Water

Durrat Al Bahrain, Manama, Bahrain


The Durrat Al Bahrain development offers a world-class residential,
leisure and tourist destination. When complete the development will
have a population of over 60,000 with a potable demand of up to
27Mld and a total irrigation and cooling water demand of about 30Mld.

Atkins was commissioned on a major project for the comprehensive


masterplanning, design and project management. Our water team
worked on the design of the potable and irrigation water supply,
wastewater collection and water treatment infrastructure and a
seawater desalination facility to be located in the utilities area of the
island from which irrigation water will be pumped to the whole resort.
Voted ‘Best Consultancy for Water and
Wastewater (UK)’ 2008
by clients and peers in the edie.net consultancy survey.

Who we are
> Atkins is a multinational design and
engineering consultancy, providing
expertise to help resolve complex
challenges presented by the built
and natural environment.

Whether it’s the concept for a new


skyscraper, the upgrade of a rail
network, the modelling of a flood
Quality delivery
defence system or the improvement Atkins implements a comprehensive range of fully certified and
of a management process, we plan, integrated quality, safety and environmental management systems
design and enable solutions. that distinguish us from our competitors. This means we can
guarantee unrivalled performance standards.
Founded in 1938 by Sir William
Atkins, Atkins employs over 16,000 All of our Middle East & India operations are externally certified to
staff based in more than 200 all three internationally recognised QSE management systems:
permanent offices worldwide.
Projects have been undertaken in
more than 150 countries. As of June BS EN ISO 9001:2000 –
2009, Atkins generated an annual Quality Management System
turnover in excess of £1.5 billion.

Atkins is the UK’s largest BS EN ISO 14001:2004 –


engineering and design consultancy Environmental Management System
and the world’s 11th largest design
firm and the largest UK engineering
consultancy in the Middle East. OHSAS 18001:2007 –
We have the breadth and depth Occupational Health and Safety Assessment Series
of expertise to respond to the
most technically challenging and We have a regional Business Quality Director to oversee the
time-critical infrastructure projects administration of the business management systems, including
and the urgent transition to a low the implementation of a Quality Management System (QMS).
carbon economy. Each office also has a Quality Manager.
Our size brings significant value to We are able to integrate quality procedures into all the projects that
our clients, allowing us to harness we deliver on behalf of government ministries, local governments,
an unrivalled pool of creative, hotel and leisure project operators, major real estate developers,
professional people to produce national oil companies, contractors in the oil and gas sector and
outstanding solutions to private clients.
challenging problems.
What we deliver
> Our aim is to always add value.

Atkins is a major player in the We combine leading-edge Our experience and capability
water industry, supporting the engineering with in-depth provides the foundation for a
water, wastewater and water- experience to deliver total client focused structure and service
related environmental sectors with solutions that satisfy the needs of delivery to enhance and support
consistently exceptional services. our clients. We have over 1,800 cost-effective, quality assured
professionals dedicated to the solutions.
We cover the entire water cycle water and environment sector
and deliver across the whole around the world.
project lifecycle, from operational
advice and strategic studies, Our clients include government
through modelling and concept ministries, investment bankers,
assessment to detailed design, water companies, environmental
project management and organisations, funding agencies
commissioning. and developers.
Water services in the region
> We work across the whole lifecycle of
water from source to sea.

With the current worldwide We use the latest technology,


trend towards urbanisation, including analytical and
the production, treatment and modelling packages, and three
distribution of potable water and dimensional computer-aided
the collection, treatment and design.
disposal of sewage and industrial
effluent and solid waste is all of Our insight and understanding
prime importance to the well- comes from having the best
being of the global community. people, who are able to
solve today’s complex water,
Water supply is a major aspect wastewater and environment
of our work in water and challenges and deliver appropriate
public health engineering. We and tailored solutions.
have experience of planning
for major cities, designing and Primary water services
implementing desalination, offered in the Middle East
water treatment plants and new include:
supply systems and reviewing
existing networks. Water quality • Water resources
is of critical concern and we
• Desalination and water
carry out testing and analysis.
treatment
Atkins has a diverse range of • Water supply and distribution
clients in the Middle East. We
• Wastewater collection
understand the complexities
that govern the business and • Wastewater treatment
the demands placed on the key • Greywater treatment
players involved.
• Water reuse
With this understanding, we • Surface and stormwater
offer a holistic approach to drainage
our clients to help them meet
regulatory and financial targets, • Water use and demand
as well as enabling them to management
manage their operations more • Water security
efficiently, delivering tailored
solutions to meet the complex We also offer support in the
challenges facing the water following areas:
industry.
• Masterplanning
Our professional advice and • Advisory services
design solutions are backed by
a thorough understanding of • Asset management
the complexities of water and • Due dilligence
wastewater engineering.
Water resources
> We advise water companies on the demand-
side impacts for water resource planning.

