SAUDI COMMITTEE FOR

PALESTINIAN RELEIF

ITB 2013- 327


PAL 10-49740 /Construction of 300 Residential Units in Rafah
Package #12: Infrastructure Works Part A.

SECTION 9: PRICE SCHEDULE (Bill of Quantities)

Electronic copy of the BOQ shall be submitted along with the signed hard copy thereof. In
case of any discrepancy between the soft and the hard copies, the hard copy shall prevail.
Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (1)
Road Works
Unit Rate Unit Rate Total
Item
Description Unit Quantity US $ US $ Amount
No.
(letters) (Numbers) US $
ROAD PAVEMENT WORKS
1. The Contractor has to submit Detailed Shop Drawings to be
approved by the Engineer before commencement of the
work, and all required materials should be supplied as
specified and subject to the Engineer approval.
2. The Contractor has to fix,maintain and replace the under
ground services that may be damaged during his work.
3. The Contractor should include in his price the costs of
sampling and testing as required and according to technical
specifications and work requirement.

4. Price includes cost of removing and/or relocating of all


obstacles such as debris, garbage, trees, existing clay base,
asphalt or concrete raod and existing services in addition to
the required materials necessary for work completion
according to engineer's instructions and specifications.

5.The Contractor should include in his price the cost of cut


and removal of trees roots, backfilling, watering ,compaction
in layers with clean sand as specified and according to the
Engineer instructions, the price also include relocation of
Power, Telephone poles and networks to sidewalk.

6.Price includes cost of adjusting the levels of existing


manholes (in any diameter) to the new design levels by
adding rings with the same specification of the existing
manhole (if necessary), replacing the damaged covers and
frames and all materials and works required to complete the
job.
Note: the manhole cover neck should not more than 25 cm.
7. Price includes costs of cleaning all sewage network using
Jetter
Clean, excavate, cut and fill carriageway & side walks with
clean dense sand from natural ground level to the bottom of
the sub-base layer design level including watering,
1.1 compaction not less than 98% & CBR not less than 15% ,all M2 18,300
according to drawing and technical specifications .Price
includes transferring the surplus materials to a site identified
by the engineer.

Supply and lay approved crushed stone base coarse 20 cm


thick in two layers( each layer10 cm thickness) with CBR >
80% for the carriage way to the levels shown in the drawings .
1.2 Price includes watering & compaction to reach 100 % of M2 12,800
maximum dry density .The Grader machine must be used in
spreading and leveling the tow layers. The work includes all
tests as per specifications & engineer instructions,

Supply and lay approved Kurkar 20 cm thick with CBR > 30%
for the side walks to the levels shown in the drawings . Price
1.3 includes watering & compaction to reach 98 % of maximum M2 6,300
dry density , the work includes all tests as per specifications &
Engineer Instructions.

Supply and istall and compact of colored interlock tile 6 cm


thick for side walk. The price includes 5 cm clean sand under
tiles, filling the bed joint between tiles with clean sand,
1.4 compacting, and the work includes all test as per M2 6,300
specification and engineer instruction.The shape and color of
interlock tiles to be approved by engineer

Supply, install and compact of interlock tiles 8 cm thick, for


carriageway The price include casting concrete beam with
B300 (size 20x40 cm) at the ends of interlock, Also supply and
spread dune sand 5 cm thick under interlock, all the
1.5 required tests, The work include connect the work with M2 12,800
existing asphalt. all works are according to specifications,
Drawings and Engineer instructions.The shape and color of
interlock tiles to be approved by engineer

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (1)
Road Works
Unit Rate Unit Rate Total
Item
Description Unit Quantity US $ US $ Amount
No.
(letters) (Numbers) US $

Supply & lay pre-cast concrete curbstones for side walks


(17x30x100 cm) including all necessary excavations, filling
with dune sand & compaction to 98% of MDD and the base
coarse layer (30x10 cm) with compaction 100%, B250 plain
concrete foundation (30x10cm) under the curb and
1.6 (15x19cm) behind, spreading 2 cm mortar under the L.M 2,850
curbstone, filling joints between curbs with cement mortar
and painting with one prime coat and two finishing coats of
approved brand name painting material ,expansion joint
every 12 m.r with selotex board and filling 3cm with
SIkaflex ,all according to drawing and technical specifications.

