You are on page 1of 36

****************************************************

* *
* STAAD.Pro *
* Version 2007 Build 01 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= NOV 29, 2013 *
* Time= 16:57:46 *
* *
* USER ID: *
****************************************************

STRUCTURAL DESIGN ANALYSIS OF THE PROPOSED EUSEBIO - 2 STORY


COMMERCIAL BUILDING LOCATED AT NIOG1, BACOOR CAVITE
1. STAAD SPACE INPUT FILE: EUSEBIO.STD
2. START JOB INFORMATION
3. ENGINEER DATE 28-NOV-13
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. SET NL 50
7. UNIT METER KN
8. JOINT COORDINATES
9. 1000 2 0 0; 1001 4.825 0 0; 1002 7.685 0 0; 1003 10.73 0 0; 1004 0 0 1.875
10. 1005 2 0 3.75; 1006 4.825 0 3.75; 1007 7.685 0 3.75; 1008 10.414 0 3.75
11. 1009 0 0 5.8; 1010 2 0 5.8; 2000 2 3 0; 2001 4.825 3 0; 2002 7.685 3 0
12. 2003 10.73 3 0; 2004 0 3 1.875; 2005 2 3 3.75; 2006 4.825 3 3.75
13. 2007 7.685 3 3.75; 2008 10.414 3 3.75; 2009 0 3 5.8; 2010 2 3 5.8
14. 2011 2 3 1.875; 2012 0 3 3.75; 2013 4.825 3 4.775; 2014 7.685 3 4.775
15. 2015 10.414 3 4.775; 2016 2 3 4.775; 3000 2 5.8 0; 3001 4.825 5.8 0
16. 3002 7.685 5.8 0; 3003 10.73 5.8 0; 3004 0 5.8 1.875; 3005 2 5.8 3.75
17. 3006 4.825 5.8 3.75; 3007 7.685 5.8 3.75; 3008 10.414 5.8 3.75; 3009 0 5.8 5.8
18. 3010 2 5.8 5.8; 3011 2 5.8 1.875; 3012 0 5.8 3.75; 3013 2 5.8 4.775
19. 3014 10.414 5.8 4.775; 3015 4.825 5.8 4.775; 3016 7.685 5.8 4.775
20. MEMBER INCIDENCES
21. 1 1000 2000; 2 1001 2001; 3 1002 2002; 4 1003 2003; 5 2000 3000; 6 2001 3001
22. 7 2002 3002; 8 2003 3003; 9 1004 2004; 10 1005 2005; 11 1006 2006
23. 12 1007 2007; 13 1008 2008; 14 2004 3004; 15 2005 3005; 16 2006 3006
24. 17 2007 3007; 18 2008 3008; 19 1009 2009; 20 1010 2010; 21 2009 3009
25. 22 2010 3010; 2000 2000 2001; 2001 2001 2002; 2002 2002 2003; 2003 2005 2006
26. 2004 2006 2007; 2005 2007 2008; 2006 2009 2010; 2007 2000 2011; 2008 2001 2006
27. 2009 2002 2007; 2010 2003 2008; 2011 2004 2012; 2012 2005 2016; 2013 2011 2005
28. 2014 2004 2011; 2015 2012 2009; 2016 2012 2005; 2017 2013 2014; 2018 2014 2015
29. 2019 2006 2013; 2020 2007 2014; 2021 2008 2015; 2022 2016 2010; 2023 2016 2013
30. 3000 3000 3001; 3001 3001 3002; 3002 3002 3003; 3003 3005 3006; 3004 3006 3007
31. 3005 3007 3008; 3006 3009 3010; 3007 3000 3011; 3008 3001 3006; 3009 3002 3007
32. 3010 3003 3008; 3011 3004 3012; 3012 3005 3013; 3013 3011 3005; 3014 3004 3011
33. 3015 3012 3009; 3016 3012 3005; 3017 3013 3010; 3018 3008 3014; 3019 3013 3015
34. 3020 3015 3016; 3021 3016 3014; 3022 3006 3015; 3023 3007 3016
35. START GROUP DEFINITION
36. MEMBER
37. _2B1 2007 TO 2010 2013
38. _2B2 2000 TO 2005
39. _2B3 2006 2012 2014 2016 2022
40. _2B4 2011 2015
41. _2B5 2019 TO 2021
42. _2EB 2017 2018 2023
43. _3B1 3007 TO 3010 3013
44. _3B2 3000 TO 3005
45. _3B3 3006 3012 3014 3016 3022
46. _3B4 3011 3015
47. _3B5 3019 TO 3021
48. _3EB 3017 3018 3023
49. _C1 1 TO 18
50. _C2 19 TO 22
51. JOINT
52. END GROUP DEFINITION
53. DEFINE MATERIAL START
54. ISOTROPIC CONCRETE
55. E 2.17185E+007
56. POISSON 0.17
57. DENSITY 24
58. ALPHA 1E-005
59. DAMP 0.05
60. END DEFINE MATERIAL
61. MEMBER PROPERTY AMERICAN
62. _2B1 PRIS YD 0.4 ZD 0.25
63. _2B2 PRIS YD 0.4 ZD 0.25
64. _2B3 PRIS YD 0.4 ZD 0.25
65. _2B4 PRIS YD 0.4 ZD 0.25
66. _2B5 PRIS YD 0.4 ZD 0.25
67. _2EB PRIS YD 0.4 ZD 0.25
68. _3B1 PRIS YD 0.35 ZD 0.2
69. _3B2 PRIS YD 0.35 ZD 0.2
70. _3B3 PRIS YD 0.35 ZD 0.2
71. _3B4 PRIS YD 0.35 ZD 0.2
72. _3B5 PRIS YD 0.35 ZD 0.2
73. _3EB PRIS YD 0.35 ZD 0.2
74. _C1 PRIS YD 0.25 ZD 0.35
75. _C2 PRIS YD 0.35 ZD 0.25
76. CONSTANTS
77. MATERIAL CONCRETE ALL
78. SUPPORTS
79. 1000 TO 1010 FIXED
80. MEMBER RELEASE
81. 2014 3014 END MZ
82. 2016 3016 START MZ
83. 2023 3019 START MZ
84. DEFINE UBC ACCIDENTAL LOAD
85. ZONE 0.4 I 1 RWX 8.5 RWZ 8.5 STYP 3 NA 1.2 NV 1.6
86. SELFWEIGHT
87. JOINT WEIGHT
88. 2000 3000 WEIGHT 9
89. 2001 3001 WEIGHT 18.12
90. 2002 3002 WEIGHT 18.82
91. 2004 3004 WEIGHT 4.78
92. 2005 3005 WEIGHT 20.66
93. 2006 3006 WEIGHT 28.75
94. 2007 3007 WEIGHT 29.86
95. 2003 3003 WEIGHT 9.2
96. 2008 3008 WEIGHT 14.3
97. 2009 2010 3009 3010 WEIGHT 4
98. MEMBER WEIGHT
99. 3000 TO 3002 3006 3007 3010 3011 3014 3015 3017 TO 3021 UNI 3.11
100. 2000 TO 2011 2013 TO 2016 UNI 7.6195
101. 2017 2018 2021 2023 UNI 2.7
102. LOAD 1 LOADTYPE SEISMIC TITLE UBCX
103. UBC LOAD X 1
104. PERFORM ANALYSIS
P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 45/ 70/ 11


