Professional Documents
Culture Documents
15
Civil Engineering Department
CE405 - Construction Materials and Testing Laboratory Manual
Course: Experiment No.:
Group No.: Section:
Group Members: Date Performed:
Date Submitted:
Instructor:
Rodded Loose
Fine Aggregate
Trial 1 Trail 2 Trial 1 Trial 2
Mass/Weight
Unit Weight/Densitya
Average
Weight of Container
Weight/Mass of water
Volume of Containerb
Rodded Loose
Coarse Aggregate
Trial 1 Trial 2 Trial 1 Trial 2
Mass/Weight
Unit Weight/Densitya
Average
Weight of Container
Weight/Mass of water
Volume of Containerb
6.1 Computation
a Unit Weight/Density = Weight of Sample/Volume of Container
b Volume of Container = (Mass of Water in the container x g)/Unit weight of water
7. Observation
8. Conclusion:
16
Civil Engineering Department
CE405 - Construction Materials and Testing Laboratory Manual
8. Assessment:
BEGINNER ACCEPTABLE PROFICIENT
CRITERIA SCORE
1 2 3
I. Laboratory Skills
Members do not Members occasionally
Manipulative Members always
demonstrate needed demonstrate needed
Skills demonstrate needed skills.
skills. skills
Members are unable Members are able to Members are able to set-up
Experimental
to set-up the set-up the materials the material with minimum
Set-up
materials. with supervision. supervision.
Members do not Members occasionally Members always
Process Skills demonstrate targeted demonstrate targeted demonstrate targeted
process skills. process skills. process skills.
Members do not Members follow safety
Safety Members follow safety
follow safety precautions most of
Precautions precautions at all times.
precautions. the time.
II. Work Habits
Time
Members do not finish Members finish on Members finish ahead of
Management /
on time with time with incomplete time with complete data
Conduct of
incomplete data. data. and time to revise data.
Experiment
Members have
Members do not know
defined Members are on tasks and
their tasks and have
responsibilities most have defined
no defined
Cooperative and of the time. Group responsibilities at all times.
responsibilities.
Teamwork conflicts are Group conflicts are
Group conflicts have
cooperatively cooperatively managed at
to be settled by the
managed most of the all times.
teacher.
time.
Clean and orderly
Clean and orderly
Messy workplace workplace with
Neatness and workplace at all times
during and after the occasional mess
Orderliness during and after the
experiment. during and after the
experiment.
experiment.
Members require
Ability to do Members require
occasional Members do not need to be
independent supervision by the
supervision by the supervised by the teacher.
work teacher.
teacher.
Other Comments/Observations: Total Score
(𝑇𝑜𝑡𝑎𝑙 𝑆𝑐𝑜𝑟𝑒)
𝑅𝑎𝑡𝑖𝑛𝑔 = × 100
24
9. Reference(s):
ASTM C29M-17 “Standard Test Method for Bulk Density (“Unit Weight”) and Voids in Aggregate”
17