Atkins possess hands-on


experience in all aspects of water Izmit Dam and Water
resource planning for various Supply Scheme, Turkey
clients from water companies to The Izmit Water Supply
government departments. Scheme provides water to
about 50 rapidly expanding
Our staff have been closely municipalities near Istanbul.
involved with the development of We reviewed the contractor’s
technical methodologies. design, monitored construction
and administered the
We produce robust, well argued construction contract.
plans, that balance risk against The project included:
customer and environmental
requirements. • A 108m high rockfill dam
• Treatment works, with a
The integration of complex capacity of up to 480
methodologies to produce megalitres per day
coherent plans, that can be laid • 96km of continuously
open to scrutiny by regulators, welded steel pipework
customers and environmental
groups is a specialised task, calling • Four booster pumping
for a wide range of technical skills stations
and experience.

Such experience is becoming


increasingly important given the 3-Dimensional Modelling of
pace at which competition is Thermal Discharges in the
growing within the water industry. Middle East
A MIKE 3D model was
We advise on the use of scenarios developed to illustrate the extent
in recharge and groundwater of the thermal plume resulting
models which assess the climate from refineries which are cooled
change impacts on critical periods with seawater. The temperature
of yield (eg. in relation to drought of water rejected from the
– providing detailed interpretation process can be elevated up to
and analysis). 10 °C. By using the 3D model,
the extent of the plume could
We offer the following water be accurately defined.
resource services through our
Middle East water teams: The modelling showed that the
• Dams extent of the area affected was
larger than was anticipated.
• Water quality assessment
The client was also alerted on
• Water quality modelling the likelihood of recirculation
• Hydrogeology of the thermal plume, which
• Hydrology can have serious consequences
for power station performance
• Inlet structures and integrity.
• Flood forecasting
Red Tide Review, Oman
Atkins has been appointed to
study the issues surrounding
red tide events and to establish
mitigation measures for future
such events for a high-profile and
prestigious development within
Oman.

Red tide events are blooms


that arise from unusually high
concentrations of various groups
of phytoplankton which react to
sunlight and result in a red/brown
colour such that they have been
called ‘Red Tides’. The seawater
quality during such events
contains high levels of organics
and algae, some species of which
can be harmful.

The client has commissioned


Atkins to assess the likelihood
of red tide algae affecting the
seawater canals, which form a
key part of their development.
Water treatment
> Our desalination team is skilled in water
management for both sea and brackish water.

Our extensive experience enables Atkins provides experts with


us to provide our clients with specialist experience including: Laayoune Brackish Water Desalination Study, Morocco
in-depth sectoral knowledge, Conseil Ingénièrie et Développement (for ONEP)
technical competence and the • Source abstraction and Atkins was sub-consultant to a Moroccan consultancy, CID,
capacity to fulfil specific needs well design commissioned by ONEP.
of projects of any size or length. • Pre-treatment and
chemical stabilisation We carried out an optioneering study to select the optimum
Atkins has the capability to work treatment process for desalination of brackish groundwater.
on conventional potable water • Reverse osmosis
treatment projects, although • Electro Dialysis Reversal (EDR)
We examined the principal treatment options and also cooling
many of our projects in the Middle • Thermal desalination techniques. A recommendation was made to use RO based on
East demand our expertise in processes cost, environmental impact, water quality and flexibility.
desalination.
• Energy recovery
We were then commissioned to proceed further, carrying out a
Our desalination team is skilled in • Plant optimisation
full feasibility study and tender stages. The design of the plant was
water management for both sea • Post treatment and undertaken based on a raw water yield of 16,000m3/per day with
and brackish water. disinfection a treatment process including:
• Water networks design
We operate internationally, • Aeration towers and sand filtration to assist in
merging state-of-the-art specialists • Water reuse and irrigation
cooling and removal of iron and manganese
with local skills in order to combine • Solids management,
top end experience with cost handling and disposal • High lift pumps
effectiveness and accessibility. • Drinking water safety plans • Two-stage RO trains to increase product water recovery

