BIAYA-BIAYA
Sewa Gedung 2,000,000
Biaya pengurusan ijin dan administrasi 500,000
Insentif untuk pembicara 1,000,000
Insentif untuk moderator 500,000
Biaya cetak 300 tiket undangan 300,000
Biaya lain-lain 2,000,000
Total Biaya 6,300,000
PEMASUKAN
Harga tiket undangan 100,000
KETERANGAN
Daya tampung gedung 500 Orang
Daya
Jumlah Total
Tampung Rugi/Laba
Peserta Pemasukan
(%)
100% 500 50,000,000 43,700,000
90% 450 45,000,000 38,700,000
80% 400 40,000,000 33,700,000
70% 350 35,000,000 28,700,000
60% 300 30,000,000 23,700,000
50% 250 25,000,000 18,700,000
40% 200 20,000,000 13,700,000
30% 150 15,000,000 8,700,000
20% 100 10,000,000 3,700,000
10% 50 5,000,000 (1,300,000)
0% - - (6,300,000)
HOTEL CENDIKIA
LAPORAN PENGHASILAN
Jl. Raya Candiroto - Ngadirejo, Temanggung
LAMA
NO. NAMA KODE CHECK-INCHECK-OUT MENGIN
AP
1 EUIS SUMIATI B 15-Mar-08 23-Mar-08 8 hari
2 SHIRLY KARTIKA A 15-Mar-04 22-Mar-04 7 hari
3 SUTEDJO B 15-Mar-04 18-Mar-04 3 hari
4 BASUKI HARJONO C 15-Mar-04 26-Mar-04 11 hari
5 MEILANIA TRIANA PRASTUTI C 16-Mar-04 29-Mar-04 13 hari
6 ALFIYAH C 16-Mar-04 19-Mar-04 3 hari
7 MUHAMMAD AMIN B 16-Mar-04 8-Apr-04 23 hari
8 BASUKI RAHMAT C 16-Mar-04 23-Mar-04 7 hari
9 RIA SARTIKA B 16-Mar-04 21-Mar-04 5 hari
10 DUDIK INDRAWAN S A 17-Mar-04 24-Mar-04 7 hari
11 LIS MURYATI B 17-Mar-04 21-Mar-04 4 hari
12 LUSIANA KAROLINA B 17-Mar-04 30-Mar-04 13 hari
13 HERAWATI HANDOJO A 17-Mar-04 25-Mar-04 8 hari
14 ANITA RAKHMAWATI A 18-Mar-04 26-Mar-04 8 hari
15 DENDY FEBRIYANTO B 18-Mar-04 31-Mar-04 13 hari
16 HANDOKO SULISTIYO C 18-Mar-04 10-Apr-04 23 hari
17 HANI JULIANTO C 19-Mar-04 25-Mar-04 6 hari
18 MASUM MAKKI B 19-Mar-04 26-Mar-04 7 hari
JUMLAH
LAMA DISKON
0 hari 10%
10 hari 15%
15 hari 20%
30 hari 30%
EXPRESS TRAVEL
LAPORAN PENGHASILAN
JAKARTA - YOGYAKARTA
1 AGUSTUS 2008