You are on page 1of 1

R=45

p1025
p1025 p1044
4 4
4 4

140 150 3062 150 150


A-A

A R=45
3652
50 3472 50 p1044
B
p1025 p1044

B-B
4 b1015 4
50 4 50
35 205 4 205 45

140 150 3062 150 150

A B

4 No. Mkd B14 (Coating as specified)

..\..\..\..\..\..\Users\Augustine Asiraboya\Desktop\logo.jpg

CLIENT GFGL
Accra / Spintex Road / Community 18
Mark Quantity Profile Length Material Area (m²) Weight (kg) PROJECT MANAGER P.O.Box LA 519 / Accra / Ghana / West Africa
Telephone: +233 30 291 5215 / +233 21713374
PROJECT ENG.
B14 4 Values for ONE assembly LSC1094/CT-CIL-04 FABRICATION OF ROOF TRUSS AND STEEL PLATFORM ELEVATION AND DETAILS
SITE MANAGER M. ARTHUR 12/1/2016
TITLE:
GOLDFIELD GHANA LTD
FABRICATION OF ROOF TRUSS AND STEEL PLATFORM ROOF PLAN CHECKED R. Arkoh CONTAINERIZED WORKSHOP
b1015 1 CHS89X3.5 3361.8 A500 GR.B 0.94 24.81 LSC1094/CT-CIL-03
LSC1094/CT-CIL-02 FABRICATION OF ROOF TRUSS AND STEEL PLATFORM FIRST FLOOR 0 ISSUED FOR FABRICATION DRAWN A. Asiraboya 12/1/2016
MARKED-UP GENERAL ARRANGEMENT
p1025 1 FL130X10 290.0 S275JR 0.08 2.96 LSC1094/CT-CIL-01 FABRICATION OF ROOF TRUSS AND STEEL PLATFORM GROUND PLAN B ISSUED FOR APPROVAL
p1044 1 FL130X10 300.0 S275JR 0.09 3.06 DESIGN REFERENCE DRAWING NO. DESCRIPTION A 12/1/2016 ISSUED FOR COMMENTS
PROJECT DWG NO. SHEET REVISION SCALE

Totals for ONE assembly 1.11 30.83 DESIGN REFERENCE DRAWINGS REV BY DATE REVISIONS CHK DATE S.L DATE APPROVAL SIGNATURE DATE A RBT01-16 168 OF Rev0 1:10

You might also like