2. The transfer of buildings or portions thereof from 8. Which of the following does NOT require a
an original location to another, either within the building permit?
same lot or to a different one. a. A small patio, only 25 sqm. in area, resting
a. Evacuation directly on the ground
b. Reassembly b. A low garden masonry wall that is only 6
c. Moving meters long and only 1.5 meters high
d. Disaster displacement c. A greenhouse that measures 2 meters x 3
meters only
3. Any physical change made on a building/ d. A mini-aviary measuring 3 meters x 4
structure to increase its value, utility and/ or to meters with a maximum height of less than
improve its aesthetic quality 6 meters measured from the ground to the
a. Slum upgrading apex of the roof
b. Renovation
c. Interior design 9. What is the minimum distance required between
d. Architectural interiors eaves and the rear and side property lines?
a. 500mm
4. According to the National Building Code, what is b. 750mm
the maximum cost of a traditional family c. 1000mm
dwelling? d. 1500mm
a. PHP10,000
b. PHP15,000 10. A written authorization granted by the Building
c. PHP20,000 Official to an applicant allowing him to proceed
d. PHP25,000 with construction after plans, specifications and
other pertinent documents have been found to be
5. Which of the following is NOT true about the in conformity with the Code
building official, according to Rule II of the IRR of a. Building permit
PD 1096? b. Occupancy permit
a. The building official must either be a duly c. FSIC
registered architect or civil engineer d. FSEC
b. The building official must be of good moral
character 11. According to Rule II of the NBC IRR, which does
c. The building official must have at least five not fall under civil/structural documents?
years of diversified and professional a. Roof framing plans
experience in building design and b. Boring and load tests
construction c. Seismic analysis
d. All of the above are true d. All of the above are included under
civil/structural documents
6. Which of the following violations is the most
grave, according to Rule II of the NBC IRR? 12. Firewalls are not allowed for R1 developments.
a. Failure to post Certificate of Occupancy However, an abutment of up to 3.20m in height is
b. Use or occupancy of building/structure allowed, provided that above ____, the abutment
without appropriate Certificate of Occupancy shall be made of perforated concrete blocks.
a. 1.00m
26. Townhouses fall under which zoning 33. This term refers to any new construction which
classification? increases the height or area of an existing
a. R-2 building.
b. R-4 a. Addition
c. R-5 b. Alteration
d. C-1 c. Renovation
d. Conversion
27. This person is tasked with the enforcement of the
National Building Code in his jurisdiction. He 34. This uses wood construction with protective fire-
issues, denies, suspends, or revokes building resistant materials and is one-hour fire-resistive
permits. throughout.
a. The secretary of the DPWH a. Type I
b. The building official b. Type II
c. The construction inspector c. Type III and IV
d. The barangay captain d. Type V
28. Which of the following are exempted from fees? 35. The provisions of the National Building Code
a. Public buildings apply to all public and private buildings except
b. Single family dwellings made of native for:
materials, costing PHP10,000 or less a. BP 220 projects
c. Hospitals b. PD 957 projects
d. Both A and B c. Projects that only involve non-structural
repairs
29. According to Article 1723 of the Civil Code, who d. Projects that only involve alteration and
shall be held liable if a building collapses due to renovation
the use of inferior materials?
a. The architect or the engineer who drew up 36. Which is not included among the valid grounds
the plans for declaring a building as dangerous?
b. The contractor and the construction a. Structural hazard
supervisor b. Aesthetic deficiency
c. The building official who reviewed and c. Unsafe electrical wiring
approved the plans d. Inadequate sanitation
d. Both A and B
37. Type I constructions are not allowed in which
30. Before using or occupying a completed building, zones?
this document must be issued first. a. Non-fire restricted zone
a. Building permit b. Fire restrictive zone
b. Certificate of inspection c. Highly fire restrictive zone
c. Certificate of compliance d. Both B and C
d. Certificate of occupancy
38. On a non-arcaded RROW, signs may be allowed
31. The Building Code requires that the owner hire a to project by as much as
full-time inspector for the construction. This a. 300mm
inspector must be a: b. 600mm
a. Licensed architect c. 900mm
b. Licensed mechanical engineer d. 1200mm
c. Licensed contractor
d. Either A or B 39. Should a sign be allowed to project beyond the
property line and into an arcaded RROW, a
32. What are the allowable firewall configurations for minimum vertical clearance of ___ must be
an R3 project? maintained from the road surface to the bottom of
a. Allowed on one side of property the sign.
