 6.13 0.25 1.53
2.00 6.28 0.30 3.77
1.00 6.28 0.25 1.57
2.00 6.28 0.30 3.77
1.00 6.28 0.25 1.57
2.00 6.28 0.30 3.77
1.00 6.28 0.25 1.57
TOTAL

1 PISO 172.88

2 PISO 172.88

TOTAL (m2) 345.76

ACERO VIGAS 1er PISO

DESCRIPCIN LONGITUDES LARGO N VIGAS DESPERDICIO PARCIAL

CONCRETO ARMADO - ACERO


VIGAS PERALTADAS
67.16
67.16
2.91
2.90
1A
2.90 143.03 1 1.05 16.69
1A

2.09
3.51 5.59 1 1.05 0.65
1.62 1.62 1 1.05 0.19
0.38
ESTRIBOS 0.88
0.26 1.52 185 1.05 32.81
26.26
26.12
35.80 88.18 1 1.05 10.29
111 - 115 4.90
4.90 9.80 1 1.05 1.14
3.38
3.38 6.76 1 1.05 0.79
0.38
0.68
0.26 1.32 17 1.05 2.62
0.38
0.88
0.26 1.52 12 1.05 2.13
0.38
ESTRIBOS 0.68
0.26 1.32 22 1.05 3.39
0.38
0.88
0.26 1.52 13 1.05 2.31
0.38
0.68
0.26 1.32 9 1.05 1.39
25.56
25.42
21.20
3.00 75.18 1 1.05 8.77
121-123 6.10
4.48
28.80
5.90
4.50 49.78 1 1.05 5.81
0.38
0.68
0.26 1.32 17 1.05 2.62
0.48
ESTRIBOS 1.08
0.26 1.82 50 1.05 10.62
0.38
ESTRIBOS

0.68
0.26 1.32 14 1.05 2.16
25.56
25.42
3.00
3.00 56.98 1 1.05 6.65
131-133 6.10
4.48
28.80
5.90
4.50 49.78 1 1.05 5.81
0.38
0.68
0.26 1.32 15 1.05 2.31
0.48
ESTRIBOS 1.08
0.26 1.82 50 1.05 10.62
0.38
0.68
0.26 1.32 14 1.05 2.16
24.20
4.16
20.96
3.00
3.00 55.32 1 1.05 6.45
141-143
6.10
4.48
35.80
5.90
4.50 56.78 1 1.05 6.62
0.38
0.88
0.26 1.52 12 1.05 2.13
0.48
ESTRIBOS 1.08
0.26 1.82 53 1.05 11.25
0.38
0.68
0.26 1.32 9 1.05 1.39
24.20
4.16
20.96
3.00
3.00 55.32 1 1.05 6.45
151-153
6.10
151-153

4.48
35.80
5.90
4.50 56.78 1 1.05 6.62
0.38
0.88
0.26 1.52 10 1.05 1.77
0.48
ESTRIBOS 1.08
0.26 1.82 53 1.05 11.25
0.38
0.68
0.26 1.32 9 1.05 1.39
22.70 22.70 1 1.05 2.65
6.28
22.46
2.20
161-163
8.28
4.58 43.80 1 1.05 5.11
1.30
3.35 4.65 1 1.05 0.54
0.38
ESTRIBOS 0.88
0.26 1.52 65 1.05 11.53
67.04
2.09
3.40 72.53 1 1.05 8.46
66.78
VP - G
2.90 69.68 1 1.05 8.13
2.50
2.10 4.60 1 1.05 0.54
1.09 1.09 1 1.05 0.13
0.38
ESTRIBOS 0.88
0.26 1.52 196 1.05 34.76

67.04
2.09
3.70
3.40
2.60
2.10
1.47 82.40 1 1.05 9.61
VP - K 69.90
VP - K
2.80 72.70 1 1.05 8.48
1.25 1.25 1 1.05 0.15
7.52
1.50
1.50
2.90
1.20
1.60 16.22 1 1.05 1.89
0.38
0.88
0.26 1.52 158 1.05 28.02
ESTRIBOS
0.38
0.68
0.26 1.32 46 1.05 7.08
54.10
2.09
3.00 59.19 1 1.05 6.91
VP - J 53.93
3.20
3.20 60.33 1 1.05 7.04
1.25 1.25 1 1.05 0.15
0.38
ESTRIBOS 0.88
0.26 1.52 156 1.05 27.66
131.36 131.36 1 1.05 15.33
VCH - 1
65.68 65.68 1 1.05 7.66
0.28
ESTRIBOS 0.68
0.26 1.22 143 1.05 20.35
V-1 14.86 14.86 1 1.05 1.73
0.28
ESTRIBOS 0.68
0.26 1.22 12 1.05 1.71
1.80 1.80 1 1.05 0.21
7.37 7.37 1 1.05 0.86
VP - 1I 7.24
3.20 10.44 1 1.05 1.22
5.80 5.80 1 1.05 0.68
0.38
ESTRIBOS 0.88
0.26 1.52 49 1.05 8.69
1 PISO 4,629.81

2 PISO 4,287.36

TOTAL (m2) 8,917.17

CONCRETO TECHO 1er PISO

DIMENSIONES
DESCRIPCIN UND. PARCIAL
LARGO ANCHO ALTURA
CONCRETO ARMADO
LOSA ALIGERADA - TECHO 1
P1 m3 14.1 _ 0.05 0.705
12.24 0.05 0.612
9.96 0.05 0.498
P2 m3 _
7.68 0.05 0.384
5.32 0.05 0.266
6.18 3.6 0.05 1.112
6.28 3.6 0.05 1.130
6.28 3.6 0.05 1.130
6.28 3.6 0.05 1.130
6.18 3.6 0.05 1.112
P3 -P4 m3
6.18 3.6 0.05 1.112
6.28 3.6 0.05 1.130
6.28 3.6 0.05 1.130
6.28 3.6 0.05 1.130
6.18 1.85 0.05 0.572
6.21 1.53 0.05 0.475
6.33 1.53 0.05 0.484
P5 m3
6.33 1.53 0.05 0.484
6.33 1.53 0.05 0.484
P6 m3 3.53 3.28 0.05 0.579

TOTAL CONCRETO

TOTAL CONCRETO
x 1.05 DESPERDICIO
DIMENSIONES
DESCRIPCIN UND. PARCIAL
LARGO ANCHO ALTURA
CONCRETO ARMADO
VIGUETAS - TECHO 1
2.44 0.10 0.15 0.037
2.42 0.10 0.15 0.036
2.40 0.10 0.15 0.036
2.38 0.10 0.15 0.036
2.35 0.10 0.15 0.035
2.33 0.10 0.15 0.035
2.31 0.10 0.15 0.035
P1 m3 2.29 0.10 0.15 0.034
2.26 0.10 0.15 0.034
2.24 0.10 0.15 0.034
2.22 0.10 0.15 0.033
2.20 0.10 0.15 0.033
2.18 0.10 0.15 0.033
2.15 0.10 0.15 0.032
2.13 0.10 0.15 0.032
2.09 0.10 0.15 0.031
2.07 0.10 0.15 0.031
2.05 0.10 0.15 0.031
2.03 0.10 0.15 0.030
2.01 0.10 0.15 0.030
1.99 0.10 0.15 0.030
1.97 0.10 0.15 0.030
1.95 0.10 0.15 0.029
1.93 0.10 0.15 0.029
1.91 0.10 0.15 0.029
1.89 0.10 0.15 0.028
1.87 0.10 0.15 0.028
1.85 0.10 0.15 0.028
1.83 0.10 0.15 0.027
1.81 0.10 0.15 0.027
1.73 0.10 0.15 0.026
1.71 0.10 0.15 0.026
1.69 0.10 0.15 0.025
1.67 0.10 0.15 0.025
1.65 0.10 0.15 0.025
1.63 0.10 0.15 0.024
1.61 0.10 0.15 0.024
1.59 0.10 0.15 0.024
1.57 0.10 0.15 0.024
1.55 0.10 0.15 0.023
1.53 0.10 0.15 0.023
1.51 0.10 0.15 0.023
1.49 0.10 0.15 0.022
1.47 0.10 0.15 0.022
1.45 0.10 0.15 0.022
P2 m3
1.37 0.10 0.15 0.021
1.35 0.10 0.15 0.020
1.33 0.10 0.15 0.020
1.31 0.10 0.15 0.020
1.29 0.10 0.15 0.019
1.27 0.10 0.15 0.019
1.25 0.10 0.15 0.019
1.23 0.10 0.15 0.018
1.21 0.10 0.15 0.018
1.19 0.10 0.15 0.018
1.17 0.10 0.15 0.018
1.15 0.10 0.15 0.017
1.13 0.10 0.15 0.017
1.11 0.10 0.15 0.017
1.09 0.10 0.15 0.016
1.01 0.10 0.15 0.015
0.99 0.10 0.15 0.015
0.97 0.10 0.15 0.015
0.95 0.10 0.15 0.014
0.93 0.10 0.15 0.014
0.91 0.10 0.15 0.014
0.89 0.10 0.15 0.013
0.87 0.10 0.15 0.013
0.85 0.10 0.15 0.013
0.83 0.10 0.15 0.012
0.81 0.10 0.15 0.012
0.79 0.10 0.15 0.012
0.77 0.10 0.15 0.012
0.75 0.10 0.15 0.011
0.73 0.10 0.15 0.011
55.62 0.10 0.15 0.834
56.52 0.10 0.15 0.848
56.52 0.10 0.15 0.848
56.52 0.10 0.15 0.848
55.62 0.10 0.15 0.834
P3 - P4 m3
49.44 0.10 0.15 0.742
50.24 0.10 0.15 0.754
50.24 0.10 0.15 0.754
50.24 0.10 0.15 0.754
24.72 0.10 0.15 0.371
22.95 0.10 0.15 0.344

P5 m3
22.95 0.10 0.15 0.344
P5 m3
22.95 0.10 0.15 0.344
22.95 0.10 0.15 0.344
P6 m3 26.24 0.10 0.15 0.394

TOTAL CONCRETO

TOTAL CONCRETO
x 1.05 DESPERDICIO

1 PISO 28.14

2 PISO 28.14

56.28
TOTAL (m3)

ENCOFRADO TECHO 1ER PISO

DIMENSIONES
DESCRIPCIN UND. N V PARCIAL
LARGO ALTURA
P1 m2 14.16
P2 12.24
9.96
7.68
5.32
P3 - P4 22.25
22.61
22.61
22.61
22.25
22.25
22.61
22.61
22.61
11.44
P5 9.42
9.58
9.58
9.58
P6 11.56
TOTAL

1 PISO 312.93

2 PISO 312.93

625.86
TOTAL (m3)

ACERO TECHO 1ER PISO

DESCRIPCIN LARGO LONGITUD N DESPERDICIO PARCIAL

CONCRETO ARMADO - ACERO


ACERO POSITIVO Y NEGATIVO 1 PISO
P1 2.5
0.2 2.7 15 1.1 5
P 0.9
N 0.35 1.25 15 1.1 2
0.9
0.35 1.25 15 1.1 2
P2 1.8
0.2 2 15 1.1 4
1.6
0.2 1.8 15 1.1 3
1
0.2 1.2 15 1.1 2
0.65
P 0.2 0.85 15 1.1 2
1.9
0.7 2.6 15 1.1 5
1.5
0.7 2.2 15 1.1 4
1.2
0.7 1.9 15 1.1 3
N 0.85
0.7 1.55 15 1.1 3
P3 - P4 6.83
P 6.83
3.98 17.64 9 1.1 19
7.23
4.08 11.31 9 1.1 12
7.23
4.08 11.31 9 1.1 12
7.23
4.08 11.31 9 1.1 12
6.85
6.85
3.98 17.68 9 1.1 19
N 1.55
0.3 1.85 9 1.1 2
4.4
4.4 8.8 9 1.1 10
4.45
4.45 8.9 9 1.1 10
3.5 3.5 9 1.1 3.85
4.45
4.45 8.9 9 1.1 10
3.5 3.5 9 1.1 3.85
4.45
4.45 8.9 9 1.1 10
1.55
0.3 1.85 9 1.1 2
3.45
3.45 6.9 9 1.1 8
3.5
3.5 7 9 1.1 8
P 6.83
6.83
3.98 17.64 8 1.1 17
7.23
4.08 11.31 8 1.1 11
7.23
4.08 11.31 8 1.1 11
6.85
6.85
3.98 17.68 8 1.1 17
6.85
6.85
3.98 17.68 8 1.1 17
1.55
0.3 1.85 9 1.1 2
1.55
0.3 1.85 9 1.1 2
N 1.55
0.3 1.85 8 1.1 2
4.45
4.45 8.9 8 1.1 9
4.45
4.45 8.9 8 1.1 9
3.5 3.5 8 1.1 3
4.45
4.45 8.9 8 1.1 9
1.55
0.3 1.85 8 1.1 2
3.45
3.45 6.9 8 1.1 7
3.5
3.5 7 8 1.1 7
P5
P 1.925 1.925 60 1.1 14
0.85
N 0.85 1.7 60 1.1 12
P6
P 3.675 3.675 8 1.1 4
1.25
N 1.25 2.5 8 1.1 2

DESCRIPCIN LARGO N DESPERDICIO PARCIAL TOTAL

CONCRETO ARMADO - ACERO


ACERO DE T 1 PISO
2.2 31 1.1 8
P1 15
6.2 9 1.1 7
1.9 32 1.1 7
6.33 10 1.1 8
6.33 8 1.1 6
1.2 32 1.1 5
P2 38
6.33 6 1.1 5
1.2 32 1.1 5
6.15 3 1.1 2
0.86 0.25 1.1 0.03
3.6 162 1.1 71
32.4 14 1.1 55
6.18 9 1.1 7
P3 - P4 242
1.85 31 1.1 7
P3 - P4 242

3.6 130 1.1 57


25.92 14 1.1 44
1.53 128 1.1 24
25.95 6 1.1 19
P5 55
3.28 14 1.1 6
3.56 15 1.1 7
350
TOTAL VARILLAS

788
TOTAL x kg

RESUMEN VARILLAS

DIAMETRO DIAMETRO TOTAL TOTAL x kg


1/2" 244.66 2,179.92
1 PISO
3/8" 88.34 445.24
1/2" 244.66 2,179.92
2 PISO
3/8" 88.34 445.24
TEMPERAT 1/4" 350.01 787.52
1/4" 350.01 787.52
TOTAL 6,825.36

LADRILLO TECHO 1ER PISO

DIMENSIONES
DESCRIPCIN UND. PARCIAL
LARGO ANCHO ALTURA
CONCRETO ARMADO
LADRILLO STANDARD - TECHO 1
P1 UND. 14.1 _ 8.33 117
12.24 8.33 102
9.96 8.33 83
P2 UND. _
7.68 8.33 64
5.32 8.33 44
6.18 3.6 8.33 185
6.28 3.6 8.33 188
6.28 3.6 8.33 188
6.28 3.6 8.33 188
6.18 3.6 8.33 185
P3 -P4 UND.
6.18 3.6 8.33 185
P3 -P4 UND.