In addition to the team’s specialist • Lime dosing to correct the pH of the treated water
expertise, all of our process We are also developing
employees are grounded in the specialist capabilities in cutting
fundamentals of desalination edge sustainable desalination
process techniques. technologies including forward
osmosis and decoupled solar
desalination.

King Abdullah University of Science & Technology, KSA


The university required a temporary desalination and potabilisation
plant that was capable of providing approximately 6,000m3/day of
water. The source water for the treatment plant was sea water.

Atkins was asked to perform a feasibility study for this plant and
an environmental impact assessment (EIA) which looked at the
effect of the desalination plant on the surroundings, particularly
on the sea water intake.

On completion of the feasibility study and EIA, Atkins prepared


the specification documentation required for the tender process.
Barr Al Jissah Hotel and Spa, Muscat, Oman
Atkins provided the performance design and
tendering of the BOOT (Build, Own, Operate and
Transfer) contract to provide a sea water RO plant
and site supervision within this luxury hotel and
spa complex.

The drinking water was provided by a sea water


RO plant that included:

• Sinking and construction of a


new sea water beach well
• A 1,500m3/day reverse osmosis sea water
desalination facility, including pre and
post treatment
• A brine disposal system

• A water supply network around the site


• A wastewater collection and
treatment system

• All external services to the plant


Water distribution

Understanding the drivers of Our clients are assured of dealing


future water demands is an with highly motivated and skilled Qatar Foundation, Education City, Doha, Qatar
essential component of the engineers and technicians, who We provided the process design, performance specification and
supply/demand balance that understand the theoretical and civil works design for the facility and developed all of the water
underpins long-term water practical aspects of leakage based utilities.
resource planning. Increasing management, thus serving to
emphasis is now being placed maximise project delivery. Agreement was sought and liaison conducted with Public Works
on assessing the uncertainties Authority and Qatar General Electricity and Water Corporation for
in forecasts and how these We focus on the long-term inflows and discharge rates.
translate into risks of security in needs of our clients, such
supply. as cost-effective reductions The potential water sources for irrigation were potable water,
in leakage, operational cost treated sewage effluent and treated groundwater, all of which
Atkins capability in demand savings and improved regulatory were evaluated on their suitability.
analysis, forecasting and reporting.
management covers all aspects of: A 20,000 m3/day RO for groundwater treatment was our
We undertake: recommended solution.
• Analysis of water consumption
• Analysis of existing systems
• Demand forecasting Detailed design of network, pumping stations and telemetry/
• Condition assessments
SCADA systems was also included.
• Impact of
• Network system optimisation
demand management
• Anomaly resolution
• Evaluation of uncertainties,
• Pressure management
and hence risks, in demand
schemes (design, audit,
forecasts
commissioning)
IMAGE DETAILS:
Drawn: TRG
Date: 05/09/2008
Area: Glascote
Viewing Inclination: 26.00
Pressure (m)
• Network design
Looking From: South
Looking To: North

• Network modelling
70
Base Layer: Pressure (m)
Base Layer Exaggeration: 6.00 65
Base Drape: Mains 60
Data Date: Glascote Peak Day 55
Data Time: Peak Day 08:00 Hrs 50
45
40
35

• Design and site implementation


30
25
20
15
10
5

of District Meter Areas (DMAs)


• DMA audits
• Statistical analysis
• Monitoring DMA
performance
IMAGE DETAILS:
Drawn: TRG
Date: 03/09/2008
Area: Glascote
Viewing Inclination: 26.00
Looking From: South Elevation (m)
Looking To: North 125
Base Layer: Elevation (m) 120