b. Allowed on both sides of the property a. 3.00 m
c. Allowed on one side and the rear b. 4.27 m
40. For glass panels that need to larger than 3.00m x 47. What is the maximum allowable slope for PWD
3.00m, the minimum thickness needs to be: ramps, according to BP 344?
a. 8mm a. 10%
b. 10mm b. 12%
c. 12mm c. 1:10
d. 15mm d. 1:12
41. According to the NBC, the maximum speed of 48. For ramps using the maximum allowable slope, a
escalators is landing must be provided after every 6.00 meters
a. 90 feet per minute of horizontal travel distance. What is the
b. 120 feet per minute minimum length of this landing?
c. 36 meters per minute a. 1.00m
d. 38 meters per minute b. 1.20m
c. 1.50m
42. According to the NBC, the minimum stairway d. 2.00m
width for buildings with an occupant load of 10-50
is 49. What is the minimum width required for a curb
a. 1.10m cutout leading to a 1.20m-wide crossing?
b. 0.90m a. 0.90m
c. 0.75m b. 1.00m
d. 0.60m c. 1.20m
d. 1.50m
43. For protection of pedestrians, what will be
required when the distance between the OFB 50. What is the minimum dimension of the required
and the inner edge of the sidewalk is equal to turnabout space for walkways and what should
75% of the building height? be the maximum distance between two turnabout
a. A fence only spaces?
b. A canopy only a. Minimum dimension of 1.20m, maximum
c. A fence and a canopy distance of 15.00m
d. A fence, a canopy, and a safety net b. Minimum dimension of 1.50m, maximum
distance of 12.00m
44. Every fence or building corner must be truncated c. Minimum dimension of 1.20m, maximum
at the corner to form a chaflan on roads that are distance of 12.00m
less than 3.60m wide. What is the minimum width d. Minimum dimension of 1.50m, maximum
of a chaflan? distance of 15.00m
a. 3.00m
b. 3.60m 51. Handrails are required for ramps, stairs, and
c. 4.00m dropped curbs at crossings. These handrails
d. 5.00m should be installed at what height/s?
a. 700mm and 900mm
45. Which formula could be used to yield building b. 800mm and 900mm
bulk? c. 900mm and 1000m
a. PSOmax * AMBF d. 900mm only
b. TLA * PSOmax * BHLmeters
c. PSOmax * TLA / BHLmeters 52. What is the minimum width of an accessible
d. [ (FLAR * TLA) * BHLstoreys] * BHLmeters parking slot?
a. 2.15m
46. Which would be included when obtaining GFA? b. 2.50m
a. Balconies with an area of 5 square meters c. 2.70m
b. Parking areas equivalent to half the area of d. 3.70m
one floor
c. Utility areas equivalent to not more than 53. What is required to be provided at the bottom
one-third of one floor and the top of a ramp?
84. For BP 220, what is the minimum thickness 91. Who is violating the Code of Ethics?
required for firewalls? a. An architect who recommends the method
a. 4 inches of arbitration when it comes to settling
b. 5 inches disputes
c. 6 inches b. An architect who informs his colleague that
d. 8 inches he is being hired by the latter’s former client
as a new architect for a project
85. Subdivisions abutting main public roads must c. An architect who refuses to make schematic
provide setbacks on both sides of the subdivision sketches without payment for a client who is
entrance for public utility vehicles. What are the short of money
minimum dimensions required for the setback? d. An architect who credits half of his
a. 2.50 m. x 5.00 m. commission from the supplier to the owner’s
b. 3.00 m. x 5.00 m. bill (to add to the owner’s discount)
c. 3.00 m. x 9.00 m.
d. 3.60 m. x 12.00 m. 92. Are architects allowed to accept gifts from
suppliers?
86. What is the minimum floor area required for a a. Only when the gift does not exceed the
medium cost family condominium according to contract amount awarded to that supplier
PD 957? b. Only when the gift will not cloud the
a. 12 sqm. architect’s judgment and objectivity
b. 18 sqm. c. Only when the gift was solicited by the
c. 22 sqm. architect
d. 36 sqm. d. The architect is never allowed to accept
gifts, no matter how small
87. An integrated piping system connected to a
source of extinguishing agent which suppressed 93. Who is not violating the Code of Ethics?
