Professional Documents
Culture Documents
sing
4,90
NT - 0 SD
N o. 4 O R A C L E - S A P NEWS N O V E M B E R 1 9 9 9 see -Use
16,6 page r on
worl 40 SD- 8
d rec U
ord - ser on U
more NIX
on p ,
age
8
Business
base technology. The 64-bit technology enables ment Pack for SAP R/3 builds on Oracle
computer systems to be faster and be more man- Enterprise Manager’s host and database
ageable. Available on a number of hardware management infrastructure, making
systems, this technology also enables customers SAP environments much easier to ma-
to increase their database size to multiple tera-
bytes. Because of added memory capacity, the Oracle8i –The Database nage. Administrators will now be able
to monitor different R/3 platforms, R/3
databases and R/3 applications from
for SAP Business
number of concurrent users allowed to run
against the database increases exponentially as one single console. All this results in
Information WarehouseTM
well. lower administrative costs and increased
administrator productivity.
SAP has developed a solution package, Ready-to- The Oracle Warehouse Integrator (OWI) for
Run R/3,™ that is especially adapted to the requi- SAP R/3 provides an easy-to-use interface to the
rements of small and mid-sized businesses. With SAP data repository, integrating the R/3 system
the objective of considerably reducing the intro- as a data source to an Oracle data warehouse.
duction and implementation phase and minimi-
zing the administration needs of R/3 solutions, Customers can utilize the full range of Oracle
SAP and its partners have put together a pre-in- warehousing technology, while taking advantage
stalled, pre-configured packaged solution. This of SAP-certified interfaces to access R/3 metadata
High Availability Solution solution makes it easier, quicker and more eco-
nomical for small and midsized businesses to
and generate SAP-certified BAPI calls and SQL
code to extract data from SAP R/3.
for NT – Oracle Fail Safe introduce the R/3 solution. Oracle is one of the
databases currently available with the SAP The OWI for SAP R/3 enables customers to:
for SAP R/3 Ready-to-Run R/3 solution. The Oracle and SAP
components have been optimized to work to-
• View the SAP data-dictionary – providing acc-
ess to English definitions of table and column
gether and with special configuration files and names from the original German-language
database procedures operation of the Oracle data- abbreviations
High availability is one of the key demands of base is largely automated. Customers can now • Browse SAP's Business Objects Repository
SAP R/3 customers – regardless of the hardware benefit from Oracle’s industry-leading database (BOR)
and operating system used. As the central node with solutions from Compaq, Hewlett-Packard, • Extract, using the Remote Function Call facility
of the R/3 system’s three-tier architecture, the IBM, Siemens-Nixdorf and NCR. • Support SAP's BAPIs
database server plays an important role in high
Using metadata-driven design and generation,
Services
availability and fail-safe operations. Oracle offers
an excellent high availability solution, called Oracle Consulting Services the OWI for SAP R/3 reduces the risk, cost and
time required to develop and maintain extracts
Oracle Fail Safe to companies which run their
from SAP for an Oracle data warehouse.
R/3 applications on NT.
The foundation for setting up a failsafe database
for SAP R/3 Customers
server system on NT is to configure two NT ser-
vers as two nodes of a cluster. Each of the two
nodes possesses its own, dual-ported disk sub-
Oracle offers extensive R/3 database services for
system, to which each node has exclusive access
SAP customers. The expertise available has deve-
during normal operations. An Oracle Fail Safe
loped through day-to-day work with R/3 solutions
R/3 configuration defines one of the two nodes as
at SAP, and it ensures that you receive the best
the production system, to which all the R/3
possible support for running your R/3 solution
application servers are connected. The second
smoothly. Through the Oracle Center of Excel-
node of the cluster serves as the fail-safe node,
lence for SAP, Oracle Consulting offers a com-
but can also perform other tasks in the meantime.
prehensive set of services including core techno-
In case of failure of the production database server, logy consulting, workshops, also migration and
Oracle Fail Safe immediately switches all neces- integration services.