Total

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (2)
Concrete Works
Unit Rate Unit Rate Total
Item
Description Unit Quantity US $ US $ Amount
No.
(letters) (Numbers) US $
Rates of Concrete Works shall include:-
1. All form works and shuttering (new lumber for shuttering)
in any form, shape and size . Making chamfered and curved
edges, allowing for and making grooves and sleeves, removal
of forms and cleaning of all exposed tie wires and rods.
2. Supplying, casting, vibrating and curing as per
specifications.
3. Approved additives and admixtures.
4.Testing cost such as New Concrete Job Mix Designs,
Sampling , testing and providing test results certificates,
storing and saving of samples.
5. Supplying reinforcement of any grade, size and length as
detailed in the drawings.
6. Painting surfaces of burried concrete elements with two
coats of hot bituminous paint (75/25) after primer layer , the
strokes of each layer to be opposite to each other.

7.The work and price include Cleaning, excavation, cutting


and backfilling for edge beams and retaining walls from
natural ground level to the bottom level including watering
and compaction not less than 98% ,all according to drawing
and technical specifications .Price includes transferring the
sand to site specified by engineer and all works according to
engineer's instructions and specifications.
8. Compaction and testing under the foundation, ground
beams, and retaining walls, the compaction must exceed 98%
of MDD.
9. The work and price include pf construction of expansion
joint every 12 m.r with selotex board and filling 3cm with
Sikaflex sealant ,all according to drawing and technical
specifications.
10. Preparation of workshop and detailed drawings
2.1 Supply and cast ready mix reinforced concretet B-250 for edg
beams and retaining walls. M3 220

Total

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (3)
Water Supply Works
Unit Rate Unit Rate Total
Item
Description Unit Quantity US $ US $ Amount
No.
(letters) (Numbers) US $
Water Supply works
1. All works must be coordinated with the water department
at the Municipality.

2. The price includes the cost of excavation to depth indicated


in drawings not less than 1m using retaining shuttering,
shoring according to instructions of Engineer, bedding of 20
cm clean dune sand under around and above the pipe with
compaction, backfilling the rest of the trench up to design
level with sand in layers 25 cm thick each with compaction
98% MDD and all required tests.

3.The work includes removal of the surplus materials outside


the site to places as instructed by the Engineer.
4.Supply and installation of elbows with any angles, Tees,
Flanges, joints, metallic warning tap, and other accessories
and thrust blocks according to details.
5.Cleaning ,disinfection and testing all the installed pipes
according to technical specification, Engineers instructions
and coordinating with water department in the municipality
6. All works are performed according to the drawings,
specifications and Engineers instruction
7.All tests costs to be included in the unit rate items,without
any extra paid money.
8.The price include reinstate repairing any damage resulted
from excavation, all according to specification & as per
engineer instructions
9. The contractor has to submit detailed shop drawings of the
coming items for the approval by the Engineer before starting
the work.
3.1 Excavation , backfilling with clean sand on layers not to
exceed 25 cm each , Supply and install house connection, the
price includes approved Saddle 110/32mm , thrust block
,MDPE pipe 32 mm diameter to be connected to 1" steel pipe
and all fittings according to drawing, specification and No. 20
engineer instructions

3.2 Ditto, but saddle 63/32 mm No. 50

Total

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (4)
Comunication Works
Unit Rate Unit Rate Total
Item
Description Unit Quantity US $ US $ Amount
No.
(letters) (Numbers) US $
Communication Works
1.The contractor has to submit detailed shop drawings of the
coming items for the approval by the PalTel Company before
starting the work.
2. The Contractor has to visit the site for inspection.
3.The price includes the cost of excavation to depth indicated
in drawings and using retaining shuttering, shoring according
to the instructions of Engineer, bedding of 15 cm clean sand
under ,around and above the pipe with compaction,
backfilling of the trench up to design level in layers 25cm
thick for each with compaction 98% MDD and all required
tests.
4.The work includes connection of the manholes to the
existing PalTel line after cleaning and adjusting the level and
orientation of the existing pipes if needed according to
engineer instructions.
5.The holes of the manholes have to be done using core
machine.
6.The price includes reinstate repairing any damage resulted
from the work, all according to specification & as per
engineer instructions
4.1 Supply, install and join single line of flexible PVC pipes 3"
diameter for the PalTel house connection including excavation
in any ground for min. 1.5m depth, shoring, shuttering, safety
measures, testing, sand beds, opining in the existing
manholes and concrete around PVC pipes all according to the No. 50
drawings, specifications and Engineers instruction.