ORIGINAL/FINAL BAND-WIDTH= 17/ 9/ 54 DOF
TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 204
SIZE OF STIFFNESS MATRIX = 12 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.2/ 222046.5 MB

***********************************************************
* *
* X DIRECTION : Ta = 0.273 Tb = 0.346 Tuser = 0.000 *
* T = 0.346, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.1412 x 1131.90 = 159.80 KN *
* *
***********************************************************

105. CHANGE
106. LOAD 2 LOADTYPE SEISMIC TITLE UBCZ
107. UBC LOAD Z 1
108. PERFORM ANALYSIS

***********************************************************
* *
* Z DIRECTION : Ta = 0.273 Tb = 0.315 Tuser = 0.000 *
* T = 0.315, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.1412 x 1131.90 = 159.80 KN *
* *
***********************************************************

109. CHANGE
110. LOAD 3 LOADTYPE DEAD TITLE LOAD CASE 3
111. SELFWEIGHT Y -1
112. FLOOR LOAD
113. YRANGE 2.9 3.1 FLOAD -3.4 XRANGE 2 10.73 ZRANGE 0 3.75 GY
114. YRANGE 2.9 3.1 FLOAD -3.4 XRANGE 0 2 ZRANGE 1.875 3.75 GY
115. YRANGE 5.7 5.9 FLOAD -2.4 XRANGE 2 10.73 ZRANGE 0 3.75 GY
116. YRANGE 5.7 5.9 FLOAD -2.4 XRANGE 0 2 ZRANGE 1.875 3.75 GY
117. *STAIRS*
118. YRANGE 2.9 5.9 FLOAD -2.4 XRANGE 0 2 ZRANGE 3.75 5.8 GY
119. ONEWAY LOAD
120. YRANGE 2.9 3.1 ONE -3.4 XRANGE 2 10.414 ZRANGE 3.75 4.775 GY
121. YRANGE 5.7 5.9 ONE -2.4 XRANGE 2 10.414 ZRANGE 3.75 4.775 GY
122. MEMBER LOAD
123. 3000 TO 3002 3006 3007 3010 3011 3014 3015 3017 TO 3021 UNI GY -3.11
124. 2000 TO 2011 2013 TO 2016 UNI GY -7.6195
125. 2017 2018 2021 2023 UNI GY -2.7
126. LOAD 4 LOADTYPE LIVE TITLE LOAD CASE 4
127. FLOOR LOAD
128. YRANGE 2.9 3.1 FLOAD -2.4 XRANGE 2 10.73 ZRANGE 0 3.75 GY
129. YRANGE 2.9 3.1 FLOAD -2.4 XRANGE 0 2 ZRANGE 1.875 3.75 GY
130. YRANGE 5.7 5.9 FLOAD -2.4 XRANGE 2 10.73 ZRANGE 0 3.75 GY
131. YRANGE 5.7 5.9 FLOAD -2.4 XRANGE 0 2 ZRANGE 1.875 3.75 GY
132. *STAIRS*
133. YRANGE 2.9 5.9 FLOAD -4.8 XRANGE 0 2 ZRANGE 3.75 5.8 GY
134. ONEWAY LOAD
135. YRANGE 2.9 3.1 ONE -2.4 XRANGE 2 10.414 ZRANGE 3.75 4.775 GY
136. YRANGE 5.7 5.9 ONE -2.4 XRANGE 2 10.414 ZRANGE 3.75 4.775 GY
137. LOAD COMB 5 DL + LL
138. 3 1.0 4 1.0
139. LOAD COMB 6 1.2DL + 1.6LL
140. 3 1.2 4 1.6
141. LOAD COMB 7 1.2DL + 1.0LL + 1.0UBCX
142. 3 1.2 4 1.0 1 1.0
143. LOAD COMB 8 1.2DL + 1.0LL + 1.0UBCZ
144. 3 1.2 4 1.0 2 1.0
145. PERFORM ANALYSIS

146. PRINT STORY DRIFT


STORY DRIFT

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE= 0.00

1 0.00 3 0.0000 0.0000 0.0000 L / 0


4 0.0000 0.0000 0.0000 L / 0
5 0.0000 0.0000 0.0000 L / 0
6 0.0000 0.0000 0.0000 L / 0
7 0.0000 0.0000 0.0000 L / 0
8 0.0000 0.0000 0.0000 L / 0

2 3.00 3 -0.0001 0.0200 0.0000 L / 15003


4 -0.0004 0.0033 0.0000 L / 91934
5 -0.0004 0.0233 0.0000 L / 12898
6 -0.0007 0.0292 0.0000 L / 10268
7 0.3601 0.0293 0.0000 L / 833
8 -0.0002 0.3008 0.0000 L / 997

3 5.80 3 0.0006 0.0637 0.0000 L / 9111


4 -0.0012 0.0115 0.0000 L / 50553
5 -0.0006 0.0751 0.0000 L / 7720
6 -0.0012 0.0947 0.0000 L / 6122
7 0.5884 0.0936 0.0000 L / 986
8 0.0008 0.5806 0.0000 L / 999

147. START CONCRETE DESIGN


CONCRETE
DESIGN

148. CODE ACI


149. CLB 0.04 ALL
150. CLS 0.04 ALL
151. CLT 0.04 ALL
152. FC 20700 ALL
153. FYMAIN 250000 ALL
154. FYSEC 250000 ALL
155. MAXMAIN 16 ALL
156. MINMAIN 16 ALL
157. MINSEC 10 ALL
158. NSECTION 12 ALL
159. TRACK 2 ALL
160. *C1
161. DESIGN COLUMN 9 12

====================================================================

COLUMN NO. 9 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 250.0 FC - 20.7 MPA, RECT SIZE - 350.0 X 250.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 875.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

8 - 16 MM 1.838 3 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 250.00 MM

COLUMN INTERACTION: MOMENT ABOUT Z -AXIS (KN-MET)

--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
1913.39 1530.71 758.37 70.47 92.9
M0 P-tens. Des.Pn Des.Mn e/h
37.76 -402.13 104.63 5.31 0.01690
--------------------------------------------------------

COLUMN INTERACTION: MOMENT ABOUT Y -AXIS (KN-MET)

--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
1913.39 1530.71 822.49 104.23 126.7
M0 P-tens. Des.Pn Des.Mn e/h
56.03 -402.13 104.63 8.09 0.02577
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 1412.96 45.03 706.48 70.19
P0 |* 1295.22 51.84 588.73 68.56
| * 1177.47 56.99 470.99 66.02
Pn,max|__* 1059.72 61.56 353.24 62.84
| * 941.98 65.44 235.49 55.42
Pn | * 824.23 68.78 117.75 47.10
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 1412.96 66.29 706.48 103.85
COMPRESSION| * 1295.22 76.05 588.73 101.56
Pb|-------*Mb 1177.47 84.57 470.99 98.01
| * 1059.72 91.94 353.24 93.56
___________|____*_______ 941.98 98.39 235.49 83.96
| * M0 Mn, 824.23 104.23 117.75 70.77
| * BENDING
P-tens|* MOMENT
|
====================================================================

COLUMN NO. 12 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 250.0 FC - 20.7 MPA, RECT SIZE - 350.0 X 250.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 875.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

8 - 16 MM 1.838 3 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 250.00 MM