6.28 3.6 8.33 188


6.28 3.6 8.33 188
6.28 3.6 8.33 188
6.18 1.85 8.33 95
6.21 1.53 8.33 79
6.33 1.53 8.33 81
P5 UND.
6.33 1.53 8.33 81
6.33 1.53 8.33 81
P6 UND. 3.53 3.28 8.33 96

TOTAL LADRILOS

1 PISO 2609

2 PISO 2609

5218
59.74
345.76
8,917.17

56.28
625.86
6,825.36
5,218.00

CONCRETO VIGAS 2do PISO

DIMENSIONES
TOTAL DESCRIPCIN UND.
LARGO ANCHO ALTURA
CONCRETO ARMADO
VIGAS PERALTADAS
6.14 0.25 0.50
6.28 0.25 0.50
3.89 VP- 2A m3 6.29 0.25 0.50
6.29 0.25 0.50
6.14 0.25 0.50
0.35 VP-211 m3 2.83 0.25 0.50
0.22 VP-212 m3 1.79 0.25 0.50
0.54 VP-213 m3 4.30 0.25 0.50
0.22 VP-214 m3 1.77 0.25 0.50
0.19 VP-215 m3 1.89 0.25 0.40
6.13 0.25 0.50
6.28 0.25 0.50
6.28 0.25 0.50
3.71 VP-2K m3
6.28 0.25 0.50
3.53 0.25 0.40
2.40 0.25 0.40
6.13 0.25 0.50
6.28 0.25 0.50
3.89 VP-2G m3 6.28 0.25 0.50
3.89 VP-2G m3
6.28 0.25 0.50
6.18 0.25 0.50
6.13 0.25 0.50
6.28 0.25 0.50
3.12 VP-2J m3
6.28 0.25 0.50
6.28 0.25 0.50
6.13 0.40 0.20
6.28 0.40 0.20
2.49 VCH-2 m3 6.28 0.40 0.20
6.28 0.40 0.20
6.18 0.40 0.20
0.77 VP-2I m3 6.18 0.25 0.50
VP-221 2.73 0.25 0.40
VP-222 7.85 0.30 0.60
VP-223 1.65 0.25 0.40
VP-231 2.37 0.25 0.40
VP-232 7.85 0.30 0.60
VP-233 1.65 0.25 0.40
VP-241 2.01 0.25 0.40
VP-242 7.85 0.30 0.60
9.04 m3
VP-243 1.65 0.25 0.40
VP-251 1.65 0.25 0.40
VP-252 7.85 0.30 0.60
VP-253 1.65 0.25 0.40
VP-261 1.25 0.25 0.40
VP-262 6.10 0.30 0.60
VP-263 3.45 0.25 0.40
V-2 3.53 0.20 0.40

28.45 TOTAL CONCRETO

29.87 TOTAL CONCRETO


x 1.05 DESPERDICIO
ENCOFRADO VIGAS - 2DO PISO

DIMENSIONES
TOTAL DESCRIPCIN UND. N V
LARGO
2A m2 1.00 32.95
1.00 6.19
1.00 6.19
1.00 6.31
1.00 6.31
1.00 6.29
1.00 6.29
1.00 6.29
1.00 6.29
1.00 6.14
33.65 1.00 6.14
211-215 m2 1.00 3.10
1.00 1.39
1.00 4.60
1.00 1.37
1.00 2.15
1.00 2.03
1.00 2.03
1.00 1.39
1.00 1.39
1.00 4.00
1.00 4.00
1.00 1.37
1.00 1.37
1.00 1.10
10.36 1.00 1.10
VP - K m2 1.00 26.47
1.00 6.43
1.00 6.13
1.00 6.13
1.00 6.28
1.00 6.28
1.00 6.28
1.00 6.28
1.00 6.28
1.00 6.28
1.00 3.43
1.00 3.43
1.00 2.30
32.12 1.00 2.30
261 - 263 m2 1.00 10.80
1.00 0.29
1.00 0.29
1.00 5.70
1.00 5.70
1.00 2.90
10.29 1.00 2.90
221 - 223 m2 2.00 1.68
1.00 1.68
2.00 3.48
1.00 3.48
2.00 3.48
1.00 3.48
2.00 1.10
9.46 1.00 1.10
231 - 233 m2 2.00 1.32
1.00 1.32
2.00 3.48
1.00 3.48
2.00 3.48
1.00 3.48
2.00 1.10
9.23 1.00 1.10
241 - 243 m2 2.00 0.96
1.00 0.96
2.00 3.48
1.00 3.48
2.00 3.48
1.00 3.48
2.00 1.10
9.19 1.00 1.10
251 - 253 m2 2.00 0.60
1.00 0.60
2.00 3.48
1.00 3.48
1.00 1.88
1.00 1.85
1.00 3.48
1.00 3.48
2.00 1.10
8.98 1.00 1.10
V-2 m2 2.00 3.28
1.97 1.00 3.28
V - 2I m2 1.00 6.18
1.00 6.18
1.00 3.53
5.19 1.00 2.45
VP - 2J m2 2.00 6.13
1.00 6.13
2.00 6.28
1.00 6.28
2.00 6.28
1.00 6.28
2.00 6.28
21.22 1.00 6.28
VP - 2G m2 2.00 6.13
1.00 6.13
2.00 6.28
1.00 6.28
2.00 6.28
1.00 6.28
2.00 6.28
21.22 1.00 6.28
172.88

TOTAL 1" 3/4" 5/8" 1/2" 3/8"

ONCRETO ARMADO - ACERO


VIGAS PERALTADAS

17 17
1 1
1 1

33 33

10 10

1 1

1 1

3 3

2 2

3 3

2 2

1 1

9 9

6 6

3 3

11 11
2 2

7 7

6 6

2 2

11 11

2 2

6 6

7 7

2 2

11 11

1 1

6 6
7 7

2 2

11 11

1 1
3 3

5 5

1 1

12 12

8 8

8 8

1 1
1 1

35 35

10 10
8 8
1 1

2 2

28 28

7 7

7 7

7 7
1 1

28 28
15 15
8 8

20 20
2 2

2 2
1 1
1 1

1 1
1 1

9 9
29 74 58 1 257
PARCIAL
1024.78 1490.22 806.50 10.85 1297.45
KILOS

4629.81
TOTAL

CONCRETO TECHO 2do PISO

DIMENSIONES
TOTAL DESCRIPCIN UND.
LARGO ANCHO ALTURA
CONCRETO ARMADO
LOSA ALIGERADA - TECHO 2
0.705 P1 m3 14.1 _ 0.05
12.24 0.05
9.96 0.05
1.760 P2 m3 _
7.68 0.05
5.32 0.05
6.18 3.6 0.05
6.28 3.6 0.05
6.28 3.6 0.05
6.28 3.6 0.05
6.18 3.6 0.05
10.691 P3 -P4 m3
6.18 3.6 0.05
6.28 3.6 0.05
6.28 3.6 0.05
6.28 3.6 0.05
6.18 1.85 0.05
6.21 1.53 0.05
6.33 1.53 0.05
P5 m3
2.507 6.33 1.53 0.05
6.33 1.53 0.05
P6 m3 3.53 3.28 0.05

15.66 TOTAL CONCRETO

16.45 TOTAL CONCRETO


x 1.05 DESPERDICIO
DIMENSIONES
TOTAL DESCRIPCIN UND.
LARGO ANCHO ALTURA
CONCRETO ARMADO
VIGUETAS - TECHO 2
2.44 0.10 0.15
2.42 0.10 0.15
2.40 0.10 0.15
2.38 0.10 0.15
2.35 0.10 0.15
2.33 0.10 0.15
2.31 0.10 0.15
0.515 P1 m3 2.29 0.10 0.15
2.26 0.10 0.15
2.24 0.10 0.15
2.22 0.10 0.15
2.20 0.10 0.15
2.18 0.10 0.15
2.15 0.10 0.15
2.13 0.10 0.15
2.09 0.10 0.15
2.07 0.10 0.15
2.05 0.10 0.15
2.03 0.10 0.15
2.01 0.10 0.15
1.99 0.10 0.15
1.97 0.10 0.15
1.95 0.10 0.15
1.93 0.10 0.15
1.91 0.10 0.15
1.89 0.10 0.15
1.87 0.10 0.15
1.85 0.10 0.15
1.83 0.10 0.15
1.81 0.10 0.15
1.73 0.10 0.15
1.71 0.10 0.15
1.69 0.10 0.15
1.67 0.10 0.15
1.65 0.10 0.15
1.63 0.10 0.15
1.61 0.10 0.15
1.59 0.10 0.15
1.57 0.10 0.15
1.55 0.10 0.15
1.53 0.10 0.15
1.51 0.10 0.15
1.49 0.10 0.15
1.47 0.10 0.15
1.45 0.10 0.15
1.269 P2 m3
1.37 0.10 0.15
1.35 0.10 0.15
1.33 0.10 0.15
1.31 0.10 0.15
1.29 0.10 0.15
1.27 0.10 0.15
1.25 0.10 0.15
1.23 0.10 0.15
1.21 0.10 0.15
1.19 0.10 0.15
1.17 0.10 0.15
1.15 0.10 0.15
1.13 0.10 0.15
1.11 0.10 0.15
1.09 0.10 0.15
1.01 0.10 0.15
0.99 0.10 0.15
0.97 0.10 0.15
0.95 0.10 0.15
0.93 0.10 0.15
0.91 0.10 0.15
0.89 0.10 0.15
0.87 0.10 0.15
0.85 0.10 0.15
0.83 0.10 0.15
0.81 0.10 0.15
0.79 0.10 0.15
0.77 0.10 0.15
0.75 0.10 0.15
0.73 0.10 0.15
55.62 0.10 0.15
56.52 0.10 0.15
56.52 0.10 0.15
56.52 0.10 0.15
55.62 0.10 0.15
7.585 P3 - P4 m3
49.44 0.10 0.15
50.24 0.10 0.15
50.24 0.10 0.15
50.24 0.10 0.15
24.72 0.10 0.15
22.95 0.10 0.15

P5 m3
1.77
22.95 0.10 0.15
P5 m3
1.77 22.95 0.10 0.15
22.95 0.10 0.15
P6 m3 26.24 0.10 0.15

26.80 TOTAL CONCRETO

28.14 TOTAL CONCRETO


x 1.05 DESPERDICIO

ENCOFRADO TECHO 2DO PISO

DIMENSIONES
TOTAL DESCRIPCIN UND. N V
LARGO
P1 m2
P2

P3 - P4

P5

312.93 P6
312.93

ACERO TECHO 2DO PISO

TOTAL DESCRIPCIN LARGO LONGITUD N

CONCRETO ARMADO - ACERO


ACERO POSITIVO Y NEGATIVO 1 PISO
P1 2.5
5 1/2" 0.2 2.7 15
P 0.9
N 0.35 1.25 15
0.9
5 3/8" 0.35 1.25 15
P2 1.8
0.2 2 15
1.6
0.2 1.8 15
1
0.2 1.2 15
0.65
P 0.2 0.85 15
1.9
0.7 2.6 15
1.5
0.7 2.2 15
1.2
0.7 1.9 15
N 0.85
26 3/8" 0.7 1.55 15
P3 - P4 6.83
P 6.83
3.98 17.64 9
7.23
4.08 11.31 9
7.23
4.08 11.31 9
7.23
4.08 11.31 9
6.85
6.85
76 1/2" 3.98 17.68 9
N 1.55
0.3 1.85 9
4.4
4.4 8.8 9
4.45
4.45 8.9 9
3.5 3.5 9
4.45
4.45 8.9 9
3.5 3.5 9
4.45
4.45 8.9 9
1.55
51 1/2" 0.3 1.85 9
3.45
3.45 6.9 9
3.5
15 3/8" 3.5 7 9
P 6.83
6.83
3.98 17.64 8
7.23
4.08 11.31 8
7.23
4.08 11.31 8
6.85
6.85
3.98 17.68 8
6.85
6.85
3.98 17.68 8
1.55
0.3 1.85 9
1.55
76 1/2" 0.3 1.85 9
N 1.55
0.3 1.85 8
4.45
4.45 8.9 8
4.45
4.45 8.9 8
3.5 3.5 8
4.45
4.45 8.9 8
1.55
33 1/2" 0.3 1.85 8
3.45
3.45 6.9 8
3.5
14 3/8" 3.5 7 8
P5
14 P 1.925 1.925 60
0.85
12 3/8" N 0.85 1.7 60
P6
4 1/2" P 3.675 3.675 8
1.25
2 3/8" N 1.25 2.5 8

