You are on page 1of 1

MoM:

- Please synchronize the pipe routing and length with civil engineers
- Please confirm the Duri Vent system vent dispersion analysis
- Please complete the simulation case (complied)
- Please clarify the instrument air requirement and instrument air
tie in location
- Every tie in demand calculation must be done ASAP
-

You might also like