COLUMN INTERACTION: MOMENT ABOUT Z -AXIS (KN-MET)

--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
1913.39 1530.71 758.37 70.47 92.9
M0 P-tens. Des.Pn Des.Mn e/h
37.76 -402.13 235.00 0.13 0.00018
--------------------------------------------------------

COLUMN INTERACTION: MOMENT ABOUT Y -AXIS (KN-MET)

--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
1913.39 1530.71 822.49 104.23 126.7
M0 P-tens. Des.Pn Des.Mn e/h
56.03 -402.13 235.00 2.66 0.00378
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 1412.96 45.03 706.48 70.19
P0 |* 1295.22 51.84 588.73 68.56
| * 1177.47 56.99 470.99 66.02
Pn,max|__* 1059.72 61.56 353.24 62.84
| * 941.98 65.44 235.49 55.42
Pn | * 824.23 68.78 117.75 47.10
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 1412.96 66.29 706.48 103.85
COMPRESSION| * 1295.22 76.05 588.73 101.56
Pb|-------*Mb 1177.47 84.57 470.99 98.01
| * 1059.72 91.94 353.24 93.56
___________|____*_______ 941.98 98.39 235.49 83.96
| * M0 Mn, 824.23 104.23 117.75 70.77
| * BENDING
P-tens|* MOMENT
|

********************END OF COLUMN DESIGN RESULTS********************

162. END CONCRETE DESIGN


163. START CONCRETE DESIGN
CONCRETE
DESIGN

164. CODE ACI


165. CLB 0.04 ALL
166. CLS 0.04 ALL
167. CLT 0.04 ALL
168. FC 20700 ALL
169. FYMAIN 250000 ALL
170. FYSEC 250000 ALL
171. MAXMAIN 16 ALL
172. MINMAIN 16 ALL
173. MINSEC 10 ALL
174. NSECTION 12 ALL
175. TRACK 2 ALL
176. *C2
177. DESIGN COLUMN 20

====================================================================

COLUMN NO. 20 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 250.0 FC - 20.7 MPA, RECT SIZE - 250.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 875.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

8 - 16 MM 1.838 3 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 250.00 MM

COLUMN INTERACTION: MOMENT ABOUT Z -AXIS (KN-MET)

--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
1913.39 1530.71 822.49 104.23 126.7
M0 P-tens. Des.Pn Des.Mn e/h
56.03 -402.13 61.84 1.52 0.00820
--------------------------------------------------------

COLUMN INTERACTION: MOMENT ABOUT Y -AXIS (KN-MET)

--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
1913.39 1530.71 758.37 70.47 92.9
M0 P-tens. Des.Pn Des.Mn e/h
37.76 -402.13 61.84 2.46 0.01327
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 1412.96 66.29 706.48 103.85
P0 |* 1295.22 76.05 588.73 101.56
| * 1177.47 84.57 470.99 98.01
Pn,max|__* 1059.72 91.94 353.24 93.56
| * 941.98 98.39 235.49 83.96
Pn | * 824.23 104.23 117.75 70.77
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 1412.96 45.03 706.48 70.19
COMPRESSION| * 1295.22 51.84 588.73 68.56
Pb|-------*Mb 1177.47 56.99 470.99 66.02
| * 1059.72 61.56 353.24 62.84
___________|____*_______ 941.98 65.44 235.49 55.42
| * M0 Mn, 824.23 68.78 117.75 47.10
| * BENDING
P-tens|* MOMENT
|

********************END OF COLUMN DESIGN RESULTS********************


178. END CONCRETE DESIGN
179. START CONCRETE DESIGN
CONCRETE
DESIGN

180. CODE ACI


181. CLB 0.04 ALL
182. CLS 0.04 ALL
183. CLT 0.04 ALL
184. FC 20700 ALL
185. FYMAIN 250000 ALL
186. FYSEC 250000 ALL
187. MAXMAIN 16 ALL
188. MINMAIN 16 ALL
189. MINSEC 10 ALL
190. NSECTION 12 ALL
191. TRACK 2 ALL
192. *2B1
193. DESIGN BEAM 2008

=====================================================================

BEAM NO. 2008 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 3750. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 3 - 16MM 0. 3061. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 27.67 KN-MET AT 1250.MM, LOAD 8|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 0. 725. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 19.21 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

3 342. 4 - 16MM 2237. 3750. NO YES


4 310. 1 - 16MM 2237. 3750. NO YES
|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 65.09 KN-MET AT 3750.MM, LOAD 8|
| REQD STEEL= 942.MM2, ROW=0.0113, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 33. MMS |
| REQD. DEVELOPMENT LENGTH = 759. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 56950.5 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 161./ 260. 12./ 19. 8/ 6


313. 252./ 86. 19./ 6. 8/ 6
625. 324./ 0. 24./ 0. 8/ 0
938. 368./ 0. 27./ 0. 8/ 0
1250. 378./ 0. 28./ 0. 8/ 0
1563. 351./ 0. 26./ 0. 8/ 0
1875. 311./ 0. 23./ 0. 6/ 0
2188. 262./ 0. 19./ 0. 6/ 0
2500. 168./ 0. 12./ 0. 6/ 0
2813. 33./ 156. 3./ 12. 6/ 8
3125. 0./ 377. 0./ 28. 0/ 8
3438. 0./ 638. 0./ 46. 0/ 8
3750. 0./ 936. 0./ 65. 0/ 8

B E A M N O. 2008 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 29.03 KNS Vc= 64.45 KNS Vs= 0.00 KNS
Tu= 0.11 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 5
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 1535. MM

AT END SUPPORT - Vu= 30.13 KNS Vc= 67.18 KNS Vs= 0.00 KNS
Tu= 0.10 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 3
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 1535. MM
___2001J____________________ 3750X 250X 400_____________________2006J____
| |
||============= ==============================||
| 3No16 H 342.| 0.TO 725 4No16 H 342.2237.TO 3750 |
| 10*10c/c171 | | | | | 10*10c/c171 |
| 3No16 H |58.| 0.TO 3061 | | | | | |
||============================================================= |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| ooo | | | | | | oooo | | oooo | | oooo |
| 3#16 | | | | | | 4#16 | | 4#16 | | 4#16 |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| ooo | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

********************END OF BEAM DESIGN**************************

194. END CONCRETE DESIGN


195. START CONCRETE DESIGN
CONCRETE
DESIGN

196. CODE ACI


197. CLB 0.04 ALL
198. CLS 0.04 ALL
199. CLT 0.04 ALL
200. FC 20700 ALL
201. FYMAIN 250000 ALL
202. FYSEC 250000 ALL
203. MAXMAIN 16 ALL
204. MINMAIN 16 ALL
205. MINSEC 10 ALL
206. NSECTION 12 ALL
207. TRACK 2 ALL
208. *2B2
209. DESIGN BEAM 2003

=====================================================================

BEAM NO. 2003 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2825. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 3 - 16MM 0. 2367. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 9.89 KN-MET AT 942.MM, LOAD 7|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 0. 1119. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 19.58 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

3 342. 3 - 16MM 1353. 2825. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 28.82 KN-MET AT 2825.MM, LOAD 7|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 14./ 265. 1./ 20. 7/ 6