DESCRIPCIN LARGO N DESPERDICIO PARCIAL

CONCRETO ARMADO - ACERO


ACERO DE T 1 PISO
2.2 31 1.1 8
P1
6.2 9 1.1 7
1.9 32 1.1 7
6.33 10 1.1 8
6.33 8 1.1 6
1.2 32 1.1 5
P2
6.33 6 1.1 5
1.2 32 1.1 5
6.15 3 1.1 2
0.86 0.25 1.1 0.03
1/4"
3.6 162 1.1 71
32.4 14 1.1 55
6.18 9 1.1 7
P3 - P4
1.85 31 1.1 7
P3 - P4

3.6 130 1.1 57


25.92 14 1.1 44
1.53 128 1.1 24
25.95 6 1.1 19
P5
3.28 14 1.1 6
3.56 15 1.1 7

TOTAL VARILLAS

TOTAL x kg

LADRILLO TECHO 2DO PISO

DIMENSIONES
TOTAL DESCRIPCIN UND.
LARGO ANCHO ALTURA
CONCRETO ARMADO
LADRILLO STANDARD - TECHO 2
117 P1 UND. 14.1 _ 8.33
12.24 8.33
9.96 8.33
293 P2 UND. _
7.68 8.33
5.32 8.33
6.18 3.6 8.33
6.28 3.6 8.33
6.28 3.6 8.33
6.28 3.6 8.33
6.18 3.6 8.33
1781 P3 -P4 UND.
6.18 3.6 8.33
1781 P3 -P4 UND.

6.28 3.6 8.33


6.28 3.6 8.33
6.28 3.6 8.33
6.18 1.85 8.33
6.21 1.53 8.33
6.33 1.53 8.33
P5 UND.
418 6.33 1.53 8.33
6.33 1.53 8.33
P6 UND. 3.53 3.28 8.33

2609 TOTAL LADRILOS


PARCIAL TOTAL

0.77
0.79
0.79 3.89
0.79
0.77
0.35 0.35
0.22 0.22
0.54 0.54
0.22 0.22
0.19 0.19
0.77
0.79
0.79
3.71
0.79
0.35
0.24
0.77
0.79
0.79 3.89
3.89
0.79
0.77
0.77
0.79
3.12
0.79
0.79
0.49
0.50
0.50 2.49
0.50
0.49
0.77 0.77
0.27
1.41
0.17
0.24
1.41
0.17
0.20
1.41
9.04
0.17
0.17
1.41
0.17
0.13
1.10
0.35
0.28

TOTAL CONCRETO 28.45

TOTAL CONCRETO 29.87


x 1.05 DESPERDICIO
DIMENSIONES
PARCIAL TOTAL
ALTURA
0.50 16.48
0.25 1.55
0.30 1.86
0.25 1.58
0.30 1.89
0.25 1.57
0.30 1.89
0.25 1.57
0.30 1.89
0.25 1.54
0.30 1.84 33.65
0.40 1.24
0.50 0.70
0.40 1.84
0.50 0.69
0.40 0.86
0.25 0.51
0.30 0.61
0.25 0.35
0.30 0.42
0.25 1.00
0.20 0.80
0.25 0.34
0.30 0.41
0.25 0.28
0.30 0.33 10.36
0.50 13.24
0.40 2.57
0.25 1.53
0.30 1.84
0.25 1.57
0.30 1.88
0.25 1.57
0.30 1.88
0.25 1.57
0.30 1.88
0.25 0.86
0.20 0.69
0.25 0.58
0.20 0.46 32.12
0.50 5.40
0.25 0.07
0.30 0.09
0.25 1.43
0.30 1.71
0.25 0.73
0.30 0.87 10.29
0.20 0.67
0.25 0.42
0.40 2.78
0.30 1.04
0.40 2.78
0.30 1.04
0.20 0.44
0.25 0.28 9.46
0.20 0.53
0.25 0.33
0.40 2.78
0.30 1.04
0.40 2.78
0.30 1.04
0.20 0.44
0.25 0.28 9.23
0.30 0.58
0.25 0.24
0.40 2.78
0.30 1.04
0.40 2.78
0.30 1.04
0.20 0.44
0.25 0.28 9.19
0.30 0.36
0.25 0.15
0.40 2.78
0.30 1.04
0.40 0.75
0.40 0.74
0.30 1.04
0.40 1.39
0.20 0.44
0.25 0.28 8.98
0.20 1.31
0.20 0.66 1.97
0.30 1.85
0.25 1.55
0.30 1.06
0.30 0.74 5.19
0.30 3.68
0.25 1.53
0.30 3.77
0.25 1.57
0.30 3.77
0.25 1.57
0.30 3.77
0.25 1.57 21.22
0.30 3.68
0.25 1.53
0.30 3.77
0.25 1.57
0.30 3.77
0.25 1.57
0.30 3.77
0.25 1.57 21.22
TOTAL 172.88

ACERO VIGAS 2do PISO

DESCRIPCIN LONGITUDES LARGO N VIGAS DESPERDICIO PARCIAL TOTAL

CONCRETO ARMADO - ACERO


VIGAS PERALTADAS
67.16
67.16
6.21
2.50
2A
2.50 145.53 1 1.05 16.98 17
2A

1.89
2.91 4.80 1 1.05 0.56 1
1.52 1.52 1 1.05 0.18 1
0.38
ESTRIBOS 0.88
0.26 1.52 185 1.05 32.81 33
26.26
26.12
17.90 70.28 1 1.05 8.20 8
211 - 215 4.90
4.90 9.80 1 1.05 1.14 1
3.38
3.38 6.76 1 1.05 0.79 1
0.38
0.68
0.26 1.32 17 1.05 2.62 3
0.38
0.88
0.26 1.52 12 1.05 2.13 2
0.38
ESTRIBOS 0.68
0.26 1.32 22 1.05 3.39 3
0.38
0.88
0.26 1.52 13 1.05 2.31 2
0.38
0.68
0.26 1.32 9 1.05 1.39 1
25.56
25.42
3.00
3.00 56.98 1 1.05 6.65 7
221-223 6.10
4.48
28.80
5.90
4.50 49.78 1 1.05 5.81 6
0.38
0.68
0.26 1.32 17 1.05 2.62 3
0.48
ESTRIBOS 1.08
0.26 1.82 50 1.05 10.62 11
0.38
ESTRIBOS

0.68
0.26 1.32 14 1.05 2.16 2
25.56
25.42
3.00
3.00 56.98 1 1.05 6.65 7
231-233 6.10
4.48
28.80
5.90
4.50 49.78 1 1.05 5.81 6
0.38
0.68
0.26 1.32 15 1.05 2.31 2
0.48
ESTRIBOS 1.08
0.26 1.82 50 1.05 10.62 11
0.38
0.68
0.26 1.32 14 1.05 2.16 2
24.20
4.16
20.96
3.00
3.00 55.32 1 1.05 6.45 6
241-243
6.10
4.48
35.80
5.90
4.50 56.78 1 1.05 6.62 7
0.38
0.88
0.26 1.52 12 1.05 2.13 2
0.48
ESTRIBOS 1.08
0.26 1.82 53 1.05 11.25 11
0.38
0.68
0.26 1.32 9 1.05 1.39 1
24.20
4.16
20.96
3.00
3.00 55.32 1 1.05 6.45 6
251-253
6.10
251-253

4.48
35.80
5.90
4.50 56.78 1 1.05 6.62 7
0.38
0.88
0.26 1.52 10 1.05 1.77 2
0.48
ESTRIBOS 1.08
0.26 1.82 53 1.05 11.25 11
0.38
0.68
0.26 1.32 9 1.05 1.39 1
22.70 22.70 1 1.05 2.65 3
6.28
22.46
2.20
261-263
8.28
4.58 43.80 1 1.05 5.11 5
1.30
3.35 4.65 1 1.05 0.54 1
0.38
ESTRIBOS 0.88
0.26 1.52 65 1.05 11.53 12
67.04
2.09
3.40 72.53 1 1.05 8.46 8
66.78
VP - G
2.90 69.68 1 1.05 8.13 8
2.50
2.10 4.60 1 1.05 0.54 1
1.09 1.09 1 1.05 0.13 1
0.38
ESTRIBOS 0.88
0.26 1.52 196 1.05 34.76 35
VP - K 136.82
1.69 138.51 1 1.05 16.16 16
2.90
2.50
2.50
2.10 10.00 1 1.05 1.17 1
0.38
0.88
0.26 1.52 158 1.05 28.02 28
ESTRIBOS
ESTRIBOS
0.38
0.68
0.26 1.32 46 1.05 7.08 7
54.10
2.09
3.00 59.19 1 1.05 6.91 7
VP - J 53.93
3.20
3.20 60.33 1 1.05 7.04 7
1.25 1.25 1 1.05 0.15 1
0.38
ESTRIBOS 0.88
0.26 1.52 156 1.05 27.66 28

VCH - 2
197.04 197.04 1 1.05 22.99 23
0.28
ESTRIBOS 0.68
0.26 1.22 143 1.05 20.35 20
V-2 14.86 14.86 1 1.05 1.73 2
0.28
ESTRIBOS 0.68
0.26 1.22 12 1.05 1.71 2
1.80 1.80 1 1.05 0.21 1
7.37 7.37 1 1.05 0.86 1
VP - 2I 7.24
3.20 10.44 1 1.05 1.22 1
5.80 5.80 1 1.05 0.68 1
0.38
ESTRIBOS 0.88
0.26 1.52 49 1.05 8.69 9

PARCIAL

KILOS

TOTAL
PARCIAL TOTAL

O 2
0.705 0.705
0.612
0.498
1.760
0.384
0.266
1.112
1.130
1.130
1.130
1.112
10.691
1.112
1.130
1.130
1.130
0.572
0.475
0.484
0.484 2.507
0.484
0.579

TOTAL CONCRETO 15.66

TOTAL CONCRETO 16.45


x 1.05 DESPERDICIO
PARCIAL TOTAL

0.037
0.036
0.036
0.036
0.035
0.035
0.035
0.034 0.515
0.034
0.034
0.033
0.033
0.033
0.032
0.032
0.031
0.031
0.031
0.030
0.030
0.030
0.030
0.029
0.029
0.029
0.028
0.028
0.028
0.027
0.027
0.026
0.026
0.025
0.025
0.025
0.024
0.024
0.024
0.024
0.023
0.023
0.023
0.022
0.022
0.022
1.269
0.021
0.020
0.020
0.020
0.019
0.019
0.019
0.018
0.018
0.018
0.018
0.017
0.017
0.017
0.016
0.015
0.015
0.015
0.014
0.014
0.014
0.013
0.013
0.013
0.012
0.012
0.012
0.012
0.011
0.011
0.834
0.848
0.848
0.848
0.834
7.585
0.742
0.754
0.754
0.754
0.371
0.344

1.77
0.344
0.344 1.77
0.344
0.394

TOTAL CONCRETO 26.80

TOTAL CONCRETO 28.14


x 1.05 DESPERDICIO

DIMENSIONES
PARCIAL TOTAL
ALTURA
14.16
12.24
9.96
7.68
5.32
22.25
22.61
22.61
22.61
22.25
22.25
22.61
22.61
22.61
11.44
9.42
9.58
9.58
9.58
11.56 312.93
TOTAL 312.93

DESPERDICIO PARCIAL TOTAL DESCRIPCIN LARGO

CRETO ARMADO - ACERO


OSITIVO Y NEGATIVO 1 PISO AC
P1 2.50
1.1 5 5 1/2" 0.20
P 0.90
1.1 2 N 0.35
0.90
1.1 2 5 3/8" 0.35
P2 1.80
1.1 4 0.20
1.60
1.1 3 0.20
1.00
1.1 2 0.20
0.65
1.1 2 P 0.20
1.90
1.1 5 0.70
1.50
1.1 4 0.70
1.20
1.1 3 0.70
N 0.85
1.1 3 26 3/8" 0.70
P3 - P4 6.83
P 6.83
1.1 19 3.98
7.23
1.1 12 4.08
7.23
1.1 12 4.08
7.23
1.1 12 4.08
6.85
6.85
1.1 19 76 1/2" 3.98
N 1.55
1.1 2 0.30
4.40
1.1 10 4.40
4.45
1.1 10 4.45
1.1 3.85 3.50
4.45
1.1 10 4.45
1.1 3.85 3.50
4.45
1.1 10 4.45
1.55
1.1 2 51 1/2" 0.30
3.45
1.1 8 3.45
3.50
1.1 8 15 3/8" 3.50
P 6.83
6.83
1.1 17 3.98
7.23
1.1 11 4.08
7.23
1.1 11 4.08
6.85
6.85
1.1 17 3.98
6.85
6.85
1.1 17 3.98
1.55
1.1 2 0.30
1.55
1.1 2 76 1/2" 0.30
N 1.55
1.1 2 0.30
4.45
1.1 9 4.45
4.45
1.1 9 4.45
1.1 3 3.50
4.45
1.1 9 4.45
1.55
1.1 2 33 1/2" 0.30
3.45
1.1 7 3.45
3.50
1.1 7 14 3/8" 3.50
P5
1.1 14 14 P 1.93
0.85
1.1 12 12 3/8" N 0.85
P6
1.1 4 4 1/2" P 3.68
1.25
1.1 2 2 3/8" N 1.25

