DIRECT MANPOWER PM1 PM2 PM3 PM4 PM5 PM6 PM7

Foreman Piping 3 5 5 6 8 8 8
Operator HDPE 6 6 6 6 6 6 6
Pipe Fitter 24 32 32 32 32 32 32
Operator Equipment 8 8 8 11 11 11 11
Rigger & Banksman 9 9 9 15 15 15 15
Unsklilled Worker 10 10 10 10 10 10 10
TOTAL 60 70 70 80 82 82 82

INDIRECT MANPOWER PM1 PM2 PM3 PM4 PM5 PM6 PM7


SITE MANAGER 1 1 1 1 1 1 1
PROJECT CONTROL 1 1 1 2 2 2 2
CONSTRUCTION ENGINEER 1 1 1 2 2 2 2
SUPERVISOR 2 2 2 3 3 3 3
SURVEYOR 1 1 1 1 1 1 1
DRAFTMAN 1 1 2 2 2 2 2
MATERIAL CONTROL 2 2 2 3 3 3 3
RIGGING SPV 1 1 1 2 2 2 2
SITE ADMINISTRATION 1 1 1 3 3 3 3
HSE OFFICER 2 2 2 2 2 2 2
HSE SPV 2 2 2 2 2 2 2
QC INSPECTOR 2 3 3 4 4 4 4
QA 1 2 2 2 2 2 2
TOTAL 18 20 21 29 29 29 29
PM8 PM9 PM10 PM11 PM12 PM13 PM14 PM15 MP MM
8 8 8 10 10 10 10 3 10 110
6 12 12 12 12 12 12 4 12 124
32 32 32 56 56 56 56 16 56 552
11 11 11 12 12 12 12 5 12 154
15 15 15 15 15 15 15 5 15 197
10 10 10 20 20 20 20 6 20 186
82 88 88 125 125 125 125 39 125 1323

PM8 PM9 PM10 PM11 PM12 PM13 PM14 PM15 MP MM


1 1 1 1 1 1 1 1 1 15
2 2 2 2 2 2 2 1 2 26
2 2 2 3 3 3 3 1 3 30
3 3 3 3 3 3 3 1 3 40
1 2 2 2 2 2 2 1 2 21
2 2 2 2 2 2 2 1 2 27
3 3 3 3 3 3 3 2 3 41
2 2 2 2 2 2 2 1 2 26
3 3 3 3 3 3 3 1 3 37
2 2 2 2 2 2 2 1 2 29
2 2 4 4 4 4 4 2 4 40
4 4 4 4 4 4 4 2 4 54
2 2 2 2 2 2 2 2 2 29
29 30 32 33 33 33 33 17 33 415
Mhr
25740
29016
129168
36036
46098
43524
309582

Mhr
3510
6084
7020
9360
4914
6318
9594
6084
8658
6786
9360
12636
6786
97110
JOBSITE MANPOWER SCH
PROJECT NAME :
BIDDER'S NAME : Green is Furmula Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4 5

1 A00 Process Direct Civil FOREMAN 0.0 Mhr 0.0


2 A00 Process Direct Civil PLATE WELDER 0.0 Mhr 0.0
3 A00 Process Direct Civil FITTER 0.0 Mhr 0.0
4 A00 Process Direct Civil PIPE WELDER 0.0 Mhr 0.0
5 A00 Process Direct Civil PIPE FITTER 0.0 Mhr 0.0
6 A00 Process Direct Civil SKILLED WORKER 0.0 Mhr 0.0
7 A00 Process Direct Civil UN-SKILLED WORKER 0.0 Mhr 0.0
8 A00 Process Direct Civil SCAFFOLDER 0.0 Mhr 0.0
9 A00 Process Direct Building BUILDING FOREMAN 0.0 Mhr 0.0
10 A00 Process Direct Building BUILDING SKILLED WORKER 0.0 Mhr 0.0
11 A00 Process Direct Building BUILDING UN-SKILLED WORKER 0.0 Mhr 0.0
12 A00 Process Direct Building MECHANICAL FOREMAN 0.0 Mhr 0.0
13 A00 Process Direct Building MECHANICAL SKILLED WORKER 0.0 Mhr 0.0
14 A00 Process Direct Building MECHANICAL UN-SKILLED WORKER 0.0 Mhr 0.0
15 A00 Process Direct Building ELECTRICAL FOREMAN 0.0 Mhr 0.0
16 A00 Process Direct Building ELECTRICAL SKILLED WORKER 0.0 Mhr 0.0
17 A00 Process Direct Building ELECTRICAL UN-SKILLED WORKER 0.0 Mhr 0.0
18 A00 Process Direct Steel FOREMAN 0.0 Mhr 0.0
19 A00 Process Direct Steel SKILLED WORKER 0.0 Mhr 0.0
20 A00 Process Direct Steel UN-SKILLED WORKER 0.0 Mhr 0.0
21 A00 Process Direct Steel WELDER 0.0 Mhr 0.0
22 A00 Process Direct Steel PAINTER 0.0 Mhr 0.0