235. 63./ 166. 5./ 12. 7/ 8
471. 100./ 87. 8./ 7. 7/ 8
706. 124./ 23. 9./ 2. 7/ 8
942. 132./ 0. 10./ 0. 7/ 0
1177. 125./ 0. 9./ 0. 7/ 0
1413. 100./ 0. 8./ 0. 7/ 0
1648. 89./ 0. 7./ 0. 6/ 0
1883. 67./ 1. 5./ 0. 6/ 7
2119. 27./ 76. 2./ 6. 6/ 7
2354. 0./ 167. 0./ 12. 0/ 7
2590. 0./ 273. 0./ 20. 0/ 7
2825. 0./ 395. 0./ 29. 0/ 7

B E A M N O. 2003 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 26.71 KNS Vc= 64.46 KNS Vs= 0.00 KNS
Tu= 0.87 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 6
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 1072. MM

AT END SUPPORT - Vu= 33.03 KNS Vc= 67.01 KNS Vs= 0.00 KNS
Tu= 0.95 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 7
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 1072. MM

___2005J____________________ 2825X 250X 400_____________________2006J____


| |
||============================= =======================================||
| 3No16|H 342. 0.TO 1119 | 3No16|H 342.1353.TO 2825 | |
| 8*10c/c171 | | | | | | | | 8*10c/c171 |
| 3No16|H 58. 0.TO 2367 | | | | | | | |
||============================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| ooo | | ooo | | | | ooo | | ooo | | ooo |
| 3#16 | | 3#16 | | | | 3#16 | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| ooo | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

********************END OF BEAM DESIGN**************************

210. END CONCRETE DESIGN


211. START CONCRETE DESIGN
CONCRETE
DESIGN

212. CODE ACI


213. CLB 0.04 ALL
214. CLS 0.04 ALL
215. CLT 0.04 ALL
216. FC 20700 ALL
217. FYMAIN 250000 ALL
218. FYSEC 250000 ALL
219. MAXMAIN 16 ALL
220. MINMAIN 16 ALL
221. MINSEC 10 ALL
222. NSECTION 12 ALL
223. TRACK 2 ALL
224. *2B3
225. DESIGN BEAM 2014

=====================================================================

BEAM NO. 2014 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2000. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________
1 58. 3 - 16MM 0. 2000. YES YES
|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 14.38 KN-MET AT 667.MM, LOAD 7|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 0. 1413. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 12.15 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 145./ 163. 11./ 12. 7/ 6


167. 165./ 116. 12./ 9. 7/ 6
333. 180./ 73. 13./ 6. 7/ 6
500. 190./ 37. 14./ 3. 7/ 6
667. 194./ 7. 14./ 1. 7/ 6
833. 191./ 2. 14./ 0. 7/ 4
1000. 182./ 0. 14./ 0. 7/ 4
1167. 167./ 0. 12./ 0. 7/ 0
1333. 145./ 0. 11./ 0. 7/ 0
1500. 116./ 0. 9./ 0. 7/ 0
1667. 82./ 0. 6./ 0. 7/ 0
1833. 43./ 0. 3./ 0. 7/ 0
2000. 0./ 0. 0./ 0. 0/ 8

B E A M N O. 2014 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 16.26 KNS Vc= 64.59 KNS Vs= 0.00 KNS
Tu= 5.39 KN-MET Tc= 2.2 KN-MET Ts= 7.2 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 118. MM C/C FOR 660. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 3.20 SQ.CM.

AT END SUPPORT - Vu= 5.24 KNS Vc= 64.59 KNS Vs= 0.00 KNS
Tu= 5.39 KN-MET Tc= 2.2 KN-MET Ts= 7.2 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 118. MM C/C FOR 660. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 3.20 SQ.CM.
___2004J____________________ 2000X 250X 400_____________________2011J____
| |
||==================================================== |
| 3No16|H 342. 0.TO 1413 | | | | |
| 7*10c/c118 | | | | | | 7*10c/c118 |
| 3No16|H 58. 0.TO 2000 | | | | |
||=========================================================================||
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| ooo | | ooo | | ooo | | ooo | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | | | |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 |
| ooo | | ooo | | ooo | | ooo | | ooo | | ooo |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

********************END OF BEAM DESIGN**************************

226. END CONCRETE DESIGN


227. START CONCRETE DESIGN
CONCRETE
DESIGN

228. CODE ACI


229. CLB 0.04 ALL
230. CLS 0.04 ALL
231. CLT 0.04 ALL
232. FC 20700 ALL
233. FYMAIN 250000 ALL
234. FYSEC 250000 ALL
235. MAXMAIN 16 ALL
236. MINMAIN 16 ALL
237. MINSEC 10 ALL
238. NSECTION 12 ALL
239. TRACK 2 ALL
240. *2B4
241. DESIGN BEAM 2011 2015

=====================================================================

BEAM NO. 2011 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 1875. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________
1 58. 3 - 16MM 0. 1875. YES YES
|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 21.65 KN-MET AT 1875.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 0. 1038. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 21.37 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 0./ 290. 0./ 21. 0/ 6


156. 14./ 211. 1./ 16. 8/ 6
313. 63./ 137. 5./ 10. 8/ 6
469. 107./ 69. 8./ 5. 8/ 6
625. 147./ 6. 11./ 0. 8/ 6
781. 182./ 0. 14./ 0. 8/ 0
938. 212./ 0. 16./ 0. 8/ 0
1094. 235./ 0. 17./ 0. 8/ 0
1250. 253./ 0. 19./ 0. 8/ 0
1406. 265./ 0. 20./ 0. 8/ 0
1563. 273./ 0. 20./ 0. 8/ 0
1719. 275./ 0. 20./ 0. 8/ 0
1875. 294./ 0. 22./ 0. 6/ 0

B E A M N O. 2011 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 26.26 KNS Vc= 63.95 KNS Vs= 0.00 KNS
Tu= 0.84 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 5
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 598. MM

AT END SUPPORT - Vu= 7.93 KNS Vc= 64.15 KNS Vs= 0.00 KNS
Tu= 0.72 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
___2004J____________________ 1875X 250X 400_____________________2012J____
| |
||========================================= |
| 3No16 H|342. |0.TO 1038 | |
| 5*10c/c171 | | | |
| 3No16 H| 58. |0.TO 1875 | |
||=========================================================================||
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| ooo | | ooo | | ooo | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | | | | | |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 |
| ooo | | ooo | | ooo | | ooo | | ooo | | ooo |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

=====================================================================

BEAM NO. 2015 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2050. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 3 - 16MM 0. 1615. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 21.18 KN-MET AT 0.MM, LOAD 8|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 697. 2050. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 32.22 KN-MET AT 2050.MM, LOAD 8|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 287./ 0. 21./ 0. 8/ 0
171. 267./ 0. 20./ 0. 6/ 0
342. 256./ 0. 19./ 0. 6/ 0
512. 238./ 0. 18./ 0. 6/ 0
683. 213./ 0. 16./ 0. 6/ 0
854. 180./ 0. 13./ 0. 6/ 0
1025. 140./ 0. 10./ 0. 6/ 0
1196. 91./ 16. 7./ 1. 6/ 8
1367. 34./ 86. 3./ 6. 6/ 8
1538. 0./ 164. 0./ 12. 0/ 8
1708. 0./ 250. 0./ 18. 0/ 8
1879. 0./ 343. 0./ 25. 0/ 8
2050. 0./ 443. 0./ 32. 0/ 8

