OCTOBER MONTHIY PROGRESS REPORTE U
A
L
DURING THE
TOTAL A ANNUAL
WTG AMOUNTE M TOTAL PERCENTAGE
S.NO WORK ITEM %AGE CONTRATE AMOUNT UNIT UNIT RATE WORK COMPLETE IN BIRR OAM0UNT COMPLETE
U
N
PLANED T PLAN ACTUAL
1.578 PLAN EXECUT ACTUAL EXECUTED AMOUNT EXECUT EXECUTED
1 FH1
INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 90 584,808,511.37 PCS 8,577.36 18 18 154392.48
### 100 100
INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 70 PCS 6,671.28 6 6 6,671.28
### 161,063.76 100 100
2 FH2
INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 90 PCS 8,577.36 72 72 617569.92
### 100 100
INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 70 PCS 6,671.28 36 36 240166.08
### 857736 100 100
3 FH3
INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 90 PCS 8,577.36 152 152 1303758.72
### 100 100
INTERAL
FLUSH TYPE
WOODEN
DOOR SIZE 70 PCS 6,671.28 76 76 507017.28
### 1810776 100 100
4 FH1
M2 261.00 360.54 242.36 94100.94
### 1117677.69 100 67.22
5 FH2
Ssupply and
fix pvc tile 261.00 1827.72 964.63 477034.92
### 100 57.78
6 FH3
Ssupply and
fix pvc tile 261.00 3733.12 3075.3 974344.32
### 100 82.38
BOILER
REACTION
7 PILE
EXCAVATION
AND
CONCRETE ML 27833.33 147.87 147.87 4115714.51
### 100 100
REIN Ø32 KG 49.26 18,216.08 18,216.08 897324.101
### 100 100
REIN Ø12 KG 42 1,515.04 1,515.04 63631.68### 5076670.29 100 100
200M3
CIRCULAR
8 RESEVOIR
PLASTTERING
EXTERNAL
SURFACE M2 163 373.78 373.78 60926.14
### 139711.488 100 100
GENERTOR
HOUSE 20 cm
9 thick HCB M2 390 60.88 60.88 23743.2
### 23743.2 100 100
TRANFORME
R HOUSE 20
10 cm thick HCB M2 390 106.36 106.36 41480.4
### 41480.4 100 100
###
OCTOBER MONTHIY PROGRESS REPORTE
DURING THE
TOTAL ANNUAL
WTG CONTRATE AMOUNT AMOUNTE TOTAL PERCENTAGE
S.NO WORK ITEM %AGE WITH VAT UNIT UNIT RATE WORK COMPLETE IN BIRR AM0UNT COMPLETE
A
C
T
U
A
L
A
M
O
U
N
PLANED T PLAN ACTUAL
1,244,141,548,35 BIRR PLAN EXECUT ACTUAL EXECUTED AMOUNT EXECUT EXECUTED
1 FH2
2 FH3
Ssupply and
fix pvc tile M2 261.00 3733.12 491.4 974344.32
### 234263.16 100 82.38
STG
GENERETOR
SEAT PILE
3 FOUNDTION
EXCAVATION
AND
CONCRETE ML 27833.33 2496 364 69471992### 100 100
REIN Ø20 KG 49.26 18,216.08 18,216.08 897324.101
### 100 100
REIN Ø16 KG 49.26 4,077.16 594.68 200840.803
###
200M3
CIRCULAR
4 RESEVOIR
P
PLASTTERING l
INTERNAL a
SURFACE 0.9 M2 163 480.4 480.4 ###n
78305.2 78305.2 100 100
n
Te 11519810 Comments
d (in case of
difference
p versus
r plan,
o corrective
g actions
r should be
e Utilisatio name with
s n of specific
Responsible Starting Planned Planned budget Utilisation s budget responsib
Objective Department date deadline (Planned total Actual cost of the rate of (Actual per le person
Name of and (Name of dept. - (yyyy.m (yyyy.mm. cost of project in project budget %progress Actual and
Nr. project content Level m.dd) dd) Birr) (Birr) (%) )(%) Progress deadline)
awash 137.5M
thermal W 30/10/20 30/10/201
1 power planet produce civil head office 06 1 1,244,141,548.35 720,748,668.80 ###
58 15 26
2
3
4
5
N.B
OCTOBER MONTHIY PROGRESS REPORTE
1. time schudal is not summited than not fallow the work properly .
2. it is not get the monthly plane progress prestage because of insufficiente mechine operatore and addittional drilling mechine . Only one pile
excavation per day .