TOTAL

ERO

15

38

1/4"

242
242

55

350

788

PARCIAL TOTAL

2
117 117
102
83
293
64
44
185
188
188
188
185
1781
185
1781

188
188
188
95
79
81
81 418
81
96

TOTAL LADRILOS 2609


1" 3/4" 5/8" 1/2" 3/8" DESCRIPCIN

DO - ACERO
TADAS

1A
17
1A

1
1

ESTRIBOS
33

8
111 - 115
1

ESTRIBOS
3

7
121-123

ESTRIBOS
11
ESTRIBOS

7
131-133

ESTRIBOS
11

6
141-143

ESTRIBOS
11

6
151-153
151-153

ESTRIBOS
11

1
3

161-163

ESTRIBOS
12

VP - G
8

1
1

ESTRIBOS
35

16

28 VP - K
VP - K

7
1

ESTRIBOS

28

23

20 VP - J
2

2
1 ESTRIBOS
1

VCH - 1
1
1
ESTRIBOS

9 V-1
27 47 64 25 248
ESTRIBOS
965.70 953.23 893.69 225.45 1249.30

4287.36
VP - 1I

ESTRIBOS
LONGITUD N DESPERDICIO PARCIAL TOTAL DESCRIPCIN

CONCRETO ARMADO - ACERO


ACERO POSITIVO Y NEGATIVO 1 PISO
P1
2.70 15.00 1.10 4.95 4.95 1/2"
P
1.25 15.00 1.10 2.29 N

1.25 15.00 1.10 2.29 4.58 3/8"


P2
2.00 15.00 1.10 3.67

1.80 15.00 1.10 3.30

1.20 15.00 1.10 2.20

0.85 15.00 1.10 1.56 P

2.60 15.00 1.10 4.77

2.20 15.00 1.10 4.03

1.90 15.00 1.10 3.48


N
1.55 15.00 1.10 2.84 25.85 3/8"
P3 - P4
P
17.64 9.00 1.10 19.40
11.31 9.00 1.10 12.44

11.31 9.00 1.10 12.44

11.31 9.00 1.10 12.44

17.68 9.00 1.10 19.45 76.18 1/2"


N
1.85 9.00 1.10 2.04

8.80 9.00 1.10 9.68

8.90 9.00 1.10 9.79


3.50 9.00 1.10 3.85

8.90 9.00 1.10 9.79


3.50 9.00 1.10 3.85

8.90 9.00 1.10 9.79

1.85 9.00 1.10 2.04 50.82 1/2"

6.90 9.00 1.10 7.59

7.00 9.00 1.10 7.70 15.29 3/8"


P

17.64 8.00 1.10 17.25

11.31 8.00 1.10 11.06

11.31 8.00 1.10 11.06

17.68 8.00 1.10 17.29

17.68 8.00 1.10 17.29

1.85 9.00 1.10 2.04

1.85 9.00 1.10 2.04 75.97 1/2"


N
1.85 8.00 1.10 1.81

8.90 8.00 1.10 8.70

8.90 8.00 1.10 8.70


3.50 8.00 1.10 3.42

8.90 8.00 1.10 8.70

1.85 8.00 1.10 1.81 33.15 1/2"

6.90 8.00 1.10 6.75

7.00 8.00 1.10 6.84 13.59 3/8"


P5
1.93 60.00 1.10 14.12 14.12 P

1.70 60.00 1.10 12.47 12.47 3/8" N


P6
3.68 8.00 1.10 3.59 3.59 1/2" P

2.50 8.00 1.10 2.44 2.44 3/8" N

RESUMEN VARILLAS

DIAMETRO DIAMETRO TOTAL TOTAL x kg


1/2" 245 2179.92
1 PISO
3/8" 88 445.24
1/2" 245 2179.92
2 PISO
3/8" 88 445.24
TOTAL 5250.32
HOJA DE METRADOS

LONGITUDES LARGO N VIGAS DESPERDICIO PARCIAL TOTAL 1" 5/8"

CONCRETO ARMADO - ACERO


VIGAS PERALTADAS
67.16
67.16
2.91
2.90
2.90 143.03 1.00 1.10 17.48 17.48
2.09
3.51 5.59 1.00 1.10 0.68 0.68 0.68
1.62 1.62 1.00 1.10 0.20 1.00 1.00
0.38
0.88
0.26 1.52 185.00 1.10 34.37 34.37
26.26
26.12
35.80 88.18 1.00 1.10 10.78 10.78 10.78
4.90
4.90 9.80 1.00 1.10 1.20 1.20 1.20
3.38
3.38 6.76 1.00 1.10 0.83 0.83
0.38
0.68
0.26 1.32 17.00 1.10 2.74 2.74
0.38
0.88
0.26 1.52 12.00 1.10 2.23 2.23
0.38
0.68
0.26 1.32 22.00 1.10 3.55 3.55
0.38
0.88
0.26 1.52 13.00 1.10 2.42 2.42
0.38
0.68
0.26 1.32 9.00 1.10 1.45 1.45
25.56
25.42
21.20
3.00 75.18 1.00 1.10 9.19 9.19
6.10
4.48

5.90
4.50 20.98 1.00 1.10 2.56 2.56 2.56
0.38
0.68
0.26 1.32 17.00 1.10 2.74 2.74
0.48
1.08
0.26 1.82 50.00 1.10 11.12 11.12
0.38
0.68
0.26 1.32 14.00 1.10 2.26 2.26
25.56
25.42
3.00
3.00 56.98 1.00 1.10 6.96 6.96
6.10
4.48
27.30
5.90
4.50 48.28 1.00 1.10 5.90 5.90 5.90
0.38
0.68
0.26 1.32 15.00 1.10 2.42 2.42
0.48
1.08
0.26 1.82 50.00 1.10 11.12 11.12
0.38
0.68
0.26 1.32 14.00 1.10 2.26 2.26
24.20
4.16
20.96
3.00
3.00 55.32 1.00 1.10 6.76 6.76 6.76
6.10
4.48
26.85
5.90
4.50 47.83 1.00 1.10 5.85 5.85 5.85
0.38
0.88
0.26 1.52 12.00 1.10 2.23 2.23
0.48
1.08
0.26 1.82 53.00 1.10 11.79 11.79
0.38
0.68
0.26 1.32 9.00 1.10 1.45 1.45
24.20
4.16
20.96
3.00
3.00 55.32 1.00 1.10 6.76 6.76 6.76
6.10
4.48
26.85
5.90
4.50 47.83 1.00 1.10 5.85 5.85 5.85
0.38
0.88
0.26 1.52 10.00 1.10 1.86 1.86
0.48
1.08
0.26 1.82 53.00 1.10 11.79 11.79
0.38
0.68
0.26 1.32 9.00 1.10 1.45 1.45
22.70 22.70 1.00 1.10 2.77 2.77
6.28
22.46
2.20
8.28
4.58 43.80 1.00 1.10 5.35 5.35 5.35
1.30
3.35 4.65 1.00 1.10 0.57 0.57
0.38
0.88
0.26 1.52 65.00 1.10 12.08 12.08
67.04
2.09
3.40 72.53 1.00 1.10 8.86 8.86
66.78
2.90 69.68 1.00 1.10 8.52 8.52 8.52
2.50
2.10 4.60 1.00 1.10 0.56 0.56
1.09 1.09 1.00 1.10 0.13 1.00
0.38
0.88
0.26 1.52 196.00 1.10 36.41 36.41

67.04
2.09
3.70
3.40
2.60
2.10
1.47 82.40 1.00 1.10 10.07 10.07
69.90
2.80 72.70 1.00 1.10 8.89 8.89 8.89
1.25 1.25 1.00 1.10 0.15 1.00 1.00
7.52
1.50
1.50
2.90
1.20
1.60 16.22 1.00 1.10 1.98 1.98
0.38
0.88
0.26 1.52 158.00 1.10 29.35 29.35
0.38
0.68
0.26 1.32 46.00 1.10 7.42 7.42
54.10
2.09
3.00 59.19 1.00 1.10 7.23 7.23
53.93
3.20
3.20 60.33 1.00 1.10 7.37 7.37
1.25 1.25 1.00 1.10 0.15 1.00
0.38
0.88
0.26 1.52 156.00 1.10 28.98 28.98
131.36 131.36 1.00 1.10 16.06 16.06 16.06
65.68 65.68 1.00 1.10 8.03 8.03
0.28
0.68
0.26 1.22 143.00 1.10 21.32 21.32
14.86 14.86 1.00 1.10 1.82 1.82 1.82
0.28
0.68
0.26 1.22 12.00 1.10 1.79 1.79
1.80 1.80 1.00 1.10 0.22 1.00 1.00
7.37 7.37 1.00 1.10 0.90 0.90
7.24
3.20 10.44 1.00 1.10 1.28 1.28 1.28
5.80 5.80 1.00 1.10 0.71 0.71
0.38
0.88
0.26 1.52 49.00 1.10 9.10 9.10
24.04 67.20
PARCIAL
859.52 938.68
KILOS

3,168.09
TOTAL
LARGO LONGITUD N DESPERDICIO PARCIAL TOTAL

CONCRETO ARMADO - ACERO


ACERO POSITIVO Y NEGATIVO 1 PISO
2.50
0.20 2.70 15.00 1.10 4.95 4.95 1/2"
0.90
0.35 1.25 15.00 1.10 2.29
0.90
0.35 1.25 15.00 1.10 2.29 4.58 3/8"
1.80
0.20 2.00 15.00 1.10 3.67
1.60
0.20 1.80 15.00 1.10 3.30
1.00
0.20 1.20 15.00 1.10 2.20
0.65
0.20 0.85 15.00 1.10 1.56
1.90
0.70 2.60 15.00 1.10 4.77
1.50
0.70 2.20 15.00 1.10 4.03
1.20
0.70 1.90 15.00 1.10 3.48
0.85
0.70 1.55 15.00 1.10 2.84 25.85 3/8"
6.83
6.83
3.98 17.64 9.00 1.10 19.40
7.23
4.08 11.31 9.00 1.10 12.44
7.23
4.08 11.31 9.00 1.10 12.44
7.23
4.08 11.31 9.00 1.10 12.44
6.85
6.85
3.98 17.68 9.00 1.10 19.45 76.18 1/2"
1.55
0.30 1.85 9.00 1.10 2.04
4.40
4.40 8.80 9.00 1.10 9.68
4.45
4.45 8.90 9.00 1.10 9.79
3.50 3.50 9.00 1.10 3.85
4.45
4.45 8.90 9.00 1.10 9.79
3.50 3.50 9.00 1.10 3.85
4.45
4.45 8.90 9.00 1.10 9.79
1.55
0.30 1.85 9.00 1.10 2.04 50.82 1/2"
3.45
3.45 6.90 9.00 1.10 7.59
3.50
3.50 7.00 9.00 1.10 7.70 15.29 3/8"
6.83
6.83
3.98 17.64 8.00 1.10 17.25
7.23
4.08 11.31 8.00 1.10 11.06
7.23
4.08 11.31 8.00 1.10 11.06
6.85
6.85
3.98 17.68 8.00 1.10 17.29
6.85
6.85
3.98 17.68 8.00 1.10 17.29
1.55
0.30 1.85 9.00 1.10 2.04
1.55
0.30 1.85 9.00 1.10 2.04 75.97 1/2"
1.55
0.30 1.85 8.00 1.10 1.81
4.45
4.45 8.90 8.00 1.10 8.70
4.45
4.45 8.90 8.00 1.10 8.70
3.50 3.50 8.00 1.10 3.42
4.45
4.45 8.90 8.00 1.10 8.70
1.55
0.30 1.85 8.00 1.10 1.81 33.15 1/2"
3.45
3.45 6.90 8.00 1.10 6.75
3.50
3.50 7.00 8.00 1.10 6.84 13.59 3/8"

1.93 1.93 60.00 1.10 14.12 14.12


0.85
0.85 1.70 60.00 1.10 12.47 12.47 3/8"

3.68 3.68 8.00 1.10 3.59 3.59 1/2"