B E A M N O. 2015 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 4.72 KNS Vc= 64.19 KNS Vs= 0.00 KNS
Tu= 0.72 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 25.42 KNS Vc= 64.00 KNS Vs= 0.00 KNS
Tu= 0.84 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 5
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 685. MM

___2012J____________________ 2050X 250X 400_____________________2009J____


| |
| ==================================================||
| 3No16 H 342. 697.TO 2050 | |
| | | | 6*10c/c171 |
| 3No16 H 58. 0.TO 1615 | | | |
||========================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| | | | | ooo | | ooo | | ooo | | ooo |
| | | | | 3#16 | | 3#16 | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | | | |
| ooo | | ooo | | ooo | | ooo | | | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

********************END OF BEAM DESIGN**************************

242. END CONCRETE DESIGN


243. START CONCRETE DESIGN
CONCRETE
DESIGN

244. CODE ACI


245. CLB 0.04 ALL
246. CLS 0.04 ALL
247. CLT 0.04 ALL
248. FC 20700 ALL
249. FYMAIN 250000 ALL
250. FYSEC 250000 ALL
251. MAXMAIN 16 ALL
252. MINMAIN 16 ALL
253. MINSEC 10 ALL
254. NSECTION 12 ALL
255. TRACK 2 ALL
256. *2B5
257. DESIGN BEAM 2019

=====================================================================

BEAM NO. 2019 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 1025. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 3 - 16MM 649. 1025. NO YES


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 3.78 KN-MET AT 1025.MM, LOAD 8|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 0. 1025. YES YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 31.16 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 0./ 428. 0./ 31. 0/ 6


85. 0./ 387. 0./ 28. 0/ 6
171. 0./ 346. 0./ 25. 0/ 6
256. 0./ 306. 0./ 23. 0/ 6
342. 0./ 266. 0./ 20. 0/ 6
427. 0./ 228. 0./ 17. 0/ 6
512. 0./ 189. 0./ 14. 0/ 6
598. 0./ 151. 0./ 11. 0/ 6
683. 0./ 114. 0./ 9. 0/ 6
769. 0./ 77. 0./ 6. 0/ 6
854. 0./ 41. 0./ 3. 0/ 6
940. 19./ 6. 1./ 0. 8/ 7
1025. 50./ 0. 4./ 0. 8/ 0
B E A M N O. 2019 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 26.31 KNS Vc= 64.58 KNS Vs= 0.00 KNS
Tu= 0.31 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 5
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 172. MM

AT END SUPPORT - Vu= 25.49 KNS Vc= 64.58 KNS Vs= 0.00 KNS
Tu= 0.31 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 5
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 171. MM C/C FOR 172. MM

___2006J____________________ 1024X 250X 400_____________________2013J____


| |
||=========================================================================||
| 3No16 H 342. 0.TO 1025 | | | |
| 3*10c/c171 | 3*10c/c171 | |
| |3No16 H 58.|649.TO 1025 | |
| ===========================||
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| ooo | | ooo | | ooo | | ooo | | ooo | | ooo |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| | | | | | | | | 3#16 | | 3#16 |
| | | | | | | | | ooo | | ooo |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

********************END OF BEAM DESIGN**************************

258. END CONCRETE DESIGN


259. START CONCRETE DESIGN
CONCRETE
DESIGN

260. CODE ACI


261. CLB 0.04 ALL
262. CLS 0.04 ALL
263. CLT 0.04 ALL
264. FC 20700 ALL
265. FYMAIN 250000 ALL
266. FYSEC 250000 ALL
267. MAXMAIN 16 ALL
268. MINMAIN 16 ALL
269. MINSEC 10 ALL
270. NSECTION 12 ALL
271. TRACK 2 ALL
272. *2EB
273. DESIGN BEAM 2017
=====================================================================

BEAM NO. 2017 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2860. MM FY - 250. FC - 21. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 3 - 16MM 109. 2632. NO NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 5.09 KN-MET AT 1430.MM, LOAD 8|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

2 342. 3 - 16MM 0. 890. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 6.24 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

3 342. 3 - 16MM 1851. 2860. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 6.85 KN-MET AT 2860.MM, LOAD 7|
| REQD STEEL= 472.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 67. MMS |
| REQD. DEVELOPMENT LENGTH = 379. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 41105.0 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 0./ 83. 0./ 6. 0/ 6


238. 0./ 40. 0./ 3. 0/ 6
477. 14./ 5. 1./ 0. 8/ 6
715. 38./ 0. 3./ 0. 8/ 0
953. 55./ 0. 4./ 0. 8/ 0
1192. 65./ 0. 5./ 0. 8/ 0
1430. 68./ 0. 5./ 0. 8/ 0
1668. 63./ 0. 5./ 0. 8/ 0
1907. 52./ 0. 4./ 0. 8/ 0
2145. 33./ 0. 2./ 0. 8/ 0
2383. 7./ 14. 1./ 1. 8/ 7
2622. 0./ 49. 0./ 4. 0/ 7
2860. 0./ 91. 0./ 7. 0/ 7

B E A M N O. 2017 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 7.49 KNS Vc= 64.57 KNS Vs= 0.00 KNS
Tu= 0.17 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 7.43 KNS Vc= 64.57 KNS Vs= 0.00 KNS
Tu= 0.17 KN-MET Tc= 2.2 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.

___2013J____________________ 2859X 250X 400_____________________2014J____


| |
||====================== ==========================||
| 3No16 H 342. 0.TO 890 3No16 H 342.1851.TO 2860 |
| |
| 3No16 H 58. 109.TO 2632 |
| ==================================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________
| | | | | | | | | | | |
| ooo | | ooo | | | | | | ooo | | ooo |
| 3#16 | | 3#16 | | | | | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

********************END OF BEAM DESIGN**************************

274. END CONCRETE DESIGN


275. START CONCRETE DESIGN
CONCRETE
DESIGN

276. CODE ACI


277. CLB 0.04 ALL
278. CLS 0.04 ALL
279. CLT 0.04 ALL
280. FC 20700 ALL
281. FYMAIN 250000 ALL
282. FYSEC 250000 ALL
283. MAXMAIN 16 ALL
284. MINMAIN 16 ALL
285. MINSEC 10 ALL
286. NSECTION 12 ALL
287. TRACK 2 ALL
288. *3B1
289. DESIGN BEAM 3008

=====================================================================

BEAM NO. 3008 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05
LEN - 3750. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 0. 3067. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 12.88 KN-MET AT 1250.MM, LOAD 8|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 0. 630. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 8.82 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

3 292. 3 - 16MM 1925. 3750. NO YES


4 260. 1 - 16MM 1925. 3750. NO YES
|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 36.39 KN-MET AT 3750.MM, LOAD 8|
| REQD STEEL= 623.MM2, ROW=0.0111, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 28. MMS |
| REQD. DEVELOPMENT LENGTH = 908. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 30863.2 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 81./ 140. 5./ 9. 8/ 6


