Professional Documents
Culture Documents
Why do you use DDIC user not SAP* for Support Packs and SPam?
Do _NOT_ use neither DDIC nor SAP* for applying support packages.
Copy DDIC to a separate user and use that user to apply them.
on Unix:
$ for i in *.SAR; do SAPCAR -xvf $i; done
A "transactional RFC" means, that either both parties agree that the
data was correctly transfered - or not. There is no "half data transfer".
What is the use of Trusted system. I know that there is no need of UID
and PWD to communicate with partner system. In what situation it is
good to go for Trusted system ?
E. g. if you have an R/3 system and a BW system and don't want to
maintain passwords. Same goes for CRM and a lot of other
systems/applications.
But keep in mind, that it's not only a technical issue whether to switch
to asynchronous. The application must also be able to handle that
correctly.
There is a "delete" button when you define the queue. If you already
started the import it's no more possible since the system will become
inconsistent.
How to see when were the optimizer stats last time run? We are using
win2k, oracle 9, sapr346c.
Assumed DB=Oracle
Select any table lets take MARA here but you should do the same for
MSEG and few others to see whether the dates match or not.Run the
following command on the command prompt:-
This gives you a straight answer .Else you can always fish around in
DB14 for seeing when the optimzer stats were updated.
The value specifies the size of the roll area in bytes. The roll area is
one of several memory areas, which satisfies the user requests of user
programs. For technical reasons, however, the first 250 KB or so of a
user context are always stored in the roll area, further data
- up to the roll area limit ztta/roll_first,
- in the extended memory, up to the limit ztta/roll_extension or if
extended memory is exhausted, then
- again in the roll area, until the roll area is full, then
- in the local process area, up to the limit abap/heap_area_dia or
abap/heap_area_total or until the address space or the
swap space is exhausted.
An R/3 instance is a group of R/3 services that are started and stopped
as a unit (by an R/3 dispatcher) and have a common instance profile.
The name of an R/3 instance is composed of letters standing for the
relevant services, and an instance number which is unique for each
computer. The services may be D, V, E, B, M, G, or S, which
respectively stand for dialogue, update, enqueue, background,
message, gateway, and spool services.
This is a very generic question and really depends on what you are
implementing (modules).
What is mysap?
It's a term for all the systems that in a contract (e. g. a MySAP
business suite consist of ERP2005, CRM2005, SRM2005).
This also depends on what your are implementing, how many users
will work on the system, how many records in what area are created
etc.
What is ASAP?
How should I set priority for Printing say like user, teamlead, project
manager?
There's nothing like "priority" settings for spool processes. Just define
more (profile parameter rdisp/wp_no_spool) processes so people don't
need to wait.
Using Tc SGEN I have generated 74% job and later I have terminated
the job. I wish to start generating from where it stopped I have
refreshed but to no chance nothing was done. How should I further
proceed so as to complete the remaining job..
Start SGEN again and select the same you have selected before. It will
popup and ask if you want to start from scratch or generate the just
the remaining.
2.Incase, My sap system was down (Users are unable to login to sap
system) How to analyze this problem?
Check if all the services of SAP, Database, SAPOSCOL are up and
running.
check the wp status using dpmon.
Try restarting the workprocess., if that does not work., than try to kill
some of the jobs. Else., restart the application Server.
4.For example, my sap system having patch number was 8.I want to
apply patch 9 and 10.Mistakenly I will apply the patch directly 11
without
applying 9 and 10.How sap system will recognize this problem?
Firstly, the dependencies are checked. And without performing a test
import no BASIS consultant would import a support pack. If you did
that., than clear the OCS queue by running OCS_RESET_QUEUE in
SE37 than import SP9 and SP10. If it is JAVA stack than no need to
make changes you can directly apply SP11.
10.What is the latest version of sap kernel? Can u give me the list of
kernel versions?
service.sap.com/swdc
710 (Demo version is available)
700
640
620
610 (WEB AS was introduced in this version)
4.6D
4.5
4.0
3.1
3.0
11.what are the prerequisite for before applying support packs? Shall I
apply sap basis patch to all the system, like BW, ABAP, HR, etc.
Dependency check.... check if the new SP to be installed has any
dependent coponents in any of the other SP's.
You must implement different SP's for different components in SAP.
17.When applying a support pack to sap system. Can you tell me what
are errors you are faced?
25.Can you tell me the path in service market place for download
support packs and kernel?
service.sap.com/swdc
Presentation Interface.
Database Interface.
Presentation Interface.
Database Interface.
9. Explain about the two services that are used to deal with
communication.
Roll and page areas are SAP R/3 buffers used to store user contexts
(process requests). The SAP dispatcher assigns process requests to
work processes as they are queued in the roll and page areas.
Roll area holds data from previous dialog steps and data that
characterize the user.
Presentation Layer.
Application Layer.
Database Layer.
Job Scheduling.
Job Processing.
Job Overview.
The union of all s/w components that are assigned to the same
databases is called as a SAP system.
The SAP Gateway process communicates with the clients based on the
TCP/IP Protocol.
V1 and V2. V1 must be processed before V2. But, we can have more
than one V2 logs.
An update request can be divided into one primary (V1) and several
Secondary update components (V2). Time-critical operations are
placed in V1 component and those whose timing is less critical are
placed in V2 components. If a V1 update fails, V2 components will not
be processed.
29. Dialog work processes perform only one dialog step and then
available for the next request.
31. Explain how SAP GUI handles output screen for the user.
The SAP front-end s/w can either run on the same computer or on
different computers provided for that purpose. User terminal input is
accepted by the SAP terminal program SAP GUI, converted to SAP
proprietary format and sent to the SAP dispatcher. The dispatcher
coordinates the information exchange between the SAP GUIs and the
work processes. The dispatcher first places the processing request in
request queues, which it then processes. The dispatcher dispatches
the requests one after another, to the available work process. The
actual processing takes place in the work process. When processing is
complete, the result of a work process is returned via the dispatcher to
the SAP GUI. The SAP GUI interprets the received data and generates
the output screen for the user.
General questions
SAP GUI
Where can we find the 4
files(saplogon.ini,sapmsg.ini,saproute.ini,sapdoccd.ini) of GUI at os
level(I mean in which directory)?
Latest Answer: All the files you can find in the system in which the SAP
is installed. The path to find these files is as follows.C:WINDOWS ...
Can SAP Patches be installed when other users are online?
Latest Answer: No. During patch implementation, the patch
manager updates some tables and programmes. If any user use that
programme or table, it cann't update those table or programme. So it
is better to apply patches when there is no user logged in the .
BACKUP QUESTIONS
/oracle
Directory holding redo logs if not in the /oracle structure
Weekly backup should be made for these OS specific directories:
Root
/etc
/dev
For Oracle, the entire /oracle directory should be backed up daily if
there is only one Oracle Instance on the server, and each separate
/oracle/<SID> directory if there is more than one instance on the
server.
It is also recommended that a full offline image of the entire server be
made before the monthly closing cycle.
The DEV and QAS Instances
Weekly backup should be made for these SAP specific directories:
/usr/sap/<SID>
/sapmnt/<SID>
Any directories containing flat files that are used by the SAP instance
Weekly backups should be made for these Oracle specific directories:
/oracle
Directory holding redo logs if not in the /oracle structure
Monthly backup should be made for these OS specific directories:
Root
/etc
/dev
For Oracle, the entire /oracle directory should be backed up daily if
there is only one Oracle Instance on the server, and each separate
/oracle/<SID> directory if there is more than one instance on the
server.
It is also recommended that a full offline image of the entire server be
made at the same time every month.