4.2 Supply, install and join single line of PVC pipes 4" diameter
V1. for the PalTel network with approved gasket rubber ring
including excavation in any ground for min. 1.5m depth,
shoring, shuttering, safety measures, testing, sand beds all
according to the drawings, specifications and Engineers L.M 25
instruction.

4.3 Ditto but double lines of PVC pipes 4" V2 L.M 25

Total

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (5)
Electrical Works
Description Unit Rate Unit Rate Total Amount
Item
No. Unit Quantity US $ US $ US $
(letters) (Numbers)
Supplying, installing, testing and commission of the electrical
works as per drawings, specifications, and engineer's
instructions. The prices of the follwing items include all
necessary junction boxes, wires, conduits, clamps, bolts,
connectors and connecting all new and existing cables to
switch ,boards & Pillars. The price includes all measurement
devices ,equipments , machinary,...., ets.
All installation shall be in accordance with :
* The drawings , specifications , instructions and demands of
the engineer and coordination with GEDCO .
* The electricity law and electrical code requirments of the
BRITISH standards.
*The contractor should repair any damage of the existing
infrastructures.
*The Ressistance of any Earthing system must be less than 2
, and the contractor must find and do the solution to be < 2
.

5.1 Supply, Install , Connect ,and Test 36 kV Switch Disconnector L.S. 1


(Isolating Switch) on the existing pole with built-in arc
interrupter , Master key lock , Compression Lugs with all
needed Arms on the two existing poles to complet the work ,
six complete tension units (with its all Tension Glass Disks ,
Half Moons and all needed for Fixing & Connection ) ,
heatshrinc termination kits ,wires for earthing ,all needed
clamps , and all acessories for Fixing & Installation .
The price include all M.V ACSR wires to connect the new
network to the closer existing network (between two poles) .
All works must be According to supervisor Instructions and
Approval of GEDCO.

5.2 Supply, Instal , Connect, and Test 24 kV, 630A Switchgear, and Unit 2
16 kA Short Circuit Current Ring Main Unit SF6, 2 incoming
switch Disconnectors, one Transformer Protection fuse switch
combination (CTC) With 22 kV Porcelain Fuses 63 A.
The price include connecting the existing cables to CTC.
The Work Include wires , Clamps ,70mm2 wires for
earthing ,Shielded Fore-Connectors with Cable Adapter &
Jacket Seal for all in/out cables & all needed acessories .
All works and materials must be According to supervisor
Instructions and Approval of GEDCO.

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (5)
Electrical Works
Description Unit Rate Unit Rate Total Amount
Item
No. Unit Quantity US $ US $ US $
(letters) (Numbers)
5.3 Supply, Instal, Connect ,and Test 22/0.4 KV Low Losses , 3 No. 2
phase , Indoor Distribution Transformer 1250 KVA Rating
Type :3 phase oilimmersed Hermetically Sealed .
Reference Manufacturing: IEC 60076 or DIN42500 Standards.
Complete with all needed Bushings and Arms for Fixing the
Cable beside the Transformer with cable ladder. The Work
Includes connecting the existing cables and all needed new
cables to connect CTC with Transformer and Transformer with
LVDB , all needed Lugs, Clamps,70mm2 Wires for Earthing
system for transformer.
The item include supplying & fixing Fire Extinguisher ,
Emergency lighting & all needed steel wire mesh protection
to isolate the Transformer.
All works and materials must be According to supervisor
Instructions and Approval of GEDCO.

5.4 Supply, Instal, Connect ,and Test L.V Distribution Board No. 2
2000A (bus bars system ) with Main CB IZM 2000A (7 Feeder).
Bus Bars ,6 Vertical LTL 630/400A & 1Vertical LTL 160/100A
(Jean Moeller Type or equivalent ) , Current and Voltage
Instruments With CTs, LTL3*32/6A , MCB 3*32A , wires ,
Clamps ,70mm2 wires for earthing , all needed acessories &
all components in the drawings.
The price include connecting all the existing & newer feeder
cables to the board.
The size and specifications of board & all works and materials
must be According to the drawing , supervisor instructions ,
specifications and approval of GEDCO.

