Ref. No. HCCL/URI-II/0255 Date: 28-Jul-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub : Approval for supply of ISHB 150X150 / 200X200.

Dear Sir,

 You are aware of the fact that procurement of ISHB 150X150 @ 27.1 Kg/ mtr / 200X200
@ 37.25 Kg/mtr has been persistently a problem from one manufacturer.

 To have alternative we now propose another vendor i.e. M/S Bajrang Alloys Ltd- Raipur.
His credentials are mentioned as below

 He has required set up, to take care of our requirement of Quantity as well as Quality.

 He has also been authorized by ISI for stamping his products.

 His Company profile is enclosed in favour of your kind information.

In view of the above we there fore, request you to kindly approve ‘M/S Bajrang Alloys Ltd –
Raipur’ for further action in the matter.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S.R.DUTTA
PROJECT MANAGER

Encl.: As stated.
CC. : CE/ URI – II/ NHPC for favour of its kind information
D:\Uri2 HEP\Contract\Aprv Supplier\page-1
Ref. No. HCCL/URI-II/0341 Date: 18-Sep-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub. : Approval for ISHB 200 X 200 @ 40 Kg/mtr.

Your letter no. - NH/UHP-II/Dam&PH/HCC/2006/887 dated 19th Aug’ 06.

Dear Sir,

This has the reference to your above mentioned letter where in you have approved ISHB 200 @
37.25 Kg/ mtr as a rock support structure for URI-II H.E.P.

As per your approval we are using the above mentioned section as rock support structure.
However, during bending, it is observed that due to smaller web thickness (6.1mm) there occurs
buckling and wave formation in the web of the ISHB.

Hence you are requested to approve the heavier section i.e. ISHB 200 X 200 @ 40 Kg/mtr (web
thickness 7.8 mm), for better quality rock support.

You may please approve the same at the earliest.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S.R.DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Aprv Supplier\page-2


Ref. No. HCCL/URI-II/0887 Date: 12-Dec-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub. : Approval for ISHB 200 X 200 @ 40 Kg/mtr.

Our letter no: HCCL/URI-II/0341 dated 18-Sep-06

Your letter no. - NH/UHP-II/Dam&PH/HCC/2006/887 dated 19th Aug’ 06.

Dear Sir,

Reference is invited to our letter no quoted above regarding approval of Structural Steel Section
as rock support structure for URI-II H.E.P.

As per the approval we are using ISHB 200 @ 37.3 Kg / m section as rock support structure
(Rib). However, during bending, it is observed that due to smaller web thickness (6.1 mm)
buckling and wave formation occurs in the flange of the ISHB.

At present our approved suppliers are not able to supply the ISHB 200 @ 37.3 Kg / m sections
as the same are not readily available at the market.

In view of above we proposed to purchase and use ISHB 200 @ 40 Kg / m (web thickness 7.8
mm) as rock support structure (Rib) of URI-II H.E.P, for better quality rock support.

It is requested to approve the same at the earliest and regularize the payment as per actual.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

D:\Uri2 HEP\Contract\Aprv Supplier\page-3


Ref. No. HCCL/URI-II/0893 Date: 17-Dec-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub. : MTC of PVC Water Stop – Submission - regarding.

Dear Sir,

Please find attached herewith the Manufacturer Test Certificate (MTC) for PVC Water Stop,
received from M/s. Jyoti Polyvinyl Limited, Baroda. The results conforms to the relevant IS
Codes as referred in Section B.12 of Technical Specification.

It is requested to approve the Water Stop of M/s. Jyoti Polyvinyl Limited, Baroda.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Aprv Supplier\page-4


Ref. No. HCCL/URI-II/01047 Date: 25-Apr-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub. : Approval for ISHB 200 X 200 @ 40 Kg/mtr.

Our letter no: 1) HCCL/URI-II/0341 dated 18-Sep-06


2) HCCL/URI II/0887 dated 12-Dec-07
Your letter no. 1) NH/UHP-II/Dam&PH/HCC/2006/887 dated 19th Aug’ 06.
2) NH/URI-II/Dam&PH/2008/144 dated 10-Apr-08

Dear Sir,

Reference is invited to our letters cited above regarding approval of Structural Steel Section
HB 200 @ 40 Kg/mtr as rock support structure.
The methodology for rib supports using HB-200 with the unit weight of 37.3 kg/mtr, has been
approved against our proposal for using HB-200 with unit weight 40 kg/mtr.
In this regard it is to be pointed out that when we use HB200 with unit weight 37.3 kg/m as per
approval, it is noticed that the ribs got buckled during bending due to the smaller web thickness
(6.1mm) and there is wave formation in the flange. This has been informed to your site
representatives and the same has also been inspected in our fabrication yard.

In order to have better workability and quality of rock supports, we procured the HB200 with unit
weight 40 kg/mtr with web thickness of 7.8mm. Hence it is requested that necessary approval
may be accorded for the use of HB200 with unit weight 40 kg/mtr in the interest of ensuring
quality in rock supports.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER
D:\Uri2 HEP\Contract\Aprv Supplier\page-5
Ref. No. HCCL/URI-II/01229 Date: 03-Oct-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub. : Approval for ISHB 200 X 200 @ 40 Kg/mtr.

Our letter no: 1) HCCL/URI-II/0341 dated 18-Sep-06


2) HCCL/URI II/0887 dated 12-Dec-07
3) HCCL/URI II/1047 dated 25-Apr-08
Your letter no.1) NH/UHP-II/Dam&PH/HCC/2006/887 dated 19th Aug’ 06.
2) NH/URI-II/Dam&PH/2008/144 dated 10-Apr-08

Dear Sir,

Reference is invited to our letters cited above regarding approval of Structural Steel Section
HB 200 @ 40 Kg/mtr as rock support structure.

As the approval pending on this issue, no payment has been considered for the difference in the
weight of 3 kg/RM, against the usage of HB200 with the unit weight 40kg/RM, instead of
37.30kg/RM, due to the reasons explained in our letter references cited above, and the total
quantity of this difference in weight is accumulated to about 40MT.

Hence it is once again requested that necessary approval may be accorded for the usage of
HB200 with unit weight 40kg/RM and the payment on the same may be released at the earliest
so as to have smooth cash flow in order to avoid any impact on the progress of works.

Early action in this regard is highly solicited.


Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER