operations.
• Intimate the AOP applicant, a suitable time and location for the
readiness
check.
The DGCA Project Manager will notify the AOP applicant of the
decision as soon as possible after the readiness check. If the
project team concluded the AOP applicant is not ready, the
applicant will be advised of their decision and the reasons for the
decision.The specific scenarios used during the readiness check
will not be the same as those prepared for the proving flight. A
successful outcome of the readiness check will not have any
bearing on the actual proving flight.
proposed date for the conduct of the proving flight, the areas to
be assessed and route the proving flight will follow.
b. Dispatch preparation
c. Aircraft loading
d. Passenger processing
e. Aircraft servicing
system
• Flight planning
• Flight dispatch
• Passenger handling
• Refuelling procedures
procedures
• Operational control
• A cabin fire
18.9 At the completion of the proving flight, the DGCA team will
meet to decide whether further proving flights are required and
the need for and extent of corrective action required by the AOP
applicant. The DGCA team shall assess the AOP applicant against
one of the three outcomes listed below.
The DGCA team will then meet with the AOP applicant to discuss
the outcome and the resolution of any deficiencies found.