377342495.xlsx / Form 6-1 Page 4 / 55


JOBSITE MANPOWER SCH
PROJECT NAME :
BIDDER'S NAME : Green is Furmula Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4 5

23 A00 Process Direct Equipment FOREMAN 0.0 Mhr 0.0


24 A00 Process Direct Equipment PLATE WELDER 0.0 Mhr 0.0
25 A00 Process Direct Equipment RIGGER 0.0 Mhr 0.0
26 A00 Process Direct Equipment SCAFFOLDER 0.0 Mhr 0.0
27 A00 Process Direct Equipment FITTER 0.0 Mhr 0.0
28 A00 Process Direct Equipment PIPE WELDER 0.0 Mhr 0.0
29 A00 Process Direct Equipment PIPE FITTER 0.0 Mhr 0.0
30 A00 Process Direct Equipment SKILLED WORKER 0.0 Mhr 0.0
31 A00 Process Direct Equipment UN-SKILLED WORKER 0.0 Mhr 0.0
32 A00 Process Direct Fired heater FOREMAN 0.0 Mhr 0.0
33 A00 Process Direct Fired heater PLATE WELDER 0.0 Mhr 0.0
34 A00 Process Direct Fired heater RIGGER 0.0 Mhr 0.0
35 A00 Process Direct Fired heater FITTER 0.0 Mhr 0.0
36 A00 Process Direct Fired heater PIPE WELDER 0.0 Mhr 0.0
37 A00 Process Direct Fired heater PIPE FITTER 0.0 Mhr 0.0
38 A00 Process Direct Fired heater BLASTER 0.0 Mhr 0.0
39 A00 Process Direct Fired heater PAINTER 0.0 Mhr 0.0
40 A00 Process Direct Fired heater RIGGER/INSULATORS 0.0 Mhr 0.0
41 A00 Process Direct Fired heater SCAFFOLDER 0.0 Mhr 0.0
42 A00 Process Direct Fired heater SKILLED WORKER 0.0 Mhr 0.0
43 A00 Process Direct Fired heater UN-SKILLED WORKER 0.0 Mhr 0.0
44 A00 Process Direct Tank FOREMAN 0.0 Mhr 0.0

377342495.xlsx / Form 6-1 Page 5 / 55


JOBSITE MANPOWER SCH
PROJECT NAME :
BIDDER'S NAME : Green is Furmula Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4 5

45 A00 Process Direct Tank PLATE WELDER 0.0 Mhr 0.0


46 A00 Process Direct Tank RIGGER 0.0 Mhr 0.0
47 A00 Process Direct Tank FITTER 0.0 Mhr 0.0
48 A00 Process Direct Tank PIPE WELDER 0.0 Mhr 0.0
49 A00 Process Direct Tank PIPE FITTER 0.0 Mhr 0.0
50 A00 Process Direct Tank BLASTER 0.0 Mhr 0.0
51 A00 Process Direct Tank PAINTER 0.0 Mhr 0.0
52 A00 Process Direct Tank RIGGER/INSULATORS 0.0 Mhr 0.0
53 A00 Process Direct Tank SCAFFOLDER 0.0 Mhr 0.0
54 A00 Process Direct Tank SKILLED WORKER 0.0 Mhr 0.0
55 A00 Process Direct Tank UN-SKILLED WORKER 0.0 Mhr 0.0
56 A00 Process Direct Piping FOREMAN 25,740.0 Mhr 2,340.0 702.0 1,170.0 1,170.0 1,404.0 1,872.0
57 A00 Process Direct Piping PLATE WELDER 0.0 Mhr 0.0
58 A00 Process Direct Piping OPERATOR EQUIPMENT 36,036.0 Mhr 2,808.0 1,872.0 1,872.0 1,872.0 2,574.0 2,574.0
59 A00 Process Direct Piping PIPE WELDER HDPE 29,016.0 Mhr 2,808.0 1,404.0 1,404.0 1,404.0 1,404.0 1,404.0
60 A00 Process Direct Piping PIPE FITTER 129,168.0 Mhr 13,104.0 5,616.0 7,488.0 7,488.0 7,488.0 7,488.0
61 A00 Process Direct Piping RIGGER 46,098.0 Mhr 3,510.0 2,106.0 2,106.0 2,106.0 3,510.0 3,510.0
62 A00 Process Direct Piping SKILLED WORKER 0.0 Mhr 0.0
63 A00 Process Direct Piping UN-SKILLED WORKER 43,524.0 Mhr 4,680.0 2,340.0 2,340.0 2,340.0 2,340.0 2,340.0
64 A00 Process Direct Electrical FOREMAN 0.0 Mhr 0.0
65 A00 Process Direct Electrical SKILLED WORKER 0.0 Mhr 0.0
66 A00 Process Direct Electrical UN-SKILLED WORKER 0.0 Mhr 0.0

377342495.xlsx / Form 6-1 Page 6 / 55


JOBSITE MANPOWER SCH
PROJECT NAME :
BIDDER'S NAME : Green is Furmula Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4 5

