You are on page 1of 10

VALORIZACIÓN DE AVANCE DE OBRA Nº 0

CORRESPONDIENTE AL MES DE MAYO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 22 DE MAYO DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

01.00.00 OBRAS PROVISIONALES


01.01.00 CAMPAMENTO PROVISIONAL DE OBRA M2 400.00 24.58 9,832.00 0.00 0.00 0.00 0.00 0.00 400.00 9,832.00 100.00
01.02.00 CARTEL DE IDENTIFICACION DE OBRA UND 2.00 806.65 1,613.30 0.00 0.00 0.00 0.00 0.00 2.00 1,613.30 100.00
02.00.00 OBRAS PRELIMINARES
02.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 72,032.00 72,032.00 0.00 0.00 0.00 0.00 0.00 1.00 72,032.00 100.00
02.02.00 TRAZO Y REPLANTEO Km 3.90 1,812.51 7,068.79 0.00 0.00 0.00 0.00 0.00 3.90 7,068.79 100.00
02.03.00 ROCE Y LIMPIEZA DE QUEBRADAS (PONTONES Y ALCANTARILLAS) M3 280.00 12.55 3,514.00 0.00 0.00 0.00 0.00 0.00 280.00 3,514.00 100.00
03.00.00 EXPLANACIONES
03.01.00 CORTE EN MATERIAL COMPACTO NO CLASIFICADO M3 11,869.40 2.64 31,335.22 0.00 0.00 0.00 0.00 0.00 11,869.40 31,335.22 100.00
03.02.00 CONFORMACION DE TERRAPLENES M3 305.00 13.48 4,111.40 0.00 0.00 0.00 0.00 0.00 305.00 4,111.40 100.00
03.03.00 ELIMINACION DE MATERIAL EXCEDENTE M3 11,903.40 6.83 81,300.22 0.00 0.00 0.00 0.00 0.00 11,903.40 81,300.22 100.00
04.00.00 BASE
04.01.00 PERFILADO Y COMPACTACION DE SUBRASANTE M2 39,040.00 0.81 31,622.40 0.00 0.00 0.00 0.00 0.00 39,040.00 31,622.40 100.00
04.02.00 HABILITACION DE CANTERAS PARA BASE M2 1,925.00 1.43 2,752.75 0.00 0.00 0.00 0.00 0.00 1,925.00 2,752.75 100.00
04.03.00 EXTRACCION DE MATERIAL M3 13,200.00 6.10 80,520.00 0.00 0.00 0.00 0.00 0.00 13,200.00 80,520.00 100.00
04.04.00 CARGUIO Y TRANSPORTE M3 13,176.00 9.56 125,962.56 0.00 0.00 0.00 0.00 0.00 13,176.00 125,962.56 100.00
04.05.00 EXTENDIDO Y COMPACTACION DE MATERIAL M2 35,136.00 1.09 38,298.24 0.00 0.00 0.00 0.00 0.00 35,136.00 38,298.24 100.00
05.00.00 PAVIMENTO ASFALTICO e=3"
05.01.00 REPLANTEO DE EJES Y BOMBEO Km 3.90 1,812.51 7,068.79 0.00 0.00 0.00 0.00 0.00 3.90 7,068.79 100.00
05.02.00 LIMPIEZA PARA IMPRIMACION, IMPRIMACION Y ARENADO M2 35,136.00 7.97 280,033.92 0.00 0.00 0.00 0.00 0.00 35,136.00 280,033.92 100.00
DEL AREA IMPRIMADA.
05.03.00 RIEGO DE LIGA M2 35,136.00 1.70 59,731.20 0.00 0.00 0.00 0.00 0.00 35,136.00 59,731.20 100.00
05.04.00 CARPETA ASFALTICA EN CALIENTE DE 3" M2 35,136.00 14.07 494,363.52 0.00 0.00 0.00 0.00 0.00 35,136.00 494,363.52 100.00
05.05.00 TRANSPORTE DE MEZCLA ASFALTICA EN CALIENTE M3 2,811.23 19.45 54,678.42 0.00 0.00 0.00 0.00 0.00 2,811.23 54,678.42 100.00
05.06.00 EXTENDIDO CONFORMADO Y COMPACTADO, e=3" M2 35,136.00 2.16 75,893.76 0.00 0.00 0.00 0.00 0.00 35,136.00 75,893.76 100.00
06.00.00 OBRAS DE ARTE
06.01.00 ALCANTARILLAS
06.01.01 TRAZO Y REPLANTEO M2 352.80 2.69 949.03 0.00 0.00 0.00 0.00 0.00 352.80 949.03 100.00
06.01.02 EXCAVACION MANUAL NO CLASIFICADA PARA OBRAS M3 182.45 10.89 1,986.88 0.00 0.00 0.00 0.00 0.00 182.45 1,986.88 100.00
DE ARTE Y DRENAJE
06.01.03 RELLENO PARA ESTRUCTURAS M3 82.50 11.39 939.68 0.00 0.00 0.00 0.00 0.00 82.50 939.68 100.00
06.01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 120.48 146.56 17,657.55 0.00 0.00 0.00 0.00 0.00 120.48 17,657.55 100.00
06.01.05 PERFILADO Y COMPACTADO DE FONDO DE CAJA M2 133.95 2.04 273.26 0.00 0.00 0.00 0.00 0.00 133.95 273.26 100.00
06.01.06 CONCRETO f´c=210 kg/cm2 PARA MUROS Y PARAPETOS M3 8.23 274.78 2,261.44 0.00 0.00 0.00 0.00 0.00 8.23 2,261.44 100.00

Página 1 de 10
VALORIZACIÓN DE AVANCE DE OBRA Nº 0
CORRESPONDIENTE AL MES DE MAYO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 22 DE MAYO DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

