You are on page 1of 2

05/11/2015 Outlook.

com Print Message

Print Close

Sewerage line Report

From:  mohd.barak.ali.bin.mohamed.jalali@cbre.com
(mohd.barak.ali.bin.mohamed.jalali@cbre.com)
Sent: Wednesday, 4 Nov, 2015 4: 51 PM
To: bio_range@yahoo.com (bio_range@yahoo.com)
Cc: abneranand@hotmail.com (abneranand@hotmail.com)
1 attachment
Sewerage line Data sheet.xlsx (12.7 KB)

Hi Francis,

Its nice to talk to you today morning.

1. Attached is the 21 Shell stations along the PLUS highways.

2. I need you to do the site visit and come with complete drawing of the system that available at site.

3. Based on the sytem that available at this sites, please propose for the schedule maintenace activities required

a. Engineering requirement

b. Statutory requirement.

4. PLease provide your report by individual site, which means I will receive 21 reports with recommendations.

5. Please provide your schedule and costing by 6th November 2015.

6. This will enable me to issue WO/PO for you to proceed.

Feel free to call me, if you need any clarification.

Best Regards

Mohd Barak Ali Bin Mohamed Jalali | Lead Regional Operations Manager

CBRE | Global Workplace Solutions – Malaysia

Bangunan THK, 1st Floor, No. 2A, Jalan 243, Section 51A,

https://blu181.mail.live.com/ol/mail.mvc/PrintMessages?mkt=en­my 1/2
05/11/2015 Outlook.com Print Message

41600 Petaling Jaya, Selangor, Malaysia.

T +603 76802100| F +603 7628 4280| M +6019 457 8634

mohd.barak.ali.bin.mohamed.jalali@cbre.com | www.cbre.com

Connect with me on LinkedIn

Follow CBRE : Facebook | Google+ | Instagram | APAC LinkedIn | Twitter | Weibo

Please consider the environment before printing this email. Thank you.

https://blu181.mail.live.com/ol/mail.mvc/PrintMessages?mkt=en­my 2/2

You might also like