67 A00 Process Direct Electrical ELECTRICIAN 0.0 Mhr 0.0


68 A00 Process Direct Electrical ELECTRICAL TECH 0.0 Mhr 0.0
69 A00 Process Direct Electrical TESTING ENGINEER 0.0 Mhr 0.0
70 A00 Process Direct Instrument FOREMAN 0.0 Mhr 0.0
71 A00 Process Direct Instrument SKILLED WORKER 0.0 Mhr 0.0
72 A00 Process Direct Instrument UN-SKILLED WORKER 0.0 Mhr 0.0
73 A00 Process Direct Instrument INTRUMENT FITTER 0.0 Mhr 0.0
74 A00 Process Direct Instrument INSTRUMENT TECH 0.0 Mhr 0.0
75 A00 Process Direct Instrument TESTING ENGINEER 0.0 Mhr 0.0
76 A00 Process Direct Insulation FOREMAN 0.0 Mhr
77 A00 Process Direct Insulation RIGGER/INSULATORS 0.0 Mhr
78 A00 Process Direct Insulation UN-SKILLED WORKER 0.0 Mhr
79 A00 Process Direct Fireproofing FOREMAN 0.0 Mhr 0.0
80 A00 Process Direct Fireproofing RIGGER/INSULATORS 0.0 Mhr 0.0
81 A00 Process Direct Fireproofing UN-SKILLED WORKER 0.0 Mhr 0.0
82 A00 Process Direct Painting FOREMAN 0.0 Mhr 0.0 0.0 0.0
83 A00 Process Direct Painting BLASTER 0.0 Mhr 0.0
84 A00 Process Direct Painting PAINTER 0.0 Mhr 0.0
85 A00 Process Direct Painting SKILLED WORKER 0.0 Mhr 0.0
86 A00 Process Direct Painting UN-SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
1 A00 Process Direct Total FOREMAN 25,740.0 Mhr 2,340.0 702.0 1,170.0 1,170.0 1,404.0 1,872.0
2 A00 Process Direct Total BUILDING FOREMAN 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 7 / 55


JOBSITE MANPOWER SCH
PROJECT NAME :
BIDDER'S NAME : Green is Furmula Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4 5

3 A00 Process Direct Total BUILDING SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
4 A00 Process Direct Total BUILDING UN-SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
5 A00 Process Direct Total MECHANICAL FOREMAN 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
6 A00 Process Direct Total MECHANICAL SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
7 A00 Process Direct Total MECHANICAL UN-SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
8 A00 Process Direct Total OPERATOR EQUIPMENT 36,036.0 Mhr 2,808.0 1,872.0 1,872.0 1,872.0 2,574.0 2,574.0
9 A00 Process Direct Total PIPE FITTER 129,168.0 Mhr 13,104.0 5,616.0 7,488.0 7,488.0 7,488.0 7,488.0
10 A00 Process Direct Total WELDER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
11 A00 Process Direct Total PLATE WELDER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
12 A00 Process Direct Total PIPE WELDER HDPE 29,016.0 Mhr 2,808.0 1,404.0 1,404.0 1,404.0 1,404.0 1,404.0
13 A00 Process Direct Total SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
14 A00 Process Direct Total PAINTER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
15 A00 Process Direct Total BLASTER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
16 A00 Process Direct Total RIGGER 46,098.0 Mhr 3,510.0 2,106.0 2,106.0 2,106.0 3,510.0 3,510.0
17 A00 Process Direct Total RIGGER/INSULATORS 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
18 A00 Process Direct Total ELECTRICAL FOREMAN 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
19 A00 Process Direct Total ELECTRICAL SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
20 A00 Process Direct Total ELECTRICAL UN-SKILLED WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
21 A00 Process Direct Total ELECTRICIAN 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
22 A00 Process Direct Total ELECTRICAL TECH 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
23 A00 Process Direct Total TESTING ENGINEER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
24 A00 Process Direct Total INTRUMENT FITTER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 8 / 55


JOBSITE MANPOWER SCH
PROJECT NAME :
BIDDER'S NAME : Green is Furmula Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4 5

25 A00 Process Direct Total INSTRUMENT TECH 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
26 A00 Process Direct Total SCAFFOLDER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0 0.0
27 A00 Process Direct Total UN-SKILLED WORKER 43,524.0 Mhr 4,680.0 2,340.0 2,340.0 2,340.0 2,340.0 2,340.0

377342495.xlsx / Form 6-1 Page 9 / 55


ANPOWER SCHEDULE FOR DIRECT WORKERS
QUOTATION FOR

Yellow is KEY in Cell

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

377342495.xlsx / Form 6-1 Page 10 / 55


ANPOWER SCHEDULE FOR DIRECT WORKERS
QUOTATION FOR

Yellow is KEY in Cell

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

377342495.xlsx / Form 6-1 Page 11 / 55


ANPOWER SCHEDULE FOR DIRECT WORKERS
QUOTATION FOR

Yellow is KEY in Cell

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

1,872.0 1,872.0 1,872.0 1,872.0 1,872.0 2,340.0 2,340.0 2,340.0 2,340.0 702.0

2,574.0 2,574.0 2,574.0 2,574.0 2,574.0 2,808.0 2,808.0 2,808.0 2,808.0 1,170.0
1,404.0 1,404.0 1,404.0 2,808.0 2,808.0 2,808.0 2,808.0 2,808.0 2,808.0 936.0
7,488.0 7,488.0 7,488.0 7,488.0 7,488.0 13,104.0 13,104.0 13,104.0 13,104.0 3,744.0
3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 1,170.0

2,340.0 2,340.0 2,340.0 2,340.0 2,340.0 4,680.0 4,680.0 4,680.0 4,680.0 1,404.0

377342495.xlsx / Form 6-1 Page 12 / 55


ANPOWER SCHEDULE FOR DIRECT WORKERS
QUOTATION FOR

Yellow is KEY in Cell

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1,872.0 1,872.0 1,872.0 1,872.0 1,872.0 2,340.0 2,340.0 2,340.0 2,340.0 702.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 13 / 55


ANPOWER SCHEDULE FOR DIRECT WORKERS
QUOTATION FOR

Yellow is KEY in Cell

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2,574.0 2,574.0 2,574.0 2,574.0 2,574.0 2,808.0 2,808.0 2,808.0 2,808.0 1,170.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7,488.0 7,488.0 7,488.0 7,488.0 7,488.0 13,104.0 13,104.0 13,104.0 13,104.0 3,744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1,404.0 1,404.0 1,404.0 2,808.0 2,808.0 2,808.0 2,808.0 2,808.0 2,808.0 936.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 3,510.0 1,170.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 14 / 55


ANPOWER SCHEDULE FOR DIRECT WORKERS
QUOTATION FOR

Yellow is KEY in Cell

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2,340.0 2,340.0 2,340.0 2,340.0 2,340.0 4,680.0 4,680.0 4,680.0 4,680.0 1,404.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 15 / 55


QUOTATION FORM FORM-6

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-1 Page 16 / 55


QUOTATION FORM FORM-6

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-1 Page 17 / 55


QUOTATION FORM FORM-6

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-1 Page 18 / 55


QUOTATION FORM FORM-6

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 19 / 55


QUOTATION FORM FORM-6

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 20 / 55


QUOTATION FORM FORM-6

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-1 Page 21 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

1 A00 Process Indirect Civil MANAGER 0.0 Mhr 0.0


2 A00 Process Indirect Civil SUPERINTENDENT 0.0 Mhr 0.0
3 A00 Process Indirect Civil SUPERVISOR 0.0 Mhr 0.0
4 A00 Process Indirect Civil QA 0.0 Mhr 0.0
5 A00 Process Indirect Civil QC INSPECTOR 0.0 Mhr 0.0
6 A00 Process Indirect Civil SHES 0.0 Mhr 0.0
7 A00 Process Indirect Civil ENGINEER 0.0 Mhr 0.0
8 A00 Process Indirect Civil DRAFTSMAN 0.0 Mhr 0.0
9 A00 Process Indirect Civil MATERIAL 0.0 Mhr 0.0
10 A00 Process Indirect Civil ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
11 A00 Process Indirect Civil INDIRECT LABOR 0.0 Mhr 0.0
12 A00 Process Indirect Civil FOREMAN 0.0 Mhr 0.0
13 A00 Process Indirect Civil SCAFFOLDING WORKER 0.0 Mhr 0.0
14 A00 Process Indirect Civil OTHERS 0.0 Mhr 0.0
15 A00 Process Indirect Building MANAGER 0.0 Mhr 0.0
16 A00 Process Indirect Building SUPERINTENDENT 0.0 Mhr 0.0
17 A00 Process Indirect Building SUPERVISOR 0.0 Mhr 0.0
18 A00 Process Indirect Building QA 0.0 Mhr 0.0
19 A00 Process Indirect Building QC INSPECTOR 0.0 Mhr 0.0
20 A00 Process Indirect Building SHES 0.0 Mhr 0.0
21 A00 Process Indirect Building ENGINEER 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 22 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

22 A00 Process Indirect Building DRAFTSMAN 0.0 Mhr 0.0


23 A00 Process Indirect Building MATERIAL 0.0 Mhr 0.0
24 A00 Process Indirect Building ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
25 A00 Process Indirect Building INDIRECT LABOR 0.0 Mhr 0.0
26 A00 Process Indirect Building FOREMAN 0.0 Mhr 0.0
27 A00 Process Indirect Building SCAFFOLDING WORKER 0.0 Mhr 0.0
28 A00 Process Indirect Building OTHERS 0.0 Mhr 0.0
29 A00 Process Indirect Steel MANAGER 0.0 Mhr 0.0
30 A00 Process Indirect Steel SUPERINTENDENT 0.0 Mhr 0.0
31 A00 Process Indirect Steel SUPERVISOR 0.0 Mhr 0.0
32 A00 Process Indirect Steel QA 0.0 Mhr 0.0
33 A00 Process Indirect Steel QC INSPECTOR 0.0 Mhr 0.0
34 A00 Process Indirect Steel SHES 0.0 Mhr 0.0
35 A00 Process Indirect Steel ENGINEER 0.0 Mhr 0.0
36 A00 Process Indirect Steel DRAFTSMAN 0.0 Mhr 0.0
37 A00 Process Indirect Steel MATERIAL 0.0 Mhr 0.0
38 A00 Process Indirect Steel ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
39 A00 Process Indirect Steel INDIRECT LABOR 0.0 Mhr 0.0
40 A00 Process Indirect Steel FOREMAN 0.0 Mhr 0.0
41 A00 Process Indirect Steel SCAFFOLDING WORKER 0.0 Mhr 0.0
42 A00 Process Indirect Steel OTHERS 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 23 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