06.01.07 CONCRETO CICLOPEO f´c=210 kg/cm2 + 25% P.M. M3 25.22 276.29 6,968.03 0.00 0.00 0.00 0.00 0.00 25.22 6,968.03 100.00
06.01.08 ACERO DE REFUERZO fy=4200 kg/cm2 KG 264.59 4.22 1,116.57 0.00 0.00 0.00 0.00 0.00 264.59 1,116.57 100.00
06.01.09 ENCOFRADO Y DESENCOFRADO EN ALCANTARILLAS M2 106.91 18.07 1,931.86 0.00 0.00 0.00 0.00 0.00 106.91 1,931.86 100.00
06.01.10 SUMINISTRO Y COLOCADO DE ALCANTARILLA TMC Ø=24" M 37.60 187.29 7,042.10 0.00 0.00 0.00 0.00 0.00 37.60 7,042.10 100.00
06.01.11 SUMINISTRO Y COLOCADO DE ALCANTARILLA TMC Ø=36" M 18.80 317.19 5,963.17 0.00 0.00 0.00 0.00 0.00 18.80 5,963.17 100.00
06.01.12 PINTADO DE PARAPETOS M2 5.04 5.61 28.27 0.00 0.00 0.00 0.00 0.00 5.04 28.27 100.00
06.02.00 CANAL DE IRRIGACION
06.02.01 TRAZO Y REPLANTEO M2 120.00 2.83 339.60 0.00 0.00 0.00 0.00 0.00 120.00 339.60 100.00
06.02.02 EXCAVACION SOLO PARA CIMENTACION M3 24.00 8.53 204.72 0.00 0.00 0.00 0.00 0.00 24.00 204.72 100.00
06.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE M3 28.80 8.40 241.92 0.00 0.00 0.00 0.00 0.00 28.80 241.92 100.00
06.02.04 PERFILADO Y COMPACTADO DE FONDO DE CANAL M2 8.00 2.04 16.32 0.00 0.00 0.00 0.00 0.00 8.00 16.32 100.00
06.02.05 CONCRETO f´c=210 kg/cm2 M3 26.01 274.78 7,147.03 0.00 0.00 0.00 0.00 0.00 26.01 7,147.03 100.00
06.02.06 CONCRETO CICLOPEO f´c=210 kg/cm2 + 70% P.M. M3 44.55 283.94 12,649.53 0.00 0.00 0.00 0.00 0.00 44.55 12,649.53 100.00
06.02.07 ACERO DE REFUERZO fy=4200 kg/cm2 KG 753.45 4.22 3,179.56 0.00 0.00 0.00 0.00 0.00 753.45 3,179.56 100.00
06.02.08 ENCOFRADO Y DESENCOFRADO M2 254.64 15.84 4,033.50 0.00 0.00 0.00 0.00 0.00 254.64 4,033.50 100.00
06.02.09 JUNTAS DE DILATACION e=1.5" M 7.89 5.27 41.58 0.00 0.00 0.00 0.00 0.00 7.89 41.58 100.00
06.03.00 CUNETAS
06.03.01 TRAZO Y REPLANTEO DE CUNETAS M2 2,880.00 0.76 2,188.80 0.00 0.00 0.00 0.00 0.00 2,880.00 2,188.80 100.00
06.03.02 CONCRETO f´c=210 kg/cm2 + 30% P.M. M3 494.00 277.95 137,307.30 0.00 0.00 0.00 0.00 0.00 494.00 137,307.30 100.00
06.03.03 ENCOFRADO Y DESENCOFRADO PARA CUNETAS M2 4,940.00 22.23 109,816.20 0.00 0.00 0.00 0.00 0.00 4,940.00 109,816.20 100.00
06.03.04 JUNTAS DE DILATACIÓN e=1.5" M 824.00 11.15 9,187.60 0.00 0.00 0.00 0.00 0.00 824.00 9,187.60 100.00
06.04.00 MUROS DE CONTENCION
06.04.01 TRAZO Y REPLANTEO M2 108.00 1.50 162.00 0.00 0.00 0.00 0.00 0.00 108.00 162.00 100.00
06.04.02 EXCAVACION MANUAL NO CLASIFICADA PARA ESTRUCTURAS M3 270.00 8.86 2,392.20 0.00 0.00 0.00 0.00 0.00 270.00 2,392.20 100.00
06.04.03 RELLENO PARA ESTRUCTURAS M3 88.00 29.07 2,558.16 0.00 0.00 0.00 0.00 0.00 88.00 2,558.16 100.00
06.04.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE M3 218.40 9.24 2,018.02 0.00 0.00 0.00 0.00 0.00 218.40 2,018.02 100.00
06.04.05 PERFILADO Y COMPACTACION PARA TERRENO DE M2 108.00 1.72 185.76 0.00 0.00 0.00 0.00 0.00 108.00 185.76 100.00
FUNDACION
06.04.06 CONCRETO CICLOPEO f´c=210 kg/cm2 + 70% P.M. M3 218.00 276.79 60,340.22 0.00 0.00 0.00 0.00 0.00 218.00 60,340.22 100.00
06.04.07 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION M2 480.00 19.79 9,499.20 0.00 0.00 0.00 0.00 0.00 480.00 9,499.20 100.00
06.05.00 PONTON PEATONAL
06.05.01 TRAZO Y REPLANTEO M2 142.08 1.50 213.12 0.00 0.00 0.00 0.00 0.00 142.08 213.12 100.00
06.05.02 EXCAVACION MANUAL NO CLASIFICADA PARA ESTRUCTURAS M3 52.80 8.86 467.81 0.00 0.00 0.00 0.00 0.00 52.80 467.81 100.00
06.05.03 RELLENO PARA ESTRUCTURAS M3 32.80 29.07 953.50 0.00 0.00 0.00 0.00 0.00 32.80 953.50 100.00

