Professional Documents
Culture Documents
500
Public Service Board Pag e 1 of 6
_____________________________________________________
(Interconnecting Utility)
An application is a Complete Application when it provides all applicable and correct information
required below. (Additional information to evaluate a request for Interconnection may be
required pursuant to the application process after the application is deemed complete).
Processing Fee:
There is a $300 Application fee that must be submitted to the Interconnection Utility along with
this Application.
Name: _______________________________________________________________________
D. For generators installed at locations with existing electric service to which the proposed
generator will interconnect, provide:
___________________________________ _______________________________
(Local Electric Service Provider*) (Existing Account Number*)
All data collected in Sections 2, 3, and 4 are applicable only to the generator facility, NOT
the necessary interconnection facilities
Energy source: _____ Solar ______ Wind ______ Hydro _____ Type (e.g. Run-of-River)
_____ Diesel _____Natural Gas ______ Fuel Oil Other (state type) __________________
List components of the Generating Facility that are currently certified by a U.S. Department of
Energy-approved laboratory and/or listed by the Underwriters Laboratory:
Generator (or solar collector) Manufacturer, Model Name & Number: _________________
Version Number: ________________________________
Nameplate Output Power Rating in kW: (Summer) _____________ (Winter) ___________
Nameplate Output Power Rating in kVA: (Summer) ____________ (Winter) ___________
Nameplate Output Power Rating: ______ kW @ _____oC temp. rise above ambient ______oC
Nameplate Output Power Rating: ______ kVA @ _____oC temp. rise above ambient ______oC
Individual Generator Power Factor
Rated Power Factor Leading: _______________________
Rated Power Factor Lagging: _______________________
Total Number of Generators in Wind Farm to be interconnected pursuant to this application:
_______________
Elevation: _______________Single phase: ___________ Three phase: ___________
Inverter Manufacturer, Model Name & Number (if used): ________________________
List of Adjustable Set points for the protective equipment or software: _________________
Effective: September 10, 2006 Vermo nt Attachment 1 to Rule 5.500
Public Service Board Pag e 4 of 6
[Note: For Wind Generators not reasonably expected to be eligible for Fast Track, a completed
General Electric Company Power Systems Load Flow (PSLF) data sheet must be supplied with
the application.]
Provide either a copy of the manufacturer's block diagram or appropriate IEEE model block
diagram of excitation system, governor system and power system stabilizer (PSS) in accordance
with the regional reliability council criteria. A PSS may be determined to be required by
applicable studies.
Effective: September 10, 2006 Vermo nt Attachment 1 to Rule 5.500
Public Service Board Pag e 5 of 6
Will a transformer be used between the generator and the point of interconnection? ____ Yes
_____ No
If Three Phase:
Transformer Primary: ________ Volts _____ Delta ______ Wye ______ Wye Grounded
Transformer Secondary: ________ Volts _____ Delta _____ Wye _____ Wye Grounded
Transformer Fuse Data (optional - Interconnection Requester may work with Interconnecting
Utility to properly size any fuses at the Point of Interconnection):
(Attach copy of fuse manufacturer's Minimum Melt & Total Clearing Time-Current Curves)
Manufacturer: ____________ Type: ________ Load Rating: ____ Interrupting Rating: ______
Trip Speed: _________
(Amps) (Amps)
(Cycles)
Enclose copy of site electrical One-Line Diagram showing the configuration of all generating
facility equipment, current and potential circuits, and protection and control schemes.
Is one-line diagram enclosed? _________ Yes
[Note: This one-line diagram must be signed and stamped by a licensed Professional Engineer if
the generating facility is larger than 150 kW.]
Enclose copy of any site documentation that indicates the precise physical location of the
proposed generating facility (e.g., USGS topographic map or other diagram or documentation).
Enclose copy of any site documentation that describes and details the operation of the protection
and control schemes. Is any available documentation enclosed? ______________ Yes
Enclose copies of schematic drawings for all protection and control circuits, relay current
circuits, relay potential circuits, and alarm/monitoring circuits (if applicable).
Are schematic drawings enclosed? ___________________ Yes
Enclose documentation of site control, showing at least one of the following: (a) ownership of, a
leasehold interest in, or a right to develop a site for the purpose of constructing a Generation
Resource; (b) an option to purchase or acquire a leasehold site for such purpose; or (c) an
exclusivity or other business relationship between the Generation Resource and the entity having
the right to sell, lease or grant the Generation Resource the right to possess or occupy a site for
such purpose.
I hereby certify that, to the best of my knowledge, all the information provided in the
Interconnection Application is true and correct.