fires when actuated by its automatic detecting a. An architect who asks to be considered for a
deviceStandpipe system project even though the owner has already
a. Standpipe system begun negotiations with another architect
b. Automatic fire suppression system (but no contract yet)
c. Fire extinguisher b. An architect who accepts a commission to
d. Fire hose remodel a building after notifying the original
architect of the commission and ensuring
88. The maximum number of persons that may be that the previous architect’s contract was
allowed to occupy a particular building or space properly terminated
a. Maximum occupancy c. An architect who fails to pay his draftsmen
b. Building load according to the work contract because of
c. Occupant load his firm’s financial difficulties
d. Occupant total d. All of these architects are violating the Code
of Ethics
89. How many sets of drawings should the Building
Official send the Fire Marshall, according to RA 94. Which of the following shall take precedence
9514? over the other?
a. 3 a. An architect’s duty to his client
b. 5 b. An architect’s duty to the public
c. 6 c. Both A and B are equally important
d. 7 d. None of the above
90. This document is issued upon determination that 95. An architect registered and licensed under R.A.
design and specification is in accordance with the No. 9266, who is directly and professionally
provisions of the Fire Code.
97. Which is not grounds for removal of a member of 102. Which person is violating RA 9266?
the PRBOA? a. An architecture graduate who posts an
a. Inability to perform his or her duties due to advertisement on www.OLX.ph that he can
sickness prepare plans that are just as good as a
b. Manipulation of grades in the exams licensed architect’s
c. Removing “Site Planning” from the syllabus b. A secretary who, upon her boss’ instruction,
of the exam. This subject should be included offers her boss’ architectural design services
because it is extremely important in even though her boss is not a licensed
architecture. architect
d. Spreading malicious rumors about an c. A person who uses another name instead of
architect that turn out to be false information his/her registered name because the new
name is more marketable and is easier to
98. Who cannot be elected as a member of the remember
PRBOA today? d. All of these persons are violating RA 9266
a. An architect who ceased all teaching
functions and connections with any school 103. When the project is not yet executed, what
or review center on September 24, 2010 happens to the intellectual property of the
only design/drawings?
b. An architect who started practicing a. The intellectual property for the design does
architecture on September 24, 2003 only not exist until the project is built
c. An architect who has never been convicted b. The intellectual property for the design is the
of crimes involving moral turpitude and who owner’s until the project is built
has plenty of related experience as current c. The intellectual property for the design
chairman of the Philippine Institute of remains the same because the construction
Architects of the project is irrelevant to intellectual
d. An architect who has never received a property
commission for high-rise building projects d. The intellectual property for the design is still
the architect’s because it only becomes the
99. Can a person who is not a citizen of the owner’s AFTER the project is built
Philippines take the licensure examination for
architects? 104. Which will need to be registered with the SEC?
a. Absolutely. The PRC encourages and freely a. A sole proprietorship
allows all architecture graduates from other b. A corporation
countries to take the exam as part of the c. An architectural firm
globalization initiative. d. Both B and C
b. Yes, but there are conditions.
c. No. Only Filipinos are allowed to take the 105. Which method of selection is recommended for
examination. small projects?
125. In SPP 202, projects are classified according to 132. This planning service places heavy emphasis on
the degree of complexity of the project. Which the non-physical and non-engineering
falls under Group 3? components of the master development plan
a. Airport a. Site planning
b. Aquarium b. Physical planning
c. Gymnasium c. Master planning
135. Who is supposed to prepare the FALAR 2? 143. What is the minimum lot frontage required for a
a. The architect socialized duplex housing unit?
b. The fire protection consultant a. 3.00m
c. The contractor b. 4.00m
d. The owner c. 5.00m
d. 6.00m
136. Who is supposed to prepare the FALAR 1?
a. The fire marshall 144. The minimum tread for existing stairs, according
b. The architect to RA 9514.
c. The construction manager a. 200mm
d. The building official b. 230mm
c. 250mm
137. What is the minimum tread required for new d. 280mm
stairs in RA 9514?
a. 180mm 145. Minimum ramp width, according to RA 9514.
b. 200mm a. 915mm
c. 250mm b. 1120mm
d. 280mm c. 1200mm
d. 1420mm
138. What is the minimum riser height required for
new stairs in RA 9514? 146. Minimum elevator pit depth according to the
a. 100mm NBC.
b. 180mm a. 300mm
c. 200mm b. 500mm
d. None of the above c. 600mm
d. 800mm
139. Which handrail height NOT allowed by RA 9514?
a. 760mm 147. Area per person for places of assembly, standing
b. 770mm rooms.
c. 850mm a. 0.18sqm
d. 870mm b. 0.28sqm
c. 0.65sqm