1.25
1.25 2.50 8.00 1.10 2.44 2.44 3/8"
1/2" 3/8"
34.37

0.83

2.74

2.23

3.55

2.42

1.45

2.74

11.12
2.26

2.42

11.12

2.26

2.23

11.79

1.45
1.86

11.79

1.45

1.00

12.08

0.56
1.00

36.41
1.98

29.35

7.42

1.00

28.98

8.03

21.32

1.79

0.71

9.10
1.27 269.55
11.37 1,358.52
DESCRIPCIN LARGO LONGITUD N DESPERDICIO PARCIAL TOTAL

CONCRETO ARMADO - ACERO


ACERO POSITIVO Y NEGATIVO 1 PISO
P1 2.50
0.20 2.70 15.00 1.10 4.95 4.95 1/2"
P 0.90
N 0.35 1.25 15.00 1.10 2.29
0.90
0.35 1.25 15.00 1.10 2.29 4.58 3/8"
P2 1.80
0.20 2.00 15.00 1.10 3.67
1.60
0.20 1.80 15.00 1.10 3.30
1.00
0.20 1.20 15.00 1.10 2.20
0.65
P 0.20 0.85 15.00 1.10 1.56
1.90
0.70 2.60 15.00 1.10 4.77
1.50
0.70 2.20 15.00 1.10 4.03
1.20
0.70 1.90 15.00 1.10 3.48
N 0.85
0.70 1.55 15.00 1.10 2.84 25.85 3/8"
P3 - P4 6.83
P 6.83
3.98 17.64 9.00 1.10 19.40
7.23
4.08 11.31 9.00 1.10 12.44
7.23
4.08 11.31 9.00 1.10 12.44
7.23
4.08 11.31 9.00 1.10 12.44
6.85
6.85
3.98 17.68 9.00 1.10 19.45 76.18 1/2"
N 1.55
0.30 1.85 9.00 1.10 2.04
4.40
4.40 8.80 9.00 1.10 9.68
4.45
4.45 8.90 9.00 1.10 9.79
3.50 3.50 9.00 1.10 3.85
4.45
4.45 8.90 9.00 1.10 9.79
3.50 3.50 9.00 1.10 3.85
4.45
4.45 8.90 9.00 1.10 9.79
1.55
0.30 1.85 9.00 1.10 2.04 50.82 1/2"
3.45
3.45 6.90 9.00 1.10 7.59
3.50
3.50 7.00 9.00 1.10 7.70 15.29 3/8"
P 6.83
6.83
3.98 17.64 8.00 1.10 17.25
7.23
4.08 11.31 8.00 1.10 11.06
7.23
4.08 11.31 8.00 1.10 11.06
6.85
6.85
3.98 17.68 8.00 1.10 17.29
6.85
6.85
3.98 17.68 8.00 1.10 17.29
1.55
0.30 1.85 9.00 1.10 2.04
1.55
0.30 1.85 9.00 1.10 2.04 75.97 1/2"
N 1.55
0.30 1.85 8.00 1.10 1.81
4.45
4.45 8.90 8.00 1.10 8.70
4.45
4.45 8.90 8.00 1.10 8.70
3.50 3.50 8.00 1.10 3.42
4.45
4.45 8.90 8.00 1.10 8.70
1.55
0.30 1.85 8.00 1.10 1.81 33.15 1/2"
3.45
3.45 6.90 8.00 1.10 6.75
3.50
3.50 7.00 8.00 1.10 6.84 13.59 3/8"
P5
P 1.93 1.93 60.00 1.10 14.12 14.12
0.85
N 0.85 1.70 60.00 1.10 12.47 12.47 3/8"
P6
P 3.68 3.68 8.00 1.10 3.59 3.59 1/2"
1.25
N 1.25 2.50 8.00 1.10 2.44 2.44 3/8"
DESCRIPCIN LARGO LONGITUD N DESPERDICIO PARCIAL TOTAL

CONCRETO ARMADO - ACERO


ACERO POSITIVO Y NEGATIVO 1 PISO
P1 2.50
0.20 2.70 15.00 1.10 4.95 4.95
P 0.90
N 0.35 1.25 15.00 1.10 2.29
0.90
0.35 1.25 15.00 1.10 2.29 4.58
P2 1.80
0.20 2.00 15.00 1.10 3.67
1.60
0.20 1.80 15.00 1.10 3.30
1.00
0.20 1.20 15.00 1.10 2.20
0.65
P 0.20 0.85 15.00 1.10 1.56
1.90
0.70 2.60 15.00 1.10 4.77
1.50
0.70 2.20 15.00 1.10 4.03
1.20
0.70 1.90 15.00 1.10 3.48
N 0.85
0.70 1.55 15.00 1.10 2.84 25.85
P3 - P4 6.83
P 6.83
3.98 17.64 9.00 1.10 19.40
7.23
4.08 11.31 9.00 1.10 12.44
7.23
4.08 11.31 9.00 1.10 12.44
7.23
4.08 11.31 9.00 1.10 12.44
6.85
6.85
3.98 17.68 9.00 1.10 19.45 76.18
N 1.55
0.30 1.85 9.00 1.10 2.04
4.40
4.40 8.80 9.00 1.10 9.68
4.45
4.45 8.90 9.00 1.10 9.79
3.50 3.50 9.00 1.10 3.85
4.45
4.45 8.90 9.00 1.10 9.79
3.50 3.50 9.00 1.10 3.85
4.45
4.45 8.90 9.00 1.10 9.79
1.55
0.30 1.85 9.00 1.10 2.04 50.82
3.45
3.45 6.90 9.00 1.10 7.59
3.50
3.50 7.00 9.00 1.10 7.70 15.29
P 6.83
6.83
3.98 17.64 8.00 1.10 17.25
7.23
4.08 11.31 8.00 1.10 11.06
7.23
4.08 11.31 8.00 1.10 11.06
6.85
6.85
3.98 17.68 8.00 1.10 17.29
6.85
6.85
3.98 17.68 8.00 1.10 17.29
1.55
0.30 1.85 9.00 1.10 2.04
1.55
0.30 1.85 9.00 1.10 2.04 75.97
N 1.55
0.30 1.85 8.00 1.10 1.81
4.45
4.45 8.90 8.00 1.10 8.70
4.45
4.45 8.90 8.00 1.10 8.70
3.50 3.50 8.00 1.10 3.42
4.45
4.45 8.90 8.00 1.10 8.70
1.55
0.30 1.85 8.00 1.10 1.81 33.15
3.45
3.45 6.90 8.00 1.10 6.75
3.50
3.50 7.00 8.00 1.10 6.84 13.59
P5
P 1.93 1.93 60.00 1.10 14.12 14.12
0.85
N 0.85 1.70 60.00 1.10 12.47 12.47
P6
P 3.68 3.68 8.00 1.10 3.59 3.59
1.25
N 1.25 2.50 8.00 1.10 2.44 2.44
DESCRIPCIN LONGITUDES LARGO N VIGAS DESPERDICIO PARCIAL TOTAL 1"

CONCRETO ARMADO - ACERO


VIGAS PERALTADAS
67.16
67.16
6.21
2.50
2A
2.50 145.53 1.00 1.10 17.79 17.79
2A

1.89
2.91 4.80 1.00 1.10 0.59 0.59
1.52 1.52 1.00 1.10 0.19 1.00
0.38
ESTRIBOS 0.88
0.26 1.52 185.00 1.10 34.37 34.37
26.26
26.12
17.90 70.28 1.00 1.10 8.59 8.59
211 - 215 4.90
4.90 9.80 1.00 1.10 1.20 1.20 1.20
3.38
3.38 6.76 1.00 1.10 0.83 0.83
0.38
0.68
0.26 1.32 17.00 1.10 2.74 2.74
0.38
0.88
0.26 1.52 12.00 1.10 2.23 2.23
0.38
ESTRIBOS 0.68
0.26 1.32 22.00 1.10 3.55 3.55
0.38
0.88
0.26 1.52 13.00 1.10 2.42 2.42
0.38
0.68
0.26 1.32 9.00 1.10 1.45 1.45
25.56
25.42
3.00
3.00 56.98 1.00 1.10 6.96 6.96
221-223 6.10
4.48
27.30
5.90
4.50 48.28 1.00 1.10 5.90 5.90 5.90
0.38
0.68
0.26 1.32 17.00 1.10 2.74 2.74
0.48
ESTRIBOS 1.08
0.26 1.82 50.00 1.10 11.12 11.12
0.38
ESTRIBOS

0.68
0.26 1.32 14.00 1.10 2.26 2.26
25.56
25.42
3.00
3.00 56.98 1.00 1.10 6.96 6.96
231-233 6.10
4.48
27.30
5.90
4.50 48.28 1.00 1.10 5.90 5.90
0.38
0.68
0.26 1.32 15.00 1.10 2.42 2.42
0.48
ESTRIBOS 1.08
0.26 1.82 50.00 1.10 11.12 11.12
0.38
0.68
0.26 1.32 14.00 1.10 2.26 2.26
24.20
4.16
20.96
3.00
3.00 55.32 1.00 1.10 6.76 6.76
241-243
6.10
4.48
26.85
5.90
4.50 47.83 1.00 1.10 5.85 5.85 5.85
0.38
0.88
0.26 1.52 12.00 1.10 2.23 2.23
0.48
ESTRIBOS 1.08
0.26 1.82 53.00 1.10 11.79 11.79
0.38
0.68
0.26 1.32 9.00 1.10 1.45 1.45
24.20
4.16
20.96
3.00
3.00 55.32 1.00 1.10 6.76 6.76
251-253
6.10
251-253

4.48
26.85
5.90
4.50 47.83 1.00 1.10 5.85 5.85 5.85
0.38
0.88
0.26 1.52 10.00 1.10 1.86 1.86
0.48
ESTRIBOS 1.08
0.26 1.82 53.00 1.10 11.79 11.79
0.38
0.68
0.26 1.32 9.00 1.10 1.45 1.45
22.70 22.70 1.00 1.10 2.77 2.77
6.28
22.46
2.20
261-263
8.28
4.58 43.80 1.00 1.10 5.35 5.35
1.30
3.35 4.65 1.00 1.10 0.57 0.57
0.38
ESTRIBOS 0.88
0.26 1.52 65.00 1.10 12.08 12.08
67.04
2.09
3.40 72.53 1.00 1.10 8.86 8.86
66.78
VP - G
2.90 69.68 1.00 1.10 8.52 8.52
2.50
2.10 4.60 1.00 1.10 0.56 0.56
1.09 1.09 1.00 1.10 0.13 1.00
0.38
ESTRIBOS 0.88
0.26 1.52 196.00 1.10 36.41 36.41
VP - K 136.82
1.69 138.51 1.00 1.10 16.93 16.93
2.90
2.50
2.50
2.10 10.00 1.00 1.10 1.22 1.22
0.38
0.88
0.26 1.52 158.00 1.10 29.35 29.35
ESTRIBOS
ESTRIBOS
0.38
0.68
0.26 1.32 46.00 1.10 7.42 7.42
54.10
2.09
3.00 59.19 1.00 1.10 7.23 7.23
VP - J 53.93
3.20
3.20 60.33 1.00 1.10 7.37 7.37
1.25 1.25 1.00 1.10 0.15 1.00
0.38
ESTRIBOS 0.88
0.26 1.52 156.00 1.10 28.98 28.98

VCH - 2
197.04 197.04 1.00 1.10 24.08 24.08
0.28
ESTRIBOS 0.68
0.26 1.22 143.00 1.10 21.32 21.32
V-2 14.86 14.86 1.00 1.10 1.82 1.82
0.28
ESTRIBOS 0.68
0.26 1.22 12.00 1.10 1.79 1.79
1.80 1.80 1.00 1.10 0.22 1.00 1.00
7.37 7.37 1.00 1.10 0.90 0.90
VP - 2I 7.24
3.20 10.44 1.00 1.10 1.28 1.28
5.80 5.80 1.00 1.10 0.71 0.71
0.38
ESTRIBOS 0.88
0.26 1.52 49.00 1.10 9.10 9.10
19.79
PARCIAL

707.65
KILOS

3,843.79
TOTAL

1/2"

3/8"

3/8"
1/2"

1/2"

3/8"

1/2"
1/2"

3/8"

3/8"

1/2"

3/8"
3/4" 5/8" 1/2" 3/8"

17.79
0.59
1.00

34.37

8.59

0.83

2.74

2.23

3.55

2.42

1.45

6.96
6.76

2.23

11.79

1.45

6.76
1.86

11.79

1.45
2.77

5.35

1.00

12.08

8.86

8.52

0.56
1.00

36.41

16.93

1.22

29.35
7.42

7.23

7.37
1.00

28.98

24.08

21.32
1.82

1.79

0.90

1.28
0.71

9.10
35.92 73.79 26.35 227.61

722.53 1,030.69 235.76 1,147.17


ITEM CONCEPTO CATEGORIA
CAPATAZ OPERARIO
1.00 REMUNERACION BASICA VIGENTE 46.55 38.79
2.00 BUC 14.90 12.41
3.00 LEY Y BENEFICIOS SOCIALES SOBRE LA R.B. 52.38 43.65
4.00 LEY Y BENEFICIOS SOCIALES SOBRE EL BUC 1.79 1.49
5.00 BONIFICACION POR MOVILIDAD ACUMULADA 7.20 7.20
6.00 OVEROL 0.40 0.40
COSTO DIA HOMBRE S/. 123.21 103.94
COSTO HORA HOMBRE S/. 15.40 12.99

PartidA No.: TRAZO Y REPLANTEO


Especificaciones : Con vallas aisladas
Cuadrilla : Habilitacin :
1.00
1.00
Habilitacin: 180.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cal Hidraulica bl 0.00
Madera Tornillo p2 0.00

Manode Obra
cap hh 0.04 15.40 0.68
pe hh 0.04 10.47 0.47

Equipo y Herram
Wincha unid 0.04 0.60 0.03
Herramientas % 5.00 1.15 0.06

TOTAL PRECIO UNITARIO S/.

PartidA No.: CERCO PROVISIONAL


Especificaciones : Con planchas de triplay, listones de 2"x2", de 2"x3"
Cuadrilla : Habilitacin :
0.10
1.00
1.00
Habilitacin: 24.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material

Manode Obra
cap hh 0.03 15.40 0.51
op hh 0.33 12.99 4.33
pe hh 0.33 10.47 3.49

Equipo y Herram
Herramientas % 5.00 8.33 0.42

TOTAL PRECIO UNITARIO S/.