Página 2 de 10
VALORIZACIÓN DE AVANCE DE OBRA Nº 0
CORRESPONDIENTE AL MES DE MAYO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 22 DE MAYO DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

06.05.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE M3 24.00 9.24 221.76 0.00 0.00 0.00 0.00 0.00 24.00 221.76 100.00
06.05.05 CONCRETO CICLOPEO f´c=210 kg/cm2 + 70% P.G. M3 62.48 274.77 17,167.63 0.00 0.00 0.00 0.00 0.00 62.48 17,167.63 100.00
(CIM Y CUERPO)
06.05.06 ACERO DE REFUERZO fy=4200 kg/cm2 KG 1,564.12 4.22 6,600.59 0.00 0.00 0.00 0.00 0.00 1,564.12 6,600.59 100.00
06.05.07 ENCOFRADO Y DESENCOFRADO M2 146.76 19.79 2,904.38 0.00 0.00 0.00 0.00 0.00 146.76 2,904.38 100.00
06.05.08 CONCRETO f´c=210 kg/cm2 RECONSTRUCCIÓN M3 3.10 274.78 851.82 0.00 0.00 0.00 0.00 0.00 3.10 851.82 100.00
DE PARAPETOS
06.06.00 SUMIDEROS TRANSVERSALES
06.06.01 TRAZO Y REPLANTEO M2 35.00 1.50 52.50 0.00 0.00 0.00 0.00 0.00 35.00 52.50 100.00
06.06.02 EXCAVACION MANUAL NO CLASIFICADA PARA ESTRUCTURAS M3 17.50 8.86 155.05 0.00 0.00 0.00 0.00 0.00 17.50 155.05 100.00
06.06.03 CONCRETO f´c=210 kg/cm2 RECONSTRUCCION DE PARAPETO M3 11.14 274.78 3,061.05 0.00 0.00 0.00 0.00 0.00 11.14 3,061.05 100.00
06.06.04 ACERO DE REFUERZO fy=4200 kg/cm2 KG 445.07 4.22 1,878.20 0.00 0.00 0.00 0.00 0.00 445.07 1,878.20 100.00
06.06.05 ENCOFRADO Y DESENCOFRADO M2 246.59 22.23 5,481.70 0.00 0.00 0.00 0.00 0.00 246.59 5,481.70 100.00
06.06.06 RIELES PARA ARMADURA LONGITUDINAL M 132.00 31.50 4,158.00 0.00 0.00 0.00 0.00 0.00 132.00 4,158.00 100.00
06.06.07 PERNO DE 3/4" UND 384.00 2.84 1,090.56 0.00 0.00 0.00 0.00 0.00 384.00 1,090.56 100.00
06.07.00 BARANDAS METALICAS
06.07.01 TRAZO Y REPLANTEO M2 44.10 1.50 66.15 0.00 0.00 0.00 0.00 0.00 44.10 66.15 100.00
06.07.02 CONCRETO f´c=210 kg/cm2 M3 0.87 274.78 239.06 0.00 0.00 0.00 0.00 0.00 0.87 239.06 100.00
06.07.03 ACERO DE REFUERZO fy=4200 kg/cm2 KG 315.88 4.22 1,333.01 0.00 0.00 0.00 0.00 0.00 315.88 1,333.01 100.00
06.07.04 ENCOFRADO Y DESENCOFRADO M2 24.80 22.23 551.30 0.00 0.00 0.00 0.00 0.00 24.80 551.30 100.00
06.07.05 TUBERIA DE ACERO NEGRO Ø= 3" UND 40.00 91.83 3,673.20 0.00 0.00 0.00 0.00 0.00 40.00 3,673.20 100.00
06.07.06 PINTURA EN BARANDAS METALICAS M 240.00 4.81 1,154.40 0.00 0.00 0.00 0.00 0.00 240.00 1,154.40 100.00
06.08.00 BUZONES
06.08.01 REPOSICION TAPA DE BUZON UND 17.00 91.77 1,560.09 0.00 0.00 0.00 0.00 0.00 17.00 1,560.09 100.00
07.00.00 SEÑALIZACIÓN Y SEGURIDAD VÍAL
07.01.00 EXCAVACION PARA CIMIENTOS M3 6.15 7.21 44.34 0.00 0.00 0.00 0.00 0.00 6.15 44.34 100.00
07.02.00 POSTES DE FIJACIÓN DE Cº Aº UND 41.00 104.95 4,302.95 0.00 0.00 0.00 0.00 0.00 41.00 4,302.95 100.00
07.03.00 CONCRETO f´c=175 kg/cm2 M3 6.15 211.00 1,297.65 0.00 0.00 0.00 0.00 0.00 6.15 1,297.65 100.00
07.04.00 COLOCACION DE SEÑALES PREVENTIVAS PZA 31.00 118.20 3,664.20 0.00 0.00 0.00 0.00 0.00 31.00 3,664.20 100.00
07.05.00 COLOCACION DE SEÑALES INFORMATIVAS PZA 4.00 118.20 472.80 0.00 0.00 0.00 0.00 0.00 4.00 472.80 100.00
07.06.00 COLOCACION DE SEÑALES REGLAMENTARIAS PZA 4.00 118.20 472.80 0.00 0.00 0.00 0.00 0.00 4.00 472.80 100.00
07.07.00 COLOCACION DE SEÑALES PREVENTIVAS EN OBRA PZA 2.00 118.20 236.40 0.00 0.00 0.00 0.00 0.00 2.00 236.40 100.00
07.08.00 COLOCACIÓN DE TACHAS BIDIRECCIONALES UND 90.00 11.12 1,000.80 0.00 0.00 0.00 0.00 0.00 90.00 1,000.80 100.00
07.09.00 MARCAS SOBRE EL PAVIMENTO M2 997.30 17.80 17,751.94 0.00 0.00 0.00 0.00 0.00 997.30 17,751.94 100.00

