LOGO DOCUMENT General-Q-TB-xxx.

revA
Origin doc. : Q-TB-rev.A
TOOLBOX MEETING QUALITY Page … of ….

Date : ...................................
Toolbox coordinator : ...................................
Project: Starting work induction
Issues: Contractors induction
Starting work on (company) sites:
- First, before any other action, step up in the blue office for induction
toolbox.
Personal Protective Equipment (PPE):
- Overalls.
- Safety footwear
- Safety helmet (when operate the overhead cranes).
- Glasses, hearing protection, respirators to be worn when required.
No exception from wearing PPE for those jobs that ”only take a few minutes”!
If it cannot be done safely, then do not do it! Consult (company) supervisor.
Operating overhead cranes and forklifts:
- Employees operating forklifts, overhead cranes must be specially trained
and certified before driving/operation the equipment. Only (company)
personal are allowed to operate these equipments on (company) site.
- Passengers are not allowed on forklifts.
Work at heights:
- Be sure that a valid scaffolding tag confirming ready/safe to use is present
on the scaffolds
Colors codes for ladders and hoisting equipments:
- Ladders - black tag (for 2017)
- Hoisting equipment’s - maroon tag (for first quarter of 2017)
- If there is no tag, or the color then is not correct– do not use it.
Emergencies:
- Raise alarm by notifying one of the (company) supervisors.

-On hearing alarm (air horn, bell or siren) assemble to near the
entrance gate on the street.
Utilization of (company) materials, tools and equipment’s
Do not waste materials (plates, tubes, profiles, etc).If is not good place it back in stock, don’t
scrap it!
USE EACH TOOL ONLY FOR THE JOB IT WAS DESIGNED TO DO!
Keep tools in good condition. Protect them from rust, nicks, burrs, and breakage.
Anyone infringing these requirements will be subject to disciplinary procedures
which may result in DISMISSAL from (company) sites!

Name Signature Name Signature

Note on doc. nr. : - First part to fill in is project number or in case of general importance use “general”.
- Second part to fill in is numeration of toolbox for this project or general use.
LOGO DOCUMENT General-Q-TB-xxx.revA
Origin doc. : Q-TB-rev.A
TOOLBOX MEETING QUALITY Page … of ….

Note on doc. nr. : - First part to fill in is project number or in case of general importance use “general”.
- Second part to fill in is numeration of toolbox for this project or general use.