43 A00 Process Indirect Equipment MANAGER 0.0 Mhr 0.0


44 A00 Process Indirect Equipment SUPERINTENDENT 0.0 Mhr 0.0
45 A00 Process Indirect Equipment SUPERVISOR 0.0 Mhr 0.0
46 A00 Process Indirect Equipment QA 0.0 Mhr 0.0
47 A00 Process Indirect Equipment QC INSPECTOR 0.0 Mhr 0.0
48 A00 Process Indirect Equipment SHES 0.0 Mhr 0.0
49 A00 Process Indirect Equipment ENGINEER 0.0 Mhr 0.0
50 A00 Process Indirect Equipment DRAFTSMAN 0.0 Mhr 0.0
51 A00 Process Indirect Equipment MATERIAL 0.0 Mhr 0.0
52 A00 Process Indirect Equipment ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
53 A00 Process Indirect Equipment INDIRECT LABOR 0.0 Mhr 0.0
54 A00 Process Indirect Equipment FOREMAN 0.0 Mhr 0.0
55 A00 Process Indirect Equipment SCAFFOLDING WORKER 0.0 Mhr 0.0
56 A00 Process Indirect Equipment OTHERS 0.0 Mhr 0.0
57 A00 Process Indirect Fired heater MANAGER 0.0 Mhr 0.0
58 A00 Process Indirect Fired heater SUPERINTENDENT 0.0 Mhr 0.0
59 A00 Process Indirect Fired heater SUPERVISOR 0.0 Mhr 0.0
60 A00 Process Indirect Fired heater QA 0.0 Mhr 0.0
61 A00 Process Indirect Fired heater QC INSPECTOR 0.0 Mhr 0.0
62 A00 Process Indirect Fired heater SHES 0.0 Mhr 0.0
63 A00 Process Indirect Fired heater ENGINEER 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 24 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

64 A00 Process Indirect Fired heater DRAFTSMAN 0.0 Mhr 0.0


65 A00 Process Indirect Fired heater MATERIAL 0.0 Mhr 0.0
66 A00 Process Indirect Fired heater ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
67 A00 Process Indirect Fired heater INDIRECT LABOR 0.0 Mhr 0.0
68 A00 Process Indirect Fired heater FOREMAN 0.0 Mhr 0.0
69 A00 Process Indirect Fired heater SCAFFOLDING WORKER 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 25 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

70 A00 Process Indirect Fired heater OTHERS 0.0 Mhr 0.0


71 A00 Process Indirect Tank MANAGER 0.0 Mhr 0.0
72 A00 Process Indirect Tank SUPERINTENDENT 0.0 Mhr 0.0
73 A00 Process Indirect Tank SUPERVISOR 0.0 Mhr 0.0
74 A00 Process Indirect Tank QA 0.0 Mhr 0.0
75 A00 Process Indirect Tank QC INSPECTOR 0.0 Mhr 0.0
76 A00 Process Indirect Tank SHES 0.0 Mhr 0.0
77 A00 Process Indirect Tank ENGINEER 0.0 Mhr 0.0
78 A00 Process Indirect Tank DRAFTSMAN 0.0 Mhr 0.0
79 A00 Process Indirect Tank MATERIAL 0.0 Mhr 0.0
80 A00 Process Indirect Tank ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
81 A00 Process Indirect Tank INDIRECT LABOR 0.0 Mhr 0.0
82 A00 Process Indirect Tank FOREMAN 0.0 Mhr 0.0
83 A00 Process Indirect Tank SCAFFOLDING WORKER 0.0 Mhr 0.0
84 A00 Process Indirect Tank OTHERS 0.0 Mhr 0.0
85 A00 Process Indirect Piping MANAGER 3,510.0 Mhr 234.0 234.0 234.0 234.0 234.0
86 A00 Process Indirect Piping SUPERINTENDENT 0.0 Mhr 0.0
87 A00 Process Indirect Piping SUPERVISOR 15,444.0 Mhr 1,170.0 702.0 702.0 702.0 1,170.0
88 A00 Process Indirect Piping QA 7,020.0 Mhr 468.0 468.0 468.0 468.0 468.0
89 A00 Process Indirect Piping QC INSPECTOR 12,636.0 Mhr 936.0 468.0 702.0 702.0 936.0
90 A00 Process Indirect Piping SHES 16,146.0 Mhr 1,404.0 936.0 936.0 936.0 936.0