• Leak detection and leakage


Base Layer Exaggeration: 6.00
Base Drape: Mains 115
Data Date: Glascote Peak Day 110
Data Time: Peak Day 08:00 Hrs 105
100
95
90

policy advice, including


85
80
75
70
65
60

assessment of economic
55

level of leakage
• Per Capita Consumption
(PCC) assessments
IMAGE DETAILS:
Drawn: TRG
Date: 28/05/2009
• Nightline analysis using
sophisticated logging
Area: Barr Beacon
Viewing Inclination: 35.00 Minimum Pressure (m)
Looking From: South
140
Looking To: North
130
Base Layer: Minimum Pressure (m)
120
Base Layer Exaggeration: 10.00
Base Drape: Mains 110

techniques
100
90
80
70
60
50
40
30
20

• System optimisation
10
0
-10
-20

• Water quality analysis


Wastewater collection

Atkins has extensive experience The range and depth of


in every aspect of the wastewater experience that our people Motor City and Uptown infrastructure services, Dubai, UAE
sector and has undertaken work incorporate has established our Atkins designed the infrastructure for the Dubai Autodrome,
for clients throughout the world. position as market leaders in the which is the first fully integrated automotive and motor
Our clients can rely on our wide fields of: sports facility in the Middle East region. It incorporates a FIA
breadth of experience, the latest sanctioned 5.39km motor racing track with state-of-the-art
technologies and engineering • Infrastructure planning and grandstands accommodating 7,000 spectators, a driving school
software, and assurance of the feasibility studies and pit complex.
highest priority given to cost and • Modelling, design and
safety when dealing with projects renovation of sewerage Infrastructure design works included potable water, fire water,
around the world. systems, including combined irrigation water, storm water drainage, foul water drainage,
sewer system separation and performance specification for upgrade of existing on-site
We offer a comprehensive • Infiltration studies sewerage treatment plant.
wastewater planning and design
• Mechanical, electrical and The treated sewage effluent from this plant was designed to
service, incorporating everything
instrumentation systems provide irrigation water for the development.
from initial masterplanning to
network implementation. • Combined sewer outfalls
• Long sea outfalls We also supervised the manufacture, construction, installation,
Our range of expertise includes: testing and commissioning of this plant.

• Infrastructure development
(network planning,
operational strategy, utility
coordination and system
design)
• Sewerage networks
– Gravity
(lifted and deep tunnel)
– Pressure
– Vacuum systems
• Pumping stations

We also have the capability to


provide network modelling,
system appraisals and audits,
F1-X Theme Park and Marriott Courtyard Hotel, Motor City
operational support, project
management, site supervision
and commissioning.
Wastewater treatment

In the field of domestic, municipal


and industrial wastewater Offshore location, Middle East
treatment, Atkins provides We worked on a major project in the Middle East to deliver the design for the reverse osmosis
experts with specialist experience drinking water plant and the sewage treatment plant.
including:
• Preliminary treatment, Hydrodynamic modelling was employed to assist in locating the brine discharge pipe outfall to
screening, grit and grease minimise any impact on the environment.
removal
Sewage treatment will be provided by a Membrane Bioreactor (MBR) process with appropriate
• Aerobic systems:
pre-treatment, which will accommodate the expected varying flows and loads throughout the
- Biological filters (conventional year to provide a high quality treated sewage effluent suitable for irrigation use. The plant will be
and modular media) sized to treat up to 1,000m3 of wastewater per day.
- Activated sludge plants
- Biological Aerated Flooded The sludge will be dewatered on site and then disposed of at a central treatment facility. Odour
Filter (BAFF) units and control is taken into account at every stage of the treatment process with innovative methods of
Submerged Aerated Flooded treating the collected mal-odorous air.
Filter (SAFF)
This is a truly multidisciplinary project combining all engineering disciplines across different
- Oxidation ditches
countries to deliver a prestigious project within demanding time scales. This is being made
- Sequencing Batch Reactors possible by strong communication between all parties involved - from client, consultant, sub-
(SBR) consultants, plant operators and contractors as well as excellent project management.
- Membrane Bioreactor (MBR)
- Package plants (e.g. rotating
biological contactors)
• Odour control facilities
• Anaerobic systems:
- Anaerobic digestion of sludge
and slurries
- High rate anaerobic systems
(e.g. UASB, EGSB)
• Solids management, handling
and disposal
• Tertiary treatment
(e.g. ozonation, UV)
• Physical chemical treatment

