You are on page 1of 40

FACULTY OF COMPUTER SYSTEMS & SOFTWARE ENGINEERING

STRUCTURED NETWORKS CABLING


BCN 1063

REQUEST FOR PROPOSAL PROJECT:


SCHOOL NETWORK LAN

Prepared by

UMP NETWORK SOLUSTION SDN BHD (GROUP 1)


LECTURER’S NAME: MADAM ROSMALISSA BINTI JUSOH

NO NAME ID

1 MUHAMMAD ZAINI BIN ZAINUDDDIN CA17134

2 MUHAMMAD SYAFIQ BIN ABAS CA17113

3 MUHAMMMAD KHAIRI ‘AFIFI BIN ABD RAZAK CA17118

4 NIK MUHAMAD IZZUDIN BIN MUHAMAD CA17119


NOOR
5 MUHAMMAD HILMI BIN ALI CA17009

6 LEONG XING FENG CA17082


Structured Networks Cabling Project RFP 1
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Table of Contents:

No Content Page
1 Introduction
i. Company background 2
ii. Task and Distribution 3-4
iii. Discussion of Scenario
5

2 Attachment A
i. Analysis of the current and future need 6
ii. Cabling infrastructure and components for the project 7
iii. Network Design
a. Logical (Overall Network Structure)
8
b. Physical
9
➢Overall structure
10
➢Network Rack Diagram
11
➢Equipment Room
➢Telecommunication Room + Work Area 12

➢Work Area 13
➢Work Area Horizontal Cabling 14

iv. Network Cost 15-16


v. Gantt Chart for Project Implementation 17
3 Attachment B
i. Group Horizontal Cabling design 18
ii. Individual Horizontal Cabling design 19-25
iii. List of network material 26
iv. Gantt Chart for Horizontal Project 27
v. Project Result (Picture) 28

4 Conclusion 29
5 References 30
6 Appendix 32-39
Structured Networks Cabling Project RFP 2
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Company Background

UMP Network Solution Sdn. Bhd. is a subsidiary company by UMP Holding Sdn. Bhd.
that was founded in September 2017 by 6 young and ambitious fresh graduate form
University Malaysia Pahang who all work together on providing our clients with the highest
level of service, without an exception. UMPNET is specialized in providing networking solution
to the customer. Some of the service that being offer by us are IT Consultation, Network
Security, Cabling Installation, Preventing Maintenance, Manage Service and more. The field
we are all working in together is always changing, so being able to adapt to new technological
conditions on the market is crucial to our success, as well as success of our clients

Contact us :

UMP Network Solution Sdn Bhd Tel : 09-549 1111


Level 2,C3 UMP Holding Fax: 09-549 1112
Universiti Malaysia Pahang Email: admin@umpnet.com.my
Lebuhraya Tun Razak Web: Web: http://www.umpnet.my
26300 Gambang
Kuantan
Pahang Darul Makmur
Structured Networks Cabling Project RFP 3
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Task and Distribution

Person in Charge TASKS


• Introduction
• Computer lab design
• Task and distribution
• Design horizontal cabling
• Develop and execute project strategies in order
to attain the goals
• Develop a detailed project plan to track
progress.

MUHAMMAD HILMI BIN ALI


PROJECT MANAGER
0193986248
• What current and future needs are.
• Cabling infrastructure.
• Design horizontal cabling.
• Design overall network layout and labelling
• TR (rack diagram schematic).
• To ensure the integrity of high availability
network infrastructure to provide maximum
performance for their users.
• Support sales efforts with in-depth product and
business knowledge.

MUHAMMAD ZAINI BIN ZAINUDDIN


CHIEF NETWORK ENGINEER
0148037515

• Estimate network cost.


• Survey the component cost.
• Design horizontal cabling.
• Replacing faulty network hardware components
when required.
• Planning future improvements, suggesting IT
solutions to business problems.

MUHAMMAD SYAFIQ BIN ABAS


NETWORK ENGINEER
0139192196
Structured Networks Cabling Project RFP 4
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

• Project Timeframe
• Design horizontal cabling
• Conferring with network users about solving
existing system problems
• Monitor network usage and security.
• Creation of marketing concepts.
• Monitor system performance to ensure that
demands are being met.

NIK MUHAMAD IZZUDIN BIN NIK


MUHAMAD NOOR
SAFETY AND HEALTH OFFICER
0179454759

• Design horizontal cabling.


• Make a reference from other sources.
• Make a measurement for horizontal cabling
(individual).
• Analyse problematic situations and occurrences
and provide solutions to ensure company
survival and growth.
• Troubleshooting, diagnosing and resolving
hardware, software, and other network and
system problems.

MUHAMMAD KHAIRI ‘AFIFI BIN ABD


RAZAK
NETWORK ARCHITECT
0199087465
• Conclusion.
• Make a measurement for horizontal cabling
(group).
• Design horizontal cabling.
• Preparation of presentations about the products
or services with all their values for the usage of
the sales department.
• To advise on bid / no bid decisions based on
technical and commercial considerations.

LEONG XING FENG


PRESALES
0189112967
Structured Networks Cabling Project RFP 5
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Discussion of Scenario

Given Scenario:

“School network LAN

A school wants to have their 4 computers labs with Internet connection. Each lab having 26 computers
that directly connected to each other and to the Internet. Each lab is aligned vertically at each floor
from ground to fourth floor. The main Internet connection is located 500 meters away at the school's
office room. The labs are used every day where students access School Net system (online learning).”

Network infrastructure for:

• 4 Computers Labs (vertically aligned)


• 26 Computers (PC) per lab – Wired LAN connection
• 500-meter interbuilding internet access
• School Net system (online learning)

Overview solution:

• Network port for each PC’s


• 48-Ports Gigabit Switch each lab
• Fiber-optic cable as interbuilding backbone
• Fast & Reliable Internet Access (Dedicated Internet/Lease Line)
Structured Networks Cabling Project RFP 6
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Analysis of the current and future need:

Based on the situation chosen, we were instructed to design and propose the network
architecture that will support the main requirement of the situation need which is 4 new computer
labs with active internet connection. Since this is school network which accommodate hundreds to
thousands of users. We need to follow the best practice in designing good network architecture1. So,
we will implement three-tier LAN design which provide these 4-priciples:

1. Hierarchy: Facilitates understanding the role of each device at every tier


2. Modularity: Allows seamless network expansion and integrated service enablement on an
on-demand basis
3. Resiliency: Satisfies user expectations for keeping the network always on
4. Flexibility: Allows intelligent traffic load sharing by using all network resources

For this project we need to assess the requirement from front end to back end. The front-end
requirement is internet access for 26 PC’s for each lab and there are 4 lab which means at least need
to provide internet access to 104 PC’s. Then start to assess it backward, since the requirement needed
for each lab is located vertically in vertically at each floor so, the best way is to use on switch for each
floor. The situation also mention that internet access sauce is located 500 meters from office, using
UTP as backbone cabling for is no longer an option. Therefore, fiber optic cables will be used as
backbone cabling from office the main distribution frame (MDF) at Block X. As now should already
have three-tier LAN, Core as core switch at the main office (Equipment Room), distribution layer we
be handle by MDF the ground floor and access switch at each floor. All that will cover the hierarchy
part of the design practice. Next, is modularity also will help of the future us of the design. For that,
addition requirement will be added as a reserved. Example since the requirement needed for 26 PC’s
per lab, we will add 4 more as a reserved. Then each faceplate will have at least 2 Rj45 ports. In
addition of that wireless access point (WAP) will allow device to have same access as PC if all the ports
are full. The move on into resiliency, in order always keep the network always up and running there
are two ways will be implemented, one is to use 2 Internet Service Provider (ISP) as a backhaul which
great is one ISP having issue and the second one is the of uninterruptible power supply (UPS) will
become in handy if any power failure occurs towards the main power supply. Last but not least,
flexibility issue for this project should be solve by using the Load balancer that allow traffic load sharing
since the school network resources not will be use 24 hours just for labs. So, load balancer will allow

1
Campus Architecture & Design Principle, Cisco Enterprise Campus 3.0
Structured Networks Cabling Project RFP 7
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

those networks resources will be allocated to the much use at the time where lab is not being use for
example after 6 PM the network resources will be redirect to hostel that much needed at the time.