PartidA No.: LIMPIEZA GENERAL DE OBRA


Especificaciones : Con vallas aisladas
Cuadrilla : Habilitacin :
1.00
1.00
Habilitacin: 45.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material

Manode Obra
cap hh 0.02 15.40 0.27
pe hh 0.18 10.47 1.86

Equipo y Herram
escobas unid 0.01 10.08 0.05
Herramientas % 5.00 2.13 0.11

TOTAL PRECIO UNITARIO S/.

PartidA No.: DEMOLICION DE LOSA DE PISO PARA ZAPATAS


Especificaciones : Con equipo elctrico
Cuadrilla : Habilitacin :
1.00
2.00
Habilitacin: 48.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material

Manode Obra
cap hh 0.03 15.40 0.51
pe hh 0.33 10.47 3.49

Equipo y Herram
martillo elctrico hm 0.17 90.00 15.00
Herramientas % 5.00 4.00 0.20

TOTAL PRECIO UNITARIO S/.

PartidA No.: DEMOLICION DE CIMENTACION EXISTENTE


Especificaciones : Con equipo neumtico
Cuadrilla : Habilitacin :
1.00
2.00
Habilitacin: 14.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material

Manode Obra
cap hh 0.11 15.40 1.76
pe hh 1.14 10.47 11.96

Equipo y Herram
martillo elctrico hm 0.57 355.00 202.86
Herramientas % 5.00 13.72 0.69

TOTAL PRECIO UNITARIO S/.

EXCAVACION MANUAL PARA ZAPATAS, H= 1.30 M


Especificaciones : En terreno normal seco, con pico y lampa
Cuadrilla : Habilitacin : 0.10
1.00
Habilitacin: 3.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
0.00 0.00 0.00
0.00 0.00 0.00

Manode Obra
cap hh 0.27 15.40 4.11
pe hh 2.67 10.47 27.91

Equipo y Herram
Herramientas % 3.00 32.02 0.96

TOTAL PRECIO UNITARIO S/.

PartidA No.: EXCAV MANUAL CIMIENTO Y VIGAS DE CIMENTACION


Especificaciones : En terreno normal seco, con pico y lampa
Cuadrilla : Habilitacin : 0.10
1.00
Habilitacin: 4.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
0.00 0.00 0.00
0.00 0.00 0.00

Manode Obra
cap hh 0.20 15.40 3.08
pe hh 2.00 10.47 20.93

Equipo y Herram
Herramientas % 3.00 24.01 0.72

TOTAL PRECIO UNITARIO S/.

PartidA No.: RELLENO Y COMPACTACION C/PLANCHA 5 HP


Especificaciones : En terreno normal seco, con pico y lampa
Cuadrilla : Habilitacin : 0.10
1.00
1.00
Habilitacin m.o: 7.00
Habilitacin equipo: 8.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
0.00 0.00 0.00
0.00 0.00 0.00

Manode Obra
cap hh 0.11 15.40 1.76
pe hh 1.14 10.47 11.96

Equipo y Herram
Plancha 5 HP 1.00 8.75 8.75
Herramientas % 3.00 13.72 0.41

TOTAL PRECIO UNITARIO S/.

PartidA No.: ACARREO INTERNO


Especificaciones : Llenado con lampa, transporte en carretilla
Cuadrilla : Habilitacin : 0.10
1.00
Habilitacin: 8.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
0.00 0.00 0.00
0.00 0.00 0.00

Manode Obra
cap hh 0.10 15.40 1.54
pe hh 0.75 10.47 7.85

Equipo y Herram
Herramientas % 5.00 9.39 0.47

TOTAL PRECIO UNITARIO S/.

PartidA No.: ELIMINACIN DE MATERIAL EXCEDENTE


Especificaciones : En terreno normal seco, con pico y lampa
Cuadrilla : Habilitacin : 0.10
100.00
Volquete 10.00
Unidad : vj
Descripcin Und Cant P.U. Parcial
Material
m3 0.00 0.00 0.00
0.00 0.00 0.00

Manode Obra
cap hh 0.01 15.40 0.12
pe hh 0.08 10.47 0.84

Equipo y Herram
Volquete 10 m3 1.00 17.00 17.00
Herramientas % 3.00 0.96 0.03

TOTAL PRECIO UNITARIO S/.

PartidA No.: SOLADO DE 3" 1:12 C: (ZAPATAS Y VIGAS DE CIMENT)


Especificaciones : Mezcla 1:12 (cemento-hormigon) preparado c/
mezcladora 7p3. P.U. incluye gasolina y aceite
Cuadrilla Habilitacion 0.20
2.00
1.00
6.00
1.00
Habilitacion 70.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.27 0.00
Hormigon m3 0.09 0.00
Mano de Obra
cap hh 0.02 15.40 0.35
op hh 0.23 12.99 2.97
of hh 0.11 11.58 1.32
pe hh 0.69 10.47 7.18
op equipo liviano hh 0.11 12.99 1.48
Equipo y Herram
Mezcladora (1) h/m 0.11 8.75 1.00
Regla de madera p2 0.11 2.80 0.31
Herramientas % 5.00 13.31 0.67
TOTAL PRECIO UNITARIO S/.

PartidA No.: CIMIENTO CORRIDO CONCRETO CICLOP 1:10 + 30% P.G.


Especificaciones : Mezcla 1:10 (cemento-hormigon) preparado c/
Cuadrilla : mezcladora 9 p3. P.U. incluye gasolina y aceite
Vaciado 0.10
1.00
2.00
8.00
1.00
Vaciado: 25.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 2.90 0.00
Hormigon m3 0.83 0.00
Piedra grande m3 0.50 0.00

Manode Obra
cap hh 0.03 15.40 0.49
op hh 0.32 12.99 4.16
of hh 0.64 11.58 7.41
pe hh 2.56 10.47 26.79
op equipo liviano hh 0.32 12.99 4.16

Equipo y Herram
Mezcladora (1) hm 0.32 12.50 4.00
Vibradora (1) hm 0.32 6.25 2.00
Herramientas % 5.00 43.01 2.15

TOTAL PRECIO UNITARIO S/.

PartidA No.: SOBRECIMIENTO CONCRETO CICLOPEO 1:8 + 25% P.M.


Especificaciones : Mezcla 1:8 (cemento-hormigon) preparado c/
Cuadrilla : trompito 7 p3. P.U. incluye gasolina y aceite
Vaciado 0.10
1.00
2.00
8.00
1.00
Vaciado: 16.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 3.70 0.00
Hormigon m3 0.85 0.00
Piedra grande m3 0.42 0.00

Manode Obra
cap hh 0.03 15.40 0.49
op hh 0.50 12.99 6.50
of hh 1.00 11.58 11.58
pe hh 4.00 10.47 41.86
op equipo liviano hh 0.50 12.99 6.50

Equipo y Herram
Mezcladora (1) hm 0.50 8.75 4.38
Vibradora (1) hm 0.50 6.25 3.13
Herramientas % 3.00 66.93 2.01

TOTAL PRECIO UNITARIO S/.

PartidA No.: ENCOF Y DESENCOF NORMAL EN SOBRECIMIENTO


Especificaciones : Madera tornillo en bruto
Cuadrilla : Habilitacin : 0.10
1.00
1.00
Encofrado : 0.10
1.00
1.00
Desencof : 1.00
2.00
Habilitacin: 80.00
Encofrado : 28.00
Desencof : 56.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Madera Tornillo p2 4.83 2.10 10.14
Clavos 3" kg 0.13 0.00
Alambre negro N 8 kg 0.26 0.00

Manode Obra
cap hh 0.04 15.40 0.59
op hh 0.39 12.99 5.01
of hh 0.53 11.58 6.12
pe hh 0.29 10.47 2.99

Equipo y Herram
Herramientas % 3.00 14.72 0.44

TOTAL PRECIO UNITARIO S/.

PartidA No.: AFIRMADO PARA VEREDA


Especificaciones : Afirmado compactado 5"
Cuadrilla :
Compactacin , instalacin 0.10
1.00
1.00
8.00
1.00
Vaciado: 200.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Afirmado bls 0.15 0.00

Manode Obra
cap hh 0.03 15.40 0.49
op hh 0.32 12.99 4.16
of hh 0.32 11.58 3.71
pe hh 0.32 10.47 3.35
op equipo liviano hh 0.04 12.99 0.52

Equipo y Herram
Compactador 5 hp hm 0.04 8.75 0.35
Herramientas % 5.00 12.23 0.61

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO PARA VEREDA f'c=140 kg/cm2


Especificaciones : Mezcla 1:2 (cemento-hormigon) preparado c/
Cuadrilla : trompito 7 p3. P.U. incluye gasolina y aceite
Reglado : 0.10
1.00
1.00
Vaciado : 0.30
2.00
1.00
5.00
Curado : 0.10
1.00
Reglado: 30.00
Vaciado : 100.00
Curado : 200.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.83 0.00
Arena Gruesa m3 0.05 0.00
Piedra Chancada 3/4" m3 0.06 0.00
Arena Fina m3 0.01 0.00

Manode Obra
cap hh 0.05 15.40 0.84
op hh 0.43 12.99 5.54
of hh 0.08 11.58 0.93
pe hh 0.71 10.47 7.40
op equipo liviano hh 0.08 12.99 1.04

Equipo y Herram
Mezcladora (1) hm 0.08 8.75 0.70
Reglas y Encofrado p2 0.99 2.80 2.76
Clavos de 3" kg 0.00 4.37 0.00
Herramientas % 3.00 15.75 0.47

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO PARA ZAPATAS f'c=210 kg/cm2


Especificaciones : Preparac c/mezcladora 9-11 p3, vibrador vaciado con buggies
Cuadrilla Prep y vaciado 0.20
2.00
2.00
8.00
2.00
Prep y vac 25.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 9.73 0.00
Arena gruesa m3 0.52 0.00
Piedra Chanc 1/2 m3 0.53 0.00
Manode Obra
cap hh 0.06 15.40 0.99
op hh 0.64 12.99 8.32
of hh 0.64 11.58 7.41
pe hh 2.56 10.47 26.79
op equipo liviano hh 0.64 12.99 8.32
Equipo y Herram
Mezcladora (1) hm 0.32 12.50 4.00
Vibrador (1) hm 0.32 6.25 2.00
Pases de madera p2 0.10 0.10 0.01
Herramientas % 5.00 51.82 2.59

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO PARA CIMIENTO f'c=210 kg/cm2


Especificaciones : Preparac c/mezcladora 9-11 p3, vibrador vaciado con buggies
Cuadrilla Vaciado 0.20
2.00
2.00
8.00
2.00
Curado 0.10
1.00
Prep y vac 25.00
curado 100.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 9.73 0.00
Arena gruesa m3 0.52 0.00
Piedra Chanc 1/2 m3 0.53 0.00
Manode Obra
cap hh 0.07 15.40 1.11
op hh 0.64 12.99 8.32
of hh 0.64 11.58 7.41
pe hh 2.64 10.47 27.63
op equipo liviano hh 0.64 12.99 8.32
Equipo y Herram
Mezcladora (1) hm 0.32 12.50 4.00
Vibrador (1) hm 0.32 6.25 2.00
Pases de madera p2 0.10 0.10 0.01
Herramientas % 5.00 52.78 2.64
TOTAL PRECIO UNITARIO S/.
Fierro de 5/8"
por 9 ml,
cortado con
PartidA No.: ACEROamoladora
fy=4200 kg/cm2
de GRADO 60
Especificaciones : 9"
Cuadrilla Habilitacin 0.10
1.00
1.00
Colocacion 0.10
1.00
1.00
Habilitacin 312.00
Colocacion 312.00
Unidad : kg
Descripcin Und Cant P.U. Parcial
Material
Fierro corrugado kg 1.07 0.00
alambre kg 0.06 0.00

Manode Obra
cap hh 0.005 15.40 0.08
op hh 0.051 12.99 0.67
of hh 0.051 11.58 0.59
Equipo y Herram
Amoladora hm 0.026 3.13 0.08
Herramientas % 3.000 0.01 0.04

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO EN COLUMNAS DE AMARRE f'c=210 kg/cm2


Preparac c/mezcladora 9-11 p3, vibrador a
Especificaciones : gasolina 2", 4HP winche elect 0.15m3/balde y 4.8HP
Cuadrilla Vaciado 0.20
2.00
2.00
10.00
3.00
Curado 0.10
1.00
Prep y vac 18.00
curado 20.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 9.73 0.00
Arena gruesa m3 0.52 0.00
Piedra Chanc 1/2 m3 0.53 0.00
Mano de Obra
cap hh 0.13 15.40 1.98
op hh 0.89 12.99 11.55
of hh 0.89 11.58 10.30
pe hh 4.84 10.47 50.70
op equipo liviano hh 1.33 12.99 17.32
Equipo y Herram
Mezcladora (1) hm 0.44 12.50 5.56
Vibrador (1) hm 0.44 6.25 2.78
Winche electrico (1) hm 0.44 15.00 6.67
Herramientas % 5.00 91.85 4.59

TOTAL PRECIO UNITARIO S/.