sary resources from the production node to the
secondary cluster node, and restarts the Oracle Core Technology Consulting offers expertise in
instance there.The R/3 application servers auto- the areas of performance optimization, Oracle
matically establish a new database connection to Parallel Server, hot standby databases, table setup
and reorganization especially for management of Leveraging the Performance and Scalability of
the Oracle instantly on the failsafe node, without
very large databases, and backup/restore/recovery Oracle8i
requiring intervention by the end user or database
administrator. for mission critical systems. Workshop themes A data warehouse capable of providing quality
include R/3 specific standard and customized analysis for the kind of Business Intelligence and
“We are pleased with the high availability, training for database administrators . Decision Support necessary to enhance your com-
robustness and ease of use of the Oracle Fail petitive position relies on both scalability and
Safe database solution. In SAP stress tests Migration Services are available for companies performance. Oracle8i offers both features, conti-
with up to 300 users, the Oracle8 Fail Safe which want to migrate their SAP R/3 installation nuing the tradition of ongoing advancement in
database was up in a minute after both plan- from a non-Oracle database to Oracle. anticipation of marketplace demands, and the
ned and unplanned failovers,” ever-increasing requirements of data warehousing.
Integration Services provide tools and services
said Karl-Heinz Hess, Member of the Extended for accessing R/3 data. Customers can create data- Now you can leverage Oracle8i’s new functiona-
board of SAP AG. “SAP customers immediately base links to access R/3 tables from other appli- lity in several major areas directly related to the
benefit from this highly-available, cost-effective cations. The Oracle Center of Excellence for SAP demands of data warehousing, among them:
solution.” Oracle Fail Safe is included in every has also created an interface to connect directly to • Summary Management
Oracle database license for R/3 on NT from the R/3 applications, enabling customers to con- • Performance Improvements
Oracle7 Release 7.3.3 onwards, and is supported stantly write to and read from the database. This • Data Management
• Data-Movement Infrastructure
from R/3 Release 3.1G and later , including R/3
Release 4.0 and 4.5 with Oracle8.
interface is called the Oracle Transactional Bridge
for SAP. 3
Built on the foundation of Oracle8i, the Oracle After extensive evaluations, Goodyear selected
family of warehouse products includes Oracle HP as its hardware vendor. “We were impressed
Warehouse Builder (OWB), an integrated system by HP’s strong regional presence and local sup-
for design, implementation and ongoing mana- port capabilities,” he said. “Our evaluations also
gement of enterprise data-warehouse and data- showed that HP and SAP was a proven combi-
mart solutions; and Oracle Discoverer and Oracle nation.”
Express server and tools for reporting, querying,
and analyzing metadata. The scalability of HP NetServers was also a cri-
tical success factor in the regional deployment.
Management tasks, including generating and For example, Goodyear Malaysia uses two HP
building the warehouse, scheduling jobs, crea- NetServer LX Pro. The multi-CPU systems are
ting extracts, viewing job status, and restarting based on Pentium Pro processors. Similar systems
jobs, are all managed via the Oracle Enterprise were installed in Japan. In India, Goodyear bro-
Manager (OEM). ught in the country’s first HP NetServer LXr
8000 system with the latest Pentium III Xeon
processor.
Goodyear’s
“The scalability of the NetServers allowed us to
use the latest processors available, and still leave
room to grow to future processors as our needs
HP’s scalable NetServers win the day at dictate,” said Mr Wronkovich. “Our experience
running the HP NetServer LX Pro for 150 users
shows that the performance has been good. The
Goodyear’s Asiawide project Xeon processor will give us enough headroom to
grow for the next three years, but we’re also exci-
ted about the forthcoming Merced processor.”