Cabling infrastructure and components for the project:


No Type of network Brand Purpose Location
material used
1 CAT 6 UTP Dintek Horizontal Cabling WA, ER
Vertical Cabling for each level TR to WA
2 Multimode Fiber Draka Interbuilding Backbone ER to TR
3 Multi-WAN Router Peplink Serve as fault tolerant ER
Serve as load balancer
Serve as bandwidth bonding
4 Firewall Fortinet Packet filtering ER
Demilitarize Zone (DMZ)
5 Core Switch Huawei Provide 3-tier hierarchical access ER
Distributing Switch TR
Access Switch
6 Wireless Controller Aruba Control and manage WAP ER
7 Wireless Access Point Aruba Wi-FI access with landing page WA
8 Network Rack LinkNet Stack all mount rack compatible ER
device in one place

** ER – Equipment Room

TR – Telecommunications Room

WA- Work Area


Structured Networks Cabling Project RFP 8
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Drawing Information
TM Metro-E Title: Logical Topology of Network Infra
1Gbps TIME Internet Direct Diagram For Proposed Lab
Static IP 1 Gbps Subsytem involved :
Static IP i. Entrance Facility
Ii. Equipment Room
Ii. Backbone Cabling
Pub lic IP Address 103.53 .32.141 Iii.Work Area
Pub lic IP Address 11.1.2. 5

Location : Office and Block X


Entrace Facility/ Address :
Demarcation Point SMK Gambang Jaya
Office
Lebuhraya Tun Razak
Block X Building 26300 Gambang, Kuantan
Equipment Room
IP Address Pahang Darul Makmur
192.168.88.8 8 Version: 1.0
Work Area
Wireless Controller Forth Floor – 26 Host Version Date : 30/11/2017
IP Address IP Address 192.168.10.1/24 Created by : Zaini Zainuddin
192.168.88.9 9 DHCP range Lectu rer PC – 1 Unit (VLAN 100)
Stu dents (VLAN11) IP Address 176.16.10.104 Company : UMP Network Solution Sdn
DMZ 10.10.1.0/2 0 Stu dent P C s -25 units (VLAN 99) Bhd
Staff/Lecturer (VLAN22) IP Address 172.16.4.10 - 172.16.4.35
10.20.2.0/2 0 WAP LAB 4
Guest (VLAN33) IP Address 192.168.10.44
10.30.3.0/2 0

Web Server Third Floo r – 26 Host


DNS Server
FTP/TFTP Server Lectu rer PC – 1 Unit (VLAN 100)
Online Learning Server IP Address 176.16.10.103
Local DHCP NMS Stu dent P C s -25 Units (VLAN 98)
Server IP Address 172.16.3.10 - 172.16.3.35 Legend
WAP LAB 3
IP Address 192.168.10.33
Personal Computer (PC)
Second Floor – 26 Host

Lectu rer PC – 1 (VLAN 100)


IP Address 176.16.10.102
Stu dent P C s -25 Units(VLAN 97) Switch
IP Address 172.16.2.10 - 172.16.2.34
WAP LAB 3
IP Address 192.168.10.22
WAN/Internet

First Flo or – 26 Host


Wireless Access Point (WAP)
Lectu rer PC – 1 Unit (VLAN 100)
IP Address 176.16.10.101
WAP LAB 1 Stu dent P C s -25 Units (VLAN 96) Firewall
P Address 192.168.10.11 IP Address 172.16.1.10 - 172.16.1.34

Servers

Cat 6 Vertical/Horizontal
Cabling
Fiber-Optic Backhoul

Fiber-Optic Backbone
Structured Networks Cabling Project RFP 9
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Drawing Information

Title: Full Structure of Physical Design


Location : Main Office + Building X
Address :
SMK Gambang Jaya
Lebuhraya Tun Razak
26300 Gambang, Kuantan
Pahang Darul Makmur
BLOK X BUILDING Version: 1.0
Rise r T ele comm uni cation Room Work Area
Version Date : 30/11/2017
COM PUT ER L AB 4
Created by : Zaini Zainuddin
Fourth Fl oor (4 F) Company : UMP Network Solution Sdn.
Bhd.
2 6 X PC

Rise r T ele comm uni cation Room Work Area


COM PUT ER L AB 3

Rise T hird Fl oor (3 F)


r

2 6 X PC

Rise r T ele comm uni cation Room Work Area


COM PUT ER L AB 2

S econd F loor
(2F )

OFFICE
2 6 X PC

Rise r T ele comm uni cation Room Work Area Legend


COM PUT ER L AB 1

EQUIP MENT ROOM


Fi rst Fl oor (1F)
E NT RACE
T IM E
FA CI LIT Y
CPE
Personal Computer (PC)
2 6 X PC

Se rve r Se rve r Se rve r Se rve r Rise r MDF


TM

Ground Fl oor Wireless Access Point (WAP)


De ma rcation (GF )
Point

Unde rground Network Rack


Fiber Backb one to Block X

CAT 6
Backbone Cabling
CAT 6
Horizontal Cabling

Fiber Backbone
Structured Networks Cabling Project RFP 10
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

