You are on page 1of 1

TAGANITO NATIONAL

HIGH SCHOOL

EXISTING ROADWAY
BEG. OF PROJECT
STA.0+000.00

BEG. OF PROJECT
STA.0+000.00
END OF PROJECT
END OF PROJECT STA.0+051.50
FITNESS
STA.0+059.60 GYM

SEE TYPICAL CANAL 2 DETAIL


SEE TYPICAL CANAL 3 DETAIL

EXISTING 910MM
EXISTING 910MM

R.C.P.C.
R.C.P.C.

EXISTING ROADWAY EXISTING ROADWAY

62600 8700 37500 5700 11300

CANAL 2 AND 3 PLAN AND PROFILE


1300 SCALE: 1:400 MILLIMETERS 600
575 150 575 200 200 200
325 325 325 325
25 25
25

25

200
200

600
200
600
200

2" HOLE
2" HOLE

200
200

CANAL 1 COVER TOP VIEW CANAL 2&3 COVER TOP VIEW


SCALE: 1:400 MILLIMETERS SCALE: 1:400 MILLIMETERS

PREPARED BY: PROJECT NAME: SHEET CONTENT: APPROVED BY: SHEET NO.

V.M.JHEK BUILDERS
LICENSED CIVIL ENGINEER
REG. NO.: TIN NO.:
CONSTRUCTION OF DRAINAGE CANAL AT P-4
PLAN
STA.0+000.00 - 0+059.60 D
PTR. NO.: DATE: STA.0+000.00 - 0+051.50 34
CONTRACTOR ISSUED AT: LOCATION: BARANGAY TAGANITO, CLAVER, SURIGAO DEL NORTE SCALE= 1:400 MILLIMETERS

You might also like