OCTOBER MONTHIY PROGRESS REPORTE U
A
L
DURING THE
TOTAL A ANNUAL
WTG AMOUNTE M TOTAL PERCENTAGE
S.NO WORK ITEM %AGE CONTRATE AMOUNT UNIT UNIT RATE WORK COMPLETE IN BIRR OAM0UNT COMPLETE
U
N
PLANED T PLAN ACTUAL
1.578 PLAN EXECUT ACTUAL EXECUTED AMOUNT EXECUT EXECUTED
1 FH1

INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 90 584,808,511.37 PCS 8,577.36 18 18 154392.48
### 100 100

INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 70 PCS 6,671.28 6 6 6,671.28
### 161,063.76 100 100
2 FH2

INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 90 PCS 8,577.36 72 72 617569.92
### 100 100

INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 70 PCS 6,671.28 36 36 240166.08
### 857736 100 100
3 FH3

INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 90 PCS 8,577.36 152 152 1303758.72
### 100 100

INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 70 PCS 6,671.28 76 76 507017.28
### 1810776 100 100
4 FH1
M2 261.00 360.54 242.36 94100.94
### 1117677.69 100 67.22
5 FH2
Ssupply and
fix pvc tile 261.00 1827.72 964.63 477034.92
### 100 57.78
6 FH3
Ssupply and
fix pvc tile 261.00 3733.12 3075.3 974344.32
### 100 82.38

BOILER
REACTION
7 PILE

EXCAVATION
AND
CONCRETE ML 27833.33 147.87 147.87 4115714.51
### 100 100
REIN Ø32 KG 49.26 18,216.08 18,216.08 897324.101
### 100 100
REIN Ø12 KG 42 1,515.04 1,515.04 63631.68### 5076670.29 100 100

200M3
CIRCULAR
8 RESEVOIR

PLASTTERING
EXTERNAL
SURFACE M2 163 373.78 373.78 60926.14
### 139711.488 100 100

GENERTOR
HOUSE 20 cm
9 thick HCB M2 390 60.88 60.88 23743.2
### 23743.2 100 100

TRANFORME
R HOUSE 20
10 cm thick HCB M2 390 106.36 106.36 41480.4
### 41480.4 100 100
###
OCTOBER MONTHIY PROGRESS REPORTE

DURING THE
TOTAL ANNUAL
WTG CONTRATE AMOUNT AMOUNTE TOTAL PERCENTAGE
S.NO WORK ITEM %AGE WITH VAT UNIT UNIT RATE WORK COMPLETE IN BIRR AM0UNT COMPLETE

A
C
T
U
A
L

A
M
O
U
N
PLANED T PLAN ACTUAL
1,244,141,548,35 BIRR PLAN EXECUT ACTUAL EXECUTED AMOUNT EXECUT EXECUTED
1 FH2

Supply and fix


pvc tile M2 261.00 1827.72 406.16 477034.92
### 100 57.78

2 FH3
Ssupply and
fix pvc tile M2 261.00 3733.12 491.4 974344.32
### 234263.16 100 82.38

STG
GENERETOR
SEAT PILE
3 FOUNDTION

EXCAVATION
AND
CONCRETE ML 27833.33 2496 364 69471992### 100 100
REIN Ø20 KG 49.26 18,216.08 18,216.08 897324.101
### 100 100
REIN Ø16 KG 49.26 4,077.16 594.68 200840.803
###

REIN Ø12 KG 42 24,374.25 3,554.56 1023718.33


### 11207241.7 100 100

200M3
CIRCULAR
4 RESEVOIR
P
PLASTTERING l
INTERNAL a
SURFACE 0.9 M2 163 480.4 480.4 ###n
78305.2 78305.2 100 100
n
Te 11519810 Comments
d (in case of
difference
p versus
r plan,
o corrective
g actions
r should be
e Utilisatio name with
s n of specific
Responsible Starting Planned Planned budget Utilisation s budget responsib
Objective Department date deadline (Planned total Actual cost of the rate of (Actual per le person
Name of and (Name of dept. - (yyyy.m (yyyy.mm. cost of project in project budget %progress Actual and
Nr. project content Level m.dd) dd) Birr) (Birr) (%) )(%) Progress deadline)

awash 137.5M
thermal W 30/10/20 30/10/201
1 power planet produce civil head office 06 1 1,244,141,548.35 720,748,668.80 ###
58 15 26
2
3
4
5

N.B
OCTOBER MONTHIY PROGRESS REPORTE

1. time schudal is not summited than not fallow the work properly .
2. it is not get the monthly plane progress prestage because of insufficiente mechine operatore and addittional drilling mechine . Only one pile
excavation per day .
3. taken soil sample for determine cement type the pile no. 30 and 40 at a depth of 5m,10m,15m.amd 20m.
4. at this time is not construction work because of drilling mechine problem from date of 17/02/10 up to 23/02/10.
5. grace engineering pile construction use normal cement type OPC. CEMENT
6. grace engineering is not written responsibility litter still.
NOVEMBER MONTHLY REPORTE

DURING THE
TOTAL ANNUAL
WTG CONTRATE AMOUNT UNIT AMOUNTE PERCENTAGE
S.NO WORK ITE %AGE WITH VAT UNIT RATE WORK COMPLETE IN BIRR TOTAL AM0UNT COMPLETE

PLAN ACTUAL
ACTUAL PLANED EXECUT EXECUTE
1,244,141,548,35 BIRR PLAN EXECUT EXECUTED AMOUNT % D%
1 FH1

Supply
and fix
pvc tile m2 261 360.54 118.18 94,100.94 10000% 10000%
2 FH2

Supply
and fix
pvc tile M2 261.00 1827.72 456.93 477034.92 100 100
3 FH3

Ssupply
and fix
pvc tile M2 261.00 3733.12 166.52 974344.32 1,545,480.18 100 100

STG
GENERET
OR SEAT
PILE
FOUNDTI Comment
3 ON s
(in case
EXCAVATI of
ON AND differenc
CONCRET e versus
E 17.455 ML 27833.33 7747 660.4 215624808 215624807.51 100 plan, 100
correctiv
217,170,287.69 e actions
should
be name
with
Utilisatio specific
n of responsi
Starting Planned Utilisation budget ble
Objective Responsible date deadline Actual cost of rate of per person
Name of and Department (yyyy.m (yyyy.m the project budget Actual progress Actual and
Nr. project content (Name of dept. - Level m.dd) m.dd) planed budget (Birr) (%) (%) Progress deadline)

awash
thermal
power 137.5MW 30/10/20 30/10/20
1 planet produce civil head office 06 11 3,872,805,490.00 950,809,105.00 24.55
2
3
4
5
SIxe month reporte

DURING THE
TOTAL ANNUAL
WTG CONTRATE UNIT PERCENTAGE
S.NO WORK ITEM %AGE AMOUNT UNIT RATE WORK COMPLETE AMOUNTE IN BIRR TOTAL AM0UNT COMPLETE

ACTUAL PLANED ACTUAL PLAN


PLAN EXECUT EXECUTED AMOUNT AMOUNT EXECUT
1 FH1 0.013 1,244,141,548.35

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. A)
type, D.-2, size:
90*2.85 PCS 8,577.36 18 18 154392.48 154392.5 100

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. b)
type, D.-2, size:
70*2.85 PCS 1.00 6 6 6,671.28 6,671.28 161,063.76 100
2 FH2

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. A)
type, D.-2, size:
90*2.85 PCS 8,577.36 108 108 926354.88 926354.9 100

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. b)
type, D.-2, size:
70*2.85 PCS 6,671.28 36 36 240166.08 240166.1 1166520.96 100
3 FH3

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. A)
type, D.-2, size:
90*2.85 PCS 8,577.36 152 152 1303758.7 1303759 100
SIxe month reporte

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. b)
type, D.-2, size:
70*2.85 PCS 6,671.28 76 76 507017.28 507017.3 1810776 100

4 FH1

Supply and fix PVC


floor tile of
approved quality m2 261.00 421.62 421.62 110042.82 110042.8 110042.82 100
5 FH2