NETWORK RACK DIAGRAM

Equipment Room
Network Rack

42U

Fiber Path Panel

Media Converter

Multi-WAN Router
Firewall
1 GbE 10 GbE
1 2 3 4 5 6 7 8 1 2 USB MGMT CONS OLE

FortiADC-600E

powered by
a  company

Telecommunication Room
Wireless Controller POW ER

STATUS
0

LNK/ 1 POE
ACT
2

3
4

5
6

7
0

3
ACCESS
POINT
STATUS
4

7
8

LNK/ 9 POE
ACT
10

11
12

13
14

15
10

11
8

9
ACCESS
POINT
STATUS
12

13

14

15
16

LNK/ 17 POE
ACT
18

19
20

21
22

23
ACCESS

16

17

18

19
POINT
STATUS
20

21

22

23
m o lex

24
LNK/
ACT
m o lex

25
LNK/
ACT

SERIAL
Network Rack

18U
Core Switch

48-Ports Gigabit
Switch

UTP Patch Panel

48-Ports UTP
Patch Panel

UPS
UPS

DRAWING INFORMATION :
TITLE : Network Rack with Equipment Design
LOCATION : Equipment Room and Telecommunication Room
ADDRESS: SMK Gambang Jaya
Version: 1.0
Version Date : 30/11/2017
Created by : Zaini Zainuddin
Company : UMP Network Solution Sdn. Bhd.
Structured Networks Cabling Project RFP 11
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Drawing Information
Title: Physical Design Equipment Room

Subsytem involved :
i. Entrance Facility
Ii. Equipment Room

OFFICE Location : Main Office

Address :
SMK Gambang Jaya
Lebuhraya Tun Razak
26300 Gambang, Kuantan
Pahang Darul Makmur
Version: 1.0
Version Date : 30/11/2017
Created by : Zaini Zainuddin
Company : UMP Network Solution Sdn
Bhd

EQUIPMENT ROOM

TIME
ENTRACE
FACILITY
CPE
Legend

Terminal
Server Server Server Server
TM

WAN/Internet

Customer Premise Equipment

Fiber Backbone to Block X


Servers
Underground
Server

Cat 6 Vertical/Horizontal
Cabling
Fiber-Optic Backhoul

Fiber-Optic Backbone
Structured Networks Cabling Project RFP 12
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Drawing Information
BLOK X BUILDING Title: Physical Designed of
Riser Telecommunication Room Work Area Proposed Computer Lab
Subsystem Involved:
CO MP UTER LAB 4
i. Telecommunication Room
Ii. Work Area
Fourth Floor (4F) Location : Building X FSKKP
Address :
SMK Gambang Jaya
26 X PC Lebuhraya Tun Razak
Telecommunication Room
26300 Gambang, Kuantan
Riser Work Area
Pahang Darul Makmur
COMP UTER LAB 3
Version: 1.0
Version Date : 26/9/2017
Third Floor (3F)
Created by : Zaini Zainuddin
Riser
Company : UMP Network Solution
Sdn. Bhd.
26 X PC

Riser Telecommunication Room Work Area

CO MPLAB
UTER2 LAB 2

Second Floor (2F)

Legend

26 X PC

Riser Telecommunication Room Work Area


Personal Computer (PC)
COMPLAB
UTER
1 LAB 1

Firs t Floor (1F) Wireless Access Point (WAP)

Network Rack
26 X PC

Riser MDF
CAT 6
Backbone Cabling

Ground Floor (GF)


CAT 6
Horizontal Cabling
Fibre-optic
cable from
Office
Structured Networks Cabling Project RFP 13
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Drawing Information
Title: Proposed Computer Lab Design
Subsystem involved :
i. Work Area

PC 1 Location : Computer Lab 1-4 Block X


Address :
SMK Gambang Jaya
Lebuhraya Tun Razak
26300 Gambang, Kuantan
Pahang Darul Makmur
Version: 1.0
Version Date : 30/11/2017
Created by : Muhd Hilmi
PC 21 Company : UMP Network Solutions
PC 2 PC 8
.10 PC 20 .29 Sdn. Bhd.
.16 .28

PC 3 PC 22
PC 9 PC 19 .30
.11
.17 .27

PC 4 PC 23
.12 PC 10 PC 18 .31
.18 .26

PC 5 PC 24 Legend
.13 PC 11 PC 17 .32
.19 .25

PC 25 Personal Computer (PC)