377342495.xlsx / Form 6-2 Page 26 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

91 A00 Process Indirect Piping ENGINEER 7,020.0 Mhr 702.0 234.0 234.0 234.0 468.0
92 A00 Process Indirect Piping DRAFTSMAN 6,318.0 Mhr 468.0 234.0 234.0 468.0 468.0
93 A00 Process Indirect Piping MATERIAL 9,594.0 Mhr 702.0 468.0 468.0 468.0 702.0
94 A00 Process Indirect Piping ACCOUNTANT/ SECRETARY/ CLERK 8,658.0 Mhr 702.0 234.0 234.0 234.0 702.0
95 A00 Process Indirect Piping INDIRECT LABOR 10,998.0 Mhr 936.0 468.0 468.0 468.0 702.0
96 A00 Process Indirect Piping FOREMAN 0.0 Mhr 0.0
97 A00 Process Indirect Piping SCAFFOLDING WORKER 0.0 Mhr 0.0
98 A00 Process Indirect Piping OTHERS 0.0 Mhr 0.0
99 A00 Process Indirect Electrical MANAGER 0.0 Mhr 0.0
100 A00 Process Indirect Electrical SUPERINTENDENT 0.0 Mhr 0.0
101 A00 Process Indirect Electrical SUPERVISOR 0.0 Mhr 0.0
102 A00 Process Indirect Electrical QA 0.0 Mhr 0.0
103 A00 Process Indirect Electrical QC INSPECTOR 0.0 Mhr 0.0
104 A00 Process Indirect Electrical SHES 0.0 Mhr 0.0
105 A00 Process Indirect Electrical ENGINEER 0.0 Mhr 0.0
106 A00 Process Indirect Electrical DRAFTSMAN 0.0 Mhr 0.0
107 A00 Process Indirect Electrical MATERIAL 0.0 Mhr 0.0
108 A00 Process Indirect Electrical ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
109 A00 Process Indirect Electrical INDIRECT LABOR 0.0 Mhr 0.0
110 A00 Process Indirect Electrical FOREMAN 0.0 Mhr 0.0
111 A00 Process Indirect Electrical SCAFFOLDING WORKER 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 27 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

112 A00 Process Indirect Electrical OTHERS 0.0 Mhr 0.0


113 A00 Process Indirect Instrument MANAGER 0.0 Mhr 0.0
114 A00 Process Indirect Instrument SUPERINTENDENT 0.0 Mhr 0.0
115 A00 Process Indirect Instrument SUPERVISOR 0.0 Mhr 0.0
116 A00 Process Indirect Instrument QA 0.0 Mhr 0.0
117 A00 Process Indirect Instrument QC INSPECTOR 0.0 Mhr 0.0
118 A00 Process Indirect Instrument SHES 0.0 Mhr 0.0
119 A00 Process Indirect Instrument ENGINEER 0.0 Mhr 0.0
120 A00 Process Indirect Instrument DRAFTSMAN 0.0 Mhr 0.0
121 A00 Process Indirect Instrument MATERIAL 0.0 Mhr 0.0
122 A00 Process Indirect Instrument ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
123 A00 Process Indirect Instrument INDIRECT LABOR 0.0 Mhr 0.0
124 A00 Process Indirect Instrument FOREMAN 0.0 Mhr 0.0
125 A00 Process Indirect Instrument SCAFFOLDING WORKER 0.0 Mhr 0.0
126 A00 Process Indirect Instrument OTHERS 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 28 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

127 A00 Process Indirect Insulation MANAGER 0.0 Mhr 0.0


128 A00 Process Indirect Insulation SUPERINTENDENT 0.0 Mhr 0.0
129 A00 Process Indirect Insulation SUPERVISOR 0.0 Mhr 0.0
130 A00 Process Indirect Insulation QA 0.0 Mhr 0.0
131 A00 Process Indirect Insulation QC INSPECTOR 0.0 Mhr 0.0
132 A00 Process Indirect Insulation SHES 0.0 Mhr 0.0
133 A00 Process Indirect Insulation ENGINEER 0.0 Mhr 0.0
134 A00 Process Indirect Insulation DRAFTSMAN 0.0 Mhr 0.0
135 A00 Process Indirect Insulation MATERIAL 0.0 Mhr 0.0
136 A00 Process Indirect Insulation ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
137 A00 Process Indirect Insulation INDIRECT LABOR 0.0 Mhr 0.0
138 A00 Process Indirect Insulation FOREMAN 0.0 Mhr 0.0
139 A00 Process Indirect Insulation SCAFFOLDING WORKER 0.0 Mhr 0.0
140 A00 Process Indirect Insulation OTHERS 0.0 Mhr 0.0
141 A00 Process Indirect Fireproofing MANAGER 0.0 Mhr 0.0
142 A00 Process Indirect Fireproofing SUPERINTENDENT 0.0 Mhr 0.0
143 A00 Process Indirect Fireproofing SUPERVISOR 0.0 Mhr 0.0
144 A00 Process Indirect Fireproofing QA 0.0 Mhr 0.0
145 A00 Process Indirect Fireproofing QC INSPECTOR 0.0 Mhr 0.0
146 A00 Process Indirect Fireproofing SHES 0.0 Mhr 0.0
147 A00 Process Indirect Fireproofing ENGINEER 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 29 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