Supply and fix PVC


floor tile of
approved quality m2 261.00 2018.88 2018.88 526927.68 526927.7 526927.7 100
6 FH3

Supply and fix PVC


floor tile of
approved quality m2 261.00 3731.6 3731.6 973947.6 973947.6 973947.6 100
7 Gueste house

Suppiy and fix


40mm thick best
quality internal
flush type wooden
doors in hard
wood frame both
sides coveded
with 4mm thick
weira ply wood. b)
type, D.-2, size:
70*2.85 psc 6,671.28 10 10 66712.8 66712.8 66712.8 100
ware house
8 building
down pipe psc 150.00 52 52 7800 7800 7800

Thermal power
plant BOILER
7 REACTION PILE
EXCAVATION AND
CONCRETE ML 27833.33 147.87 147.87 4115714.5 4115715 100
REIN Ø32 KG 49.26 18,216.08 18,216.08 897324.1 897324.1 100
REIN Ø12 KG 42 1,515.04 1,515.04 63631.68 63631.68 5076670.2879 100

200M3 CIRCULAR
8 RESEVOIR

apply XYPET or
equivalent
internally on wall
and floor of
reservoir and roof. M2 756 716 716 541296 541296 541296 100

PLASTTERING
EXTERNAL
SURFACE M2 163 373.78 373.78 60926.14 60926.14 60926.14 100

GENERTOR HOUSE
9 20 cm thick HCB M2 390 60.88 60.88 23743.2 23743.2 23743.2 100
SIxe month reporte

apply three coats


of plaster in
cement mortar
(1:3) to external
HCB wall surfaces. M2 177 60.88 60.88 10775.76 10775.76 10775.76 100

apply three coats


of plaster in
cement mortar
(1:3) to internal
HCB wall surfaces. M2 402.55 60.88 60.88 24507.244 24507.24 24507.244 100

TRANFORMER
HOUSE 20 cm
10 thick HCB M2 390 106.36 106.36 41480.4 41480.4 41480.4 100

apply three coats


of plaster in
cement mortar
(1:3) to external
HCB wall surfaces. M2 177 106.36 106.36 18825.72 18825.72 18825.72 100

apply three coats


of plaster in
cement mortar
(1:3) to internal
HCB wall
surfaces. M2 402.55 106.36 106.36 42815.218 42815.22 42815.218 100

Thermal power
plant STG
11 builiding

C- 30 reinforced
concrete with
minimum Mesobo
product law heat
-high sulphate
resistance (LH
-HSRC 42.5N)
cement content of
400kg/m3. ml 27833.33 7747 1395 215624808 38827495 38827495.35 100
TOTAL 49,492,326.96

Utilisatio
n of
Objecti Responsible Starting Planned Utilisation budget
ve and Department date deadline Planned budget Actual cost of rate of Planned per
conten (Name of dept. - (yyyy.m (yyyy.m (Planned total cost the project budget progress Actual progress Actual
Nr. Name of project t Level m.dd) m.dd) of project in Birr) (Birr) (%) (%) (%) Progress
137.5
MW
awash thermal produc 30/10/20 30/10/20
1 power planet e civil head office 06 11 3,872,805,490.00 950,809,105.00 24.55
2
3
4
5
SIxe month reporte

DURING THE
ANNUAL
PERCENTAGE
COMPLETE

ACTUAL
EXECUTE
D

100

100

100

100

100
SIxe month reporte

100

100

100

100

100

100
100
100

100

100

100
SIxe month reporte

100

100

100

100

100

18.03

Comment
s
(in case
of
differenc
e versus
plan,
correctiv
e actions
should
be name
with
specific
responsi
ble
person
and
deadline)
ስድሰት ወር ሪፖርት

ብኢኮ በ2010
በጀት አመት
የያዛቸውን
ግቦች
የአፈፃፀም
መለኪያዎች
በባላንስድ
ስኮርካርድ የአፈፃፀም
በ2010 መለኪያዎች
በጀት አመት ግቦቹን ለማሳካት የሚከናወኑ አበይት ተግባራት (Performance
የተያዙ ግቦች
በ2010
     