3. taken soil sample for determine cement type the pile no. 30 and 40 at a depth of 5m,10m,15m.amd 20m.
4. at this time is not construction work because of drilling mechine problem from date of 17/02/10 up to 23/02/10.
5. grace engineering pile construction use normal cement type OPC. CEMENT
6. grace engineering is not written responsibility litter still.
NOVEMBER MONTHLY REPORTE
DURING THE
TOTAL ANNUAL
WTG CONTRATE AMOUNT UNIT AMOUNTE PERCENTAGE
S.NO WORK ITE %AGE WITH VAT UNIT RATE WORK COMPLETE IN BIRR TOTAL AM0UNT COMPLETE
PLAN ACTUAL
ACTUAL PLANED EXECUT EXECUTE
1,244,141,548,35 BIRR PLAN EXECUT EXECUTED AMOUNT % D%
1 FH1
Supply
and fix
pvc tile m2 261 360.54 118.18 94,100.94 10000% 10000%
2 FH2
Supply
and fix
pvc tile M2 261.00 1827.72 456.93 477034.92 100 100
3 FH3
Ssupply
and fix
pvc tile M2 261.00 3733.12 166.52 974344.32 1,545,480.18 100 100
STG
GENERET
OR SEAT
PILE
FOUNDTI Comment
3 ON s
(in case
EXCAVATI of
ON AND differenc
CONCRET e versus
E 17.455 ML 27833.33 7747 660.4 215624808 215624807.51 100 plan, 100
correctiv
217,170,287.69 e actions
should
be name
with
Utilisatio specific
n of responsi
Starting Planned Utilisation budget ble
Objective Responsible date deadline Actual cost of rate of per person
Name of and Department (yyyy.m (yyyy.m the project budget Actual progress Actual and
Nr. project content (Name of dept. - Level m.dd) m.dd) planed budget (Birr) (%) (%) Progress deadline)
awash
thermal
power 137.5MW 30/10/20 30/10/20
1 planet produce civil head office 06 11 3,872,805,490.00 950,809,105.00 24.55
2
3
4
5
SIxe month reporte
DURING THE
TOTAL ANNUAL
WTG CONTRATE UNIT PERCENTAGE
S.NO WORK ITEM %AGE AMOUNT UNIT RATE WORK COMPLETE AMOUNTE IN BIRR TOTAL AM0UNT COMPLETE
4 FH1
Thermal power
plant BOILER
7 REACTION PILE
EXCAVATION AND
CONCRETE ML 27833.33 147.87 147.87 4115714.5 4115715 100
REIN Ø32 KG 49.26 18,216.08 18,216.08 897324.1 897324.1 100
REIN Ø12 KG 42 1,515.04 1,515.04 63631.68 63631.68 5076670.2879 100
200M3 CIRCULAR
8 RESEVOIR
apply XYPET or
equivalent
internally on wall
and floor of
reservoir and roof. M2 756 716 716 541296 541296 541296 100