PC 6 PC 12 PC 16
.14 .20 .24 .33
Chair
PC 26
PC 7 PC 13 PC 15 .34
.15 .21 .23 Desk

Projector

Projector Screen
PC 14
.22 Wireless Access
Point (WAP)
Structured Networks Cabling Project RFP 14
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

TITLE : Horizontal Cabling Design


LOCATION : Work area (Lab 1 – 4
ADDRESS: Universiti Malaysia Pahang (UMP)
Version: 1.0
Version Date : 30/11/2017
Created by : Zaini Zainuddin
Company : UMP Network Solution Sdn. Bhd.
Structured Networks Cabling Project RFP 15
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Network Costing

QUANTITY TOTAL
N0 ITEM BRAND / MODEL PRICE
/ UNIT PRICE
RM
Internet Service 10,000.00
RM 10,000.00
1 Provider I TIME Internet Direct ( Installation 1
Fee)
RM
Internet Service 10,000.00
RM 10,000.00
2 Provider II Telekom Malaysia Metro E (Installation 1
Fee)
Peplink / Balance 305 Multi-WAN
Multi-WAN Router RM 8200.00
3 RM 8200.00 1

Huawei / S6720-EI Series 48-Port RM


4 Switch RM 3799.00 6
22,794.00

Fortinet / FortiGate-60D Next


5 Firewall Generation RM 4270.77 1 RM 4270.77

Fiber Patch Panel 12 Ports SC or ST


or LC Panel Rack Mount (S210)
6 Fiber Patch Panel RM 390.00 1 RM 390.00

Dintek / 2U 48 PORT UTP SNAP-IN


RM
PATCH PANEL
7 UTP Patch Panel RM 290.00 6 1740.00
Multimode Fiber Draka / OM4 50/125 Armoured RM 6 /
8 550 Meter RM 3300.00
Cable Loose Tube Fibre Optic Cable meter
Dintek / Cat 6 4 Pair UTP Network
RM 689.00 /
Cable 305 Meter
9 CAT 6 UTP Cable Box 1 RM 689.00
Aruba / 7200 Series Mobility
Wireless
Controllers RM 5500.00
10 Controller RM 5500.00 1
Aruba / IAP-207 Wireless Access
Wireless Access Point JX954A
RM
11 Point RM 1200.00 4
4800.00
APC / Smart-UPS RM
Uninterruptible SMT1500RM2U 1000W/1440VA
12 RM
Power Supply 2U Rackmount
RM 1920.00 6 11520.00
Structured Networks Cabling Project RFP 16
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

LinkNet / 48 U
RM 1200.00 1 RM 1200.00

13 Network Rack
LinkNet / 18 U
RM 750.00 4 RM 3000.00
RJ45 port
14 Modular Jack RM 4 / Unit 224 RM 896.00
PVC Faceplate RM 2.45 /
15 RJ45 port 112 RM 274.40
Unit
PVC Angled
16 Surface Back Box RM 0.61 /
45° Angle 112 RM 68.32
Unit
PVC Half Moon
RM 19 /
17 Casing
2” Meter 8 Meter RM 152.00
PVC Conduit RM 1 /
18 1 “ Diameter 30 Meter RM 30.00
Meter
PVC Trunking RM 5 /
19 2” Diameter 56 Meter RM 336.00
Meter
PVC U Clip RM 0.32 /
20 1” Diameter 64 RM 20.48
Unit
PVC Male adapter
21 RM 1.20 /
1” Diameter 224 RM 268.80
Unit
RM 13.00 /
Screw
22 1 KG Box Box 3 Boxes RM 39.00
RM 20 / 100
23 Cable Ties Label Cable Ties With Tag 200 Pcs RM 40.00
Pcs

GRAND TOTAL RM
89,528.77
Structured Networks Cabling Project RFP 17
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Gantt Chart – Expected Project Timeframe


Structured Networks Cabling Project RFP 18
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Attachment B
Horizontal Cabling Project
Structured Networks Cabling Project RFP 19
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 20
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 21
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 22
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 23
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 24
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 25
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 26
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

List of network material

NO Item Size Length (cm) Qty


1 PVC Trunking - 170+180 1
2 PVC Conduit 1” 100 6
3 PVC Conduit ¾” 20+20+45 1
4 Faceplate + Backbox - - 7
5 PVC T 1” - 1
6 PCV Flexible ¾” 8 1
7 PVC U Clip ¾” 20mm 4
8 PVC U Clip 1” 25mm 24
9 PCV male connector 1” - 12
10 PCV male connector ¾” - 1
11 PVC Elbow ¾” - 1
12 PVC Reducer 1” to 3”4 - 1
13 Modular Jack - - 14

