JSW Steel Ltd.

Dolvi Works
Kaizen Template Rev04 / 3rd July’ 2017
Department Kaizen No Date
Mill E&A 05/11/2017

Kaizen Title: Emergency Shear Home position Entry Lock


Improvement Area (Tick only one):  Productivity Quality Cost Delivery Safety Morale Safety Environment

Before (Situation) Root Analysis Improvement Measures After (Situation)

Slab hit bottom knife of There was no entry lock for Shear home position signal added in
Emergency shear and cobble checking home position on entry lock condition. Now if top or
occurred. Shear. So when bottom knife bottom knife will move from home
left home position no entry position than entry lock will be
lock generated. generated. And no slab can be
discharged from furnace.

Benefits: (In case of financial savings, please mention annual saving value in Rs-Lacs) Implemented By: (Maximum Two Persons)
SN Name Emp. No. Grade Organization
1> Cobble saved if shear is not in home position. 1. Pradeep Singh 12272 L10 Mill

Standardization:- Horizontal Deployment Opportunities (Replication):-

Single Point Lesson:- Kaizen Categorization A - CAT B - CAT

Date of KAIZEN Expert : Name & Employee ID Signature CHAMPION : Name & Employee ID Signature
Implementation:
05/11/2017