5.5 Supply, Instal, Connect ,and Test 630A M.LV Pillar (bus bars Unit 2
system ) with main Vertical LTL (630/400 A) , 3 Vertical LTL
(250/160A) ,(Jean Moeller Type) , Bus bars for phases + N + E
, 4 Inch sleeves and all needed wires , accessories and PVC
Terminals connections.
The price include all needed civil structure according the
drawing , specifications of GEDCO , supervisor instruction,
and comply with the existing Pillars.
The price include earthing system ( manholes , electrodes ,
35mm2 wires , treatment of the soil, all accessories and all
needed to be the Ressistance less than 2 )
The work include connecting all the in/out feeder cables to
the Pillar.
All works and materials must be According to the drawing ,
supervisor instructions , specification and approved of
GEDCO.

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (5)
Electrical Works
Description Unit Rate Unit Rate Total Amount
Item
No. Unit Quantity US $ US $ US $
(letters) (Numbers)
5.6 Supply, Instal, Connect ,and Test 250A LV Pillar (bus bars Unit 6
system ) with main Vertical LTL (250/160 A) , 6 Vertical LTL
(160/63A) , (Jean Moeller Type) , Bus bars for phases + N + E ,
4 Inch sleeves and all needed wires , accessories and PVC
Terminals connections.
The price include all needed civil structure according the
drawing , specifications of GEDCO , supervisor instruction,
and comply with the existing Pillars.
The price include earthing system ( manholes , electrodes ,
35mm2 wires , treatment of the soil,all accessories and all
needed to be the Ressistance less than 2 )
The work include connecting all the in/out feeder cables to
the Pillar.
All works and materials must be According to the drawing ,
supervisor instructions , specification and approved of
GEDCO.

5.7 Supply, Install Connect and Test external lighting HEIMEL Unit 2
Control Panel box , as the following:
The panel must be made of water proof fiberglass ,
(80*60*25 cm) size, including :
LTL 3*160/100A , 3ph KWHM , NZM1 3*80A , 3A Kaga
photocell ,(no. 3) Moller Contactors DIL/M65 30KW , PSK
Timer , over/under voltage relay protect ,triple switches ,
MCB's , wires , busbars , all according to the drawings & all
needed connectors and accessories.
The item include supplying & installing all needed cable XLPE
3*25+16 between LVDB and lighting panel , Cables Guards to
protect the cables, and Cable Holders to fix the cables .
All works must be According to drawing and supervisor
Instructions .

5.8 Supply, Install Connect and Test 0.6/1KV , L.V Cable L.m. 120
3*150+75 mm2 CU, XLPE. The work include the following :
Excavation of the cable trenches in any soil with dim. ( 50 cm
width & 110 cm depth ) .
Supply & lay UPVC pipes (SN8- 6") at cross road trenches .
Supply & backfill by clean sand around the cables,as
drawings.
Supply & fixed 45x45x5cm concrete slabs with flexural
strength (5 Mpa), along the trenches including the warning
tape after Backfill clean Sand 10 cm Thickness .All needed to
complete the work
The work includes watering & compaction to 100% of MDD
each layer with 25cm depth as per drawings & supervisor
instructions.
All works must be According to drawings and supervisor
Instructions .

5.9 Ditto but 3*50+25 mm2 CU, XLPE . L.m. 300

5.10 Supply, Instal, Connect ,and Test L.V Cable 4*16 mm2 Cu., L.m. 2000
XLPE .
The work include the following :
Excavation of the cable trenches in any soil with dim. ( 40 cm
width & 90 cm depth ) .
Supply & lay spring pipe 3" at the trench .
Supply & backfill by clean sand around the pipes, first layers
with 50 cm depth. then warning tape and after Backfill clean
Sand with 40 cm thickness.
The work include all needed to connect the dwelling units
M.D.Bs with electricity .
All work must be according the drawings and Engineer
approval .