Indicators)%
ዓ/ም
የተርማል
ፓወር ፕላንት
ፕሮጀክት
50%
የፕሮጀክቱን
ግንባታ 1- ተርማል ፓወር ፕላንት ግንባታ ፕሮጀክት
በማከናወን
የሚደረገው
የኢንዳስትሪያ

ዲቨሎፕመን
ት ጉዞ 1.በቅድሚያ በ2010 ዓ/ም ሊሰሩ የታቀዱትን የስቪል ስራ ማከናወን
ማረጋገጥ፤ 1.1     የናን  ፕላንት  የሲቭልስራዎች  ማጠናቀቅ
ü  ዎርክሾፖችን መገንባት 0
ü  ቋሚ መመገቢያ አዳራሽ ግንባታ 0
ü  የአስተዳደር ቢሮዎችን መገንባት 0

ü  ሰዓት መቆጣጠሪ ግንባታ 0

ü  ፓርኪንግ ግንባታ 0
1.2- የተጀመሩትን  ቋሚ  የመኖርያቤቶች  ቀሪ  ስራዎች  ማጠናቀቅ  እና  ለአገልግሎት  ዝግጁ  ማድረግ

ü  የዉስጥ ለዉስጥ መንገድ ስራ 0

ü  የሰራተኛ መኖሪያ ህንጻ የወለል ፕላስቲክ ማንጠፍ ስራ 100

ü  የመጠጥ ዉሃ ማጠራቀሚያ እና የዉሃ መስመር ዝርጋታ ስራ 0

ü  የኤለክትሪክ መስመር ዝርጋታ 0

ü  የሰራተኛ መኖሪያ የውስጥ በር ገጠማስራ ባለ 90*2.85 100

ü  የሰራተኛ መኖሪያ የውስጥ በር ገጠማስራ ባለ 70*2.85 100

ü  የመጠጥ ዉሃ ማጠራቀሚያ የዋተር ፕሩፍ ስራ  100

ü  የመጠጥ ዉሃ ማጠራቀሚያ የልስን ስራ  100

ü  የትራንሰፎርመር እና የጀነሪተር  የልስን ስራ  100

ü  የትራንሰፎርመር እና የጀነሪተር  የብሎኬት ስራ  100

ü  ኤሲ ገጠማ ማከናወን 0

   1.3- ለኤሌክትሮ-መካኒካልስራውፋውንዴሽንማዘጋጀት
ü  ቦይለር ፓይል ፋውንዴሽን 100
ü  ቦይለር ፓይል ካፕ ፋውንዴሽ ስራ እና አከር ቦልት ቀበራ 0

ü  ችምኒ ፋውንዴሽን 0

ü  የውሃ ማጣሪያ  ግንባታ  0

ü  ኩሊግ ታወር ግንባታ 0


ü  ስቲም ተርባይንእና ጀነሬተር የዋናው ህንፃ ፓይል ፋውንዴሽን 0
ü  ስዊች ያርድ ፋዉንዴሽን 0
ü  ስቲም ተርባይን እና ጀነሬተርከ ፋውንዴሽን 83.33
ü  የኮንዴንሰር ፋውንዴሽን 0

1.4-በሳይት ላይ ያሉት የእስቲም ተርባይን ጀነሬተር እቃዎች የሜንቴናንስ ስራ ማከናወን


ü  የጀነሬተር እድሳት 0
ü  የኦይል ሲስተም እድሳት ገጠማ ማከናወን 0
ü  ኮንደንሰር እድሳት እናገጠማ 0
ü  ዲያሬተር እና የውሀታንከር እድሳት ገጠማ ማከናወን 0
ü  የከፍተኛ እና የዝቅተኛ ፕሬዠር ማሞቂያ እድሳት 0
ü  የትራንስፎርመር እድሳት ማከናወን 0
ü  ተርባይን እድሳት ገጠማ ማከናወን 0