PLASTTERING
EXTERNAL
SURFACE M2 163 373.78 373.78 60926.14 60926.14 60926.14 100
GENERTOR HOUSE
9 20 cm thick HCB M2 390 60.88 60.88 23743.2 23743.2 23743.2 100
SIxe month reporte
TRANFORMER
HOUSE 20 cm
10 thick HCB M2 390 106.36 106.36 41480.4 41480.4 41480.4 100
Thermal power
plant STG
11 builiding
C- 30 reinforced
concrete with
minimum Mesobo
product law heat
-high sulphate
resistance (LH
-HSRC 42.5N)
cement content of
400kg/m3. ml 27833.33 7747 1395 215624808 38827495 38827495.35 100
TOTAL 49,492,326.96
Utilisatio
n of
Objecti Responsible Starting Planned Utilisation budget
ve and Department date deadline Planned budget Actual cost of rate of Planned per
conten (Name of dept. - (yyyy.m (yyyy.m (Planned total cost the project budget progress Actual progress Actual
Nr. Name of project t Level m.dd) m.dd) of project in Birr) (Birr) (%) (%) (%) Progress
137.5
MW
awash thermal produc 30/10/20 30/10/20
1 power planet e civil head office 06 11 3,872,805,490.00 950,809,105.00 24.55
2
3
4
5
SIxe month reporte
DURING THE
ANNUAL
PERCENTAGE
COMPLETE
ACTUAL
EXECUTE
D
100
100
100
100
100
SIxe month reporte
100
100
100
100
100
100
100
100
100
100
100
SIxe month reporte
100
100
100
100
100
18.03
Comment
s
(in case
of
differenc
e versus
plan,
correctiv
e actions
should
be name
with
specific
responsi
ble
person
and
deadline)
ስድሰት ወር ሪፖርት
ብኢኮ በ2010
በጀት አመት
የያዛቸውን
ግቦች
የአፈፃፀም
መለኪያዎች
በባላንስድ
ስኮርካርድ የአፈፃፀም
በ2010 መለኪያዎች
በጀት አመት ግቦቹን ለማሳካት የሚከናወኑ አበይት ተግባራት (Performance
የተያዙ ግቦች
በ2010
Indicators)%
ዓ/ም
የተርማል
ፓወር ፕላንት
ፕሮጀክት
50%
የፕሮጀክቱን
ግንባታ 1- ተርማል ፓወር ፕላንት ግንባታ ፕሮጀክት
በማከናወን
የሚደረገው
የኢንዳስትሪያ
ል
ዲቨሎፕመን
ት ጉዞ 1.በቅድሚያ በ2010 ዓ/ም ሊሰሩ የታቀዱትን የስቪል ስራ ማከናወን
ማረጋገጥ፤ 1.1 የናን ፕላንት የሲቭልስራዎች ማጠናቀቅ
ü ዎርክሾፖችን መገንባት 0
ü ቋሚ መመገቢያ አዳራሽ ግንባታ 0
ü የአስተዳደር ቢሮዎችን መገንባት 0
ü ሰዓት መቆጣጠሪ ግንባታ 0
ü ፓርኪንግ ግንባታ 0
1.2- የተጀመሩትን ቋሚ የመኖርያቤቶች ቀሪ ስራዎች ማጠናቀቅ እና ለአገልግሎት ዝግጁ ማድረግ
ü የዉስጥ ለዉስጥ መንገድ ስራ 0
ü የመጠጥ ዉሃ ማጠራቀሚያ እና የዉሃ መስመር ዝርጋታ ስራ 0
ü የኤለክትሪክ መስመር ዝርጋታ 0
ü የመጠጥ ዉሃ ማጠራቀሚያ የዋተር ፕሩፍ ስራ 100
ü የመጠጥ ዉሃ ማጠራቀሚያ የልስን ስራ 100
ü ኤሲ ገጠማ ማከናወን 0
1.3- ለኤሌክትሮ-መካኒካልስራውፋውንዴሽንማዘጋጀት
ü ቦይለር ፓይል ፋውንዴሽን 100
