You are on page 1of 12

Figure 3.1. Photograph showing views of the Building Substation, of IOCL Turbhe Plant.

(a) (b)

(c)
Figure 3.2. Photographs showing distress in the columns of the Building Substation, of IOCL
Turbhe Plant.
(a) (b)

(c) (d)

(e) (f)
Figure 3.3. Photographs showing distress in the beams of the Building Substation, of IOCL
Turbhe Plant.
(a) (b)

(c) (d)
Figure 3.4. Photographs showing distress in the seepage and leakage problems of the
Building Substation, of IOCL Turbhe Plant.
(a) (b)

(c) (d)

(e) (f)
Figure 3.5. Photographs showing distress in the chajjas/plastering work of the Building
Substation, of IOCL Turbhe Plant.
NDT PHOTOS
(a) (b)

(c) (d)

(e)
Figure 3.6. Photographs showing Rebound Hammer Tests of Columns of the Building
Substation, of IOCL Turbhe Plant.
(a) (b)

(c) (d)
Figure 3.7. Photographs showing Rebound Hammer Tests of Beams and Slabs of the Building
Substation, of IOCL Turbhe Plant.
(a) (b)

(c) (d)
Figure 3.8. Photographs showing Ultrasonic Pulse Velocity Tests of Columns of the Building
Substation, of IOCL Turbhe Plant.
(a) (b)

(c) (d)
Figure 3.9. Photographs showing Ultrasonic Pulse Velocity Tests of Beams and Slabs of the
Building Substation, of IOCL Turbhe Plant.
(a) (b)

(c) (d)

Figure 3.10. Photographs showing the Carbonation and Half Cell Potentiometer Tests of the
Building Substation, of IOCL Turbhe Plant.

You might also like