Pall Mall
The IT Infrastructure
to Spur Growth of Rothmans of Pall Mall With that choice made, Rothmans was able to
When United Automotive Electronic Systems what’s more, SAP R/3 on Oracle was the only
and nation-wide implementations – is not with- was founded in 1996, the managers of the young one to offer a full Chinese version.” One of
out its inherent risks. “To manage these risks, we enterprise proved both foresight and determina- UAES’main assets are its highly qualified staff,
insisted on a Risk Mitigation Plan (RMP) which tion to meet and exceed market requirements. As however, “we did not have enough expertise to
anticipates problems and minimises them,” said General Manager You Yichen says, “Quality, do the implementation all by ourselves. We deci-
Mr Grasso. “our board of Directors signed off the Service and Price” were identified as the three ded to work with experienced consultants from
Service Level Agreements (SLAs) which together critical factors to make the Sino-German Joint Siemens Nixdorf to help us with the modeling of
with the RMP forms an important part of the Venture the market leader in its field. UAES’- our business processes and the implementation
vendor contracts.” Indeed, Rothmans” foresight renowned parents are Zhong-Lian Automotive itself,” says Thomas Schoenenberg. Siemens
in establishing SLAs, which link to the RMP, Electronics Co, Ltd., member of the SAIC group, Nixdorf, which is wholly owned by Siemens, has
prevented any major problems. Two weeks before and Robert Bosch GmbH. been the very first SAP implementation partner
the systemÕs cutover, a major fault occurred in in China and possesses comprehensive consulting
one of the systems. Foreseeing the impact, HP “We produce world-class Engine Management experience in various industries, especially in
was able to nip the problem in the bud before it Systems which not only improve the engine’s manufacturing. It was also the only SAP partner
eventuated and averted any potential disasters. performance but also reduce fuel consumption with a proven track record for full scale imple-
“In spite of this, HP recognised our anxiety to get and pollution”, adds Thomas Schoenenberg, mentation services.
the project done on schedule, and corrected the First Deputy General Manager. “With Chinese Furthermore, Siemens Nixdorf was able to offer
problem on its own accord,” Mr Grasso recalled. regulations for environmental protection approa- UAES a total solution, including high-perfor-
“HP showed genuine goodwill and respect, and ching the strict European norm, we are well pre- mance Primergy 560 and 760 NT servers.
shared our commitment to make our project a pared to meet the demands of the growing auto- The fact that UAES had just recently been foun-
success.” “To me, this was partnership at it’s best.” motive sector.” The Pudong-based high-tech ded and did not have firmly established business
enterprise is the automotive parts enterprise processes, yet turned out to be an advantage: “We
Making a Big Difference with largest investment ever in China and has did not need to do any business process reen-
Project ASAS will make its impact felt at the been listed as one of the key development pro- gineering, but had the possibility to get a fresh
very core of Rothmans’ business, especially in its jects in Shanghai. But UAES’management also start,” says Project Manager Wu Ying.
ability to access and manage information. “The knew that high-tech products alone will not Which was UAES’ approach to R/3 implementa-
most visible impact will be in our ability to shor- guarantee success in an increasingly complex tion?
ten the closing of our monthly accounts – from environment. “Only quality management can Schoenenberg: “Since we did not have much
seven days to only one and a half days,” said Mr ensure good service and quality products. This is experience, we asked our Siemens Nixdorf con-
Grasso. “This means faster reporting and conso- why we decided to use state-of-the-art Enter- sultants to ‘take us by the hand’. We wanted to
lidation across all levels of the organisation.” The prise Resource Planning software to increase keep everything simple in the first step in order
new IT infrastructure will also enable Rothmans transparency and efficiency of our operations,” to allow for ‘learning by doing’. Our plan is to
to exchange information more effectively with continues Schoenenberg. After rigorous evaluati- expand the use of more advanced functionalities
all its offices throughout the country. This will on of available software packages, UAES decided as we learn more about the system.”