Página 3 de 10
VALORIZACIÓN DE AVANCE DE OBRA Nº 0
CORRESPONDIENTE AL MES DE MAYO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 22 DE MAYO DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

07.10.00 COLOCACION DE HITOS KILOMETRICOS UND 3.00 96.55 289.65 0.00 0.00 0.00 0.00 0.00 3.00 289.65 100.00
08.00.00 IMPACTO AMBIENTAL
08.01.00 DEPOSITO DE DESECHOS UND 20.00 22.40 448.00 0.00 0.00 0.00 0.00 0.00 20.00 448.00 100.00
08.02.00 EVACUACION DE RESIDUOS SOLIDOS DIA 90.00 44.00 3,960.00 0.00 0.00 0.00 0.00 0.00 90.00 3,960.00 100.00
08.03.00 READECUACION AMBIENTAL DE CANTERAS M2 1,000.00 2.89 2,890.00 0.00 0.00 0.00 0.00 0.00 1,000.00 2,890.00 100.00
08.04.00 CAPACITACION DE PERSONAL EN MANEJO AMBIENTAL MES 3.00 2,628.00 7,884.00 0.00 0.00 0.00 0.00 0.00 3.00 7,884.00 100.00
08.05.00 READECUACION AMBIENTAL DE CAMPAMENTOS Y PATIO DE M2 1,400.00 4.14 5,796.00 0.00 0.00 0.00 0.00 0.00 1,400.00 5,796.00 100.00
MAQUINAS
08.06.00 ALQUILER DE SS.HH. EN ZONA DE TRABAJO DIA 90.00 84.00 7,560.00 0.00 0.00 0.00 0.00 0.00 90.00 7,560.00 100.00
08.07.00 LIMPIEZA GENERAL DE OBRA DIA 5.00 845.04 4,225.20 0.00 0.00 0.00 0.00 0.00 5.00 4,225.20 100.00
COSTO DIRECTO 1,988,491.15 0.00 0.00 0.00 0.00 1,988,491.15 100.00

GASTOS GENERALES (12% C.D.) 238,618.94 0.00 0.00 0.00


UTILIDAD (3% C.D.) 59,654.73 0.00 0.00 0.00
SUPERVISION DE OBRA (5% C.D.) 99,424.56 0.00 0.00 0.00
SUB TOTAL (ST) 2,386,189.37 0.00 0.00 0.00
I.G.V. (19% ST) 453,375.98 0.00 0.00 0.00
PRESUPUESTO TOTAL 2,839,565.36 0.00 0.00 0.00

Página 4 de 10
VALORIZACION DE AVANCE DE OBRA Nº 05-2005
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2005

CORREGIDO SEGÚN EXPEDIENTE REFORMULADO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 31 DE DICEMBRE DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