313. 130./ 39. 8./ 3. 8/ 6
625. 171./ 0. 11./ 0. 8/ 0
938. 197./ 0. 12./ 0. 8/ 0
1250. 206./ 0. 13./ 0. 8/ 0
1563. 199./ 0. 12./ 0. 6/ 0
1875. 188./ 0. 12./ 0. 6/ 0
2188. 145./ 0. 9./ 0. 6/ 0
2500. 69./ 15. 4./ 1. 6/ 8
2813. 13./ 133. 1./ 8. 4/ 8
3125. 0./ 273. 0./ 17. 0/ 8
3438. 0./ 435. 0./ 26. 0/ 8
3750. 0./ 613. 0./ 36. 0/ 8
B E A M N O. 3008 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 6.82 KNS Vc= 77.46 KNS Vs= 0.00 KNS
Tu= 0.05 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 22.21 KNS Vc= 44.36 KNS Vs= 0.00 KNS
Tu= 0.06 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 5
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 146. MM C/C FOR 1585. MM

___3001J____________________ 3750X 200X 350_____________________3006J____


| |
||=========== ====================================||
| 2No16 H 292. 0.TO 630 =3No16=H=292.1925.TO=3750===========||
| 1No16 H|260.1925.TO|375010c/c146 |
| 2No16 H 58. 0.TO 3067 | | | | | | | | |
||============================================================= |
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| oo | | oo | | | | | | ooo | | ooo | | ooo |
| 2#16 | | 2#16 | | | | | | 3#16 | | 3#16 | | 3#16 |
| | | | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | | | |
| oo | | oo | | oo | | oo | | oo | | | | |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

********************END OF BEAM DESIGN**************************

290. END CONCRETE DESIGN


291. START CONCRETE DESIGN
CONCRETE
DESIGN

292. CODE ACI


293. CLB 0.04 ALL
294. CLS 0.04 ALL
295. CLT 0.04 ALL
296. FC 20700 ALL
297. FYMAIN 250000 ALL
298. FYSEC 250000 ALL
299. MAXMAIN 16 ALL
300. MINMAIN 16 ALL
301. MINSEC 10 ALL
302. NSECTION 12 ALL
303. TRACK 2 ALL
304. *3B2
305. DESIGN BEAM 3003

=====================================================================
BEAM NO. 3003 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2825. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 0. 2373. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 3.79 KN-MET AT 1177.MM, LOAD 7|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 0. 1024. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 10.18 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

3 292. 2 - 16MM 1683. 2825. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 11.66 KN-MET AT 2825.MM, LOAD 7|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 0./ 162. 0./ 10. 0/ 6


235. 9./ 105. 1./ 7. 7/ 6
471. 32./ 55. 2./ 3. 7/ 6
706. 49./ 16. 3./ 1. 7/ 8
942. 58./ 0. 4./ 0. 7/ 0
1177. 59./ 0. 4./ 0. 7/ 0
1413. 54./ 0. 3./ 0. 6/ 0
1648. 52./ 0. 3./ 0. 6/ 0
1883. 39./ 0. 3./ 0. 6/ 0
2119. 16./ 33. 1./ 2. 6/ 7
2354. 0./ 77. 0./ 5. 0/ 7
2590. 0./ 128. 0./ 8. 0/ 7
2825. 0./ 186. 0./ 12. 0/ 7
B E A M N O. 3003 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 11.72 KNS Vc= 45.78 KNS Vs= 0.00 KNS
Tu= 1.51 KN-MET Tc= 1.3 KN-MET Ts= 2.0 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 93. MM C/C FOR 1122. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.22 SQ.CM.

AT END SUPPORT - Vu= 8.94 KNS Vc= 49.96 KNS Vs= 0.00 KNS
Tu= 1.51 KN-MET Tc= 1.3 KN-MET Ts= 2.0 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 93. MM C/C FOR 1122. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.22 SQ.CM.

___3005J____________________ 2825X 200X 350_____________________3006J____


| |
||========================== ==============================||
| 2No16 H 292.| 0.TO 1024| 2No16 H|292.1683.TO 2825 |
| 14*10c/c 93 | | | | | | | | | | 14*10c/c 93 |
| 2No16 H 58.| 0.TO 2373| | | | | | | |
||============================================================== |
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| oo | | oo | | oo | | | | oo | | oo | | oo |
| 2#16 | | 2#16 | | 2#16 | | | | 2#16 | | 2#16 | | 2#16 |
| | | | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | |
| oo | | oo | | oo | | oo | | oo | | oo | | |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

********************END OF BEAM DESIGN**************************

306. END CONCRETE DESIGN


307. START CONCRETE DESIGN
CONCRETE
DESIGN

308. CODE ACI


309. CLB 0.04 ALL
310. CLS 0.04 ALL
311. CLT 0.04 ALL
312. FC 20700 ALL
313. FYMAIN 250000 ALL
314. FYSEC 250000 ALL
315. MAXMAIN 16 ALL
316. MINMAIN 16 ALL
317. MINSEC 10 ALL
318. NSECTION 12 ALL
319. TRACK 2 ALL
320. *3B3
321. DESIGN BEAM 3014
=====================================================================

BEAM NO. 3014 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2000. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 0. 2000. YES YES


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 5.53 KN-MET AT 833.MM, LOAD 7|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 0. 1151. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 6.68 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 28./ 105. 2./ 7. 7/ 6


167. 46./ 74. 3./ 5. 7/ 6
333. 62./ 45. 4./ 3. 7/ 6
500. 74./ 21. 5./ 1. 7/ 6
667. 83./ 3. 5./ 0. 7/ 4
833. 87./ 0. 6./ 0. 7/ 4
1000. 87./ 0. 6./ 0. 7/ 0
1167. 82./ 0. 5./ 0. 7/ 0
1333. 73./ 0. 5./ 0. 7/ 0
1500. 60./ 0. 4./ 0. 7/ 0
1667. 43./ 0. 3./ 0. 7/ 0
1833. 23./ 0. 1./ 0. 7/ 0
2000. 0./ 0. 0./ 0. 0/ 8

B E A M N O. 3014 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 9.33 KNS Vc= 48.77 KNS Vs= 0.00 KNS
Tu= 2.02 KN-MET Tc= 1.3 KN-MET Ts= 2.7 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 93. MM C/C FOR 710. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.64 SQ.CM.

AT END SUPPORT - Vu= 3.59 KNS Vc= 49.59 KNS Vs= 0.00 KNS
Tu= 2.02 KN-MET Tc= 1.3 KN-MET Ts= 2.7 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 93. MM C/C FOR 710. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.64 SQ.CM.