enable managers at the head office to see the per- to go for SAP R/3 on Oracle8. What was the rea- In the first phase, modules FI, CO, SD and MM
formance of each business unit or territory in son? “It’s easy: We want to be the market leader, and PP are implemented for the baseline busin-
real-time. “With greater integration of our busi- that’s why we chose the market leader. And SAP ess processes. Additionally, PM and QM will be
ness processes and timely information, we can R/3 on Oracle may be more expensive, but all introduced in Phase 2. UAES’ additional plants
make more accurate and in-depth analyses of our other packages have limited functionalities in Wuxi and Xi’an will also be included in the
sales performance based on up-to-the-minute which would not have supported all of our pro- R/3 rollout after the pilot project in Shanghai
6 information,” said Mr Grasso. cesses,” explains the General Manager. “And, has been completed.
Imperial
The FI/CO modules were prepared in just two
months and have been productive since January Imperial Tobacco Ltd.
1998. On June 30th, UAES celebrated its “Ready
to go Live” ceremony, where sample workflows
such as the creation of a purchase order were
demonstrated to an interested audience. After
some additional user training, the actual “Go
live” was scheduled for September 1st, 1998.
“We are already benefiting from the improved
information flow. And with the whole system
productive, we will not only have an excellent
cost controlling tool, but many opportunities to
serve our customers even better,” says Wu Ying.
Which advice would General Manager You
Yichen give to other companies thinking about
using SAP R/3 on Oracle? “Do it, and pay much
attention to defining processes and customizing,
ensure top management commitment and make
sure everyone is on board.”
With SAP R/3 on Oracle up and running, plus
the ISO 9001 and ISO 14000 (environment) cer-
tificates which are currently being prepared,
UAES is also in an excellent starting position for
its planned growth. From currently over 400
employees, UAES plans to grow to more than
2500 staff, and to generate revenues of 700
Million RMB.
Oracle on Linux Even for the most profitable of companies, these times
hold the greatest of uncertainties. Shifting customer
Oracle7 (and soon to be Oracle8) database.
Oracle8 is the world’s leading universal data ser-
Linux
preferences, stiffening government regulations, ver, enabling simple, cost-effective, and reliable
Oracle8 for Linux for skyrocketing information demands – each alone network computing. ITL also makes extensive
SAP R/3 available could dampen the fire of corporate growth. Many use of Oracle’s Designer tools to design data-
of today’s most foresighted companies have leapt bases for complementary applications.
ahead of such stagnation by implementing the
robust power of an enterprise information mana- “The SAP and Oracle solution has
gement solution from SAP and Oracle. done Imperial Tobacco a great ser-
vice and will continue to help us
With a commanding two-thirds domestic market
move ahead.”
share, Imperial Tobacco Ltd. (ITL) handily ranks as
Canada’s largest tobacco company. Headquartered – Margret Nodwell, Implementation Services
in Montreal and with seven plants in Canada,
Manager, Imperial Tobacco Ltd.
ITL employs more than 2,000 people and earned
CA $800 million on CA $1.7 billion in 1998
revenues. Integrating that kind of heady success,
40,000 Linux Developers running on Oracle8
however – and preparing for even more to come Why Oracle and SAP
Leveraging their industry leadership positions – threatened to overwhelm the firm’s disparate
further to meet customer business requirements, “SAP people really knew their application and
information management systems.
Oracle Corp. and the Oracle/SAP Competence that gave us great confidence in the functionality,”
Center in Walldorf have announced this spring explained Paul Goyetche, Manager of Data and
Challenge Application Integration at ITL. “On a higher
that Oracle8 for Linux is available. Oracle also
opened Internet developer registration for Oracle8i ITL’s success had brought about the challenge of level, we also knew that SAP would help us
on Linux via the Oracle Technology Network managing ever-increasing volumes of information. streamline our business processes by replacing
(OTN), and announced that the first 20,000 In the past, ITL sometimes hired temporary help redundant systems and applications. When it
registrants will receive a free early access CD. to overcome the inefficiencies of its systems. This came to the database, Oracle’s engine offered the
Through this special offer OTN members can was getting more difficult to do. “We were at a most robust, most mature database management
register at http://technet.oracle.com and have point where hours of work became weeks of work system. We’ve never had a problem with Oracle
an Oracle8i on Linux CD shipped to them directly. and our information systems just couldn’t keep in three-and-a-half years. Oracle runs smoothly,
As part of the previously announced Oracle up with, much less integrate, our exceptional it’s like it’s not even there.”