1.5-የስታንድ ባይ ጄነሬተር እና ትራንስፎርመር ሃዉስ ግንባታና ተከላ ማጠናቀቅ


ስድሰት ወር ሪፖርት

1.6-የተርማል ፓወር ፕላንት ፕሮጀክተ ኢሬክሽንና ኢንስታሌሽን ስራዎችን ማስጀመርና ማጠናቀቅ

*መካኒካል ኢኩፕመንትስ ገጠማና ተከላ


ü  ተርባይን ገጠማ 0
ü  ቦይለር ገጠማና ተከላ 0
ü  የጀነሬተር ገጠማ 0
ü  የኦይል ሲስተም ገጠማ ማከናወን 0
ü  ኮንደንሰር መግጠም 0
ü  ዲያሬተር እና የውሃ ታንከር ገጠማ ማከናወን 0
ü  የከፍተኛ እና  የዝቅተኛፕሬዠር ማሞቂያ መትከል 0
 * የኤሌክትሪካል ኢኩፕመንቶች ገጠማና ተከላ
ü  የትራንስፎርመር ተከላና ገጠማ ማከናወን 0
ü  የስዊች ካብኔት እና የስዊች ቦርድ  ተከላና ገጠማ ማከናወን
ü  የኬብል ዝርጋታ ማከናወን
ü  ሰብስቴሽን ገጠማና ተከላ

1.7-የብሪኬት ማምረቻ ግንባታን የማጠናቀቅ ስራ መስራት

ማሳሰቢያ :- አረንጓዴ ቀለም ያለው የስድስት ወር ሪፖርት ነው፡፡


ማሳሰቢያ
ፕሮጀክቱን በአጭር ጊዜ ለመጨረስ ያጋጠሙን ችግሮች
1. የዲዛይኑ አለመጠናቀቁ ለፋብሪካው ግንባታ አለመፋጠን ትልቅ ችግር ሆኖል ፡፡
2.ኮንትራት ሳይታሰርላቸው የነን ፕላንት ስራዎች ለአንድ አመት የተቀመጡ ሲሆኖ አሁን ግን የመሬት ጠረጋና ለይአዉት የማስቀመጥ ስራ ተጀምሯል ፡፡
3.የሰራትኞች የመኖሪያ ቤት አጠናቆ ከማስረከብ አንጻር ምንም አይነት የተጠናከረ የመንገድ ፤ የውሃ መስመር ፤ ኤሲ ገጠማስራ እና የኤሌትሪክ መስመር ዝርጋታ ኮትራክተሩ በተለያየ ምክኒት ስራዎች እየ
4.የዋናው የፋብሪካ ግንባታ ላይ የስቲም ተርባይን የፓይል ፋውንዲሽን ስራ በተፈለገው መጠን እየተፋጠነ አይደለም ፡፡ ምክኒያቱም ፓይል የሚቆፍረው ማሽን እጥረት እና የማሽን ኦፕሪተር እጥረት ስላለ ስ
5. የቴስት ፓይል እስካሁን የስቲም ተርባይን ጀነሬተር ላይ ሁለት ሪአከሽን ፓይል ተሰርቷል ፡፡ ኮንትራክተሩ በዉሉ ላይ የሚያነሳቸዉ ጥያቄዎች ስላለ መልሱ እስኪመለስለት ድረስ ስራዉ በአንዱ ሪአክሽን ፓ
6.የቦይለር ቴስት ማድረግ ሲቻል ነገር ግን ኮንትራክተሩ የሞብላዜሽን እና የቴስት ዋጋ ከፍተኛ በመሆኑ ለሁለቱም STG ጨምሮ በአንድ ጊዜ ነው ማድረግ የምችለው ማለቱ እና በተለያየ ጊዜ ማድረግ አላስ
8. የስቲም ተርባይን ጀነሪተር ከመሬት በላይ የሚገኘውን ህንጻ ለመገንባት በዲዛይኑ ላይ ያለው ኮድ እስካልመጣ ድረስ ምንም አይነት ፓይል ካፕ እና የላይኛው ን የህንጻ ክፍል መስራት አይቻልም ፡፡
መፍትሄ
1. የስቲም ተርባይን ጀነሪተር ቲስት ማፍጠን አንዱ ሲሆን ሌላው ደግሞ ቀሪ ዲዛይኖችን ለምርምር ናልማት እና በተጨማሪም ለሌላ ዲዛይን ክፍል አካፍሎ መስጠት ፡፡
2. ኮንተራክተሮን በአጭር ጊዜ ውለታውን እዲፈርም ማድርግ እና ወደ ስራ ማስገባት፡፡
3. የስቲም ተርባይን ጀነሪተር ኮድ ቴስት ፓይሎች ተሰርቶ በአፋጣኝ ሪፖርቱ እንዲላክ ማድረግ ነው፡፡
4. ሌላው በውይይት የሚፈታ ነው፡፡
ትኩረት የሚሹ ጉዳዮች
1-ፕሮጀክቱ በተቀመጠለት ጊዜ እየተሰራ ባለመሆኑ ኮንትራክተሩ ሌላ ተጨማሪ ማሽን እንዲያስገባ ቢደረግ
2-በመኖርያ ቤቶች የሚሰሩ ስራዎች ማለትም የመንገድ ስራ ሌሎች ተጓዳኝ ስራዎች እንዳይሰሩ እያደረገ በመሆኑ በሙሉ አቅሙ እንዲሰራ ቢደረግ
3-የፕሮጀክቱ ቀሪ ዲዛይኖች በአጭር ጊዜ ተሟልቶ የሚቀርብበት ሁኔታ ቢመቻች
4-ለፕሮጀክቱ የምንጠይቃቸዉ በጀቶች በጊዜዉ መልስ እያገኙ ቢሄዱ ስራዎቻችን ፍጥነት ይኖራቸዋል
ስድሰት ወር ሪፖርት