As an addition to this, Atkins offers


advice on:
• Reuse (e.g. irrigation of treated
effluents, greywater recycling)
• Effluent polishing for district
cooling use
• Outfall dispersion modelling
• Environmental impact
assessment
• Odour modelling
Abu Dhabi Masterplan, UAE
Atkins was responsible for the comprehensive regional development
plan for the Emirate of Abu Dhabi. The commission included a
regional and town planning study for 20 years.

Sewerage and sewage treatment was limited to Abu Dhabi city and
Al Ain, with plans required for expansion of the system into rural
settlements.

Atkins’ input on this project included the appraisal of spare capacity


in the existing systems and the need for future water supply,
sewerage and sewage treatment, surface water discharge and solid
waste disposal systems.

Master directive plans were prepared for the more strategic


settlements, including cost-effectiveness appraisals of a number of
options and a mapped recommendation.

It was also our responsibility to liaise between these expansion plans


and the town planning departments of settlement communities.

Ajman Wastewater BOOT Technical & Revenue Due Diligence, UAE


A BOOT (Build, Own, Operate and Transfer) concession was awarded
by the Government of Ajman for the construction and operation of a
wastewater collection and treatment system for up to 300,000 people in
the Emirate of Ajman. The concession is for a 27.5 year period.

Atkins was appointed to carry out an independent revenue and technical


due diligence review of the concession for the group of potential lenders,
consisting of international and UAE banks. The principle objective of the
appointment was to advise on any aspect that may endanger the lenders’
position.

The assignment involves the review of the concession agreement,


the EPC contract and the O&M contract to assess that risk is properly
assigned to each party, review of projected revenue estimates and
review of the technical aspects of the scheme.

Construction of the scheme commenced in February 2003 and we


continue to be retained by the lenders providing construction monitoring,
certification and reporting services.

Our appointment also involved semi-annual reporting on the operation and


performance of the system during the operational phase of the project.

Yenkit Tourism Development, Muscat, Oman


We were commissioned to carry out a range of services to enable the
client to acquire a development agreement for an Integrated Tourism
Complex with the Omani government. These services included an
EIA, preliminary ground investigation, bathymetric and topographic
survey and traffic assessment.

Following on from this initial work, Atkins was commissioned to


produce infrastructure concept designs. As well as the designs for a
reverse osmosis (RO) desalination plant, potable water storage tanks,
a distribution network, gravity sewers and two types of storm water
collection systems, Atkins designed a sewage treatment works (STW)
located to the south west of the site in a topographical dip to screen
it from view of the development and reduce the quantity of pumping
required.

The STW will be built in phases, the first two phases sized to treat
3,000m3/day increasing to 5,500m3/day in the final phase. The
treated sewage effluent (TSE) produced will be used for irrigation
purposes on the development such that in the final phase, the
irrigation requirements are met by the TSE.
Water reuse
> Reuse strategies are essential with water resources
coming under increasing pressure from climate change.