Partner Program First-to-Market initiative for effort,” acknowledged Margret Nodwell, Imple-
independent software vendors (ISVs), SAP has mentation Services Manager for Imperial Tobacco Benefits
chosen the Oracle dataserver as one of their major Ltd. “With six distinct inventory systems, asking
Linux database platforms. Intensive tests at SAP for an inventory status would soon take a couple Reduced financial cycle time
with Oracle8 on Linux have confirmed Oracle’s of days. We simply had to fix our systems.”
Integrating data from throughout the company,
position as the leading provider of database pro- the new system has reduced the time needed to
ducts for the ERP market. The availability of Solution generate crucial management reports. This is
Oracle8 for SAP R/3 on Linux will allow custo- ITL integrated its systems by implementing the clearly seen in accounting. “Both our month-end
mers to choose a proven alternative operating SAP R/3 ERP suite of applications, including and year-end processing have been reduced dra-
system for their Intel-based database servers. It financial, materials management, payroll, HR, matically,” reported Goyetche. “Year end used to
expands the scalability of their SAP environment,
and increases performance and high availability.
and production planning. The solution gives more
than 800 users real-time access to a 180-gigabyte
take us well into February; now we’ve got it done
by mid-January.” 7
Imperial Tobacco Ltd. from Page 7
R/3 NT Benchmark UNIX SD Benchmark
DG Record
with Data General on
mproved Teamwork
Being able to share information has brought World Record 16,640
together formerly distant segments of the com-
pany. “We were a very divisional company,” ex-
Oracle 8 User with IBM on Oracle
plained Nodwell. “Everyone had their own
systems. Divisions now share any information
that will help us all to understand the business as
a big picture.” Record breaking results - surpassing 4,900 SD Oracle Corporation and IBM Corporation today
announced the highest performance results ever
Philadelphia, September 13, 1999 - Oracle has
Increased inventory accuracy for the SAP R/3 4.0 application suite running on
once again proven itself as the underlying high
The solution has eliminated redundancy and an UNIX server. 16,640 Sales & Distribution
performance database by beating previous per-
increased inventory accuracy. A single bill of users with 4,908.433 dialogsteps/hour and an
formance results for SAP R/3 with Data General
materials – instead of four – allows raw materials average response time of 1,9 seconds is the new
on an 8-way 8,900 platform.
to be inter changeable between products and fac- world leading benchmark.
tories. “There was time when our products sel- “These outstanding results demonstrate that the
dom changed, now they change often for market, This record-setting performance was made possi-
Oracle8 database on Data General provides the
regulatory, or quality reasons. The system has ble by IBM RS6000 S80 with 24 CPUs, CPU
maximum performance and scalability for SAP
simplified this transition.” type RS64 III and 32 MB total L2 cache on
R/3 solutions. This combination delivers the pro-
Oracle8.05.
ven reliability, scalability and flexibility deman-
Improved regulatory compliance ded by large SAP R/3 implementations,” said
“We are especially proud of this world record
Donald Haig, Vice President of Corporate
Keeping up with the government can be tough, benchmarks because compared to previous relea-
Accounts, Oracle Corporation. “Both the Oracle
but ITL is doing so more efficiently than ever. ses of SAP R/3, version 4.0 has a 30% higher
and Data General have worked together as a
“We’re closely regulated by both the federal and consumption rate and generates more load to the
seamless team to achieve this fantastic bench-
provincial governments,” concluded Nodwell. database. So the fact that we have a higher number
mark result,” Haig continued.