148 A00 Process Indirect Fireproofing DRAFTSMAN 0.0 Mhr 0.0


149 A00 Process Indirect Fireproofing MATERIAL 0.0 Mhr 0.0
150 A00 Process Indirect Fireproofing ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
151 A00 Process Indirect Fireproofing INDIRECT LABOR 0.0 Mhr 0.0
152 A00 Process Indirect Fireproofing FOREMAN 0.0 Mhr 0.0
153 A00 Process Indirect Fireproofing SCAFFOLDING WORKER 0.0 Mhr 0.0
154 A00 Process Indirect Fireproofing OTHERS 0.0 Mhr 0.0
155 A00 Process Indirect Painting MANAGER 0.0 Mhr 0.0
156 A00 Process Indirect Painting SUPERINTENDENT 0.0 Mhr 0.0
157 A00 Process Indirect Painting SUPERVISOR 0.0 Mhr 0.0
158 A00 Process Indirect Painting QA 0.0 Mhr 0.0
159 A00 Process Indirect Painting QC INSPECTOR 0.0 Mhr 0.0
160 A00 Process Indirect Painting SHES 0.0 Mhr 0.0
161 A00 Process Indirect Painting ENGINEER 0.0 Mhr 0.0
162 A00 Process Indirect Painting DRAFTSMAN 0.0 Mhr 0.0
163 A00 Process Indirect Painting MATERIAL 0.0 Mhr 0.0
164 A00 Process Indirect Painting ACCOUNTANT/ SECRETARY/ CLERK 0.0 Mhr 0.0
165 A00 Process Indirect Painting INDIRECT LABOR 0.0 Mhr 0.0
166 A00 Process Indirect Painting FOREMAN 0.0 Mhr 0.0 0.0
167 A00 Process Indirect Painting SCAFFOLDING WORKER 0.0 Mhr 0.0
168 A00 Process Indirect Painting OTHERS 0.0 Mhr 0.0

377342495.xlsx / Form 6-2 Page 30 / 55


JOBSITE MANPOWER SCHEDULE FOR INDIREC

PROJECT NAME : Green is Furmula Cell


BIDDER'S NAME :
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

Personnel Name
Local/Expatriate

Country Name
Work Position
Organization
Staff/Worker

Company in

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category Position1 Total MM Unit
No
1 2 3 4

169 A00 Process Indirect MANAGER 3,510.0 Mhr 234.0 234.0 234.0 234.0 234.0
172 A00 Process Indirect QA 7,020.0 Mhr 468.0 468.0 468.0 468.0 468.0
173 A00 Process Indirect QC INSPECTOR 12,636.0 Mhr 936.0 468.0 702.0 702.0 936.0
174 A00 Process Indirect SHES 16,146.0 Mhr 1,404.0 936.0 936.0 936.0 936.0
178 A00 Process Indirect ACCOUNTANT/ SECRETARY/ CLERK 8,658.0 Mhr 702.0 234.0 234.0 234.0 702.0
175 A00 Process Indirect ENGINEER 7,020.0 Mhr 702.0 234.0 234.0 234.0 468.0
176 A00 Process Indirect DRAFTSMAN 6,318.0 Mhr 468.0 234.0 234.0 468.0 468.0
170 A00 Process Indirect SUPERINTENDENT 0.0 Mhr 0.0 0.0 0.0 0.0 0.0
171 A00 Process Indirect SUPERVISOR 15,444.0 Mhr 1,170.0 702.0 702.0 702.0 1,170.0
180 A00 Process Indirect FOREMAN 0.0 Mhr 0.0 0.0 0.0 0.0 0.0
177 A00 Process Indirect MATERIAL 9,594.0 Mhr 702.0 468.0 468.0 468.0 702.0
181 A00 Process Indirect SCAFFOLDING WORKER 0.0 Mhr 0.0 0.0 0.0 0.0 0.0
179 A00 Process Indirect INDIRECT LABOR 10,998.0 Mhr 936.0 468.0 468.0 468.0 702.0
182 A00 Process Indirect OTHERS 0.0 Mhr 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-2 Page 31 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 32 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 33 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 34 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 35 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0

1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 468.0
468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0
936.0 936.0 936.0 936.0 936.0 936.0 936.0 936.0 936.0 936.0 468.0
936.0 936.0 936.0 936.0 936.0 1,404.0 1,404.0 1,404.0 1,404.0 1,404.0 702.0

377342495.xlsx / Form 6-2 Page 36 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

468.0 468.0 468.0 468.0 468.0 468.0 702.0 702.0 702.0 702.0 234.0
468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 234.0
702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 468.0
702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 234.0
702.0 702.0 702.0 702.0 936.0 936.0 936.0 936.0 936.0 936.0 468.0

377342495.xlsx / Form 6-2 Page 37 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 38 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 39 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