የ6 ወር የስራ አፈጻጸም

በዲዛይ ምክኒያት እስከ ጥቅምት 01/02/10 ዓ.ም ድርስ አልተጀመረም ነበር፡፡ ነገር ግን በሁኑ ሰዓት በሳይት ላይ
ችግሩ ከተፈታ በኋላ የመንገድ ቆረጣ ስራ ጀምሯል ፡፡

FH1,FH2 AND FH3 የወለው ፕላስቲክ ማንጠፍ ስራ ሙሉ በሙሉ ተጠናቆል፡፡


200M3 ሰርኩራል የዉሀ ማጠራቀምያ አጠቃላይ የፕላስተሪንግ ስራ 100% ተከናዉኗል፡፡

ከመንገድ ጋር ተያያዥነት ስላለዉ ስራዉ አልተጀመረም


FH1,FH2 ,FH3 and gueste huose የውስጥ በር ስራ ሙሉ በሙሉ ተጠናቆል፡፡
FH1,FH2 ,FH3 and gueste huose የውስጥ በር ስራ ሙሉ በሙሉ ተጠናቆል፡፡
የመጠጥ ውሃ ማጠራቀሚያ ዋተር ፕሩፍ ስራ ሙሉ በሙሉ ተጠናቆል፡፡
የመጠጥ ውሃ ማጠራቀሚያ የውስጥ እና የውጭ የልስን ስራ ሙሉ በሙሉ ተጠናቆል፡፡

የትራንሰፎርመር እና የጀነሪተር  የልስን ስራ ሙሉ በሙሉ ተጠናቆል ፡፡


የትራንሰፎርመር እና የጀነሪተር  የልስን ስራ ሙሉ በሙሉ ተጠናቆል ፡፡
ኮንትራክተሩ በተለያዩ ምክኒያቶች አሁን ከገጠምኩት እቃዉ ይበላሽብኛል በማለትአልተጀመረም

እስከአሁን 330 ፓይል ፋዉንዴሽን ተሰርቷል ለቴስት የሚሆን የሪአከሽን ፓይል ቀበራ ስራ ተከናዉነዋል
በቲስት ባልመደረጉ ምክኒያት ስራ ሊዘገይ ችላል
በዲዛይ ምክኒያት አልጀመረም