“We pay CA$3.5 billion in taxes and they want of users in this configuration proves onces again
to know exactly where it’s coming from – SAP that Oracle8 provides the scalability and high
The user number was achieved with SAP's R/3
on Oracle lets us get to information quickly and performance that SAP customers need”, said
Sales & Distribution (SD) standard application
reliably.” Donald Haig, Vice President of Corporate
benchmark running on Data General's AViiON
Accounts, Oracle Corporation.
enterprise servers using Intel's Pentium III Xeon
Increased vendor flexibility For more information ask at the Oracle booth
processors and Data General’s CLARiiON full
The new system’s ability to handle multiple lan- #515 or send an e-mail to orasapcc@de.oracle.com.
fibre channel storage solutions.
guages and currencies also allows ITL to pur-
chase globally. “The solution has facilitated pro-
curement, sped up billing, and helped in our
negotiations with vendors,” added Nodwell.
"We are also very pleased with this result of both
teams, and the value implications it has for
customers,” said Rich Clifton, Vice President of
Imprint
Imprint
Published by:
Applications Competency Centers at Data Oracle /SAP Competence Center
Increased MIS productivity General Corporation. “By applying the latest Altrottstr. 31
Oracle8i technology, our 8-way 8900 platform, 69190 Walldorf, Germany
The new R/3 system has also freed IT staff to Tel. ++49 (0) 6227-7 -31 252
spend less time programming and more time and our expertise in large ERP configurations, Fax ++49 (0) 6227-7 -31 299
analyzing the business. “We used to have a lot of we were able to set this significant new record
manual work interfacing and troubleshooting,” with a much smaller configuration. This result is Albrecht Haug
more than 8.6% higher than the previous best ahaug@de.oracle.com
detailed Goyetche. “Since we have eliminated Internet: http://www.oracle.com/st
more than half of our distinct systems, the NT result, and it was done with 1/3 fewer CPUs. http://www.sap.com/partner/index.htm
number of interfaces has reduced drastically. When coupled with the industry leading High
Additional Contributors to his issue:
Additionally, through SAP’s configuration, the Availability characteristics and performance gua- D. Bryant, Jürgen Führer, Donald Haig, Uwe Heinz,
user can customize things that formerly involved rantees we offer for this environment, we have Knut Hofmann, Jan Klokkers, Gerhard Kuppler,
now pushed cost effective computing based on Tom Stickler, Burkhard Thomas
changes at the programming level.”
Windows NT, Intel, and Oracle to new heights Translationservice,
of enterprise computing.” Falkner Translationservice, Munich, Roswitha Greig
Y2K saving Logistics:
Switching to a new R/3 solution saved ITL sig- Cretschmar Cargo, A. Lotzwick
Ask for more information at the Oracle booth at
nificant costs related to the Y2K bug. “Because Sapphire US, #515, Data General #332 or send Lithos by:
G+A Repro, Oeffingen
we were running on an old mainframe platform, an e-mail to orasapcc@de.oracle.com.
Y2K compliance threatened to become a huge Photos:
Photos on Page 2-8 from SAP archives, Uwe Heinz
problem,” relayed Goyetche “We figured that,
Printed by Gaiser GmbH, Schwaebisch Gmuend
by eliminating the lines of code that we would Printed on bleached, chlorine-free paper
have had to rewrite, we saved CA$15 million by Designed by:
being on SAP and Oracle. Gross Art, Stuttgart
Reproduction allowed only with the publishers
express permission
Oracle, Oracle8, Oracle8i, Oracle Express, Discoverer,
Designer, Developer, and the Oracle Logo are trademarks
or registered trademarks of Oracle Corporation.
SAP, R/3, and all SAP product names mentioned are used
for identification purposes only, and may Copyright©
Oracle Corporation 1999. All rights reserved.