5.11 Ditto but 4*25 mm2 CU, XLPE . L.m. 90

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (5)
Electrical Works
Description Unit Rate Unit Rate Total Amount
Item
No. Unit Quantity US $ US $ US $
(letters) (Numbers)
5.12 Supply and Install concrete base for future installation of Hot No. 35
galvanized octagonal street light pole 8m long including bolts
galvanized steel base and B200 concrete foundations
5.13 1*1*1m^3
Supply and ,Install
then cast concrete
3" spring pipe0.5*0.5*0.2m^3 , theaswork
layed at 80cm deep L.m. 1000
includes 3"
following spring
(pipe pipe
then 30cm soft sand then warning tape then
All work
50cm must be according the drawings and Engineer
sand).
approval .
As per drawings and Engineer instruction.
5.14 Ditto but UPVC 6'' SN8 for future XLPE 3*150+70mm cable at L.m. 40
depth 110 cm

5.15 Supply and Install Octagonal lighting Pole 8m , the work Unit 75
include supplying and installing the following :
- Single Arm , with 105 degree angle.
-150W M.H Luminaire ,chock coil , condenser , ballast ( Type :
PhilipsMalaga-SGS102/SON-T150W ) .
3*2.5mmsq cable inside 1 Inch flexible conduit for Luminaire.
-control box with 1x10 A m.c.b.
- All needed Bolts ,Nuts ,Washers,Terminal connections,
Accessories, & all needed rinforced cement .
All works must be According to drawing and supervisor
Instructions

5.16 Supply, Instal, Connect ,and Test N2XY Cu cable 5*10mm2. L.m. 2100
The work include the following :
Laying the cables inside the existing or new spring pipes.
Repairing any damages in the existing spring pipes as
required.
All works must be According to the drawing and supervisor
instructions.

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

Bill No (5)
Electrical Works
Description Unit Rate Unit Rate Total Amount
Item
No. Unit Quantity US $ US $ US $
(letters) (Numbers)
5.17 Supply and install 60 cm internal diameter precast circular Unit 15
reinforced concrete manhole for St. Light Earthing System,
with iron cover with frame 8 ton capacity. The work includes
excavation in any type of soil to any depth , backfilling with
clean sand and compaction 98% MDD up to the design
leveling of the roads.
The item inclue all needed (4-Parallel, 18mm,3m Cu
electrodes) with 3m minimum distance,Cu stranded wire
35mm2 in 2'' flixable pipe to connect between the electrodes
and pole , clamps ,Chemical treatment of the soil, all
accessories to be the Ressistance less than 2 .
The Manhole above one electrode only.
All works must be According to the drawings and supervisor
instructions.

5.18 Supply and install 35*3mm hot galvanized steel strip to L.S. 1
connect between all existing and new earting manhols of
Electrical Pillars with the proposed earthing system .
The work includes excavation up to 100 cm depth , backfilling
with clean sand and compaction 98% MDD up to the design
leveling of the roads.The work includes all needed clamps ,
70mm wires, accessories ,... , etc.
The price includes suppy and install 60 cm internal diameter
precast manhole , with iron cover with frame 8 ton capacity.
The work includes excavation and backfilling , also all needed
Cu electrodes, wires 35mm2, clamps .
The number of manhols and electrodes is according to be the
Resistance of earthing system less than 2 .
All works must be According to the drawings and supervisor
instructions.

5.19 Supply and install 60 cm internal diameter precast circular Unit 4


reinforced concrete manhole , with iron cover with frame 8
ton capacity. The work includes excavation in any type of soil
to any depth , backfilling with clean sand and compaction
98% MDD up to the design leveling of the roads.

Total

Contractor's Signature and Seal


Package #12: Infrastructure Works Part A. ITB 2013-327

OVERALL SUMMARY

Total Amount $
DESCRIPTION

Bill No.1 ROAD WORKS

Bill No.2 CONCRET WORKS

Bill No.3 WATER SUPPLY WORKS

Bill No.4 TELCOMUNICATION WORKS

Bill No.5 ELECTRICAL WORKS

Sub Total $

Deduction
Ratio
Grand Total After Deduction

Total in numbers .........................................................................

Total in letters ..............................................................................

Name of the contractor ......

Authorized signature ......

Signature and Sealing.

Title ...

Telephone.

Fax .

Mobile .