___3004J____________________ 2000X 200X 350_____________________3011J____


| |
||========================================== |
| 2No16 H 292.| 0.TO 1151| | | | |
| 9*10c/c 93 | | | | | | | 9*10c/c 93 |
| 2No16 H |58.| 0.TO 2000| | | | |
||=========================================================================||
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| oo | | oo | | oo | | oo | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | | | | | |
| | | | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 |
| oo | | oo | | oo | | oo | | oo | | oo | | oo |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

********************END OF BEAM DESIGN**************************

322. END CONCRETE DESIGN


323. START CONCRETE DESIGN
CONCRETE
DESIGN

324. CODE ACI


325. CLB 0.04 ALL
326. CLS 0.04 ALL
327. CLT 0.04 ALL
328. FC 20700 ALL
329. FYMAIN 250000 ALL
330. FYSEC 250000 ALL
331. MAXMAIN 16 ALL
332. MINMAIN 16 ALL
333. MINSEC 10 ALL
334. NSECTION 12 ALL
335. TRACK 2 ALL
336. *3B4
337. DESIGN BEAM 3011 3015

=====================================================================

BEAM NO. 3011 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05
LEN - 1875. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 136. 1875. NO YES


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 11.86 KN-MET AT 1875.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 0. 943. YES NO


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 12.63 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 0./ 201. 0./ 13. 0/ 6


156. 0./ 148. 0./ 9. 0/ 6
313. 0./ 98. 0./ 6. 0/ 6
469. 31./ 52. 2./ 3. 8/ 6
625. 59./ 10. 4./ 1. 8/ 6
781. 85./ 0. 5./ 0. 8/ 0
938. 106./ 0. 7./ 0. 8/ 0
1094. 124./ 0. 8./ 0. 8/ 0
1250. 137./ 0. 9./ 0. 8/ 0
1406. 148./ 0. 9./ 0. 8/ 0
1563. 160./ 0. 10./ 0. 6/ 0
1719. 176./ 0. 11./ 0. 6/ 0
1875. 189./ 0. 12./ 0. 6/ 0

B E A M N O. 3011 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 19.37 KNS Vc= 47.56 KNS Vs= 0.00 KNS
Tu= 0.53 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 6
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 146. MM C/C FOR 648. MM

AT END SUPPORT - Vu= 2.91 KNS Vc= 42.91 KNS Vs= 0.00 KNS
Tu= 0.29 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
___3004J____________________ 1875X 200X 350_____________________3012J____
| |
||===================================== |
| 2No16 H 292.| 0.TO 943| | |
| 6*10c/c146 | | | | |
| 2No16 H |58. 136.TO 1875 | |
| ======================================================================||
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| oo | | oo | | oo | | oo | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | | | | | |
| | | | | | | | | | | | | |
| | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 |
| | | oo | | oo | | oo | | oo | | oo | | oo |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

=====================================================================

BEAM NO. 3015 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2050. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 0. 1621. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 11.30 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 964. 2050. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 15.91 KN-MET AT 2050.MM, LOAD 8|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 180./ 0. 11./ 0. 6/ 0
171. 179./ 0. 11./ 0. 6/ 0
342. 174./ 0. 11./ 0. 6/ 0
512. 165./ 0. 10./ 0. 6/ 0
683. 151./ 0. 10./ 0. 6/ 0
854. 131./ 0. 8./ 0. 6/ 0
1025. 104./ 0. 7./ 0. 6/ 0
1196. 69./ 0. 4./ 0. 6/ 0
1367. 29./ 32. 2./ 2. 6/ 8
1538. 0./ 81. 0./ 5. 0/ 8
1708. 0./ 134. 0./ 9. 0/ 8
1879. 0./ 193. 0./ 12. 0/ 8
2050. 0./ 256. 0./ 16. 0/ 8

B E A M N O. 3015 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 1.36 KNS Vc= 42.35 KNS Vs= 0.00 KNS
Tu= 0.29 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 20.47 KNS Vc= 49.38 KNS Vs= 0.00 KNS
Tu= 0.53 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 6
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 146. MM C/C FOR 735. MM

___3012J____________________ 2050X 200X 350_____________________3009J____


| |
| ========================================||
| 2No16 H 292. 964.TO 2050 |
| | | | | 7*10c/c146 |
| 2No16 H 58. 0.TO 1621 | | | | |
||=========================================================== |
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| | | | | | | oo | | oo | | oo | | oo |
| | | | | | | 2#16 | | 2#16 | | 2#16 | | 2#16 |
| | | | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | | | |
| oo | | oo | | oo | | oo | | oo | | | | |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

********************END OF BEAM DESIGN**************************

338. END CONCRETE DESIGN


339. START CONCRETE DESIGN
CONCRETE
DESIGN

340. CODE ACI


341. CLB 0.04 ALL
342. CLS 0.04 ALL
343. CLT 0.04 ALL
344. FC 20700 ALL
345. FYMAIN 250000 ALL
346. FYSEC 250000 ALL
347. MAXMAIN 16 ALL
348. MINMAIN 16 ALL
349. MINSEC 10 ALL
350. NSECTION 12 ALL
351. TRACK 2 ALL
352. *3B5
353. DESIGN BEAM 3019

=====================================================================

BEAM NO. 3019 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2825. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 0. 2609. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 6.96 KN-MET AT 1177.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 1919. 2825. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 4.70 KN-MET AT 2825.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 0./ 0. 0./ 0. 0/ 8
235. 38./ 0. 2./ 0. 6/ 0
471. 68./ 0. 4./ 0. 6/ 0
706. 90./ 0. 6./ 0. 6/ 0
942. 104./ 0. 7./ 0. 6/ 0
1177. 110./ 0. 7./ 0. 6/ 0
1413. 109./ 0. 7./ 0. 8/ 0
1648. 101./ 0. 6./ 0. 8/ 0
1883. 86./ 0. 5./ 0. 8/ 0
2119. 64./ 0. 4./ 0. 8/ 0
2354. 34./ 1. 2./ 0. 8/ 4
2590. 0./ 24. 0./ 2. 0/ 7
2825. 0./ 74. 0./ 5. 0/ 6
B E A M N O. 3019 D E S I G N R E S U L T S - SHEAR

AT START SUPPORT - Vu= 8.42 KNS Vc= 44.07 KNS Vs= 0.00 KNS
Tu= 3.34 KN-MET Tc= 1.3 KN-MET Ts= 4.5 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 93. MM C/C FOR 1122. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.71 SQ.CM.

AT END SUPPORT - Vu= 10.56 KNS Vc= 44.07 KNS Vs= 0.00 KNS
Tu= 3.34 KN-MET Tc= 1.3 KN-MET Ts= 4.5 KN-MET LOAD 8
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 93. MM C/C FOR 1122. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.71 SQ.CM.

___3013J____________________ 2825X 200X 350_____________________3015J____


| |
| ========================||
| 2No16|H 292.1919.TO 2825 |
| 14*10c/c 93 | | | 14*10c/c 93 |
| 2No16 H 58. 0.TO 2609 | | | | | | |
||===================================================================== |
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| | | | | | | | | | | oo | | oo |
| | | | | | | | | | | 2#16 | | 2#16 |
| | | | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | |
| oo | | oo | | oo | | oo | | oo | | oo | | |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

********************END OF BEAM DESIGN**************************

354. END CONCRETE DESIGN


355. START CONCRETE DESIGN
CONCRETE
DESIGN

356. CODE ACI


357. CLB 0.04 ALL
358. CLS 0.04 ALL
359. CLT 0.04 ALL
360. FC 20700 ALL
361. FYMAIN 250000 ALL
362. FYSEC 250000 ALL
363. MAXMAIN 16 ALL
364. MINMAIN 16 ALL
365. MINSEC 10 ALL
366. NSECTION 12 ALL
367. TRACK 2 ALL
368. *3EB
369. DESIGN BEAM 3017

=====================================================================

BEAM NO. 3017 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 1025. MM FY - 250. FC - 21. MPA, SIZE - 200. X 350. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR


(MM) (MM) (MM) STA END
_____________________________________________________________________

1 58. 2 - 16MM 0. 938. YES NO


|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 7.04 KN-MET AT 0.MM, LOAD 6|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