ü ቦይለር ፓይል ካፕ ፋውንዴሽ ስራ እና አከር ቦልት ቀበራ 0
ü ችምኒ ፋውንዴሽን 0
ü የውሃ ማጣሪያ ግንባታ 0
የ6 ወር የስራ አፈጻጸም
በዲዛይ ምክኒያት እስከ ጥቅምት 01/02/10 ዓ.ም ድርስ አልተጀመረም ነበር፡፡ ነገር ግን በሁኑ ሰዓት በሳይት ላይ
ችግሩ ከተፈታ በኋላ የመንገድ ቆረጣ ስራ ጀምሯል ፡፡
እስከአሁን 330 ፓይል ፋዉንዴሽን ተሰርቷል ለቴስት የሚሆን የሪአከሽን ፓይል ቀበራ ስራ ተከናዉነዋል
በቲስት ባልመደረጉ ምክኒያት ስራ ሊዘገይ ችላል
በዲዛይ ምክኒያት አልጀመረም
የፓዎር ኢንጂነሪንግ እቅድ በመሆኑ ዝርዝር ጉዳዩ ቢጠየቁና ዉሳኔ ቢደረስ ሌላም ከመብራት ሃይል ጋር ዉል ስሌለዉ
ዉለታዉ ማየት እና መነጋገር ይጠይቃል::
የሰድስት ወር የስራ አፈጻጸም
ብኢኮ
በ2010
በጀት
አመት
የያዛቸውን
ግቦች
የአፈፃፀም
መለኪያዎ
ች
በባላንስድ በ2010 በጀት አመት
ስኮርካርድ የተያዙ
ግቦቹን ለማሳካት የሚከናወኑ አበይት ተግባራት
በ2010ግቦች ዓ/ም
የተርማል ፓወር ፕላንት
ፕሮጀክት 50%
የፕሮጀክቱን ግንባታ 1- ተርማል ፓወር ፕላንት ግንባታ ፕሮጀክት
በማከናወን የሚደረገው
የኢንዳስትሪያል
ዲቨሎፕመንት ጉዞ
ማረጋገጥ፤ 1.በቅድሚያ በ2010 ዓ/ም ሊሰሩ የታቀዱትን የስቪል ስራ ማከናወን
1.2- የተጀመሩትን ቋሚ የመኖርያቤቶች ቀሪ ስራዎች ማጠናቀቅ እና ለአገልግሎት ዝግጁ ማድረግ
ü የሰራተኛ መኖሪያ ህንጻ የወለል ፕላስቲክ ማንጠፍ ስራ
ü የሰራተኛ መኖሪያ የውስጥ በር ገጠማስራ ባለ 90*2.85
ü የሰራተኛ መኖሪያ የውስጥ በር ገጠማስራ ባለ 70*2.85
ü የመጠጥ ዉሃ ማጠራቀሚያ የዋተር ፕሩፍ ስራ
ü የመጠጥ ዉሃ ማጠራቀሚያ የልስን ስራ
ü የትራንሰፎርመር እና የጀነሪተር የልስን ስራ
ü የትራንሰፎርመር እና የጀነሪተር የብሎኬት ስራ
1.3- ለኤሌክትሮ-መካኒካልስራውፋውንዴሽንማዘጋጀት
ማሳሰቢያ
ፕሮጀክቱን በአጭር ጊዜ ለመጨረስ ያጋጠሙን ችግሮች
1. የዲዛይኑ አለመጠናቀቁ ለፋብሪካው ግንባታ አለመፋጠን ትልቅ ችግር ሆኖል ፡፡
2.ኮንትራት ያልታሰረላቸውም የነን ፕላንት ስራዎች ለአንድ አመት የተቀመጡ ሲሆኖ አሁንም ምንም አይነት ምላሽ አልተሰጠባቸውም ፡፡
3.የሰራትኞች የመኖሪያ ቤት አጠናቆ ከማስረከብ አንጻር ምንም አይነት የተጠናከረ የመንገድ ፤ የውሃ መስመር ፤ ኤሲ ገጠማስራ እና የኤሌትሪክ መስመር ዝርጋታ የኮትራክተሮ በተለያየ ምክኒት ስራዎች ሳ
4.የዋናው የፋብሪካ ግንባታ ላይ የስቲም ተርባይን የፓይል ፋውንዲሽን ስራ በተፈለገው መጠን እየተፋጠነ አይደለም ፡፡ ምክኒያቱም ፓይል የሚቆፍረው ማሽን እጥረት እና የማሽን ኦፕሪተር እጥረት ስላለ ስ
5. የቲስት ፓይል እስካሁን የስቲም ተርባይን ጀነሪተር ላይ ምንም አልተሰራም ፡፡ ምክኒቱም የኮንትራክተሩየመስራት ፍላጎት ማጣት ነው ፡፡
6.የቦይለር ቲስት ማድረግ ሲቻል ነገር ግን ኮንትራክተሩ ለሁለቱም በአንድ ጊዜ ነው የማድለግ የምችለው ማለቱ እና በተለያየ ጊዜ ማድረግ አልፈልግም በማለቱ ስራው ሳይሰራ ቆይቶል ፡፡
8. የስቲም ተርባይን ጀነሪተር ከመሬት በላይ የሚገኘውን ህንጻ ለመገንባት በዲዛይኑ ላይ ያለው ኮድ እስካልመጣ ድረስ ምንም አይነት ፓይል ካፕ እና የላይኛው ን የህንጻ ክፍል መስራት አይቻልም ፡፡
መፍትሄ
1. የስቲም ተርባይን ጀነሪተር ቲስት ማፍጠን አንዱ ሲሆን ሌላው ደግሞ ቀሪ ዲዛይኖችን ለምርምር ናልማት እና በተጨማሪም ለሊላ ዲዛይን ክፍል አካፍሎ መስጠት ፡፡
2. ኮንተራክተሮን በአጭር ጊዜ ውለታውን እዲፈርም ማድርግ እና ወደ ስራ ማስገባት፡፡
3. የስቲም ተርባይን ጀነሪተር ኮድ ቲስት ፓይሎ ተሰርቶ በአፋጣኝ ሪፖርቱ እንዲላክ ማድረግ ነው፡፡
4. ሌላው በውይይት የሚፈታ ነው፡፡
የሰድስት ወር የስራ አፈጻጸም
የአፈፃፀም መለኪያዎች
(Performance የህዳር ወር የስራ አፈጻጸም
Indicators)%