በዲዛይ ምክኒያት አልጀመረም

በዲዛይ ምክኒያት አልጀመረም


ከ239 የዋናው ህንፃ ፓይል ፋውንዴሽን የኮንክሪት ተከላ ስራ አልጀመረም በዲዛይን ማስተካከያ ምክኒያት
ዲዛይኑ ስለሌለ ስራዉ አልተጀመረም
ከ66ቱ ፓይል 56 ፓይል እና 2 ሪአክሽን ፓይል የኮንክሪት ተከላ ስራ ተሰርቷል
ከእስቲም ተርባይን ተያያዥነት ስላለዉ ፓይል ፋዉንዴሽን ከተሰራ በኋላ የሚሰራ ስለሆነ ጊዜዉ ገና ነዉ

አንዳንድ የፕሪዘርቬሽን ስራ ተጀምሯል፤ መሰረታዊ የሜንተናንስ ስራ ግን አልተጀመረም

የጄኔረተር እና ተራንስፎረመር ሃዉስ ግንባታ ተከናዉኗል ቀሪ ስራዎችየፍኒሽንግና የበር ገጠማ ይቀረዋል


ስድሰት ወር ሪፖርት

እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም


እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም
እቅዱ ከጥር ወር በኋላ ስለሚጀመር አሁን ኢሬክሽን የለም

የፓዎር ኢንጂነሪንግ እቅድ በመሆኑ ዝርዝር ጉዳዩ ቢጠየቁና ዉሳኔ ቢደረስ ሌላም ከመብራት ሃይል ጋር ዉል ስሌለዉ
ዉለታዉ ማየት እና መነጋገር ይጠይቃል::
የሰድስት ወር የስራ አፈጻጸም

ብኢኮ
በ2010
በጀት
አመት
የያዛቸውን
ግቦች
የአፈፃፀም
መለኪያዎ

በባላንስድ በ2010 በጀት አመት
ስኮርካርድ የተያዙ
ግቦቹን ለማሳካት የሚከናወኑ አበይት ተግባራት
      በ2010ግቦች ዓ/ም
የተርማል ፓወር ፕላንት
ፕሮጀክት 50%
የፕሮጀክቱን ግንባታ 1- ተርማል ፓወር ፕላንት ግንባታ ፕሮጀክት
በማከናወን የሚደረገው
የኢንዳስትሪያል
ዲቨሎፕመንት ጉዞ
ማረጋገጥ፤ 1.በቅድሚያ በ2010 ዓ/ም ሊሰሩ የታቀዱትን የስቪል ስራ ማከናወን
1.2- የተጀመሩትን  ቋሚ  የመኖርያቤቶች  ቀሪ  ስራዎች  ማጠናቀቅ  እና  ለአገልግሎት  ዝግጁ  ማድረግ
ü  የሰራተኛ መኖሪያ ህንጻ የወለል ፕላስቲክ ማንጠፍ ስራ
ü  የሰራተኛ መኖሪያ የውስጥ በር ገጠማስራ ባለ 90*2.85
ü  የሰራተኛ መኖሪያ የውስጥ በር ገጠማስራ ባለ 70*2.85
ü  የመጠጥ ዉሃ ማጠራቀሚያ የዋተር ፕሩፍ ስራ 
ü  የመጠጥ ዉሃ ማጠራቀሚያ የልስን ስራ 
ü  የትራንሰፎርመር እና የጀነሪተር  የልስን ስራ 
ü  የትራንሰፎርመር እና የጀነሪተር  የብሎኬት ስራ 
   1.3- ለኤሌክትሮ-መካኒካልስራውፋውንዴሽንማዘጋጀት