01.00.00 OBRAS PROVISIONALES


01.01.00 CAMPAMENTO PROVISIONAL DE OBRA M2 400.00 24.58 9,832.00 0.00 0.00 0.00 0.00 0.00 400.00 9,832.00 100.00
01.02.00 CARTEL DE IDENTIFICACION DE OBRA UND 2.00 806.65 1,613.30 0.00 0.00 0.00 0.00 0.00 2.00 1,613.30 100.00
02.00.00 OBRAS PRELIMINARES
02.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 22,184.00 22,184.00 0.00 0.00 0.00 0.00 0.00 1.00 22,184.00 100.00
02.02.00 TRAZO Y REPLANTEO KM 3.90 1,812.51 7,068.79 0.00 0.00 0.00 0.00 0.00 3.90 7,068.79 100.00
02.03.00 ROCE Y LIMPIEZA DE QUEBRADAS (PONTONES Y ALCANTARILLAS) M3 280.00 12.55 3,514.00 0.00 0.00 0.00 0.00 0.00 280.00 3,514.00 100.00
03.00.00 EXPLANACIONES
03.01.00 CORTE EN MATERIAL COMPACTO NO CLASIFICADO M3 11,869.40 1.76 20,890.14 0.00 0.00 0.00 0.00 0.00 11,869.40 20,890.14 100.00
03.02.00 CONFORMACION DE TERRAPLENES M3 366.00 8.98 3,286.68 0.00 0.00 0.00 0.00 0.00 366.00 3,286.68 100.00
03.03.00 ELIMINACION DE MATERIAL EXCEDENTE M3 11,503.40 6.57 75,577.34 0.00 0.00 0.00 0.00 0.00 11,503.40 75,577.34 100.00
04.00.00 BASE
04.01.00 MEJORAMIENTO DE SUBRASANTE M3 7,650.00 23.90 182,835.00 0.00 0.00 0.00 0.00 0.00 7,650.00 182,835.00 100.00
04.02.00 PERFILADO Y COMPACTACION DE SUBRASANTE M2 39,040.00 0.80 31,232.00 0.00 0.00 0.00 0.00 0.00 39,040.00 31,232.00 100.00
04.03.00 MATERIAL SELECCIONADO PARA BASE M3 13,035.46 22.89 298,381.68 0.00 0.00 0.00 0.00 0.00 13,035.46 298,381.68 100.00
04.04.00 CARGUIO Y TRANSPORTE DE MATERIAL DE BASE M3 13,035.46 11.78 153,557.72 0.00 0.00 0.00 0.00 0.00 13,035.46 153,557.72 100.00
04.05.00 EXTENDIDO Y COMPACTACION DE MATERIAL M2 39,040.00 1.71 66,758.40 0.00 0.00 0.00 0.00 0.00 39,040.00 66,758.40 100.00
05.00.00 PAVIMENTO ASFALTICO E=3"
05.01.00 REPLANTEO DE EJES Y BOMBEO KM 3.90 1,812.51 7,068.79 0.00 0.00 0.00 0.00 0.00 3.90 7,068.79 100.00
05.02.00 LIMPIEZA PARA IMPRIMACION, IMPRIMACION Y ARENADO M2 39,040.00 5.75 224,480.00 0.00 0.00 0.00 0.00 0.00 39,040.00 224,480.00 100.00
DEL AREA IMPRIMADA.
05.03.00 MATERIAL PETREO PARA CARPETA ASFÁLTICA M3 2,766.96 20.27 56,086.28 0.00 0.00 0.00 0.00 0.00 2,766.96 56,086.28 100.00
05.04.00 CANGUIO Y TRANSPORTE DE MATERIAL PARA CHANCADO EN M3 2,766.96 11.77 32,567.12 0.00 0.00 0.00 0.00 0.00 2,766.96 32,567.12 100.00
HUANCABAMBA
05.05.00 MEZCLA ASFALTICA EN CALIENTE DE 3" M2 36,190.08 23.83 862,409.61 0.00 0.00 0.00 0.00 0.00 36,190.08 862,409.61 100.00
05.06.00 TRANSPORTE DE MEZCLA ASFALTICA EN CALIENTE M3 3,425.76 23.53 80,608.13 0.00 0.00 0.00 0.00 0.00 3,425.76 80,608.13 100.00
05.07.00 EXTENDIDO Y COMPACTADO DE MEZCLA ASFALTICA EN M2 35,136.00 2.83 99,434.88 0.00 0.00 0.00 0.00 0.00 35,136.00 99,434.88 100.00
CALIENTE e=3"
06.00.00 OBRAS DE ARTE
06.01.00 ALCANTARILLAS
06.01.01 TRAZO Y REPLANTEO M2 352.80 2.98 1,051.34 0.00 0.00 0.00 0.00 0.00 352.80 1,051.34 100.00
06.01.02 EXCAVACION MANUAL NO CLASIFICADA PARA OBRAS M3 182.45 8.17 1,490.62 0.00 0.00 0.00 0.00 0.00 182.45 1,490.62 100.00
DE ARTE Y DRENAJE
06.01.03 RELLENO PARA ESTRUCTURAS M3 82.05 14.20 1,165.11 0.00 0.00 0.00 0.00 0.00 82.05 1,165.11 100.00

Página 5 de 10
VALORIZACION DE AVANCE DE OBRA Nº 05-2005
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2005

CORREGIDO SEGÚN EXPEDIENTE REFORMULADO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 31 DE DICEMBRE DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