PartidA No.: ENCOF Y DESENCOF EN COLUMNAS DE AMARRE


Especificaciones : Madera tornillo en bruto
Cuadrilla : Habilitacin : 0.10
1.00
1.00
Encofrado : 0.10
1.00
1.00
Desencof : 1.00
2.00
Habilitacin: 60.00
Encofrado : 14.00
Desencof : 60.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Madera Tornillo p2 5.16 2.10 10.84
Clavos 3" kg 0.17 0.00
Alambre negro N 8 kg 0.30 0.00

Manode Obra
cap hh 0.07 15.40 1.09
op hh 0.70 12.99 9.16
of hh 0.84 11.58 9.71
pe hh 0.27 10.47 2.79
Equipo y Herram
Herramientas % 5.00 22.74 1.14

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO EN VIGAS


Preparac DE AMARRE
c/mezcladora f'c=210
9-11 p3, kg/cm2
vibrador winche elec 0.15m3/bal
Especificaciones : 4.8HP
Cuadrilla Vaciado 0.20
2.00
2.00
10.00
3.00
Curado 0.10
1.00
Prep y vac 22.00
curado 40.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 9.73 0.00
Arena gruesa m3 0.52 0.00
Piedra Chanc 1/2 m3 0.53 0.00
Manode Obra
cap hh 0.09 15.40 1.43
op hh 0.73 12.99 9.45
of hh 0.73 11.58 8.42
pe hh 3.84 10.47 40.15
op equipo liviano hh 1.09 12.99 14.17
Equipo y Herram
Mezcladora (1) hm 0.36 12.50 4.55
Vibrador (1) hm 0.36 6.25 2.27
Winche electrico (1) hm 0.36 12.50 4.55
Herramientas % 5.00 73.62 3.68

TOTAL PRECIO UNITARIO S/.

PartidA No.: ENCOFRADO Y DESENCOFRADO EN VIGAS


Especificaciones : Madera tornillo en bruto
Cuadrilla : Habilitacin : 0.10
1.00
1.00
Encofrado : 0.10
1.00
1.00
Desencof : 1.00
2.00
Habilitacin: 60.00
Encofrado : 18.00
Desencof : 46.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Madera Tornillo p2 6.71 2.10 14.09
Clavos 3" kg 0.24 0.00
Alambre negro N8 kg 0.21 0.00

Manode Obra
cap hh 0.06 15.40 0.89
op hh 0.58 12.99 7.51
of hh 0.75 11.58 8.71
pe hh 0.35 10.47 3.64

Equipo y Herram
Herramientas % 5.00 20.74 1.04

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO PREMEZCL CON BOMBA f'c=280 kg/cm2


Especificaciones : Preparac c/mezcladora 9-11 p3, vibrad
Cuadrilla Vaciado 0.10
4.00
8.00
2.00
Curado 0.10
1.00
Prep y vac 40.00
curado 80.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
Concreto premezclado m3 1.00 0.00
Servicio de Bombeo m3 1.00 0.00

Manode Obra
cap hh 0.03 15.40 0.46
op hh 0.80 12.99 10.39
pe hh 1.70 10.47 17.79
op equipo liviano hh 0.40 12.99 5.20
Equipo y Herram
Vibrador (2) hm 0.40 6.25 2.50
Herramientas % 3.00 33.84 1.02

TOTAL PRECIO UNITARIO S/.

PartidA No.: ENCOF Y DESENCOF NORMAL EN LOSA ALIGERADA


Especificaciones : Madera tornillo en bruto, no incluye friso
Cuadrilla : Habilitacin : 0.10
1.00
1.00
Encofrado : 0.10
1.00
1.00
Desencof : 1.00
2.00
Habilitacin: 75.00
Encofrado : 18.00
Desencof : 36.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Madera Tornillo p2 5.15 2.10 10.82
Clavos 2 1/2" kg 0.11 0.00
Alambre negro N16 kg 0.10 0.00

Manode Obra
cap hh 0.06 15.40 0.85
op hh 0.55 12.99 7.16
of hh 0.77 11.58 8.96
pe hh 0.44 10.47 4.65

Equipo y Herram
Herramientas % 5.00 21.62 1.08

TOTAL PRECIO UNITARIO S/.

PartidA No.: LADRILLO DE TECHO 30x30x15


Especificaciones : Ladrillos huecos de arcilla 15 x 30 x 30
Cuadrilla : subida y colocacin
0.10
1.00
1.00
9.00
Habilitacin: 1,800.00
Unidad : pz
Descripcin Und Cant P.U. Parcial
Material

Manode Obra
cap hh 0.00 15.40 0.01
op hh 0.00 12.99 0.06
of hh 0.00 11.58 0.05
pe hh 0.04 10.47 0.42

Equipo y Herram
Herramientas % 5.00 0.53 0.03

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONCRETO EN ESCALERAS f'c=210 kg/cm2


Especificaciones : #REF!
Cuadrilla Vaciado 0.20
2.00
2.00
10.00
3.00
Curado 0.10
1.00
Prep y vac 18.00
curado 30.00
Unidad : m3
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 9.73 0.00
Arena gruesa m3 0.52 0.00
Piedra Chanc 1/2 m3 0.53 0.00
Manode Obra
cap hh 0.12 15.40 1.78
op hh 0.89 12.99 11.55
of hh 0.89 11.58 10.30
pe hh 4.71 10.47 49.30
op equipo liviano hh 1.33 12.99 17.32
Equipo y Herram
Mezcladora (1) hm 0.44 12.50 5.56
Vibrador (1) hm 0.44 6.25 2.78
Winche electrico (1) hm 0.44 12.50 5.56
Herramientas % 5.00 90.25 4.51

TOTAL PRECIO UNITARIO S/.

PartidA No.: ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS


Especificaciones : Madera tornillo en bruto, no incluye friso
Cuadrilla : Habilitacin : 0.10
1.00
1.00
Encofrado : 0.10
1.00
1.00
Desencof : 1.00
2.00
Habilitacin: 28.00
Encofrado : 6.00
Desencof : 18.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Madera Tornillo p2 5.74 2.10 12.05
Clavos 2 1/2" kg 0.10 0.00
Alambre negro N16 kg 0.08 0.00

Manode Obra
cap hh 0.16 15.40 2.49
op hh 1.62 12.99 21.04
of hh 2.06 11.58 23.90
pe hh 0.89 10.47 9.30

Equipo y Herram
Herramientas % 5.00 56.73 2.84

TOTAL PRECIO UNITARIO S/.

PartidA No.: MUROLadrillo


DE SOGA LAD.
de 24 K.K.
x 14 MEZ.
x 9, juntaC:A 1:4 EN
1.5cm, 1 y 1:5
mezcla 2 muro
PISO.
Especificaciones : de mas de 4 m de largo
Cuadrilla : Colocacion: 0.10
1.00
0.50
Acarreo: 1.00

Colocacion: 10.56
Acarreo: 27.78

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.68 0.00
Arena gruesa m3 0.06 0.00
Ladrillo 24x14x9 cm pz 36.00 0.00

Manode Obra
cap hh 0.08 15.40 1.17
op hh 0.76 12.99 9.85
pe hh 0.67 10.47 6.98

Equipo y Herram
Andamio de metal cpo 0.21 4.00 0.83
Herramientas % 3.00 17.99 0.54

TOTAL PRECIO UNITARIO S/.

PartidA No.: MURO DE CABEZAde


Ladrillo LAD.
24K.K.
x 14MEZ.
x 9,C:A 1:4 1.5cm,
junta EN 1 y mezcla
2 PISO.1:5 muro
Especificaciones : de mas de 4 m de largo
Cuadrilla : Colocacion: 0.10
1.00
0.50
Acarreo: 1.00

Colocacion: 6.94
Acarreo: 16.13

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.41 0.00
Arena gruesa m3 0.06 0.00
Ladrillo 24x14x9 cm pz 66.00 0.00

Manode Obra
cap hh 0.12 15.40 1.78
op hh 1.15 12.99 14.99
pe hh 1.07 10.47 11.23

Equipo y Herram
Andamio de metal cpo 0.35 0.50 0.17
Herramientas % 3.00 27.99 0.84

TOTAL PRECIO UNITARIO S/.

PartidA No.: TARRAJEO INTERIOR


Paeteo previo,DE MUROS
espesor 1 y 2
1.5cm, PISO1:4 muro de menos de 2m
mezcla
Especificaciones : largo
Cuadrilla : Paeteo: 0.10
1.00
0.33
Tarrajeo: 0.10
1.00
0.50
Paeteo: 40.00
Tarrajeo: 24.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.13 0.00
Arena fina m3 0.02 0.00

Manode Obra
cap hh 0.05 15.40 0.82
op hh 0.53 12.99 6.93
pe hh 0.23 10.47 2.43

Equipo y Herram
Andamio de metal cpo 0.13 0.50 0.06
Regla de aluminio p2 0.03 6.72 0.17
Herramientas % 3.00 10.19 0.31

TOTAL PRECIO UNITARIO S/.

PartidA No.: TARRAJEO EXTERIOR DE MUROS FACHADA


Especificaciones : Paeteo previo, espesor 1.5cm, mezcla 1:5
Cuadrilla : Paeteo: 0.10
1.00
0.33
Tarrajeo: 0.10
1.00
0.33
Armar andamio: 0.10
1.00
1.00
Desarmar Andamio: 1.00
1.00

Paeteo: 35.00
Tarrajeo: 18.00
Armar andamio 42.00
Desarmar andamio 140.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.12 0.00
Arena fina m3 0.02 0.00

Manode Obra
cap hh 0.09 15.40 1.33
op hh 0.92 12.99 11.96
pe hh 0.47 10.47 4.93

Equipo y Herram
Andamio de metal cpo 0.03 0.50 0.02
Regla de aluminio p2 0.02 6.72 0.10
Herramientas % 3.00 18.22 0.55

TOTAL PRECIO UNITARIO S/.

PartidA No.: CIELO RASO


Paeteo previo, espesor 1.5cm, mezcla 1:4 muro de menos de 2m
Especificaciones : largo
Cuadrilla : Empaste: 0.10
1.00
0.33
Armar andamio: 0.10
0.17
Empaste: 10.00
Armar andamio: 14.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.13 0.00
Arena fina m3 0.02 0.00

Manode Obra
cap hh 0.14 15.40 2.11
op hh 0.80 12.99 10.39
pe hh 0.36 10.47 3.76

Equipo y Herram
Andamio de metal cpo 0.57 0.50 0.29
Regla de aluminio p2 0.03 6.72 0.17
Herramientas % 5.00 16.27 0.81

TOTAL PRECIO UNITARIO S/.

PartidA No.: TARRAJEO DE COLUMNAS


Paeteo 1 , 2
previo, espesor y 3 mezcla
1.5cm, PISO 1:4 muro de menos de 2m
Especificaciones : largo
Cuadrilla : Tarrajeo: 0.10
1.00
0.50
Tarrajeo: 8.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.13 0.00
Arena fina m3 0.02 0.00

Manode Obra
cap hh 0.10 15.40 1.54
op hh 1.00 12.99 12.99
pe hh 0.50 10.47 5.23

Equipo y Herram
Andamio de metal cpo 1.00 0.50 0.50
Regla de aluminio p2 0.03 6.72 0.17
Herramientas % 3.00 19.77 0.59

TOTAL PRECIO UNITARIO S/.

PartidA No.: TARRAJEO DE VIGAS


Paeteo previo,1espesor
y 2 PISO
1.5cm, mezcla 1:4 muro de menos de 2m
Especificaciones : largo
Cuadrilla : Tarrajeo: 0.10
1.00
0.50
Tarrajeo: 7.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.13 0.00
Arena fina m3 0.02 0.00

Manode Obra
cap hh 0.11 15.40 1.76
op hh 1.14 12.99 14.85
pe hh 0.57 10.47 5.98

Equipo y Herram
Andamio de metal cpo 1.14 0.50 0.57
Regla de aluminio p2 0.03 6.72 0.17
Herramientas % 3.00 22.59 0.68

TOTAL PRECIO UNITARIO S/.

PartidA No.: REVESTIMIENTO FONDO


Paeteo previo, DE ESCALERAS
espesor 1.5cm, mezcla 1:4 muro de menos de 2m
Especificaciones : largo
Cuadrilla : Vestidura 0.10
1.00
0.50
Armar andamio: 0.00
0.08
Vestidura 8.00
Armar andamio: 8.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.13 0.00
Arena fina m3 0.02 0.00

Manode Obra
cap hh 0.10 15.40 1.54
op hh 1.00 12.99 12.99
pe hh 0.58 10.47 6.10
Equipo y Herram
Andamio de metal cpo 1.00 0.50 0.50
Regla de aluminio p2 0.03 6.72 0.17
Herramientas % 5.00 20.64 1.03

TOTAL PRECIO UNITARIO S/.

PartidA No.: DERRAMES EN PUERTAS Y VENTANAS


Especificaciones : Ancho del vano 0.10m, espesor 11.5cm, mezcla 1:5
Cuadrilla: Vestidura: 0.10
1.00
0.33
Vestidura: 18.00

Unidad : ml
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.02 0.00
Arena fina m3 0.00 0.00

Manode Obra
cap hh 0.04 15.40 0.68
op hh 0.44 12.99 5.77
pe hh 0.15 10.47 1.53

Equipo y Herram
Andamio de metal cpo 0.44 0.50 0.22
Regla de aluminio p2 0.07 6.72 0.49
Herramientas % 3.00 7.99 0.24

TOTAL PRECIO UNITARIO S/.