CAT 5e Measurement

No Name Faceplate Label Length (cm) Extra (cm) Total length (m)

1 Zaini FP01 100+170+180 50+300 8.00


2 Syafiq FP02 100+150+180 50+300 7.80
3 Hilmi FP03 100+130+180 50+300 7.60
4 Nik FP04 100+110+180 50+300 7.40
5 Afifi FP05 100+90+180 50+300 7.20
6 Leong FP06 100+70+80 50+300 7.00
7 Extra FP07 50+50+50 50+300 5.00
Grand Total 50.0
Structured Networks Cabling Project RFP 27
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Gantt Chart for Horizontal Project


Structured Networks Cabling Project RFP 28
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Project Result (Picture)


Structured Networks Cabling Project RFP 29
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Conclusion

As a conclusion, we able to solve situation given which to provide network infrastructure for
4 computer lab which each lab having 26 computers for the school. This project uses fiber
optic cable interbuilding backbone that can have supported up to 1Gbps the maximum to
transfer data. Then each lab we use wired LAN connection to connect to the network. We use
48-Ports Gigabit Switch each lab that can that have plenty more empty ports for future needs.

By developing this project, its teach how to work together with our team that everyone was
given the task to complete the project. Group members need to solve the problem and task
that have been given from executive manager and make every one of group members
responsible to do the task and finish their work. This project will be given advantages to the
student where students can access School Net System (online learning).

For the LAN connection, our group uses UTP CAT 6 for Vertical Cabling for each level. We use
Multimode Fiber interbuilding backbone that can transfer two-way data. Multi-WAN Router
is used for the server and to provide 3-tier hierarchical access our group use core switch
distributing switch access switch. Wireless control uses for control and manages WAP.
Network rack uses for stack all mount rack compatible device in one place at Equipment Room
(ER).

Last but not least, group member needs to build horizontal cabling each of the group
members. This gives the experience to group member so our group can learn and know how
to create and construct the network. This project gives much new information to our group
that we don’t know. We can apply this skill for our future.
Structured Networks Cabling Project RFP 30
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Reference

BOOKS

• ANDREW OLIVIERO, BILL WOODWARD


o CABLING, THE COMPLETE GUIDE TO COPPER AND FIBER-OPTIC NETWORKING
FOURTH EDITION
• DAVID BARNETT, DAVID GROTH, JIM MCBEE
o CABLING, THE COMPLETE GUIDE TO NETWORK WIRING, THIRD EDITION
• SEAN MCHUGH
o COMMUNICATIONS INFRASTRUCTURE STANDARDS & SPECIFICATIONS, COPPER AND
OPTICAL FIBRE CABLING SPECIFICATION
• SONAM DUKDA
o INTRODUCTION TO NETWORK CABLING
• JAMES P. CLEMENTS, JACK GIDO
o EFFECTIVE PROJECT MANAGEMENT, FOURTH EDITION

WEBSITES

• STRUCTURED CABLING-WIKIPEDIA (JANUARY 2011), RETRIEVED 14 OCTOBER 2017, FROM


• https://en.wikipedia.org/wiki/Structured_cabling
• THE BASICS OF STRUCTURED CABLING, RETRIEVED 01 APRIL 2000, FROM
• http://www.ecmweb.com/basics/basics-structured-cabling
• THE SIX SUBSYSTEM OF A STRUCTURED CABLING SYSTEM, RETRIEVED FROM
o https://www.anixter.com/en_au/resources/literature/techbriefs/the-six-
subsystems-of-a-structured-cabling-system.html
• STRUCTURED CABLING SPECIFICATIONS AND STANDARDS-FOSCO (FIBRE OPTIC FOR SALES
CO.), FROM
o https://www.fiberoptics4sale.com/blogs/archive-posts/95044422-structured-
cabling-specifications-and-standards
• WHAT IS STRUCTURED CABLING?(AND WHY YOU SHOULD CARE), ACCORDING FIBER OPTIC
ASSOCIATION, FROM CABLEXPRESS
• http://www.cablexpress.com/blog/what-is-structured-cabling-why-its-important/
Structured Networks Cabling Project RFP 31
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________

Appendix
Structured Networks Cabling Project RFP 32
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 33
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 34
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 35
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 36
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 37
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 38
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________
Structured Networks Cabling Project RFP 39
UMP NETWORK SOLUTION SDN BHD (GROUP 1)__________________________________________________