In the future, water resources in With regard to Green Building


the Middle East and around the ratings, such as LEED and
world are likely to come under Estidama, in which water
increasing pressure from climate saving options such as local
change, a growing population, water recycling can harvest
and socio-economic changes. credits, Atkins has successfully
incorporated separate greywater
Sustainable water management collection, treatment and reuse
is critical to balancing the in the design of various multi-
availability and demand for storey buildings. The type of
water, mitigating risks and treatment that is necessary
delivering environmental depends on the water quality
improvements. required, which in turn, depends
on the reuse purpose such as:
Atkins is working with a broad • Restricted and Unrestricted
range of clients, including Irrigation
water companies, regulators,
planning authorities, research • Toilet flushing
bodies, private developers and • District cooling
the general public, to develop
integrated strategies to meet The benefits of greywater reuse
these challenges. are a reduction in potable
water demand and a reduction
Our approach is based on in wastewater production.
an integrated assessment of The extent of reuse is initially
economic, social, political determined by the production
and environmental pressures of a waterbalance. Projects that
and outcomes to help clients include a greywater system in
with long term sustainable Dubai, are:
development. We can also
identify strategies and schemes • Iris Mist tower achieving a
that will provide the maximum LEED Silver rating
environmental benefits for the
• Taaleem Flagship Campus,
lowest carbon cost.
also achieving LEED Silver
rating
• DIFC Lighthouse tower which
produces up to 50% less
carbon emissions, uses up to
40% less water and is aiming
to achieve the highest LEED
Platinum rating.
Cairo Wastewater Project, Egypt
Atkins was commissioned to undertake a study of irrigated We then selected a series of crops (citrus, nuts, dates, timber trees,
agriculture development options based on the use of treated cereals, legumes and oilseed) that were suited to irrigation with
effluent from the Gabel Asfar sewage treatment plant. treated effluent, taking into account international and local health
guidelines and local social sensitivities.
The first phase of the proposed treatment plant was designed to
produce one million cubic metres of treated wastewater daily, We identified options for irrigated agriculture development, including
sufficient to irrigate 15,000 hectares during the summer months. the possibility of reusing the treated effluent in the Delta region via
A further two million cubic metres of effluent was to become the existing drainage system.
available upon completion of subsequent phases.
Alternative project designs were compared in financial and economic
We identified potentially suitable sites in consultation with the terms. We recommended that priority should be given to a
Egyptian authorities, taking into account topography, soil conditions, development east of Cairo, based on trickle irrigated tree
existing land use and planning proposals for future urban expansion. crops (fruit & nuts).
Surface and stormwater

With diverse experience in Our commitment, experience, Our services add value to our
drainage engineering for training, and diversity of skills clients by:
development, our team brings bring clear benefits to our clients • Cost reductions through
the full spectrum of skills and with capabilities in: the efficiencies that a single
knowledge to a client’s proposal integrated and pro-active
• Planning and feasibility studies
helping to deliver sustainable, approach can offer
cost-effective solutions. • Stormwater collection
• Reduction of risk to the
• Pump stations client, through our worldwide
We like to work closely with our
• Drainage area and commitment to delivering
clients, constantly seeking ways
impact studies optimum solutions
of improving our service.
• Delivery of sustainable
• Water retaining/attenuation
Where required, our specialist solutions
structures, landscaped dams
hydraulic design teams use • A single source of
state-of-the-art hydraulic • Sustainable Urban Drainage responsibility for the delivery
and flood plain modelling Systems (SUDS) of the solutions
technology, and are able • Flood plain studies
to ensure compatibility and We offer the following detailed
transferability of data with the • Sea outfalls
services:
client according to his demands. • Masterplanning • Planning and data capture
• Project advice and for GIS
management • Design and build GIS
• Operations management systems and strategies for
implementation
• Underground asset surveys
• Risk assessment, and value
• Design and build packages analysis to cross-examine
and improve efficiencies and
• Design and inspection of
effectiveness
reservoirs and dams
• Feasibility, social,
• Environmental Impact environmental and legal
Assessment (EIA) framework studies, as
components for project
preparation
• Designs and rehabilitation
plans to full tender
documentation
• Management and supervision
of project implementation
• Training in all areas of O&M by
experienced and certified staff
• Expert witness services
Stormwater masterplanning, Infrastructure Planning and Stormwater drainage,
KSA Design, KSA Colombo, Sri Lanka Lake Environmental Project,
Atkins was commissioned to In association with Saudi This study, carried out on behalf Kashmir, India
deliver a stormwater masterplan, Consulting House, we prepared of the National Water Supply Srinagar is the capital city of
funded by the Ministry of plans, detailed designs and and Drainage Board, reviewed Kashmir in Northern India,
Municipalities and Rural Affairs. tender documentation for water the existing stormwater facilities with a population in excess of
distribution, foul sewerage and in Colombo and identified half a million. It faces major
The project comprised a detailed stormwater drainage systems for areas for improvement and urban management problems,
hydrological study for the the new development areas. rehabilitation. including a chronic under-
entire catchment basin draining investment in utilities.
into and across the 120km The population of the Dammam The principal tasks included a
long Jeddah city area; studies metropolitan area is expected to review of existing reports and Atkins was appointed to
were undertaken on both the grow to around 700,000 by the data, liaison with authorities formulate and appraise a set of
interaction of groundwater, year 2010. (including staff working in the projects designed to jointly solve
sewerage and drainage systems client’s offices) to establish the problems of basic services
in the city and the development Most of the population growth is an overview of the system, provision and lake pollution.
of a masterplanning strategy for anticipated to be in seven new, which covers some 4,000
the storm water network. still to be developed areas. ha, and preparation of the
implementation programme
In addition, a drainage and costs estimates. We also
information system was built undertook the design of
using intergraph/Oracle which drainage schemes, where an
was intended as a prototype immediate improvement could
for the nationwide Urban be expected, particularly where
Information System. Stage 1 these would benefit the poor.
is now complete and funding
is being awaited for the final
masterplanning stage.
Masterplanning