377342495.xlsx / Form 6-2 Page 40 / 55


HEDULE FOR INDIRECT WORKERS
QUOTATION FORM FORM-6

Yellow is KEY in Cell

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 234.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
936.0 936.0 936.0 936.0 936.0 936.0 936.0 936.0 936.0 936.0 468.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
936.0 936.0 936.0 936.0 936.0 1,404.0 1,404.0 1,404.0 1,404.0 1,404.0 702.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 234.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
468.0 468.0 468.0 468.0 468.0 468.0 702.0 702.0 702.0 702.0 234.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 468.0 234.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 468.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 702.0 468.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
702.0 702.0 702.0 702.0 936.0 936.0 936.0 936.0 936.0 936.0 468.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-2 Page 41 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 42 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 43 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 44 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 45 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 46 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 47 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 48 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

377342495.xlsx / Form 6-2 Page 49 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

0.0
0.0 0.0
0.0 0.0 0.0

377342495.xlsx / Form 6-2 Page 50 / 55


34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

377342495.xlsx / Form 6-2 Page 51 / 55


MOBILIZATION SCHEDULE FOR DIRECT CONSTRUCTIO

PROJECT NAME :
BIDDER'S NAME :
WORK CATEGORY: Green is Furmula Cell

PROJECT INFORMATION
AREA CODE WORK VOLUME

DESCRIPTION-3

DESCRIPTION-4

Work Position

Owner/Rental

Local / Import
Cost Peak Max
NO Revision Main Area
Category
Category CEQ Type Total Set Month Unit
No
1 2 3 4 5 6 7

106 A0 Infrastructure CEQ Temp Facility CRANE LESS THAN 100 TON 14.0 Set-Month 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

107 A1 Infrastructure CEQ Temp Facility CRANE MORE THAN 100 TON 0.0 Set-Month 0.0

108 A2 Infrastructure CEQ Temp Facility PILING MACHINE 0.0 Set-Month 0.0

109 A3 Infrastructure CEQ Temp Facility EXCAVATOR, LOADER, BULLDOZER 14.0 Set-Month 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

110 A4 Infrastructure CEQ Temp Facility DUMP TRUCK 0.0 Set-Month 0.0

111 A5 Infrastructure CEQ Temp Facility CARGO TRUCK 0.0 Set-Month 0.0

112 A6 Infrastructure CEQ Temp Facility CONCRETE MIXER 0.0 Set-Month 0.0

113 A7 Infrastructure CEQ Temp Facility CONCRETE PUMP 0.0 Set-Month 0.0

114 A8 Infrastructure CEQ Temp Facility WATER TANKER 0.0 Set-Month 0.0

115 A9 Infrastructure CEQ Temp Facility POWER GENERATOR 139.0 Set-Month 13.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0

116 A10 Infrastructure CEQ Temp Facility AIR COMPRESSOR 23.0 Set-Month 2.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0

117 A11 Infrastructure CEQ Temp Facility AIR BLOWER 0.0 Set-Month 0.0

118 A12 Infrastructure CEQ Temp Facility OTHERS 0.0 Set-Month 0.0

377342495.xlsx / Form 7-1 Page 52 / 55


CT CONSTRUCTION EQUIPMENT AND VEHICLES
QUOTATION FORM FORM-7

Yellow is KEY in Cell

CONSTRUCTION MONTH / WEEK

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

1.0 1.0 1.0 1.0 1.0 1.0 1.0

1.0 1.0 1.0 1.0 1.0 1.0 1.0

7.0 13.0 13.0 13.0 13.0 13.0 13.0 5.0

2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.0

377342495.xlsx / Form 7-1 Page 53 / 55


/ WEEK

43 44 45 46 47 48 49 50

0.0

377342495.xlsx / Form 7-1 Page 54 / 55


MOBILIZATION SCHEDULE FOR INDIRECT CONSTRUCTION EQUIPMENT AND VEHICLES

PROJECT NAME : QUOTATION FORM FORM-7


BIDDER'S NAME : Green is Furmula Cell Yellow is KEY in Cell
WORK CATEGORY:

PROJECT INFORMATION
AREA CODE WORK VOLUME

DESCRIPTION-3

DESCRIPTION-4

Work Position

Owner/Rental

Nationality
Cost Peak Max
NO Revision Main Area
Category
Category CEQ Type Total Set Month Unit
No
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

1 A00 CEQ Summary Men Transportation SEDAN 15.0 Set-Month 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2 A00 CEQ Summary PICK-UP 26.0 Set-Month 2.0 1.0 1.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 A00 CEQ Summary Micro Bus less 15 person 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 A00 CEQ Summary BUS 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5 A00 CEQ Summary Utility Support Water Tanker 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 A00 CEQ Summary Septic Car 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 A00 CEQ Summary Fuel Rolly 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 A00 CEQ Summary Material Handling Manitou 15.0 Set-Month 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 A00 CEQ Summary Crane less 50 ton 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 A00 CEQ Summary Tower Crane 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11 A00 CEQ Summary Over 50ton Crane 0.0 Set-Month 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0