Professional Documents
Culture Documents
ActiveWorkGroup.Index = 1
End Sub
4) Set the Variables attribute to GBNA,StackerStatus.
5) Share in the GBNA Control worker (57b7na1) to the Data Objects workgroup of this script host, and
then also add a new Integer Store worker called Stacker Status.
6) Add a pass-thru to the Result 1 workgroup for this script host.
7) Create a workflow connecting the signal ‘Pass-thru - Triggered’ from the ‘Stacker Status’
workgroup to the ‘Is Escrow Full’ workgroup.
8) Now share in the Stacker Status integer store to the Escrow Capacity Available script host
(351b7na1) Data Objects workgroup.
9) Set the Variables attribute to GBNA,NotesInEscrowCount,StackerStatus.
10) Change the script to
Const CIM_STACKER_FULL = 3
Sub activate()
Else
End If
End Sub
11) Make sure this script host is shared into all the areas where it existed before replacing it.
12) Next, find and replace the BNARefund director (215b7na1).
13) Remove the workgroup entitled Check Availability and ensure the signal from Init Flags now goes
straight to the workgroup containing the Refund script host.
14) Make sure this director is shared into all the areas where it existed before replacing it.