ü  ስቲም ተርባይን እና ጀነሬተርከ ፋውንዴሽን

ማሳሰቢያ
ፕሮጀክቱን በአጭር ጊዜ ለመጨረስ ያጋጠሙን ችግሮች
1. የዲዛይኑ አለመጠናቀቁ ለፋብሪካው ግንባታ አለመፋጠን ትልቅ ችግር ሆኖል ፡፡
2.ኮንትራት ያልታሰረላቸውም የነን ፕላንት ስራዎች ለአንድ አመት የተቀመጡ ሲሆኖ አሁንም ምንም አይነት ምላሽ አልተሰጠባቸውም ፡፡
3.የሰራትኞች የመኖሪያ ቤት አጠናቆ ከማስረከብ አንጻር ምንም አይነት የተጠናከረ የመንገድ ፤ የውሃ መስመር ፤ ኤሲ ገጠማስራ እና የኤሌትሪክ መስመር ዝርጋታ የኮትራክተሮ በተለያየ ምክኒት ስራዎች ሳ
4.የዋናው የፋብሪካ ግንባታ ላይ የስቲም ተርባይን የፓይል ፋውንዲሽን ስራ በተፈለገው መጠን እየተፋጠነ አይደለም ፡፡ ምክኒያቱም ፓይል የሚቆፍረው ማሽን እጥረት እና የማሽን ኦፕሪተር እጥረት ስላለ ስ
5. የቲስት ፓይል እስካሁን የስቲም ተርባይን ጀነሪተር ላይ ምንም አልተሰራም ፡፡ ምክኒቱም የኮንትራክተሩየመስራት ፍላጎት ማጣት ነው ፡፡
6.የቦይለር ቲስት ማድረግ ሲቻል ነገር ግን ኮንትራክተሩ ለሁለቱም በአንድ ጊዜ ነው የማድለግ የምችለው ማለቱ እና በተለያየ ጊዜ ማድረግ አልፈልግም በማለቱ ስራው ሳይሰራ ቆይቶል ፡፡
8. የስቲም ተርባይን ጀነሪተር ከመሬት በላይ የሚገኘውን ህንጻ ለመገንባት በዲዛይኑ ላይ ያለው ኮድ እስካልመጣ ድረስ ምንም አይነት ፓይል ካፕ እና የላይኛው ን የህንጻ ክፍል መስራት አይቻልም ፡፡
መፍትሄ
1. የስቲም ተርባይን ጀነሪተር ቲስት ማፍጠን አንዱ ሲሆን ሌላው ደግሞ ቀሪ ዲዛይኖችን ለምርምር ናልማት እና በተጨማሪም ለሊላ ዲዛይን ክፍል አካፍሎ መስጠት ፡፡
2. ኮንተራክተሮን በአጭር ጊዜ ውለታውን እዲፈርም ማድርግ እና ወደ ስራ ማስገባት፡፡
3. የስቲም ተርባይን ጀነሪተር ኮድ ቲስት ፓይሎ ተሰርቶ በአፋጣኝ ሪፖርቱ እንዲላክ ማድረግ ነው፡፡
4. ሌላው በውይይት የሚፈታ ነው፡፡
የሰድስት ወር የስራ አፈጻጸም

የአፈፃፀም መለኪያዎች
(Performance የህዳር ወር የስራ አፈጻጸም
Indicators)%

ናን ፕላንት በተመለከተ ኮንትራት ስላልታሰረ ስራዉ አልተጀመረም

100 FH1,FH2 AND FH3 የወለው ፕላስቲክ ማንጠፍ ስራ ሙሉ በሙሉ ተጠናቆል፡፡

100 FH1,FH2 ,FH3 and gueste huose የውስጥ በር ስራ ሙሉ በሙሉ ተጠናቆል፡፡


100 FH1,FH2 ,FH3 and gueste huose የውስጥ በር ስራ ሙሉ በሙሉ ተጠናቆል፡፡
100 የመጠጥ ውሃ ማጠራቀሚያ ዋተር ፕሩፍ ስራ ሙሉ በሙሉ ተጠናቆል፡፡

100 የመጠጥ ውሃ ማጠራቀሚያ የውስጥ እና የውጭ የልስን ስራ ሙሉ በሙሉ ተጠናቆል፡፡

100 የትራንሰፎርመር እና የጀነሪተር  የልስን ስራ ሙሉ በሙሉ ተጠናቆል ፡፡


100 የትራንሰፎርመር እና የጀነሪተር  የልስን ስራ ሙሉ በሙሉ ተጠናቆል ፡፡
ኮንትራክተሩ በተለያዩ ምክኒያቶች አሁን ከገጠምኩት እቃዉ ይበላሽብኛል
በማለትአልተጀመረም
83.33 ከ66ቱ ፓይል 55 ፓይል የኮንክሪት ተከላ ስራ ተሰርቷል