2 292. 2 - 16MM 67. 1025. NO YES


|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 12.92 KN-MET AT 1025.MM, LOAD 8|
| REQD STEEL= 322.MM2, ROW=0.0055, ROWMX=0.0317 ROWMN=0.0055 |
| MAX/MIN/ACTUAL BAR SPACING= 504./ 41./ 84. MMS |
| REQD. DEVELOPMENT LENGTH = 318. MMS |
|----------------------------------------------------------------|

Cracked Moment of Inertia Iz at above location = 20084.7 cm^4

REQUIRED REINF. STEEL SUMMARY :


-------------------------------
SECTION REINF STEEL(+VE/-VE) MOMENTS(+VE/-VE) LOAD(+VE/-VE)
( MM ) (SQ. MM ) (KNS-MET )

0. 111./ 0. 7./ 0. 6/ 0
85. 103./ 0. 7./ 0. 6/ 0
171. 92./ 0. 6./ 0. 6/ 0
256. 80./ 0. 5./ 0. 6/ 0
342. 67./ 0. 4./ 0. 6/ 0
427. 51./ 1. 3./ 0. 6/ 8
513. 35./ 26. 2./ 2. 6/ 8
598. 17./ 53. 1./ 3. 6/ 8
683. 1./ 82. 0./ 5. 7/ 8
769. 0./ 111. 0./ 7. 0/ 8
854. 0./ 142. 0./ 9. 0/ 8
940. 0./ 174. 0./ 11. 0/ 8
1025. 0./ 206. 0./ 13. 0/ 8

B E A M N O. 3017 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 6.27 KNS Vc= 46.03 KNS Vs= 0.00 KNS
Tu= 0.05 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 3
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 21.68 KNS Vc= 48.31 KNS Vs= 0.00 KNS
Tu= 0.16 KN-MET Tc= 1.3 KN-MET Ts= 0.0 KN-MET LOAD 8
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 146. MM C/C FOR 223. MM

___3013J____________________ 1025X 200X 350_____________________3010J____


| |
| =======================================================================||
| 2No16 H 292. 67.TO 1025 | | |
| | 3*10c/c146 |
| 2No16 H 58. 0.TO 938 | | |
||==================================================================== |
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
| | | oo | | oo | | oo | | oo | | oo | | oo |
| | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 |
| | | | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | |
| oo | | oo | | oo | | oo | | oo | | oo | | |
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|

********************END OF BEAM DESIGN**************************

370. END CONCRETE DESIGN


371. PRINT SUPPORT REACTION ALL
SUPPORT REACTION ALL

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE


-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1000 3 0.65 75.69 2.57 1.84 0.07 -0.53


4 0.12 12.96 0.44 0.33 0.02 -0.11
5 0.77 88.65 3.00 2.17 0.09 -0.63
6 0.98 111.56 3.78 2.74 0.11 -0.80
7 -11.50 90.42 3.95 2.62 -0.13 19.51
8 -0.65 85.94 -9.40 -20.41 0.70 1.78
1001 3 -0.32 101.64 2.74 1.82 0.07 0.44
4 -0.03 24.33 0.72 0.57 0.01 0.04
5 -0.35 125.98 3.45 2.39 0.08 0.48
6 -0.43 160.91 4.43 3.10 0.10 0.59
7 -14.54 151.92 3.59 2.00 -0.05 22.54
8 -2.15 125.99 -11.78 -25.27 0.81 3.27
1002 3 0.05 104.64 2.41 1.27 0.05 0.08
4 0.03 25.65 0.60 0.42 0.01 -0.01
5 0.08 130.28 3.01 1.69 0.06 0.07
6 0.10 166.59 3.86 2.20 0.07 0.08
7 -13.99 146.95 3.43 1.81 -0.13 22.00
8 -1.69 125.12 -13.97 -29.10 0.57 2.82
1003 3 -1.40 69.06 1.23 -0.09 0.04 1.51
4 -0.26 11.38 0.11 -0.12 0.01 0.27
5 -1.65 80.44 1.34 -0.21 0.05 1.78
6 -2.09 101.07 1.65 -0.29 0.07 2.25
7 -14.18 113.09 2.09 0.51 -0.15 22.18
8 -3.14 71.57 -16.70 -32.82 0.59 4.26
1004 3 1.71 74.31 2.36 1.82 0.06 -1.68
4 0.31 11.89 0.38 0.31 0.01 -0.33
5 2.02 86.20 2.74 2.13 0.06 -2.01
6 2.55 108.19 3.44 2.68 0.08 -2.54
7 -9.66 81.55 3.06 2.63 0.11 17.72
8 1.87 88.62 -8.21 -17.40 0.74 -1.38
1005 3 -0.35 128.97 -3.03 -3.67 0.05 0.32
4 -0.06 38.41 -0.43 -0.53 0.01 0.05
5 -0.41 167.38 -3.46 -4.20 0.06 0.38
6 -0.52 216.21 -4.32 -5.25 0.07 0.47
7 -13.98 194.13 -4.96 -6.16 0.06 21.90
8 -0.27 182.79 -20.51 -31.37 0.72 0.06
1006 3 0.17 154.74 -1.33 -2.17 0.06 -0.19
4 0.03 40.98 -0.39 -0.52 0.01 -0.04
5 0.20 195.73 -1.72 -2.69 0.07 -0.23
6 0.25 251.27 -2.22 -3.44 0.08 -0.29
7 -14.04 229.80 -2.58 -4.07 0.05 21.95
8 0.70 244.90 -18.44 -31.81 0.71 -0.90
1007 3 0.05 159.05 -1.39 -2.45 0.06 -0.07
4 0.01 41.83 -0.38 -0.56 0.01 -0.02
5 0.06 200.87 -1.77 -3.01 0.07 -0.09
6 0.08 257.78 -2.28 -3.83 0.08 -0.11
7 -14.29 225.68 -2.19 -3.70 -0.01 22.20
8 0.37 257.13 -19.61 -34.64 0.62 -0.57

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE


-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1008 3 -0.95 106.01 -2.19 -3.43 0.06 0.92


4 -0.25 19.60 -0.36 -0.58 0.01 0.24
5 -1.20 125.62 -2.55 -4.00 0.07 1.17
6 -1.54 158.58 -3.21 -5.04 0.09 1.50
7 -14.20 168.17 -2.25 -3.75 0.02 22.10
8 -0.80 173.54 -21.10 -36.94 0.60 0.59
1009 3 0.76 66.21 -2.37 -2.61 0.07 -0.97
4 0.17 15.17 -0.42 -0.46 0.01 -0.22
5 0.93 81.38 -2.79 -3.06 0.09 -1.19
6 1.18 103.72 -3.52 -3.86 0.11 -1.51
7 -18.80 40.70 -2.68 -2.85 0.38 32.09
8 3.70 113.02 -10.06 -14.75 0.76 -5.70
1010 3 -0.38 46.50 -0.98 -1.33 0.07 0.16
4 -0.07 10.86 -0.28 -0.33 0.02 0.02
5 -0.46 57.36 -1.25 -1.66 0.09 0.18
6 -0.58 73.17 -1.61 -2.12 0.12 0.22
7 -20.62 114.82 -1.47 -2.12 1.00 33.90
8 2.07 88.60 -10.01 -15.65 0.67 -4.09
************** END OF LATEST ANALYSIS RESULT **************

372. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= NOV 29,2013 TIME= 16:57:47 ****