Atkins incorporates the full Our proactive approach is Our commitment, experience, Our expertise in the challenging
spectrum of skills and knowledge reflected in our close association training and diversity of skills sphere of masterplanning
integral to meeting the with our clients. We are translate into a range of client encompasses:
expectations of today’s client, constantly seeking ways of benefits. These include: • Data collection and verification
for competitive, sustainable and improving our services delivery, • Reductions in cost through
effective solutions. adopting methods well-suited to • Asset management planning
the efficiencies offered by and reviews
partnering. an integrated and proactive
Our comprehensive approach • Review of institutional, legal
experience covers all aspects We employ the latest CAD, and regulatory frameworks
of masterplanning from the GIS and hydraulic modelling • Reduction of risk to the • Review of related masterplans
initial asset management and software, ensuring compatibility client through our worldwide hierarchy
investment requirements, and transferability of data to commitment to deliver
optimum solutions • Hydrological studies
advising on Geospatial suit client needs. In addition we
Information System (GIS) and provide institutional and training • Design criteria assessment
• A single source of
corporate databases through advice required for installation of responsibility for the delivery • Plan preparation
to the modelling and detailed client systems. of solutions • Environmental impact of
assessments. groundwater and sewerage
Atkins is able to address all upon storm systems
aspects of the planning cycle • Planning and data capture for
and provide a pool of related GIS
resources for transport planning,
urban regeneration and other • Design and build GIS
related issues. systems and strategies for
implementation
• O&M reviews and preparation
of O&M manuals

Southern Oman Regional Development Plan, Oman


The government of Oman wished to carry out a study to indicate
how best to pursue the development of the largely undeveloped
southern Oman region.

One of the principal constraints to development is the availability


of water at a reasonable price. We examined the existing policy
framework for the exploitation of groundwater resources in the
region and proposed a national water masterplan and control of
water resources through national legislation.

Algiers Water Supply Project, Algeria


Atkins was commissioned, in association with Binnie and
Partners, to provide a water masterplan for domestic, industrial
and irrigation water use for the Greater Algiers area, the Mitidja
Plain and the Sébaou river basin.
Advisory services

There is an increasing demand Private sector participation Our technical capability in water We can also provide teams
on the public purse promotes the transfer of and wastewater technology is to deal with integrated
worldwide to finance the responsibility for payment of complemented by a wide range infrastructure projects, which
massive investments needed the real cost of services from of in-house resources, including: might cover transport, power,
to provide better water and the taxpayer to the paying • Project financial modelling telecommunications and gas,
sanitation services to global customer, thus helping to as well as water and sanitation.
communities. achieve significant and sustained • Risk assessment and analysis
cost savings in the provision of • Due diligence
In response to these demands, services. • Planning and environmental
governments are looking to issues
the private sector to assist At Atkins, we have worked
• Cost estimating
in financing investment closely within multidisciplinary
programmes and to inject teams, along with corporate • Asset management planning
commercial management skills bankers, lawyers and • Advising on institutional issues
in order to enhance operational accountants, to attract and forge
• Utility regulation and
efficiency. concrete partnerships between
performance measurement
the public and private sectors.