06.01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 120.48 66.79 8,046.86 0.00 0.00 0.00 0.00 0.00 120.48 8,046.86 100.00
06.01.05 PERFILADO Y COMPACTADO DE FONDO DE CAJA M2 133.95 2.35 314.78 0.00 0.00 0.00 0.00 0.00 133.95 314.78 100.00
06.01.06 CONCRETO f´c=210 kg/cm2 PARA MUROS Y PARAPETOS M3 8.23 282.91 2,328.35 0.00 0.00 0.00 0.00 0.00 8.23 2,328.35 100.00
06.01.07 CONCRETO CICLOPEO f´c=210 kg/cm2 + 25% P.M. M3 25.22 284.48 7,174.59 0.00 0.00 0.00 0.00 0.00 25.22 7,174.59 100.00
06.01.08 ACERO DE REFUERZO fy=4200 kg/cm2 KG 264.59 4.22 1,116.57 0.00 0.00 0.00 0.00 0.00 264.59 1,116.57 100.00
06.01.09 ENCOFRADO Y DESENCOFRADO EN ALCANTARILLAS M2 106.91 18.07 1,931.86 0.00 0.00 0.00 0.00 0.00 106.91 1,931.86 100.00
06.01.10 SUMINISTRO Y COLOCADO DE ALCANTARILLA TMC Ø=24" M 37.60 187.29 7,042.10 0.00 0.00 0.00 0.00 0.00 37.60 7,042.10 100.00
06.01.11 SUMINISTRO Y COLOCADO DE ALCANTARILLA TMC Ø=36" M 18.80 317.19 5,963.17 0.00 0.00 0.00 0.00 0.00 18.80 5,963.17 100.00
06.01.12 PINTADO DE PARAPETOS M2 5.04 7.98 40.22 0.00 0.00 0.00 0.00 0.00 5.04 40.22 100.00
06.01.13 PASES DE AGUA CON TUB. PVC - SAP Ø=8" M 60.00 14.17 850.20 0.00 0.00 0.00 0.00 0.00 60.00 850.20 100.00
06.01.14 PASES DE AGUA CON TUB. PVC - SAP Ø=10" M 192.00 15.75 3,024.00 0.00 0.00 0.00 0.00 0.00 192.00 3,024.00 100.00
06.02.00 CANAL DE IRRIGACION
06.02.01 TRAZO Y REPLANTEO M2 120.00 2.83 339.60 0.00 0.00 0.00 0.00 0.00 120.00 339.60 100.00
06.02.02 EXCAVACION SOLO PARA CIMENTACION M3 24.00 8.53 204.72 0.00 0.00 0.00 0.00 0.00 24.00 204.72 100.00
06.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE M3 28.80 8.96 258.05 0.00 0.00 0.00 0.00 0.00 28.80 258.05 100.00
06.02.04 PERFILADO Y COMPACTADO DE FONDO DE CANAL M2 8.00 2.35 18.80 0.00 0.00 0.00 0.00 0.00 8.00 18.80 100.00
06.02.05 CONCRETO f´c=210 kg/cm2 M3 26.01 282.91 7,358.49 0.00 0.00 0.00 0.00 0.00 26.01 7,358.49 100.00
06.02.06 CONCRETO CICLOPEO f´c=210 kg/cm2 + 70% P.M. M3 44.55 291.10 12,968.51 0.00 0.00 0.00 0.00 0.00 44.55 12,968.51 100.00
06.02.07 ACERO DE REFUERZO fy=4200 kg/cm2 KG 753.45 4.22 3,179.56 0.00 0.00 0.00 0.00 0.00 753.45 3,179.56 100.00
06.02.08 ENCOFRADO Y DESENCOFRADO M2 254.64 18.30 4,659.91 0.00 0.00 0.00 0.00 0.00 254.64 4,659.91 100.00
06.02.09 JUNTAS DE DILATACION e=1.5" M 7.89 11.14 87.89 0.00 0.00 0.00 0.00 0.00 7.89 87.89 100.00
06.03.00 CUNETAS
06.03.01 TRAZO Y REPLANTEO DE CUNETAS KM 7.81 1,223.42 9,554.91 0.00 0.00 0.00 0.00 0.00 7.81 9,554.91 100.00
06.03.02 CONCRETO f´c=210 kg/cm2 + 30% P.M. M3 646.00 308.59 199,349.14 0.00 0.00 0.00 0.00 0.00 646.00 199,349.14 100.00
06.03.03 ENCOFRADO Y DESENCOFRADO PARA CUNETAS M2 6,460.00 22.23 143,605.80 0.00 0.00 3,386.30 75,277.45 52.42 3,073.70 68,328.35 47.58
06.03.04 JUNTAS DE DILATACIÓN e=1.5" M 1,648.40 11.87 19,566.51 0.00 0.00 0.00 0.00 0.00 1,648.40 19,566.51 100.00
06.04.00 MUROS DE CONTENCION
06.04.01 TRAZO Y REPLANTEO M2 136.50 1.37 187.01 0.00 0.00 0.00 0.00 0.00 136.50 187.01 100.00
06.04.02 EXCAVACION MANUAL NO CLASIFICADA PARA ESTRUCTURAS M3 336.75 8.86 2,983.61 0.00 0.00 0.00 0.00 0.00 336.75 2,983.61 100.00
06.04.03 RELLENO PARA ESTRUCTURAS M3 138.60 21.05 2,917.53 0.00 0.00 0.00 0.00 0.00 138.60 2,917.53 100.00
06.04.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE M3 237.78 11.67 2,774.89 0.00 0.00 0.00 0.00 0.00 237.78 2,774.89 100.00
06.04.05 PERFILADO Y COMPACTACION PARA TERRENO DE M2 136.50 1.72 234.78 0.00 0.00 0.00 0.00 0.00 136.50 234.78 100.00
FUNDACION
06.04.06 CONCRETO CICLOPEO f´c=210 kg/cm2 + 70% P.M. M3 301.95 273.64 82,625.60 0.00 0.00 0.00 0.00 0.00 301.95 82,625.60 100.00

Página 6 de 10
VALORIZACION DE AVANCE DE OBRA Nº 05-2005
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2005

CORREGIDO SEGÚN EXPEDIENTE REFORMULADO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 31 DE DICEMBRE DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