PartidA No.: REPARACIN DE FALSO PISO (CIMIENTOS y ZAPATAS)


Especificaciones : Mezcla 1:2 (cemento-hormigon) preparado c/
Cuadrilla : trompito 7 p3. P.U. incluye gasolina y aceite
Reglado : 0.10
1.00
1.00
Vaciado : 0.30
3.00
1.00
6.00
Curado : 0.10
1.00
Reglado: 100.00
Vaciado : 45.00
Curado : 200.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.83 0.00
Arena Gruesa m3 0.05 0.00
Piedra Chancada 3/4" m3 0.06 0.00
Arena Fina m3 0.01 0.00

Manode Obra
cap hh 0.07 15.40 1.01
op hh 0.61 12.99 7.97
of hh 0.18 11.58 2.06
pe hh 1.19 10.47 12.42
op equipo liviano hh 0.18 12.99 2.31

Equipo y Herram
Mezcladora (1) hm 0.18 8.75 1.56
Reglas y Encofrado p2 0.99 2.80 2.76
Clavos de 3" kg 0.00 4.37 0.00
Herramientas % 3.00 25.76 0.77

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONTRAPISO


PreparacPULIDO DE 50mm
c/mezcladora 9-11EN
p3,ALMACEN
base de 3.8cm
Especificaciones : mezcla 1:5, acabado 1cm mezcla 1:2
Cuadrilla Prep: 0.30
3.00
1.00
6.00
1.00
Prep: 80.00

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.46 0.00
Arena fina m3 0.05 0.00

Manode Obra
cap hh 0.03 15.40 0.46
op hh 0.30 12.99 3.90
of hh 0.10 11.58 1.16
pe hh 0.60 10.47 6.28
op equipo liviano hh 0.10 12.99 1.30
Equipo y Herram
Mezcladora (1) hm 0.10 12.50 1.25
Regla de aluminio p2 0.06 6.72 0.40
Herramientas % 5.00 13.10 0.65

TOTAL PRECIO UNITARIO S/.

PartidA No.: REVESTIMIENTO DEMezcla


Base de 1pulg. PASOS1:4
y CONTRAPASOS
incluye fragua, hab. Mayores de
Especificaciones : 20m2, 18 tandas de mezcla de vol de 1 bl de cemento
Cuadrilla Asentado 0.10
1.00
0.33
Asentado 7.80

Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.26 0.00
Arena fina m3 0.03 0.00
Loseta 30 x 30cm m2 1.05 0.00
Manode Obra
cap hh 0.10 15.40 1.58
op hh 1.03 12.99 13.33
pe hh 0.34 10.47 3.54
Equipo y Herram
Regla de aluminio cu 0.06 6.72 0.37
Cortadora de cermica hm 1.03 1.00 1.03
Herramientas % 5.00 18.45 0.92

TOTAL PRECIO UNITARIO S/.

PartidA No.: PISO CERMICO 33X33 cm DE COLOR


Base de 1pulg. Mezcla 1:4 incluye fragua, hab. Mayores de
Especificaciones : 20m2, 18 tandas de mezcla de vol de 1 bl de cemento
Cuadrilla Asentado 0.10
1.00
0.50
Asentado 10.00
Unidad : m2
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.26 0.00
Arena fina m3 0.03 0.00
Loseta 30 x 30cm m2 1.05 0.00
Manode Obra
cap hh 0.08 15.40 1.23
op hh 0.80 12.99 10.39
pe hh 0.40 10.47 4.19
Equipo y Herram
Regla de aluminio cu 0.06 6.72 0.37
Cortadora de cermica hm 0.80 1.00 0.80
Herramientas % 5.00 15.81 0.79

TOTAL PRECIO UNITARIO S/.

PartidA No.: CONTRAZOCALO DE MAYOLICA EN LOCAL


Base de 1pulg. Mezcla 1:4 incluye fragua, hab. Mayores de
Especificaciones : 20m2, 18 tandas de mezcla de vol de 1 bl de cemento
Cuadrilla Asentado 0.10
1.00
0.50
Asentado 42.00

Unidad : ml
Descripcin Und Cant P.U. Parcial
Material
Cemento bls 0.26 0.00
Arena fina m3 0.03 0.00
Loseta 30 x 30cm m2 1.05 0.00
Manode Obra
cap hh 0.02 15.40 0.29
op hh 0.19 12.99 2.47
pe hh 0.10 10.47 1.00
Equipo y Herram
Regla de aluminio cu 0.06 6.72 0.37
Cortadora de cermica hm 0.19 1.00 0.19
Herramientas % 5.00 3.76 0.19

TOTAL PRECIO UNITARIO S/.


CATEGORIA
OFICIAL PEON
34.56 30.93
10.37 9.28
38.89 34.80
1.24 1.11
7.20 7.20
0.40 0.40
92.66 83.72
11.58 10.47

cap
peo
m2/da

Total
0.00

1.15

0.08

1.23

2", de 2"x3"

cap
op
peo
m2/da
Total
0.00

8.33

0.42

8.75

cap
peo
m2/da

Total
0.00

2.13

0.16

2.29

cap
peo
m2/da

Total
0.00

4.00

15.20

19.20

cap
peo
m3/da

Total
0.00

13.72

203.54

217.26

cap
peo
m3/da

Total
0.00

32.02

0.96

32.98

cap
peo
m3/da

Total
0.00

24.01

0.72

24.73

cap
pe
plancha
m3/da
m3/dia

Total
0.00

13.72

9.16

22.88

cap
pe
m3/da

Total
0.00

9.39

0.47

9.86

cap
m3/dia
m3/vj

Total
0.00

0.96

17.03

17.99

rado c/
aceite
cap
op
of
pe
op eq liv
m2/dia

Total

0.00

13.31

1.98
15.29

+ 30% P.G.
rado c/
aceite
cap
op
of
pe
op eq liv
m3/da

Total
0.00

43.01

8.15

51.16

ado c/
eite
cap
op
of
pe
op eq liv
m3/da
Total
0.00

66.93

9.51

76.44

cap
op
of
cap
op
of
of
pe
m2/da
m2/da
m2/da

Total
10.14

14.72
0.44

25.30

cap
op
of
pe
op eq liv
m2/da

Total
0.00

12.23

0.96

13.19

ado c/
eite
cap
op
pe
cap
op
of
pe
cap
pe
m2/da
m2/da
m2/da

Total
0.00

15.75

0.47

16.22

r vaciado con buggies


cap
op
of
pe
op eq liv
m3/da

Total
0.00

51.82

8.60

60.42

r vaciado con buggies


cap
op
of
pe
op eq liv
cap
pe
m3/da
m3/da

Total

0.00

52.78

8.65
61.43

cap
op
of
cap
op
of
m3/da
m3/da

Total

0.00

1.34

0.12

1.46

10 kg/cm2
e y 4.8HP
cap
op
of
pe
op eq liv
cap
pe
m3/da
m3/da

Total
0.00

91.85

19.59

111.45

cap
op
of
cap
op
of
of
pe
m2/da
m2/da
m2/da

Total
10.84

22.74
1.14

34.71

r winche elec 0.15m3/balde y

cap
op
of
pe
op eq liv
cap
pe
m3/da
m3/da

Total

0.00

73.62

15.04

88.67

cap
op
of
cap
op
of
of
pe
m2/da
m2/da
m2/da

Total

14.09

20.74

1.04

35.87

cap
op
pe
op eq liv
cap
pe
m3/da
m3/da

Total
33.84

3.52

37.36

cap
op
of
cap
op
of
of
pe
m2/da
m2/da
m2/da

Total
10.82

21.62

1.08

33.51

cap
op
of
peo
pz/da

Total
0.00

0.53

0.03

0.56

cap
op
of
pe
op eq liv
cap
pe
m3/da
m3/da

Total

0.00

90.25
18.40

108.65

cap
op
of
cap
op
of
of
pe
m2/da
m2/da
m2/da

Total
12.05

56.73

2.84

71.62

clay 1:5
2 muro
PISO.

cap
op
pe
pe

m2/da 350 lad/dia


m2/da 000 lad/dia

Total
0.00

17.99

1.37

19.37

cla 1:5 muro

cap
op
pe
pe

m2/da 400 lad/dia


m2/da 1000lad/dia

Total
0.00

27.99
1.01

29.00

1:4 muro de menos de 2ml de

cap
op
pe
cap
op
pe
m2/da
m2/da

Total
0.00

10.19

0.54

10.72

1:5
cap
op
pe
cap
op
pe
cap
op
pe
op
pe

m2/da
m2/da
m2/da
m2/da

Total
0.00

18.22

0.67

18.89

1:4 muro de menos de 2ml de

cap
op
pe
cap
pe
m2/da
m2/da

Total
0.00
16.27

1.27

17.53

1:4 muro de menos de 2ml de

cap
op
pe
m2/da

Total
0.00

19.77

1.26

21.03

1:4 muro de menos de 2ml de


cap
op
pe
m2/da

Total
0.00

22.59

1.42

24.01

1:4 muro de menos de 2ml de

cap
op
pe
cap
pe
m2/da
m2/da

Total
0.00

20.64
1.70

22.34

mezcla 1:5
cap
op
pe
ml/da

Total
0.00

7.99

0.95

8.95

ado c/
eite
cap
op
pe
cap
op
of
pe
cap
pe
m2/da
m2/da
m2/da

Total
0.00

25.76

0.77

26.54

3.8cm

cap
op
of
pe
op eq liv
m2/da

Total

0.00
13.10

2.31

15.40

ab. Mayores de
e cemento
cap
op
pe
ml/da

Total

0.00
18.45

2.32

20.77

ab. Mayores de
e cemento
cap
op
pe
m2/da
Total

0.00
15.81

1.96

17.77

ab. Mayores de
e cemento
cap
op
pe
m2/da

Total

0.00
3.76

0.75

4.51
CRONOGRAMA DE OBRA

Cia.
INDUVAL INGENIEROS S.A.C.

Ppto. #REF!

Lugar ICA
Item Descripcin Semana 1
1.00 OBRAS PRELIMINARES
1.01 DESMONTAJES y DEMOLICIN DE MUROS desm y dem
1.02 TRAZO Y REPLANTEO trazo y replanteo
1.03 CERCO PROVISIONAL cerco prov
1.04 LIMPIEZA GENERAL DE OBRA limpieza feneral durante la obra
1.05 DEMOLICION DE LOSA DE PISO PARA ZAPATAS
1.06 DEMOLICION DE CIMENTACION EXISTENTE

2.00 MOVIMIENTO DE TIERRAS


2.01 EXCAVACION MANUAL PARA ZAPATAS, H= 1.30 M
2.02 EXCAV MANUAL CIMIENTO Y VIGAS DE CIMENTACION
2.03 RELLENO Y COMPACTACION C/PLANCHA 5 HP
2.04 ACARREO INTERNO acarreo de desmonte
2.05 ELIMINACIN DE DESMONTE eliminacin de desmonte

3.00 CONCRETO SIMPLE


3.01 SOLADO DE 3" 1:12 C: (ZAPATAS Y VIGAS DE CIMENTACIN)
3.02 CIMIENTO CORRIDO CON CONCRETO CICLOPEO 1:10 + 30% P.G.
3.03 SOBRECIMIENTO CON CONCRETO CICLOPEO 1:8 + 25% P.M.
3.04 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO
3.05 AFIRMADO PARA VEREDA
3.06 CONCRETO PARA VEREDA f'c=140 kg/cm2

4.00 CONCRETO ARMADO


4.01 ZAPATAS
4.02 VIGAS DE CIMENTACION
4.03 COLUMNAS
4.04 VIGAS
4.05 LOSAS ALIGERADAS
4.06 ESCALERAS

5.00 MAMPOSTERIA
5.01 MURO DE LADRILLO KK DE SOGA

6.00 TARRAJEO Y REVOQUES


6.01 TARRAJEO INTERIOR DE MUROS 1 y 2 PISO
6.02 TARRAJEO EXTERIOR DE MUROS FACHADA
6.03 CIELO RASO
6.04 TARRAJEO DE COLUMNAS 1 , 2 y 3 PISO
6.05 TARRAJEO DE VIGAS 1 y 2 PISO
6.06 REVESTIMIENTO FONDO DE ESCALERAS
6.07 DERRAMES EN PUERTAS Y VENTANAS

7.00 PISOS Y PAVIMENTOS


7.01 REPARACIN DE FALSO PISO (CIMIENTOS y ZAPATAS)
7.02 CONTRAPISO PULIDO DE 50mm EN ALMACEN
7.03 CONTRAPISO FROTACHADO EN 1er y 2do PISO PARA ENCHAPE
7.04 REVESTIMIENTO DE PASOS y CONTRAPASOS
7.05 PISO CERMICO 33X33 cm DE COLOR
7.06 CONTRAZOCALO DE MAYOLICA EN LOCAL
Semana 2 Semana 3 Semana 4 Semana 5 Semana 6 Semana 7 Semana 8 Semana 9

zo y replanteo trazo y replanteo

mpieza feneral durante la obra


demol losa
demol cim

excav man

relleno com
arreo de desmonte
minacin de desmonte

solado
cimiento
conc sobrec
encof sobr

zapatas
vigas cim
Col Estruct 1 piso Col am 1 Col Estruct 2 piso Col am 2 p
habilitac instalacin habilitac instalacin
habilitac instalacin habilitac instalacin
habilitac instalacin habilitac instalacin

muros 1 p saldo muros 2 saldo

tarr int 1 saldo

tarr techo 1 saldo


tarr col 1 saldo
tarr vig 1 saldo
rev f esc 1 p
rep piso 1

contrap 1 p
Semana 10 Semana 11 Semana 12 Semana 13

afirm vereda
conc vereda

Col Est 3 p

tarr int saldo


tarr fachada
tarr techo 2 saldo
tarr col 2 saldo
tarr vig 2 saldo
rev f esc 2
contrap 3 p
contrap 2 p
rev esc 1 p rev esc 2 p
p ceram 1 p p ceram 2 p
contraz 1 p contraz 2 p

You might also like