06.04.07 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION M2 633.00 21.27 13,463.91 0.00 0.00 0.00 0.00 0.00 633.00 13,463.91 100.00
06.05.00 PONTON PEATONAL
06.05.01 TRAZO Y REPLANTEO M2 142.08 1.37 194.65 0.00 0.00 0.00 0.00 0.00 142.08 194.65 100.00
06.05.02 EXCAVACION MANUAL NO CLASIFICADA PARA ESTRUCTURAS M3 52.80 8.86 467.81 0.00 0.00 0.00 0.00 0.00 52.80 467.81 100.00
06.05.03 RELLENO PARA ESTRUCTURAS M3 32.80 21.05 690.44 0.00 0.00 0.00 0.00 0.00 32.80 690.44 100.00
06.05.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE M3 24.00 11.67 280.08 0.00 0.00 0.00 0.00 0.00 24.00 280.08 100.00
06.05.05 CONCRETO CICLOPEO f´c=210 kg/cm2 + 70% P.G. M3 62.48 268.95 16,804.00 0.00 0.00 0.00 0.00 0.00 62.48 16,804.00 100.00
(CIM Y CUERPO)
06.05.06 ACERO DE REFUERZO fy=4200 kg/cm2 KG 1,564.12 4.22 6,600.59 0.00 0.00 0.00 0.00 0.00 1,564.12 6,600.59 100.00
06.05.07 ENCOFRADO Y DESENCOFRADO M2 146.76 21.27 3,121.59 0.00 0.00 0.00 0.00 0.00 146.76 3,121.59 100.00
06.05.08 CONCRETO f´c=210 kg/cm2 RECONSTRUCCIÓN M3 3.10 282.91 877.02 0.00 0.00 0.00 0.00 0.00 3.10 877.02 100.00
DE PARAPETOS
06.06.00 SUMIDEROS TRANSVERSALES
06.06.01 TRAZO Y REPLANTEO M2 47.00 1.37 64.39 0.00 0.00 0.00 0.00 0.00 47.00 64.39 100.00
06.06.02 EXCAVACION MANUAL NO CLASIFICADA PARA ESTRUCTURAS M3 23.50 8.86 208.21 0.00 0.00 0.00 0.00 0.00 23.50 208.21 100.00
06.06.03 CONCRETO f´c=210 kg/cm2 RECONSTRUCCION DE PARAPETO M3 14.50 282.91 4,102.20 0.00 0.00 0.00 0.00 0.00 14.50 4,102.20 100.00
06.06.04 ACERO DE REFUERZO fy=4200 kg/cm2 KG 597.45 4.22 2,521.24 0.00 0.00 0.00 0.00 0.00 597.45 2,521.24 100.00
06.06.05 ENCOFRADO Y DESENCOFRADO M2 390.59 22.23 8,682.82 0.00 0.00 0.00 0.00 0.00 390.59 8,682.82 100.00
06.06.06 RIELES PARA ARMADURA LONGITUDINAL M 234.67 31.50 7,392.11 0.00 0.00 0.00 0.00 0.00 234.67 7,392.11 100.00
06.06.07 PERNO DE 3/4" UND 504.00 2.84 1,431.36 0.00 0.00 0.00 0.00 0.00 504.00 1,431.36 100.00
06.07.00 BARANDAS METALICAS
06.07.01 TRAZO Y REPLANTEO M2 44.10 1.37 60.42 0.00 0.00 0.00 0.00 0.00 44.10 60.42 100.00
06.07.02 CONCRETO f´c=210 kg/cm2 M3 0.87 282.91 246.13 0.00 0.00 0.00 0.00 0.00 0.87 246.13 100.00
06.07.03 ACERO DE REFUERZO fy=4200 kg/cm2 KG 315.88 4.22 1,333.01 0.00 0.00 0.00 0.00 0.00 315.88 1,333.01 100.00
06.07.04 ENCOFRADO Y DESENCOFRADO M2 24.80 22.23 551.30 0.00 0.00 0.00 0.00 0.00 24.80 551.30 100.00
06.07.05 TUBERIA DE ACERO NEGRO Ø= 3" UND 40.00 91.83 3,673.20 0.00 0.00 0.00 0.00 0.00 40.00 3,673.20 100.00
06.07.06 PINTURA EN BARANDAS METALICAS M 240.00 5.78 1,387.20 0.00 0.00 0.00 0.00 0.00 240.00 1,387.20 100.00
06.08.00 BUZONES
06.08.01 REPOSICION DE TAPA DE BUZON UND 69.00 95.28 6,574.32 0.00 0.00 0.00 0.00 0.00 69.00 6,574.32 100.00
07.00.00 SEÑALIZACIÓN Y SEGURIDAD VÍAL
07.01.00 EXCAVACION PARA CIMIENTOS M3 6.15 7.21 44.34 0.00 0.00 0.00 0.00 0.00 6.15 44.34 100.00
07.02.00 POSTES DE FIJACIÓN DE Cº Aº UND 41.00 104.95 4,302.95 0.00 0.00 0.00 0.00 0.00 41.00 4,302.95 100.00
07.03.00 CONCRETO f´c=175 kg/cm2 M3 6.15 225.12 1,384.49 0.00 0.00 0.00 0.00 0.00 6.15 1,384.49 100.00
07.04.00 COLOCACION DE SEÑALES PREVENTIVAS PZA 31.00 118.20 3,664.20 0.00 0.00 0.00 0.00 0.00 31.00 3,664.20 100.00

Página 7 de 10
VALORIZACION DE AVANCE DE OBRA Nº 05-2005
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2005

CORREGIDO SEGÚN EXPEDIENTE REFORMULADO

OBRA : "MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS"


RESIDENTE : INGº FELIX CASTAÑEDA MORALES
EJECUTA : GERENCIA SUB REGIONAL CHANKA - ANDAHUAYLAS
FECHA : 31 DE DICEMBRE DEL 2006
FORMULA 01: MEJORAMIENTO VIAL TALAVERA ANDAHUAYLAS

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION Precio ANTERIOR ACTUAL ACUMULADO
Unid. Metrado Unitario en Presupuesto
S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. METRADO VALORIZADO S/. % METRADO VALORIZADO %

07.05.00 COLOCACION DE SEÑALES INFORMATIVAS PZA 4.00 118.20 472.80 0.00 0.00 0.00 0.00 0.00 4.00 472.80 100.00
07.06.00 COLOCACION DE SEÑALES REGLAMENTARIAS PZA 4.00 118.20 472.80 0.00 0.00 0.00 0.00 0.00 4.00 472.80 100.00
07.07.00 COLOCACION DE SEÑALES PREVENTIVAS EN OBRA PZA 2.00 118.20 236.40 0.00 0.00 0.00 0.00 0.00 2.00 236.40 100.00
07.08.00 COLOCACIÓN DE TACHAS BIDIRECCIONALES UND 90.00 11.52 1,036.80 0.00 0.00 0.00 0.00 0.00 90.00 1,036.80 100.00
07.09.00 MARCAS SOBRE EL PAVIMENTO M2 997.30 21.23 21,172.68 0.00 0.00 0.00 0.00 0.00 997.30 21,172.68 100.00
07.10.00 COLOCACION DE HITOS KILOMETRICOS UND 3.00 96.55 289.65 0.00 0.00 0.00 0.00 0.00 3.00 289.65 100.00
08.00.00 IMPACTO AMBIENTAL
08.01.00 DEPOSITO DE DESECHOS UND 20.00 22.40 448.00 0.00 0.00 0.00 0.00 0.00 20.00 448.00 100.00
08.02.00 READECUACION AMBIENTAL DE CANTERAS M2 1,000.00 3.31 3,310.00 0.00 0.00 0.00 0.00 0.00 1,000.00 3,310.00 100.00
08.03.00 CAPACITACION DE PERSONAL EN MANEJO AMBIENTAL MES 3.00 2,628.00 7,884.00 0.00 0.00 0.00 0.00 0.00 3.00 7,884.00 100.00
08.04.00 READECUACION AMBIENTAL DE CAMPAMENTOS Y PATIO DE M2 1,400.00 4.23 5,922.00 0.00 0.00 0.00 0.00 0.00 1,400.00 5,922.00 100.00
MAQUINAS
08.05.00 ALQUILER DE SS.HH. EN ZONA DE TRABAJO DIA 90.00 84.00 7,560.00 0.00 0.00 0.00 0.00 0.00 90.00 7,560.00 100.00
08.06.00 LIMPIEZA GENERAL DE OBRA DIA 3.00 1,113.92 3,341.76 0.00 0.00 0.00 0.00 0.00 3.00 3,341.76 100.00
COSTO DIRECTO 2,916,071.77 0.00 0.00 75,277.45 2.58 2,840,794.32 97.42

GASTOS GENERALES (5% C.D.) 145,803.59 0.00 0.00 9,033.29


SUPERVISION DE OBRA (5% C.D.) 145,803.59 0.00 0.00 3,763.87
SUB TOTAL (ST) 3,207,678.95 0.00 0.00 88,074.62
I.G.V. (19% ST) 609,459.00 0.00 0.00 16,734.18
PRESUPUESTO TOTAL 3,817,137.95 0.00 0.00 104,808.79

Página 8 de 10
PRESUPUESTO DE OBRA REFORMULADO - DEDUCTIVOS INSTALACIONES ELÉCTRICAS (CARGAS ESPECIALES)
INSTALACION Y EQUIPAMIENTO DE LOS LABORATORIOS DE CIENCIAS BASICAS EN LA UNIVERSIDAD NACIONAL JOSE
OBRA:
MARIA ARGUEDAS.
RESIDENTE DE OBRA: ARQ. JOSÉ FERNANDO CORNEJO RAYMUNDO
ESPECIALISTA: ING. ROLANDO EDUARDO CARRILLO SEGOVIA
FECHA: OCTUBRE DEL 2016
SUB PRESUPUESTO 04: INSTALACIONES ELECTRICAS (CARGAS ESPECIALES)
PRESUPUESTO
ITEM DESCRIPCION Precio Unitario Metrado Metrado
Unid. Metrado Costo Diferencia Adicional Deductivo
en S/. Real Diferencia
04 INSTALACIONES ELECTRICAS
04.07 INSTALACIONES ESPECIALES
04.07.02 INSTALACIONES DE PARLANTES AUDIO Y PERIFONEO
04.07.02.10 GABINETE DE MADERA BLANCO PARA DIFUSORES DE 8" und 30.00 46.46 0.00 -30.00 -1,393.80 -1,393.80
04.07.03 INSTALACIONES DE ALARMA CONTRA INCENDIO Y ROBO
04.07.03.10 SENSOR DE HUMO Y CALOR und 100.00 358.25 97.00 -3.00 -1,074.75 -1,074.75
04.07.03.11 SENSOR TIPO PIR 360º und 21.00 382.85 20.00 -1.00 -382.85 -382.85
04.07.04 INSTALACIONES DE CAMARAS DE SEGURIDAD
04.07.04.13 DVR 16 CANALES und 2.00 162.80 1.00 -1.00 -162.80 -162.80
04.07.05 INSTALACIONES PARA RED DE COMPUTO
04.07.05.12 SWITCH DE 24 PUERTOS CAT SE und 4.00 42.15 1.00 -3.00 -126.45 -126.45
04.07.05.13 PATCH PANEL DE 24 PUERTOS SE und 4.00 273.39 1.00 -3.00 -820.17 -820.17
04.07.05.14 ORDENADOR HORIZONTAL DE 2 UR und 4.00 115.95 2.00 -2.00 -231.90 -231.90

COSTO DIRECTO -4,192.72 0.00 -4,192.72


SUSTENTO DE DEDUCTIVOS DE OBRA REFORMULADO INSTALACIONES ELÉCTRICAS (CARGAS
ESPECIALES)
INSTALACION Y EQUIPAMIENTO DE LOS LABORATORIOS DE CIENCIAS BASICAS EN LA UNIVERSIDAD
OBRA:
NACIONAL JOSE MARIA ARGUEDAS.
RESIDENTE DE OBRA: ARQ. JOSÉ FERNANDO CORNEJO RAYMUNDO
ESPECIALISTA: ING. ROLANDO EDUARDO CARRILLO SEGOVIA
FECHA: OCTUBRE DEL 2016
SUB PRESUPUESTO 04: INSTALACIONES ELECTRICAS (CARGAS ESPECIALES)

PARLANTES Y AUDIO INST. ALARMA INC. ROBO INST. CÁMARAS SEG. INST. PARA RED DE CÓMPUTO

04.07.02.10 GABINETE DE MADERA BLANCO PARA


PLUG. RJ11 KR-204L

DVR 16 CANALES

SWITCH DE 24 PUERTOS CAT SE


PATCH PANEL DE 24 PUERTOS SE
INTERCOMUNICADOR

SENSOR DE HUMO Y CALOR


SENSOR TIPO PIR 360º

ORDENADOR HORIZONTAL DE 2 UR
SECTORES
SECTORES

DIFUSORES DE 8"

04.07.03.10
04.07.03.11

04.07.04.13

04.07.05.12
04.07.05.13
04.07.05.14
CÓDIGO
PRIMER PISO 25 5 1 1 1 2
SEGUNDO PISO 24 5
TERCER PISO 24 5
CUARTO PISO 24 5

METRADO TOTAL 0 97 20 1 1 1 2